Você está na página 1de 18

No

Type of culvert

Chainage

Height

Width/SPAN

Length

No

Type of culvert

Chainage

Height

Width/SPAN

Length

SLAB CULVERT

0+307

35

SLAB CULVERT

5+280

SLAB CULVERT

0+413

36

SLAB CULVERT

5+370

SLAB CULVERT

0+558

37

SLAB CULVERT

5+420

SLAB CULVERT

0+615

1.5

1.5

38

SLAB CULVERT

5+530

SLAB CULVERT

0+730

39

SLAB CULVERT

5+570

SLAB CULVERT

0+905

40

SLAB CULVERT

5+610

SLAB CULVERT

0+950

41

SLAB CULVERT

5+670

SLAB CULVERT

1+010

42

SLAB CULVERT

5+740

1+640

1.5

43

1+660

1.5

44

5+880

1.5

1+925

1.5

1.5

45

SLAB CULVERT
2 VENT SLAB
CULVERT
SLAB CULVERT

5+790

11

SLAB CULVERT
2 VENT SLAB
CULVERT
SLAB CULVERT

6+005

12

SLAB CULVERT

1+975

46

SLAB CULVERT

6+030

13

SLAB CULVERT

2+120

47

SLAB CULVERT

6+140

14

2+280

48

SLAB CULVERT

6+200

2+392

49

SLAB CULVERT

6+250

16

SLAB CULVERT
2 VENT SLAB
CULVERT
SLAB CULVERT

2+670

50

SLAB CULVERT

6+360

17

SLAB CULVERT

2+770

51

SLAB CULVERT

6+455

18

SLAB CULVERT

2+900

52

SLAB CULVERT

6+575

19

SLAB CULVERT

3+060

53

SLAB CULVERT

6+750

20

SLAB CULVERT

3+250

54

SLAB CULVERT

6+960

1.5

1.5

21

SLAB CULVERT

3+425

55

SLAB CULVERT

7+040

22

SLAB CULVERT

3+540

1.5

56

SLAB CULVERT

7+215

1.5

23

SLAB CULVERT

3+695

1.5

57

SLAB CULVERT

7+300

1.5

24

SLAB CULVERT

3+775

58

SLAB CULVERT

7+480

25

SLAB CULVERT

4+000

59

SLAB CULVERT

7+545

1.5

26

SLAB CULVERT

4+270

60

SLAB CULVERT

7+720

27

SLAB CULVERT

4+385

61

SLAB CULVERT

7+870

1.5

28

SLAB CULVERT

4+560

62

SLAB CULVERT

8+010

29

SLAB CULVERT

4+650

63

SLAB CULVERT

8+220

30

SLAB CULVERT

4+800

64

SLAB CULVERT

8+265

31

SLAB CULVERT

4+890

1.5

65

SLAB CULVERT

8+500

32

SLAB CULVERT

4+910

66

SLAB CULVERT

8+670

33

SLAB CULVERT

5+040

67

SLAB CULVERT

8+820

1.5

1.5

34

SLAB CULVERT

5+160

10

15

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE&AES COMPANY
ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE
DRAWING SCALE

STRUCTURE SCHEDULE
PLOT DATE: 03 - 04 - 2013

Sheet No

27

) of 142

GENERAL REQUIREMENT FOR THE CONSTRUCTION OF STRUCTURES


1.

CEMENT:
ORDINARY PORTLAND CEMENT
A.

SETTING TIME:
INITIAL SETTING TIME: NOT LESS THAN 45 MINUTES
FINAL SETTING TIME: NOT GREATER THAN 8 HOURS

B.

STRENGTH:
COMPRESSING STRENGTH (STANDARD CUBE)
3 DAYS:
7 DAYS:
28 DAYS:

2. REINFORCEMENT:
A. STRENGTH:
YIELD STRENGTH (fy) OF MILD STEEL DEFORMED BAR
FOR ALL MEMBER AND THE STEEL SHOULD CONFORM ASTM-A615-40.0.
B. SPLICES IN REINFORCEMENT:
- SPLICES IN REINFORCEMENT IF NECESSARY SHALL BE MADE ONLY AS AUTHORIZED BY THE ENGINEER.
- SPLICES IN REINFORCEMENT AT POINTS OF MAXIMUM STRESS IN SLABS, BEAMS AND GIRDERS SHOULD BE AVOIDED.
- LAP LENGTH WILL BE:
i ) FOR TENSION M.S DEFORMED BAR:
- 40 BAR DIAMETER WITHOUT HOOKS
- 30 BAR DIAMETER WITH STANDARD HOOKS
ii ) FOR COMPRESSION M.S. DEFORMED BAR:
- 24 BAR DIAMETER WITHOUT HOOKS
3. CONCRETE:
FOR VERTICAL MEMBER, BASE SLAB, DECK SLAB, WING WALL RAIL POSTS AND HAND RAILS:

MIX RATIO BY VOLUME, CEMENT : SAND : COARSE AGGREGATE = 1:2:4


OR A RICHER MIX IF THE ABOVE STRENGTH REQUIREMENT IS NOT SATISFIED.
4. MINIMUM CLEAR COVER TO MAIN REINFORCEMENT BAR:
FOR REILPOST AND HAND RAIL -25 mm, ALL FACES
FOR SLAB:
TOP BAR
- 50 mm
BOTTOM BAR - 40 mm
EDGE
-50 mm
FOR VERTICAL MEMBER, WING WALL:
EARTH FACE -50 mm, WHEN FORM WORK IS USED.
WATER FACE -50 mm
MEMBERS CAST AGAINST AND PERMANENTLY
EXPOSED TO NON-SALINE WATER/SOIL :75 mm
MEMBERS PERMANENTLY EXPOSED TO SLAIN WATER / SOIL 100 mm
5. MIXER MACHINE AND VIBRATOR MUST BE USED IN ALL RCC CASTING.
6. WRITTEN DIMENSIONS ARE TO BE TAKEN IN PREFERENCE TO SCALED ONES.
7. CONSTRUCTION JOINTS IN ADDITION TO THE PLACES SHOWN IN THE DRAWING
SHALL BE PROVIDED AS PER DIRECTION OF THE ENGINEER-IN- CHARGE.

