GENERAL DIRECTORATE OF CIVIL DEFENCE

MINISTRY OF INTERIOR
STATE of QATAR

PLANS SUBMISSION SCHEDULE OF FINDINGS


1374

Proposed Development :

B+G+3 RESIDENTIAL BUILDING


AL SADD / 39470041

Application Ref. No.

N/2016/0002279

Location / Pin No.

Type of Plans

MV

Owner / Client

SHK ALI BIN AHMED MOHAMMED THANI AL THANI

Review Ref. No.

R3

Consultant

CONSULTING ENGINEERING COMPLEX

Date of Review

20-Jul-16

Findings

Remarks & Compliance

1.Fresh air supply to the generator room shall be directly from


external.

generator fan must be included also


in the table for equipment schedule

2.Include in the submission calculation reports to


verify/confirm capacities of proposed equipment.
3.Provide adequate separation distance between the fresh air
supply outlet and exhaust inlet in the fire pump room.

4.

Rectify.Jet fans are not


used in this design

Indicate the applicable


design reference standards
Notes for the Owners, Consultants and Contractors:
Update the plans, details and other related documents and calculations affected by the changes. All clarifications,
reports, compliances and reply to comments are subject for review and evaluation in the succeeding submissions. QCDD
officers and engineers reserve the right to add further comment/s base on the compliance of the above findings and/or as
per code, standards & requirements that were missed in the previous reviews. Any requirement not indicated in the final
approved plans but are required for full compliance to fire and life safety standards and requirements shall be provided
by the contractor without extra cost.