L&T-VALDEL

ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 2 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

TABLE OF CONTENTS
DESCRIPTION
PART-1

SL. NO.

REV NO: C1

PAGE NO.

[
]

1.0

REVISION STATUS SHEET

[
]

2.0

SUMMARY DESCRIPTION OF SUPPLY

[
]

3.0

VENDOR DOCUMENT REQUIREMENT SCHEDULE (VDRS)

[
]

4.0

QC PROGRAMME REQUIREMENTS

[
]

5.0

INSPECTION REQUIREMENT TABLE (IRT)

[
]

6.0

INSTRUCTIONS TO BIDDERS/VENDORS AND FORMS

9 12

[
]

7.0

[
] A, [
] B, [
] C, [
] D, [
] E, [
] F, [
] G, [
] H,[ ] I, [ ] J, [
] K

13 23

[
]

8.0

ADDITIONAL/TECHNICAL NOTES

24 26

[ ]

9.0

SPARE

[ ]

10.0

SPARE

[ ]

11.0

SPARE

[
]

12.0

INDEX TO ATTACHMENT

[ ]

12.1

MECHANICAL

[ ]

12.2

ELECTRICAL

[ ]

12.3

INSTRUMENTATION

[ ]

12.4

PIPING

[ ]

12.5

PROCESS

[
]

12.6

STRUCTURAL

[ ]

12.7

PIPELINES

[
]

12.8

VENDOR DOCUMENTS

56

27

28 58
59 101

PART-2
[ ]

13.1

MECHANICAL

[
]

13.2

ELECTRICAL

102 114

[ ]

13.3

INSTRUMENTATION

[ ]

13.4

PIPING

[ ]

13.5

PROCESS

[ ]

13.6

STRUCTURAL

[ ]

13.7

PIPELINES

[
]

13.8

GENERAL SPECIFICATION & STANDARDS

LEGEND :

= INDICATES THE DOCUMENTS ATTACHED (REPLACE [ ] WITH  WHERE APPLICABLE)


LTV5095/0 C12014

115 133

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT

PAGE : 3 OF 133
CONTRACT No.: C12014

REQN. FOR: CATHODIC PROTECTION SYSTEM

DOC. No.:C12014-75-504

REVISION STATUS SHEET


PAGE
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

REV.

ADDL.
PAGE NO.

C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
Attach(28-133)

REV.

PAGE
NO.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

REV.

ADDL.
PAGE NO.

REV NO: C1
REV.

PAGE
NO.

REV.

ADDL.
PAGE NO.

REV.

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

NOTE: IF REVISION REQUIRES ADDITIONAL PAGES TO BE INSERTED IN BETWEEN THE DOCUMENT, THE NUMBER OF THE PAGE
AT INSERTION SHALL BE NUMBERED WITH DECIMAL (e.g. INSERTION BETWEEN PAGE 10 AND 11 SHALL BE NUMBERED AS 10.1,
10.2 ........)

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT

PAGE : 4 OF 133
CONTRACT No.: C12014

REQN. FOR: CATHODIC PROTECTION SYSTEM

DOC. No.:C12014-75-504

SUMMARY DESCRIPTION OF SUPPLY

REV NO: C1

The following Table gives a brief summary of items of supply covered under this requisition. It is not intended to be
exhaustive or complete. Vendor is bound by the scope of supply as detailed in this Material/Purchase Requisition sheets
and attachments as listed in the table of contents.
SL. NO.

ITEM NO.

QUANTITY

DESCRIPTION

B-127 WELLHEAD PLATFORM


DESIGN, MANUFACTURE, INCLUDING TESTING, PACKING &

1.

321*
A3560SOSP

SUPPLY OF LONG SLENDER STAND OFF TYPE SACRIFICIAL


ANODES

FOR B-127 WELLHEAD PLATFORM

JACKET

STRUCTURE AND J-TUBE

B-55-5 WELLHEAD PLATFORM


DESIGN, MANUFACTURE, INCLUDING TESTING, PACKING &

2.
A3560SOSP

177*

SUPPLY OF LONG SLENDER STAND OFF TYPE SACRIFICIAL


ANODES

FOR

B-55-5

WELLHEAD

PLATFORM

JACKET

STRUCTURE

B-157 WELLHEAD PLATFORM


DESIGN, MANUFACTURE, INCLUDING TESTING, PACKING &

3.