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE&AES COMPANY
ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE
DRAWING SCALE

STRUCTURE GENERAL NOTE


PLOT DATE: 03 - 04 - 2013

Sheet No

28

) of 142

1000

1000
1000

300

300

1000

1000

1500

2600
2800

400

1000

300

400

1000

1000

5700

400

3000

1000
300

400

300

1000

See
Detail"A"

400

300

1000

400

3500

1000

300

1000

See
Detail"A"

600

600

1000

See
Detail"A"

600

Ch. 1+660 - 1+840

Ch. 1+000 - 1+260


1+840 - 2+120

400

NOTES:

4500

50

2. No stone to stone contact is to exist in the completed


wall, each stone must be placed on a layer of mortar.

75

3. Concrete for the base slab is to be proportioned by


volume, 1:2:4, cement: sand: aggregate. Concrete is to be
proportioned with a water to cement ratio of 0.45 to be
checked and recorded by the site engineer during
construction on site control sheets.

100

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c H & 1000c/cV

1800

2500

50

1. All dimensions in millimetres unless otherwise stated

4. Concrete foundation slab is to be cured (by placing wet


sand or hemp sacks on the concrete surface after pouring
and rewetting when required) for a minimum of one week
prior to placement of the masonry work.

75-100mm

Ch. 1+660 - 1+840

5. A mortar mix proportion of 1:4, cement : sand is to be


used for all mortar work.

25-28mm
10-20mm
FINE SAND

6. Location & Length of retaining wall may be changed on


site condition as per directed by the engineer.

See Detail (A)

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE&AES COMPANY
ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE
DRAWING SCALE

RETAINING WALLS
PLOT DATE: 03-04-2013

Sheet No

29

) of 142

50mm Plain
Concrete 1:2:4

NOTES:

600

16 ST1@150 C/C

REINFORCEMENT DETAIL ( SECTION A-A)


Scale 1:40

500
16 ST1@150 C/C

DESCRIPTION

DATE

16 ST2@250 C/C

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

No

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

650

200 300
1 of 4-20 ST6

10 ST4@300 C/C

C/C

Culvert Level

100mm Plain
Concrete 1:2:4

700
100

16 ST2@250 C/C

10 ST3@300 C/C
12

1250

300

1 of 6-10 ST5

10 ST3@300 C/C

200

10 ST4@300 C/C

500

250

SECTION (D-D)
Scale 1:40

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

28.589

600.368

5% LOSSES

GRAND TOTAL

63.921

571.779

0.888
72.000

SUB TOTAL

b ed
c

30.00

15.00
150

T3

2
700 500 800 200
200
12
EL

a
b

20

2300

10

2100

T3

100

0
2100

2100
T1

T2

T2

15.536

45.376
2.466

0.617
25.200

18.400
8.00

12.00
6.00

4.00
2

40.135

46.855
0.617

0.617
65.100

76.000
8.00

31.00
31.00

8.00
300

300
1

140.941

219.014
1.578

1.578
89.300

138.767
60.33

9.40
9.40

60.33
150

250
1

1
9500

2100
T2

T2
9500

2400
T1

SECTION (B-B)
Scale 1:100

ST6

SECTION (C-C)
Scale 1:40

ST5

100mm Stone Pitching

100mm Leane Concrete 1:2:4

PARAP
ET
WALL

400

100mm Plain
Concrete 1:2:4

2100

1100

10

Canal
Level

75mm PVC Drain pipe

10

50mm Pcc
Capping 1:2:4

4000

1000

25999,99
10000

300

2.5% Slope

700

Canal
Level

Road Level
2.5% Slope

Ground Level

1650

200 300

9100

ST4

250

ST3

16000
250

25999,99

600

PLAN VIEW
Scale 1:100

TOP
SLAB

50mm Plain
Concrete 1:2:4

100

SECTION (A-A)
Scale 1:40

2100

Road Way

300

9500

100mm Plain
Concrete 1:2:4

T1

1200

1200

T2

1:1.5

2300

100
A

1:1.5

9500

600

650

100

16

400

16

1000 x1000

ST1

100

00

00
10

10

900

1000

3814,21

75mm PVC Drain pipe

600

COMPO BAR
NENT MARK

950

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (0.9 X 0.6 x 9)m SLAB CULVERT

50mm Plain Concrete 1:2:4

100mm Plain Concrete 1:2: 4


150mm Gravel Compacted Layer

9000

Road Level

1:1.5

ST2

300

Road Level

1:1.5

TOTAL
WEIGHT
(KG)

350

UNIT
WEIGHT
OF BAR
(KG/M)

25
300

TOTAL
TOTAL
LENGTH
No. OF
IN
BAR
(M)

600

No. SPACI
No. OF
BAR IN
OF
NG IN
MEMB
EACH
(MM)
AR
MEMBAR

1000

BAR DIMENSIONS IN
(MM)

600

BAR
BAR
BAR
DIA
LENGTH SHAPE
IN
IN (MM) CODE
(MM)

300

Road Way

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

(1 x 1 X 9) m Slab culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

30

) of 142

400

100mm Plain
Concrete 1:2:4

100mm Stone Pitching

100mm Leane Concrete 1:2:4

40.634

853.322

5% LOSSES

GRAND TOTAL

812.688

81.381
0.888
91.667

SUB TOTAL

b ed
c

36.67

18.33
150
500 850
750
200

T2

2500
12
EL

2800
20
ST6

2600
10
ST5

9500

2600

T3

100

0
2600

2600
T1

T2

9500
T2

9500

2600
T2

T2

200

T3

19.235

69.050
2.466

0.617
31.200

28.000
10.00

12.00
6.00

5.00
2

49.691

56.617
0.617
91.833
9.67
9.67
300
1

209.913
1.578

0.617
80.600

133.000
14.00

31.00
31.00

14.00
200

300
1

326.801
1.578
207.060
71.40
71.40

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

250
300

1 of 6-10 ST5

250 300

10 ST3@300 C/C

10 ST4@300 C/C

250

16 ST1@125 C/C
1 of 5-20 ST6

12

500

C/C

10 ST3@300 C/C
10 ST4@300 C/C

16 ST2@200 C/C
16 ST1@125 C/C

16 ST2@200 C/C
REINFORCEMENT DETAIL ( SECTION B-B)
REINFORCEMENT DETAIL ( SECTION A-A)
Scale 1:40
DESCRIPTION

125

NOTES:

