PACKAGE
PLUMBING SYSTEM
DESCRIPTION REQUEST FOR INFORMATION - 2
MEP TENDER Dated - 20-2-2016
SR.NO.
QUERY
PDA REPLY
DB Remarks
Shall revert.
Not Required.
All PHE pumps shall be mounted on pump skid.Till panel it will be in electrical vender scope.
Refer attached electrical load sheet.All incomer to pump till skid panel will be in
electrical scope.
As Discussed sevral time, Please to provide Details as same is not reflecting in drawings
Velocity breaker shown on schematic, but same is unavailable in BOQ please clarify.
Valve chamber shown on the drawing but size not shown also same is missing in the BOQ please clarify.
Electrical Panel,Cable,Cable tray not considered in the BOQ and same is unavailable in the drawing, Please clarify.
All the sump details required and same is missing the BOQ also, Please clarify.
10
11
12
13
Drawing no DB-OC-PL-T-A-013,014-R1 as per legend on the specified drawing all pipe size are mention 150mm dia
but as per layout it is 300mm dia pipe, please clarify.
As per Drawing no DB-OC-PL-T-A-017-R1 pipe size not mention on drawing near shaft no 13-16 and shaft no 5-6,so
we considered as per information on the drawing, please clarify.
Drawing no DB-OC-PL-T-A-017-FL-R1 rain water pipe shown on drawing with out any size and not joint any where,
Please clarify.
Schematic shows WTP scheme already.Refer attached STP write up as discussed at site.
Fittings are part of drawing already shared.Will mention pipe sizes in drawing.
why sizes are missing all the time, jsutify your status
For riser only PN20 valves are used.Rest all are PN 16.
14
Drawing no DB-OC-PL-T-A-40-R1 pipe size not mention on all pipe, so considered, please clarify.
15
16
17
Shall revert.
18
Shall revert.
19
Shall revert.
20
PDA is to propose the driver toilets for MCPL( In co-ordination with AHC) fordetailedpiping and scheme.
Tentatively in the non tower area.
21
22
Will plan the services as per toilet locations.Toilet proposal to be done by AHC or DB.
Not Required.
Noted & Closed.
Agreed, Again corresponded documents showns only Rain water storage tank, Hence
requested you to provide details for Rain water harweting (As discussed with you at
our site office 3rd march)
We discussed and given the BOQ for Rain water pipe separately.Harvesting not
considered.Only Storage
PDA to revisit D.W.S. schematic for finalized location of PRV to meet require working pressure.
incomplet
23
incomplet
24
Pda to revisit cutout size as some of them are bigger then requirment
incomplet
25
incomplet
Please refer tender submitted.Its part of tender submitted.We plan as per Rain water storage tanks.