PROJECT : ORCHID CROWN, PRABHADEVI, MUMBAI.

PACKAGE
PLUMBING SYSTEM
DESCRIPTION REQUEST FOR INFORMATION - 2
MEP TENDER Dated - 20-2-2016

SR.NO.

QUERY

PDA REPLY

DB Remarks

PDA Remarks 07.04.16

Shall provide by 12.03.16

Still waiting for information

Refer attached file.

Refer attached file.

Please to provide Detail calculation, Design drawings for same

Refer attached file.

Shall revert.

Please to provide information ASAP

Not Required.

Shall be in Non Tower Area.

Not acceptabel, no tender will be separate for non tower area

Shall be part of NTA as discussed and explained at site.

Man hole shall be part of GFC layout.

Not acceptabel, no tender will be separate for non tower area

Refer revise BOQ

Its shown on groun floor.Shall be part of infra.

Not acceptabel, no tender will be separate for non tower area

Shall be part of NTA as discussed and explained at site.

All PHE pumps shall be mounted on pump skid.Till panel it will be in electrical vender scope.

Please to provide Scope matrix

Refer attached electrical load sheet.All incomer to pump till skid panel will be in
electrical scope.

Already Part of BOQ.

As Discussed sevral time, Please to provide Details as same is not reflecting in drawings

Refer revise BOQ

Sump shall be in NTA part.

Not acceptabel, no tender will be separate for non tower area

Shall be part of NTA as discussed and explained at site.

TYPICAL APARTMENT BOQ_TOWER A & B


1

Please provide us the measurement sheet

Pumps not considered in the BOQ, Please clarify

Velocity breaker shown on schematic, but same is unavailable in BOQ please clarify.

Escavation for pipe item missing, please clarify.

As per drawing no DB/OC/PL/T/A/1/040 - R1,DB/OC/PL/T/A/1/059 - R1,DB/OC/PL/T/A/1/004 - R1 chamber shown on


the drawing but same is missing in the BOQ please clarify.

Valve chamber shown on the drawing but size not shown also same is missing in the BOQ please clarify.

Electrical Panel,Cable,Cable tray not considered in the BOQ and same is unavailable in the drawing, Please clarify.

Puddle flange schedule and BOQ required, Please clarify.

All the sump details required and same is missing the BOQ also, Please clarify.

10

WTP details and BOQ required.

11
12
13

Drawing no DB-OC-PL-T-A-013,014-R1 as per legend on the specified drawing all pipe size are mention 150mm dia
but as per layout it is 300mm dia pipe, please clarify.
As per Drawing no DB-OC-PL-T-A-017-R1 pipe size not mention on drawing near shaft no 13-16 and shaft no 5-6,so
we considered as per information on the drawing, please clarify.
Drawing no DB-OC-PL-T-A-017-FL-R1 rain water pipe shown on drawing with out any size and not joint any where,
Please clarify.

Refer attached file.

B.o.q. only received, Please to provide Design drawings

Schematic shows WTP scheme already.Refer attached STP write up as discussed at site.

Shall update the legends.Plan remains same.

complete the drawings in all respect. This is incomplete for us

Refer Attched drawing.

Shall updated and revert.

be specific with dates ,you are taken many months to attend

Refer Attched drawing.

Fittings are part of drawing already shared.Will mention pipe sizes in drawing.

why sizes are missing all the time, jsutify your status

Refer Attched drawing.

Shall updated and revert.

be specific with dates ,you are taken many months to attend

Refer Attched drawing.

For riser only PN20 valves are used.Rest all are PN 16.

Please to provide pressure details at verious nodes in preciesly manner

Refer Revise Schematic.

14

Drawing no DB-OC-PL-T-A-40-R1 pipe size not mention on all pipe, so considered, please clarify.

15

Please provide the Valve schedule with details.

16

hydraulic calculation shall be provided for all pumps

Already Provide for all domestic and flushing pumps

Provided calculation is wrongly calculated, Please to provide with using correct


methodology.

Refer attched file.

17

Please to be provide drain stack/pipe size calculation

Shall revert.

be specific with dates ,you are taken many months to attend

Refer attched file.

18

Hydraulic calculation shall be provided for domestic water supply line

Shall revert.

be specific with dates ,you are taken many months to attend

Refer attched file.

19

Velocity breaker calculation shall be provided.

Shall revert.

be specific with dates ,you are taken many months to attend

20

PDA is to propose the driver toilets for MCPL( In co-ordination with AHC) fordetailedpiping and scheme.
Tentatively in the non tower area.

21

Rain Harwesting scheme required and BOQ

22

Will plan the services as per toilet locations.Toilet proposal to be done by AHC or DB.

Not Required.
Noted & Closed.

Agreed, Again corresponded documents showns only Rain water storage tank, Hence
requested you to provide details for Rain water harweting (As discussed with you at
our site office 3rd march)

We discussed and given the BOQ for Rain water pipe separately.Harvesting not
considered.Only Storage

PDA to revisit D.W.S. schematic for finalized location of PRV to meet require working pressure.

incomplet

Refer attached schematic & sheet

23

Hydropneumatic Pump working sequence shall be provide.

incomplet

Refer attached sequence.

24

Pda to revisit cutout size as some of them are bigger then requirment

incomplet

Will send sketch for your review.

25

PDA to specify accepted maximum sound level for all pumps.

incomplet

Around 78 dBA @ 1 mtr distance.

Note :- Above query is applicable for both the tower.

Please refer tender submitted.Its part of tender submitted.We plan as per Rain water storage tanks.