SECTION (B-B)
Scale 1:100

No

SECTION (C-C)
Scale 1:40

T1

100

1200

PARAP
ET
WALL

Canal
Level

75mm PVC Drain pipe

9500

1250
SECTION (D-D)
Scale 1:40

10

50mm PCC
Capping 1:2:4

800

ST4

1000

100mm Plain
Concrete 1:2:4

700

300

250 300

2.5% Slope

2.5% Slope

700

Canal
Level

Road Level

10

Ground Level

1750

250
9100

250

250

400
650

700

Culvert Level

500

50mm Plain
Concrete 1:2:4

PLAN VIEW
Scale 1:100

16

600
600

ST3

50mm Plain
Concrete 1:2:4

ST2

Road Way

TOP
SLAB

SECTION (A-A)
Scale 1:40

1:1.5

100mm Plain
Concrete 1:2:4

100

1200

1:1.5

100

1200

100

600

10
00

650

75mm PVC Drain pipe

1750

1500

400

100

00

10

950

1500x1000

150

600

950

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 X 1.5 x 9)M SLAB CULVERT

9000

50mm Plain Concrete 1:2:4

1:1.5

1:1.5

2600

100mm Plain Concrete 1:2: 4


150mm Gravel Compacted Layer

T1

Road Way

2900

Road Level

300

16

300

ST1

350

TOTAL
WEIGHT
(KG)

Road Level

300

25
300

UNIT
TOTAL
No.
SPAC No. OF TOTAL
LENGT WEIGHT
OF ING IN BAR IN
No. OF
H IN
OF BAR
MEMB (MM)
EACH
BAR
(M)
(KG/M)
AR
MEMBAR

600

BAR DIMENSIONS IN
(MM)

1500

BAR
BAR
BAR
DIA
COMPO BAR
LENGTH SHAPE
IN
NENT MARK
IN (MM) CODE
(MM)

600

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

Scale 1:40

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

(1 x 1.5 x 9)m culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

31

) of 142

SECTION (B-B)
Scale 1:100

50mm Plain
Concrete 1:2:4

NOTES:

600

16 ST1@100 C/C

REINFORCEMENT DETAIL ( SECTION A-A)


Scale 1:40

500
16 ST1@100 C/C

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

No

DESCRIPTION

DATE

16 ST2@150 C/C

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

100mm Plain
Concrete 1:2:4

650

250 300
1 of 4-20 ST6

10 ST4@300 C/C

C/C

Culvert Level

700
100

16 ST2@150 C/C

10 ST3@300 C/C
12

1250

300

1 of 6-10 ST5

10 ST3@300 C/C

250

10 ST4@300 C/C

500

250

SECTION (D-D)
Scale 1:40

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

55.883

1173.546

5% LOSSES

GRAND TOTAL

96.177

1117.663

0.888
108.333

SUB TOTAL

b ed
c

43.33

21.67
150

T3

2
750 500 850 200
200

a
b

12
EL

3300
20
ST6

3100
10
ST5

9500

3100

T3

2
100

0
3100

3100
T1

T2

3100

9500
T2

T2

T2

65.104

22.935
0.617

2.466
26.400

37.200
12.00

8.00
4.00

6.00

66.379

59.248
0.617

0.617
107.667

96.100
31.00

11.33
11.33

31.00
300

300
1

324.865

482.957
1.578

1.578
205.833

306.000
90.00

21.67
21.67

90.00
100

150
1

1
150

9500

3100

10

2500
T1

100mm Stone Pitching

100mm Leane Concrete 1:2:4

PARAP
ET
WALL

400

SECTION (C-C)
Scale 1:40

100mm Plain
Concrete 1:2:4

10

1100

ST4

Canal
Level

75mm PVC Drain pipe

ST3

50mm Pcc
Capping 1:2:4

100

1000

650
2.5% Slope

2.5% Slope

700

Canal
Level

300

250 300

Road Level

Ground Level

TOP
SLAB

9100

T1

1650

250

250

400

T2

PLAN VIEW
Scale 1:100

9500

600

3400

100
50mm Plain
Concrete 1:2:4

16

650

1:1.5

250

100mm Plain
Concrete 1:2:4

SECTION (A-A)
Scale 1:40

Road Way

300

1200

1200

16

1:1.5

100

100

600

10

00

10
00

100
B

75mm PVC Drain pipe

650

2000

400

COMPO BAR
NENT MARK

250
D

900

600

1000 x2000

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 x 2 x 9)m SLAB CULVERT

950

150 mm Gravel compacted Layer

50mm Plain Concrete 1:2:4

9000

100mm Plain Concrete 1:2: 4

1:1.5

No. SPACI
No. OF
BAR IN
OF
NG IN
MEMB
EACH
(MM)
AR
MEMBAR

1:1.5

TOTAL
TOTAL
LENGTH
No. OF
IN
BAR
(M)

UNIT
WEIGHT
OF BAR
(KG/M)

Road Level

ST1

Road Level

300

ST2

350

TOTAL
WEIGHT
(KG)

25
300

Road Way

600

BAR DIMENSIONS IN
(MM)

300

2000

BAR
BAR
BAR
DIA
LENGTH SHAPE
IN
IN (MM) CODE
(MM)

600

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1 x 2 x 9 m Slab culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

32

) of 142

400

200mm Stone Pitching

100mm Leane Concrete 1:2:4

50mm Plain
Concrete 1:2:4

SECTION (B-B)
Scale 1:100

NOTES:

600

10 ST3@300 C/C

1 of 5-20 ST6

REINFORCEMENT DETAIL ( SECTION A-A)


