Você está na página 1de 6

Company

United company for sugar

Date

Nov23,2014

Attention

Eng. Mohiey

From

UNICON CO.

Our ref

erection

Your ref

Erection offer

B.O.Q FOR SUPPLY & ERECTION


Items
1

Supply&erection of wall connection piece 8" with required flanges,pipes / fire pumps

Supply&erection of wall connection piece 6" with required flanges,pipes / fire pumps

Supply&erection of wall connection piece 4" with required flanges,pipes / domestic pumps

Supply&erection bedplate beams

Supply&erection of simless concentric reducer

Supply&erection of simless ecentric increaser

Supply&erection of 8" simless elbow with bliend cover

Supply&erection of 6" simless elbow

Supply&erection of wall connection piece 2" with required flanges,pipes / jockey pump

10 Supply&erection of 8"OS&Y gate valve,UL listed & FM approved.


11 Supply&erection of 6"OS&Y gate valve,UL listed & FM approved.
12 Supply&erection of 6"non return valve,UL listed & FM approved.
13 Supply&erection of 2" valve/Jp
14 Supply of 2"non return valve/Jp
15 Supply&erection of 4"pressure relief valve,UL listed & FM approved.
16 Supply&erection of 6"alarm automatic valve.

17 Supply&erection of 6" gate valve/ over flow line


18 Supply&erection of simless elbows
19 Supply&erection of 6" simless pipe / over flow line
20 Supply&erection of 4" gate valve/ domestic suction pipe
21 Supply&erection of T simless /domestic suction pipe
22 Supply&erection of 4" simless pipe / domestic suction pipe
23 Supply&erection of 4" gate valve/drain pipe
24 Supply&erection of 4" simless pipe / drain pipe
25 Supply&erection of tamper switch
26 Supply&erection Nuts sets
27 Supply&erection Rubber rings sets
28 Supply&erection set of welding materials
29 Supply&erection Steel plate for JP
30 Supply&erection Glass wall for exhaust pipe isolation
Supply&erection set power and control cables from Fire pumps control panel to Diesel,Electrical and
31
Jockey pumps
Supply&erection set power and control cables from Water booster control panel to Booster pumps
32
33 Supply&erectionof 6" simless flange
34 Supply&erection of 4" simless flange
35 Supply&erection Simless 8" pipe table 40
36 Supply&erectionSimless 6" pipe table 40
37 Supply&erection Simless 2" pipe table 40
38 Transportaion
Erection for two submersible pumps,supply all necessary accessories for erection & control panel
39
40 Erection for water booster & control panel

Commercial offer :

Total price for supply & erection the a/m reguriments is 145000 L.E

above price is excluding sales taxes.


erection time : 2-3 weeks from dowpayment
payment : 50% in advance , 30% after supplying the materials , 20% with test.
our works will be inside the pump room only .

Thanks & Best Regards


Eng./ Shereen Thabet

umps

umps

estic pumps

y pump

QTY
____
____
____
____
____
____
____
____
____
4
4
2
2
1
1
1

3
____
____
5
____
____
____
____
10
____
____
____
____
____
Diesel,Electrical and

l to Booster pumps

on & control panel

____
____
____
____
____
____
____
____
____

____

with test.

Você também pode gostar