250*
A3560SOSP

SUPPLY OF LONG SLENDER STAND OFF TYPE SACRIFICIAL


ANODES

FOR

B-157

WELLHEAD

PLATFORM

JACKET

STRUCTURE

ZC WELLHEAD PLATFORM

4.

305*

DESIGN, MANUFACTURE, INCLUDING TESTING, PACKING &


SUPPLY OF LONG SLENDER STAND OFF TYPE SACRIFICIAL

A3560SOSP

ANODES FOR ZC WELLHEAD PLATFORM JACKET STRUCTURE

VENDOR HAS ESTIMATED THE QUANTITY OF ANODES BASED


ON THE TENTATIVE SURFACE AREAS OF JACKET STRUCTURES
ATTACHED FOR EACH PLATFORM SEPERATELY. HOWEVER,
FINAL NUMBER OF ANODES SHALL BE BASED ON "APPROVED
FOR CONSTRUCTION" STRUCTURAL DRAWINGS.

LTV5095/0 C12014

ANODE DETAILS:
1)

ANODE MATERIAL

2)
3)

ANODE NET WEIGHT


ANODE GROSS WEIGHT

: GALVALUM -III OR
EQUIVALENT
[AL ALLOY (Al-Zn-In)]
: 356.0 Kg
: 413.2 Kg

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT

PAGE : 5 OF 133
CONTRACT No.: C12014

REQN. FOR: CATHODIC PROTECTION SYSTEM

DOC. No.:C12014-75-504

VENDOR DOCUMENT REQUIREMENT SCHEDULE (VDRS)

REV NO: C1

Requirement of document/No. of prints to be furnished by Vendor at Bid stage, after placement of Letter of Intent
(LOI)/order and Final document is given in the table below. It should be understood that Vendor has to keep furnishing the
stated no. of copies of document meant for Review/Approval till the document are finally approved.
WITH
BID

DOCUMENT
DESCRIPTION

SL.NO.

FINAL
DOC .IN
DOSSIER

FORMAL SUBMISSION
AFTER LOI/ORDER

MANUFACTURING SCHEDULE

---

---

DULY FILLED-IN DATA SHEETS

---

---

DIMENSION
WEIGHT
AND
GENERAL
ARRANGEMENT DRAWINGS INDICATING
MOUNTING ARRANGEMENT DETAILS

---

---

MATERIAL OF CONSTRUCTION FOR VARIOUS


COMPONENTS/PARTS

---

---

DEVIATION LIST (FORM-B)

---

---

SPARE LIST (FORM C THRO F)

---

---

WEIGHT AND DIMENSIONAL DATA (FORM-G)

---

---

EQUIPMENT WEIGHT CERTIFICATE (FORM-H)

---

---

VENDOR DCI/MCI (FORM-I)

---

---

10

VENDOR DOCUMENT REVIEW (FORM-J)

---

---

11

CATALOGS, BROCHURE, ETC.

---

---

12

INSPECTION AND TEST PLAN

---

---

13

TYPE AND ROUTINE TEST


CERTIFICATES FOR ANODES

---

---

14

SURFACE PREP. & PAINTING PROCEDURE

---

---

15

SHIPPING & PACKING DOCUMENTS

---

16

INSPECTION RELEASE CERTIFICATE (IRC)

---

17

UNPACKING & PRESERVATION PROCEDURE

---

---

18

TESTING METHOD OF ANODES


DETAILS OF THE TEST PROCEDURE

---

---

REPORTS &

AND

LEGEND:
A
P
W
I
*

S -

FOR REVIEW AND APPROVAL


NO. OF PRINTS (INCLUDING CD/DVD)
NO. OF WEEKS FROM LOI/ ORDER
FOR INFORMATION
AT INSPECTION STAGE
SOFT COPY

LTV5095/0 C12014

M R ** -

MANDATORY DOCUMENTS
WITH DELIVERY
NO. OF REPRODUCIBLES
(REQUIRED FOR SIZES ABOVE A3)
EVERY MONTH

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT

PAGE : 6 OF 133
CONTRACT No.: C12014

REQN. FOR: CATHODIC PROTECTION SYSTEM

DOC. No.:C12014-75-504

VENDOR DOCUMENT REQUIREMENT SCHEDULE (VDRS)

DOCUMENT
DESCRIPTION

SL. No.