Scale 1:40

500
16 ST1@100 C/C

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

No

DESCRIPTION

DATE

16 ST2@125 C/C

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

100mm Plain
Concrete 1:2:4

700
100

16 ST1@100 C/C

10 ST4@300 C/C

C/C

300

300
16 ST2@125 C/C

12

Culvert Level

650

10 ST3@300 C/C

1250

300

1 of 6-10 ST5

300

10 ST4@300 C/C

500

250

SECTION (D-D)
Scale 1:40

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

1656.304

78.872
5% LOSSES

GRAND TOTAL

130.801

1577.432

0.888
147.333

SUB TOTAL

b ed
c

56.67

28.33
150

2
800 500 900 200

12
EL

20

4100
10

ST6

4100

9500

T3
2600

200

2
100

0
4100

4100
T1

T2

4300

4100

9500
T2

T2

T3

106.041

30.333
0.617

2.466
43.000

49.200
12.00

10.00
5.00

6.00

85.902

78.360
0.617

0.617
139.333

127.100
31.00

14.67
14.67

31.00
300

300
1

506.789

639.207
1.578

1.578
321.100

405.000
90.00

33.80
33.80

90.00
100

125
1

200
4100

9500

T2
T1

700

SECTION (C-C)
Scale 1:40

100mm Plain
Concrete 1:2:4

ST5

75mm PVC Drain pipe

PARAP
ET
WALL

1100
Canal
Level

10

1000

50mm Pcc
Capping 1:2:4

100

300

2.5% Slope

2.5% Slope

10

Road Level

300 300
Canal
Level

650

9100

ST4

Ground Level

ST3

250

TOP
SLAB

1650

250

250

400

T1

PLAN VIEW
Scale 1:100

T2

600

4500

300

9500

50mm Plain
Concrete 1:2:4

Road Way

16

1:1.5

650

1:1.5

100mm Plain
Concrete 1:2:4

16

SECTION (A-A)
Scale 1:40

ST1

100
100

600

1200

1200

ST2

650

00

00

10

10

100

COMPO BAR
NENT MARK

900

100

3000

75mm PVC Drain pipe

400

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 X 3 x 9)m SLAB CULVERT

300

600

1000 x 3000

950

100mm Plain
Concrete 1:2: 4

50mm Plain Concrete 1:2:4

150 mm Gravel
compacted Layer

9000

TOTAL
WEIGHT
(KG)
UNIT
WEIGHT
OF BAR
(KG/M)

Road Level

1:1.5

Road Level

1:1.5

300

TOTAL
TOTAL
LENGTH
No. OF
IN
BAR
(M)

350

No.
No. OF
SPACI
OF
BAR IN
NG IN
MEMB
EACH
(MM)
AR
MEMBAR

25
300

600

BAR DIMENSIONS IN
(MM)

Road Way

3000

BAR
BAR
BAR
DIA
LENGTH SHAPE
IN
IN (MM) CODE
(MM)

600

300

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1 x 3 x 9 m Slab culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

33

) of 142

2.5% Slope

325
1000

50mm PCC
Capping 1:2:4
Canal
Level

700

75mm PVC Drain pipe

500

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

REINFORCEMENT DETAIL ( SECTION A-A)


Scale 1:40

SECTION (B-B)
Scale 1:100

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

325

200mm Stone Pitching

200mm Stone Pitching

135.667

2849.000

5% LOSSES

GRAND TOTAL

b ed
c

170.958

2713.333

73

192.567

0.888
SUB TOTAL

36
150
2
200

825 500 925


200

T2

100

0
5300

5300

a
b

12
EL

2650
T1

5500
22

5300
10

ST6

ST4

ST5

5300

T1

T2

T2

5300

9500

9500
T2

T2

T3

e
d
c
225

T3

39.211

164.117
2.984

0.617
63.600

55.000
10

12
6

5
2

212.802

199.321
0.617
323.300
61
61
150

650.729
1.578

0.617
345.167

412.300
43

36
36

43
125

150
1

1276.195
2.466
517.500
90
90
100
1

TOTAL
WEIGHT
(KG)

NOTES:

100mm Leane Concrete 1:2:4

400

PARAP
ET
WALL

Road level
2.5% Slope

Canal
Level

325

300

300

9100

10

250
300

250

9500

300

250

9500

SECTION (C-C)
Scale 1:80

10

PLAN VIEW
Scale 1:100

100mm Plain
Concrete 1:2:4

16

SECTION (D-D)
Scale 1:80

1100

ST2

1:1.5

1:1.5

ST3

100

100mm Plain
Concrete 1:2:4

50

TOP
SLAB

700

100

Road Way

1650

900

50

400

Ground Level

1250

1150

Canal
Level

50mm Plain
Concrete 1:2:4

600
650

700 1089

10

700 1089

00

C
50mm Plain
Concrete 1:2:4

600

5300

SECTION (A-A)
Scale 1:60

T1

100mm Plain
Concrete 1:2:4

1400

5750

1000

200mm stone
pitching

20

100mm Plain
Concrete 1:2:4

1400

100

325

850
1650
650

100

ST1

75mm PVC Drain pipe

4000

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1 x 4 x 9)m SLAB CULVERT

4000

00
10

4000

1089 700

1089 700

950
500

150

9000

UNIT
TOTAL
TOTAL
LENGTH WEIGHT
No. OF
IN
OF BAR
BAR
(M)
(KG/M)

50mm Plain Concrete 1:2:4

No. SPACI
No. OF
OF
BAR IN
NG IN
MEMB (MM)
EACH
AR
MEMBAR

Road level

100

150mm Gravel
Compacted Layer

300

300

350
300

Road level

100mm Plain
Concrete 1:2: 4

Road Way

700

BAR DIMENSIONS IN
(MM)

1:1.5

1:1.5

4000

BAR
BAR
BAR
DIA
COMPO BAR
LENGTH SHAPE
IN
NENT MARK
IN (MM) CODE
(MM)

25
700

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.
PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1 x 4 x 9 m Slab Culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

34

) of 142

2.5% Slope

50mm PCC
Capping 1:2:4
75mm PVC Drain pipe

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c

750

50

50

Canal
Level

100

75

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

500
100mm Leane Concrete 1:2:4

100mm Stone Pitching

100mm Stone Pitching

250

75-100mm

SECTION (B-B)
Scale 1:100
REINFORCEMENT DETAIL ( SECTION A-A)
Scale 1:40
No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

47.208

991.370

944.162

87.299

SUB TOTAL

5% LOSSES

b ed
c

GRAND TOTAL

0.888
98.333

T3

39

a
T2

200

12
EL

2500

20
ST6

2800
10
ST5

3000

10
ST4

2800

9500

9500

T3

100

0
2800

2800
T1

T2

2800
T2

9500

9500
T2

T2

750 500 850

200

150

20

20.715

73.982
2.466

0.617
33.600

30.000
10

12
6

5
2

60.522

53.514
0.617
86.800
31
31
300
1

294.877
1.578

0.617
98.167

186.833
20

10
10

20
150

300
1

353.253
1.578
223.820
72
72
125

NOTES:

500

Canal
Level

T1

250 300

2.5% Slope

PARAP
ET
WALL

300

300

Road level

e
COMPO BAR
NENT MARK

250
9100

250
1500

100mm Plain
Concrete 1:2:4

SECTION (C-C)
Scale 1:80

250
250

1500

10

100

SECTION (D-D)
Scale 1:80

50

16

100mm Plain
Concrete 1:2:4

400

ST2

900

100

1100

2450

Ground Level

PLAN VIEW
Scale 1:100

350

ST3

700

900

1950

350

750

900

Canal
Level

TOP
SLAB

350

1:1.5

1:1.5

50mm Plain
Concrete 1:2:4

650

D
50mm Plain
Concrete 1:2:4

650
Road Way

SECTION (A-A)
Scale 1:60

150

100

1089
650

350

1089

15
40

650

100mm Plain
Concrete 1:2:4

1700

100mm stone pitching

1700

2800

100
100mm Plain
Concrete 1:2:4

T1

650

2500

900

400

300

300

See Detail "F"

3100

1500

1500

16

75mm PVC Drain pipe

150

800

400

650
B

1500

40
15

1089

1089

650

9000

1500

950

350

350

300

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 X 1.5 x 9)m SLAB CULVERT

Road Way

TOTAL
WEIGHT
(KG)

50mm Plain Concrete 1:2:4

ST1

150mm Gravel Compacted Layer

TOTAL
UNIT
TOTAL
LENGTH WEIGHT
No. OF
IN
OF BAR
BAR
(M)
(KG/M)

100

100mm Plain Concrete 1:2: 4

1:1.5

Road level

No. SPACI
No. OF
OF
BAR IN
NG IN
MEMB (MM)
EACH
AR
MEMBAR

Road level

1:1.5

300

350
300

BAR DIMENSIONS IN
(MM)

700

1500

BAR
BAR
BAR
DIA
LENGTH SHAPE
IN
IN (MM) CODE
(MM)

25
700

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

25-28mm
10-20mm
FINE SAND

Detail (F)

PROJECT NAME

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1.5 x 1.5 x 9 m culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

35

) of 142

75mm PVC Drain pipe

750

75

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

100

500
100mm Leane Concrete 1:2:4

100mm Stone Pitching

100mm Stone Pitching

250

75-100mm

SECTION (B-B)
Scale 1:100

REINFORCEMENT DETAIL ( SECTION A-A)


Scale 1:40
No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

60.120

1262.518

1202.398

102.096

SUB TOTAL

5% LOSSES

b ed
c

GRAND TOTAL

0.888
115.000

T3

46

a
T2

200

12
EL

2500

20
ST6

3500

10
ST5

3300

10
ST4

3300

9500

10

9500

T3

100

0
3300

3300
T1

T2

3300
T2

9500

9500
T2

T2

750 500 850

200

150

23

24.414

86.313
2.466

0.617
39.600

35.000
10

12
6

5
2

70.283

63.070
0.617
102.300
31
31
300
1

344.856
1.578

0.617
114.000

218.500
23

12
12

23
150

300
1

511.366
1.578
324.000
90
90
100
1

e
d
c
b

NOTES:

500

50

Canal
Level

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c

250
1500

50mm PCC
Capping 1:2:4

50

2.5% Slope

2.5% Slope

T1

250 300

Road level

PARAP
ET
WALL

300

300

9100

16

2450
100mm Plain
Concrete 1:2:4

SECTION (C-C)
Scale 1:80

250

250

1500

COMPO BAR
NENT MARK

250

100

SECTION (D-D)
Scale 1:80

50

ST2

100mm Plain
Concrete 1:2:4

400

ST3

1100

900

100

PLAN VIEW
Scale 1:100

Ground Level

350

TOP
SLAB

700

900

1950

350

750

900

350

Canal
Level

1:1.5

1:1.5

50mm Plain
Concrete 1:2:4

650

150

D
50mm Plain
Concrete 1:2:4

650

350

650

SECTION (A-A)
Scale 1:60

Road Way

300

100mm Plain
Concrete 1:2:4

1700

100mm Stone
pitching

3300

1700

T1

250
1500

900

100mm Plain
Concrete 1:2:4

1089

40
15

1089

650

100

300

Canal
Level

See Detail "F"

2000

400

100

75mm PVC Drain pipe

650

2500

650
1089
2000

40
15

2000

800

350

350
1089

650

9000

400

150

950

300

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 x 2 x 9)m SLAB CULVERT

Road Way

3600

50mm Plain Concrete 1:2:4

16

150mm Gravel Compacted Layer

ST1

100

100mm Plain Concrete 1:2: 4

1:1.5

TOTAL
UNIT
TOTAL
LENGTH WEIGHT
No. OF
IN
OF BAR
BAR
(M)
(KG/M)

Road level

Road level

1:1.5

TOTAL
WEIGHT
(KG)

300

350
300

No. SPACI
No. OF
OF
BAR IN
NG IN
MEMB (MM)
EACH
AR
MEMBAR

700

BAR DIMENSIONS IN
(MM)

2000

BAR
BAR
BAR
DIA
LENGTH SHAPE
IN
IN (MM) CODE
(MM)

25
700

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

25-28mm
10-20mm
FINE SAND

Detail (F)

PROJECT NAME

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1.5 x 2 x 9 m Slab Culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