WITH
BID

REV NO: C1
FINAL
DOC. IN
DOSSIER

FORMAL SUBMISSION
AFTER LOI/ORDER

19

MANUFACTURING DATA BOOK

---

---

20

HSE & QUALITY PLAN

---

---

21

PROGRESS REPORT

---

**

---

22

LIST OF PREVIOUS SIMILAR EXPERIENCE

---

---

23

LIST OF BOUGHT OUT ITEMS

---

---

24

MECH. WARRANTY

---

---

25

INSTALLATION, OPERATING AND


MAINTENANCE INSTRUCTIONS

---

---

FINAL ACCEPTANCE TESTING AND


PERFORMANCE TEST REPORT
GUARANTEED MINIMUM ELECTRO
CHEMICAL VALUE IN AMPERE-HR PER KG
(CERTIFICATE)
NET & GROSS WT. OF ANODE IN AIR AND IN
SEA-WATER

---

---

---

---

---

---

29

MINIMUM CLOSED CIRCUIT POTENTIAL IN


VOLTS (CERTIFICATE)

---

---

30

RECOMMENDED MEANS OF ANODE SUPPORT

---

---

31

ANODE COMPOSITION (PERCENTAGE


WEIGHT & VOLUME)

---

---

32

CALCULATION OF ANODE QUANTITY BASED


ON CURRENT & WEIGHT METHOD

---

---

33

ANODE DISTRIBUTION DRAWING

---

---

34

BEM ANALYSIS REPORT

---

---

26
27
28

NOTES:
1.

VENDOR TO COMPLY WITH THE VENDOR DATA REQUIREMENTS LISTED HEREIN.

2.

THE VENDOR SHALL BE HELD RESPONSIBLE FOR FURNISHING ALL DATA / DRAWINGS IN PROPER FORM AND QUALITY
IN ACCORDANCE WITH THESE REQUIREMENTS. THE VENDOR SHALL ALSO BE ACCOUNTABLE FOR DOCUMENTATION
REQUIRED FROM HIS SUB VENDOR.

3.

EACH VENDOR DATA ITEM REQUESTED ABOVE MUST BE IDENTIFIED BY THE PURCHASE ORDER NUMBER AND
EQUIPMENT TAG NUMBER LOCATED ON THE COVER SHEET OR FIRST PAGE OF SAID ITEM AND IN CASE OF
ENGINEERING DRAWING ON EACH AND EVERY DRAWING.

4.

ANY ADDITIONAL DATA / DRAWINGS REQUIRED AS A RESULT OF ISSUING SUPPLEMENTS TO A PURCHASE ORDER OR
DURING ENGINEERING SHALL BE FURNISHED BY VENDOR AND HANDLED IN THE SAME MANNER AS ORIGINAL ORDER.

5.

ALL DRAWINGS AND LITERATURES SHALL BE IN THE ENGLISH LANGUAGE AND SI MEASUREMENT SYSTEM.

6.

THE REPRODUCIBLE DRAWINGS, 297mm X 432mm (11 x 17) SIZE AND FULL SIZE ARE TO BE OF SUCH QUALITY THAT
CLEAR LEGIBLE PRINTS CAN BE MADE WITH REPRODUCTION FACILITIES.

7.

VENDOR TO SUBMIT SOFT COPIES OF ALL DOCUMENTS ALONG WITH EACH SUBMISSION AND ALSO AS BUILT
DRAWINGS IN CD-ROM

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 7 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

QC PROGRAMME REQUIREMENTS

REV NO: C1

The following QC programme is a broad outline of Purchasers Requirement. Vendor should take note of this at
the time of submitting his quotation as these requirements would be valid after placement of order.
1.
(a) Provisional Quality Plan to be submitted with tender documents for
approval/information.