36

) of 142

500
50

Canal
Level

100

75

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

750

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c

75mm PVC Drain pipe

500
100mm Leane Concrete 1:2:4

200mm Stone Pitching

300

75-100mm

SECTION (B-B)
Scale 1:100

25-28mm
10-20mm
FINE SAND

Detail (F)
REINFORCEMENT DETAIL ( SECTION A-A)
Scale 1:40

No

DESCRIPTION

DATE

1732.632

82.506
5% LOSSES

GRAND TOTAL

136.956

1650.126

0.888
154.267

SUB TOTAL

59
30
150
200

T2

T3
12
EL

2600
T1

100
4300

4300
T2

T1
4500
20

4300
10

ST6

ST4

ST5

4300
10

T2

4300

9500

9500
T2
9500
10

T2
9500
16

800 500 900

200

T3

31.812

110.973
2.466

0.617
51.600

45.000
10

12
6

5
2

89.806

82.182
0.617
133.300
31
31
300

530.779
1.578

0.617
145.667

336.300
35

15
15

35
125

300
1

667.617
1.578
423.000
90
90
100
1

e
d
c
b

200

NOTES:
50

50mm PCC
Capping 1:2:4

200mm Stone Pitching

2% Slope

300

2% Slope

PARAP
ET
WALL

300
300

300

Road level

4300

150

250
9100

300

2450

SECTION (C-C)
Scale 1:80

250

300
1500

100mm Plain
Concrete 1:2:4

1500

ST2

100

SECTION (D-D)
Scale 1:80

50

ST3

100mm Plain
Concrete 1:2:4

400

TOP
SLAB

900

1100

PLAN VIEW
Scale 1:100

Canal
Level

300
700

1950
900
100

Ground Level

350

750

900

350

350

1:1.5

50mm Plain
Concrete 1:2:4

650

T1

100
350

50mm Plain
Concrete 1:2:4

650

Canal
Level

250

100mm Plain
Concrete 1:2:4

1700

1700
SECTION (A-A)
Scale 1:60

Road Way
1:1.5

200mm stone
pitching

4700

100mm Plain
Concrete 1:2:4

300

1500

800
2500

650
1089

650

100

1089
650

1089

650

400

900

40
15

See Detail "F"

3000

3000

3000

15
40

650
1089

950
400

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 x 3 x 9)m SLAB CULVERT

350

350

9000

16

50mm Plain Concrete 1:2:4

ST1

150mm Gravel Compacted Layer

300

TOTAL
WEIGHT
(KG)

100

100mm Plain Concrete 1:2: 4

Road Way

UNIT
TOTAL
TOTAL
LENGTH WEIGHT
No. OF
IN
OF BAR
BAR
(M)
(KG/M)

Road level

No. SPACI
No. OF
OF
BAR IN
NG IN
MEMB (MM)
EACH
AR
MEMBAR

300

350
300

BAR DIMENSIONS IN
(MM)

700

Road level

1:1.5

1:1.5

3000

BAR
BAR
BAR
DIA
COMPO BAR
LENGTH SHAPE
IN
NENT MARK
IN (MM) CODE
(MM)

25
700

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1.5 x 3 x 9 m Slab Culvert

DRAWING SCALE

As shown

PLOT DATE: 13-04-2013

Sheet No

37

) of 142

325

2.5% Slope

50mm PCC
Capping 1:2:4

50

500

75mm PVC Drain pipe

50

Canal
Level

Canal
Level

75
100

750

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

500
100mm Leane Concrete 1:2:4

200mm Stone Pitching

75-100mm

325

200mm Stone Pitching

SECTION (B-B)
Scale 1:100
REINFORCEMENT DETAIL ( SECTION A-A)
Scale 1:40
No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

135.667

2849.000

5% LOSSES

GRAND TOTAL

b ed
c

170.958

2713.333

73

192.567

0.888
SUB TOTAL

36
150
2
200

825 500 925


200

T2

100

0
5300

5300

a
b

12
EL

2650
T1

5500

5300

22

ST4

10

5300
10

ST6

9500

ST5

9500

10

T1

T2

T2

5300

9500

9500
T2

T2

T3

e
d
c
225

b
a

T3

39.211

164.117
2.984

0.617
63.600

55.000
10

12
6

5
2

212.802

199.321
0.617
323.300
61
61
150

650.729
1.578

0.617
345.167

412.300
43

36
36

43
125

150
1

1276.195
2.466
517.500
90
90
100
1

TOTAL
WEIGHT
(KG)
UNIT
TOTAL
TOTAL
LENGTH WEIGHT
No. OF
IN
OF BAR
BAR
(M)
(KG/M)

NOTES:
50mm DIA PVC PIPE WEEP HOLE
@2000 c/c

2.5% Slope

PARAP
ET
WALL

300
300

300

Road level

16

2450

250
9100

325
1500

100mm Plain
Concrete 1:2:4

SECTION (C-C)
Scale 1:80

250
250

1500

ST2

100

SECTION (D-D)
Scale 1:80

PLAN VIEW
Scale 1:100

50

5300

700
100mm Plain
Concrete 1:2:4

ST3

1100

400

TOP
SLAB

100

Ground Level

900

1:1.5

350

750

900

Road Way
1:1.5

350
1950

350

900

D
Canal
Level

T1

50mm Plain
Concrete 1:2:4

650

5750

50mm Plain
Concrete 1:2:4

650

20

650

350

1089

40
15

1089

100mm Plain
Concrete 1:2:4

1700

1700

650

200mm stone
pitching

ST1

100mm Plain
Concrete 1:2:4

SECTION (A-A)
Scale 1:60

300

300

150

100

No. SPACI
No. OF
OF
BAR IN
NG IN
MEMB (MM)
EACH
AR
MEMBAR

650

2500

900

400

100

75mm PVC Drain pipe

See Detail "F"

4000

4000

4000

1500

325

400

800

650

950

1089

40
15

50mm Plain Concrete 1:2:4

BAR DIMENSIONS IN
(MM)

350

350
1089

650

9000

Road level

100

150mm Gravel
Compacted Layer

300

300

350
300

Road level

100mm Plain
Concrete 1:2: 4

Road Way

700

SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (1.5 x 4 x 9)m SLAB CULVERT

1:1.5

1:1.5

4000

BAR
BAR
BAR
DIA
COMPO BAR
LENGTH SHAPE
IN
NENT MARK
IN (MM) CODE
(MM)

25
700

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

25-28mm
10-20mm
FINE SAND

Detail (F)

PROJECT NAME

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

1.5 x 4 x 9 m Slab Culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

38

) of 142

A
1:1.5

800

25
450

800

300
450

1:1.5

Road Way

300

4000

300

9000

1533,33

1533,33

250

250

1533,33

250

300

250

600

C
Road level

100

100mm Plain Concrete 1:2: 4


50mm Plain Concrete 1:2:4

4000

950

325

150mm Gravel Compacted Layer

500

1000

500

4000

See Detail "F"

4100

500

1000

300

600

1000

20
0

3000

75mm PVC Drain pipe

00
20

1414,21

1200

150

1414,21

Road level

1:1.5

100

1:1.5

PLAN VIEW
Scale 1:100

100mm Plain
Concrete 1:2:4

2500

100

Road Way

200mm stone
pitching

2500
100mm Plain
Concrete 1:2:4

SECTION (A-A)
Scale 1:60

250

250

325 300

9100

600

50mm Plain
Concrete 1:2:4

2.5% Slope

2.5% Slope

1100

300

Road level

50mm Pcc
Capping 1:2:4

50mm Plain
Concrete 1:2:4

600

600

200mm Stone Pitching

2050

1000

300

900
100

Canal Level

900

750

Canal
Level

3900

Canal
Level

Culvert
Level

600

600

3000

1300

75mm PVC Drain pipe

1100

100mm Plain
Concrete 1:2:4

100

100mm Leane Concrete 1:2:4

500
200mm Stone Pitching

SECTION (B-B)
Scale 1:100

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

2000

SECTION (D-D)
Scale 1:80

100mm Plain
Concrete 1:2:4

SECTION (C-C)
Scale 1:80

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

(3 X 4 X 9) Culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

39

) of 142

GI Pipe

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c

75

75

50

12x12 Chamfer

50

Rail Post 250x250

NOTES:

100

10@150 C/C- ST8

1. All dimensions are in "mm" unless otherwise specified,


2. If rounded stone from a river or other source is used, it shall not
comprise of more then 30% of the total volume of stone and shall be
evenly distributed through out the wall;
3. All masonry work should be pointed;
4. Concrete foundations should be reinforced for earthquake zones;
5. Angle and length of wing walls is to be adjusted by the Engineer as
per site conditions;
6. Refer to the bar schedule for the length and shape of reinforcement,
7. Concrete mix shall be proportioned by volume with a water/cement
ratio of not more than 0.45;
8. Concrete with a recorded slump value greater than 100mm shall be
rejected by the Engineer;
9. The culvert should be constructed with a fall of 2-4%;
10.
;
11. Concrete having f c'=4000 psi and steel f y=60000 psi should be used.

2x2-20 -ST7

75-100mm
25-28mm
10-20mm
FINE SAND

Detail (F)

325

250

2x2x- 20-ST7

10@150
C/C-ST8

250
SCHEDULE AND QUANTITIES OF REINFORCEMENT FOR (3 X 4 X 9)M Culvert
REINFORCEMENT DETAIL ( SECTION A-A)
Scale 1:40

SECTION "F-F"

COMPON BAR
ENT
MARK

250

800

TOP
SLAB

10@150 C/C- ST8


PARAPET
WALL

300

2x2-20 -ST7

300

RAIL
POST

325

b
225

UNIT
TOTAL
TOTAL
WEIGHT
No. OF LENGTH IN OF BAR
(M)
BAR
(KG/M)

TOTAL
WEIGHT
(KG)

ST1

20

5950

T1

5500

100

90

90

535.500

2.466

1320.585

16

9500

T2

9500

125

45

45

427.500

1.578

674.719

ST3

10

5500

T2

5500

150

60

60

331.833

0.617

204.582

ST4

10

9500

T2

9500

150

38

38

357.833

0.617

220.611

ST5

10

5500

T2

5500

12

66.000

0.617

40.690

ST6

22

5900

T1

5500

200

10

59.000

2.984

176.053

200

825

38

75

199.633

0.888

177.232

32

65.600

2.466

161.775

48

46.080

0.617

28.409

EL

12

2650

T3

ST7

20

2050

T4

1650 200 200

ST8

10

960

T6

200
T3

T2
a

No.
SPACI No. OF
OF
BAR IN
NG IN
MEMB (MM)
EACH
AR
MEMBAR

BAR DIMENSIONS IN
(MM)

ST2

T1

500

BAR
BAR
BAR
DIA
LENGTH SHAPE
IN
IN (MM) CODE
(MM)

500 925

200

e
c

150

80

T4

a
b

200

150
T6

a
b

SUB TOTAL

3004.656

5% LOSSES

150.233

GRAND TOTAL

3154.888

REINFORCEMENT DETAIL ( SECTION B-B)


Scale 1:40

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

(3 X 4 X 9) Culvert

DRAWING SCALE

As shown

PLOT DATE: 03-04-2013

Sheet No

40

) of 142

200600100

100600200
Culvert

2.5%

2.5%

5000

5000

9600

9800

900

11100
15204

B
50

75 mm
PVC Drain
Pipe @
2600 C/C

100

75

50

10900

9600

100

100
900

100

1392

100

1392

See Detail "C"