[ ]

Yes

[
]

No

(b) Specific Quality Plan to be submitted after order placement. for approval as
per category

[
]

Yes

[ ]

No

2.

Major sub-vendors to be approved prior to commitment of purchase order.

[
]

Yes

[ ]

No

3.

Pre-production meeting to be held in PURCHASER'S office within 2 weeks of


receipt of approved Specific Quality Plan.

[
]

Yes

[ ]

No

a) Vendor's and/or sub-vendor's QC to be monitored by Purchaser throughout


execution of order.

[ ]

Yes

[
]

No

b) Vendor's and/or sub-vendor's QC to be monitored by Purchaser only on a


random basis.

[
]

Yes

[ ]

No

5.

Specific stage QC activities to be witnessed by Purchaser and TPI / CA which will


be Specified after review of VENDOR'S specific Quality Plan.

[
]

Yes

[ ]

No

6.

Purchaser to witness final testing.

[
]

Yes

[ ]

No

7.

This material is subject to independent inspection by TPI & CA as per Inspection


Categories

[
]

Yes

[ ]

No

4.

[ ]

Stage & Final Inspection by CA / TPI for Category A items

[ ]

Final Inspection by CA / TPI for category B items

[
]

Final Inspection by TPI for category C items

[ ]

Certificate/Test Report Review by Purchaser / TPI / CA for category bulk items

[ ]

Indicates option/Inspection Category

Legends :
CA Certification Agency Appointed by ONGC
Q Quality Control
TPI - Third Party Inspection Agency
TBA To Be Announced

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 8 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 9 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

INSTRUCTIONS TO VENDORS

REV NO: C1

This document outlines general information, instructions and requirements to be complied by Vendors.
1.0

DEFINITIONS

COMPANY/OWNER

OIL AND NATURAL GAS CORPORATION LTD, INDIA

PURCHASER/CLIENT

LARSEN & TOUBRO LIMITED, E&C UPSTREAM, INDIA

PURCHASER'S CONSULTANT

L&T-VALDEL ENGINEERING LTD, INDIA

VENDOR

M/S TRI-STAR INDUSTRIES PTE LTD

MATERIAL / PURCHASE

It is a comprehensive term meant to cover all documents, data


sheets, specification, drawings, standards, codes etc. which are
enclosed with the requisition.

.
REQUISITION
2.0

GENERAL INSTRUCTIONS

2.1

The language for all correspondence, documents, drawings, Instructions, Manuals etc. shall be English and they
shall state the name of Company, Purchaser, Project Title, Contract No., Requisition Number, Item number and
Service, Title / Description of item etc. as appropriate.
All revised documents/drawings submitted by vendor to the purchaser till final Review/approval is obtained shall
be at no additional cost and/or time to the purchaser.

2.2

2.3

Metric system (MKS/SI Systems) shall be used for documents/drawing/measurement unless otherwise specified.

2.4

The documents furnished shall be in standard A0, A1, A3, A4 sizes.

2.5

Vendor should send all documents in required number of copies and all other correspondence to
NAME

:RAHUL MORE

DESIGNATION

:PROCUREMENT MANAGER, EMAIL: rahul_more@lntenc.com

ADDRESS

:3

RD

Floor EPC block, Gate no.1,Powai Campus, Sakhi Vihar Road, Mumbai 72

2.6

Final documents to be submitted in a dossier form for proper preservation/use.

3.0

REQUIREMENTS: AT BID STAGE (PART A) / AT ORDER STAGE (PART B)

3.1

GENERAL

3.1.1

Bids shall accompany answers to specific questions and requirements in part A, irrespective of whatever is stated
in the body of Vendor's quotation and/or covering letter.

3.1.2

Similarly, any reservation not explicitly highlighted as an answer to this requirement in part-B will not be binding
on purchaser/purchaser's consultant.