1000

2300

800

800

50
0

1200

100 mm PCC
Capping 1:2:4

600

250

25-28mm
10-20mm
FINE SAND

400
200

400

100600 200

800

200600100

75-100mm

2450

1500

1352

100

1300

2700

100 1500

2600

1500

2602

1600

5175

5175

Base Course

1500

50

75 mm Drain
Pipe, PVC
@2600 C/C

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c H & 1000c/cV

50

CL

00

50 mm PCC
Capping, 1:2:4

100

600

250

800

100 700

2.5%

350 600

Base course

200

100 mm PCC
1:2:4

CL

1500

Culvert

2.5%

700

2000
250

1100
100 mm PCC
1:2:4

75mm PVC Drain Pipe


@2600 C/C

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

2@(1.5 X 4 X 9)M CULVERT

DRAWING SCALE

As shown

PLOT DATE: 03 - 04 - 2013

Sheet No

41

) of 142

Culvert
CL

250

250

250

1392

250

Rail Post 250x250

CL

75

12x12 Chamfer

GI Pipe

10@150 C/C- ST8


See Detail "B"
1000

700

300

2x2-20 -ST7
700

400

350 350

100

1500

400

2x2x- 20-ST7

250

700
800

1392

CL

150 mm
PCC
1:2:4

350 600

800

100 mm PCC
1:2:4

See Detail "A"

300

550

2850

10@150
C/C-ST8

250

100 mm PCC
1:2:4

See Detail "C"

1500

1500

1200

100

100

100
200 mm Stone
Pitching

250

2500

2200

2200

100 mm PCC
1:2:4
F

800

10@150 C/C- ST8


2x2-20 -ST7

12 ST4@150 C/C

1 OF 6-12 -ST5
600

12 ST3@150 C/C

12

12 ST4@150 C/C

EL@150 C/C

16 ST2@125 C/C

350

350

350

12 ST3@150 C/C

20 ST1@100 C/C
1OF 6 -20 -ST6
500

16 ST2@125 C/C
20 ST1
@100 C/C

50 mm Wooden Plank
RCC SLAB
RCC SLAB
T=350mm

10 mm
Rubber
Bearing
Plate

PVC Pipe

10mm
Rubber
Bearing
Plate

c/c-ST10

Filling
16@200
c/c-ST11

22@1000 c/c
with PVC Pipe-ST13
8@200 c/c-ST12

RCC PILLER
CUP, h=300MM
Stone Massonry

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

Stone Massonry
Abutment

16@180 c/c-ST9

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

2@(1.5 X 4 X 9)M CULVERT

DRAWING SCALE

As shown

PLOT DATE: 03 - 04 - 2013

Sheet No

42

) of 142

200600100

100600200

Bridge

CL

0
50

50

2.5%
Slope

2.5%
Slope

Base Course

5000

5175

5000

2000

5175

75 mm Drain
Pipe, PVC
@2600 C/C

2700
2000
900

11304
15204

75

50

50

75 mm
PVC Drain
Pipe @
2600 C/C

100

50mm DIA PVC PIPE WEEP HOLE


@2000 c/c H & 1000c/cV

9600

10000

11100

9600

100

100
900

200

1600

1250

100

1300

100 1500

2600

2000

2510

1392

100

1392

See Detail "C"

1000

1000

1400

D
200600100

100600 200

1000

2546

100 mm PCC
Capping 1:2:4

600

250

75-100mm
25-28mm
10-20mm
FINE SAND

400

200

400

3050

50 mm PCC
Capping, 1:2:4

2.5%
Slope

2000
100 mm PCC
1:2:4

100

1100

75mm PVC Drain Pipe


@2600 C/C

No

DESCRIPTION

DATE

100 mm PCC
1:2:4

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

200
2000

Base course

350 600

2.5%
Slope

800

CL

900

250

Culvert

100

250

1000

1000

600

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

2@(2 X 4 X9)M Culvert

DRAWING SCALE

As shown

PLOT DATE: 03 - 04 - 2013

Sheet No

43

) of 142

Culvert

800

CL

250

1392

250

CL

250

1392

250

Rail Post 250x250

CL

75

12x12 Chamfer

150 mm
PCC
1:2:4

GI Pipe

10@150 C/C- ST8


See Detail "B"
1000

700

2x2-20 -ST7
300

700
See Detail "B"

2000

400

300

400

2x2x- 20-ST7

100 mm PCC
1:2:4

350 350

See Detail "A"

200
200

250

See Detail "C"


400

600

600 350 600

800

100 mm PCC
1:2:4

See Detail "c"

10@150
C/C-ST8

250

550

2750

100

250

100

100

200 mm Stone
Pitching

1500

1500

1400

2700

100 mm PCC
1:2:4

2600

10@150 C/C- ST8

800

2600

2x2-20 -ST7
12 ST4@150 C/C

1 OF 6-12 -ST5
600

12 ST3@150 C/C

12

12 ST4@150 C/C

EL@150 C/C

16 ST2@125 C/C

350

350

350

12 ST3@150 C/C

20 ST1@100 C/C
1OF 6 -20 -ST6
500

16 ST2@125 C/C
20 ST1
@100 C/C

50 mm Wooden Plank
RCC SLAB
RCC SLAB
T=350mm

10 mm
Rubber
Bearing
Plate

PVC Pipe

10mm
Rubber
Bearing
Plate

c/c-ST10

Filling
16@200
c/c-ST11

22@1000 c/c
with PVC Pipe-ST13
8@200 c/c-ST12

RCC PILLER
CUP, h=300MM
Stone Massonry

No

DESCRIPTION

DATE

SURVEYED BY
DESIGNED BY

AGE & AES COMPANY


ENG. SIDDIQULLAH "SALARI"

DRAWN BY
CHECKED BY

ENG. ABDUL BARI "RAHIMI"


DR. MOHAMMAD IMAM "ALIMI"

VERIFIED BY

ENG. MAHMOOD "SAEED"


ENG. ABDUL SATTAR "RAUFI"

APPROVED BY

ISLAMIC REPUBLIC OF AFGHANISTAN


MINISTRY OF PUBLIC WORKS
UNITED NATIONS OFFICE FOR PROJECT
SERVICES (UNOPS) KABUL, AFGHANISTAN
TRANSPORT SECTION PORTFOLIO (TSP)

Stone Massonry
Abutment

16@180 c/c-ST9

PROJECT NAME

Rehabilitation of Trinkot (Surkhlez) to Chinartu Road ch.(0+000-9+000)

CONTRACT NO
DRAWING TITLE

2@(2 X 4 X9)M Culvert

DRAWING SCALE

As shown

PLOT DATE: 03 - 04 - 2013

Sheet No

44

) of 142

Você também pode gostar