3.2

PART A- AT BID STAGE

3.2.1

Instructions while bidding


a)

Vendor shall clearly highlight deviations, if any, from specifications in Form'B' (enclosed) irrespective
of whatever is stated elsewhere in the offer. Any deviation not stated in above form will not be
considered and it will be presumed that vendor will comply with all other requirements stipulated in
the material requisition.

b)

Vendor shall make a specific mention in the covering letter of his bid that "all requirements stipulated in
bid documents of the material requisition, other than those specifically stated in deviation list covered in
Form 'B', shall be met".

c)

Vendor shall furnish answers to questions listed in enclosed Form A-Technical Questionnaire and
submit along with his offer. Also required with bid, Form C to G (as applicable) duly completed.

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 10 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

INSTRUCTIONS TO VENDORS

REV NO: C1

3.2.2

Documents to Accompany Bids

a)

Vendor will furnish documents in number of copies required as per VDRS.

b)

In addition to documents listed in VDRS, the Vendor shall furnish such additional documents which are essential
for safe and guaranteed operation and maintenance of the supplied equipment/material.

c)

It is normally presumed that all work connected with this Material Requisition would be handled at Vendors own
premises. However, if Vendor finds it unavoidable that certain portion be handled elsewhere at sub vendors
premises, then Vendor shall provide (1) names, (2) addresses (3) track records of such sub-vendors along with the
bid. Purchaser/Purchaser's Consultant reserves the right to accept or reject such sub-vendors. If the bid does not
contain this list, it will be presumed that entire work of this Material Requisition will be handled at the Vendors
premises only.

d)

List of bought out items like electric motors, instruments, control panels, valves, fittings, etc. needed for this
Material Requisition along with names, addresses and track records of respective sub-vendors, along with the bid.
Purchaser reserves the right to reject any sub-vendor. Vendor shall not change sub-vendors after placement of
order.

e)

If Vendor intends to avail services of outside party or consultant (s) for design, then the name, address and track
record of such consultant (s) should be submitted.

f)

The Vendor will submit a list of similar jobs handled in past by him along with the details of client, year of
completion and copies of any feedback information received by him from clients regarding the functioning of
equipment/material supplied by him.

g)

Personnel
Vendor shall provide competent and authorized technical and commercial representatives of all disciplines for
technical and commercial discussions at bid evaluation stage. Normally discussions will be held at purchaser's /
Consultant's office. A notice period of about 7 to 10 days for bidders will be given for such discussions.

3.3

PART 'B'-AT ORDER STAGE

3.3.1

Instructions upon placement of order

a)

Personnel
Vendor shall make available competent and authorized technical and commercial representatives for a kick-off
meeting prior to commencing work as per purchase order.
During design and/or manufacture if Purchaser/Purchaser's Consultant finds it necessary to discuss, some matters
relating to the order, then vendor shall provide competent and authorized technical and/or techno-commercial
personnel for such discussions. Such meetings are normally held at purchaser's/ purchase consultants premises.
Notice for such meetings in the above cases will be given as in Para 'g' above.

b)

If during design/detailed Engineering/manufacture of the ordered items the vendor discovers any
discrepancies/conflicts in the purchase requisition documents, he shall obtain clarification in writing from the
purchaser / purchaser's consultant before proceeding with the work.
In the event of errors occurring during manufacture, vendor shall alert the purchaser immediately giving all details.

c)

Vendors compliance to specification does not relieve him of his responsibility to provide equipment and
accessories of proper design to meet the operations, maintenance and safety requirement of supplied material.

d)

Vendor on whom the purchase order is placed is responsible for the due compliance of the order by himself his
manufacturer, sub-vendor, supplier etc.

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

INSTRUCTIONS TO VENDORS
e)

PAGE : 11 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

REV NO: C1

After placement of Purchase Order, the vendor shall abide by the requirements of the purchase requisition
documents except for the deviations accepted by the purchaser vide 'Form B' enclosed to the purchase requisition.
However during the execution of the order, the vendor feels that additional deviations are necessary for executing
the order, the vendor shall immediately request the approval of the purchaser and purchaser's consultant of the
proposed deviations giving the following details.
P.O. number and description.
P.O. item No., Tag No./Equipment No. etc.
Drawings and documents affected by the request.
Description and reason for request with enclosures as required.
Effect of this request on price and time schedule.
It should be clearly understood that the purchaser is not obliged to entertain and approve such requests from
Vendor. However in the interest of work purchaser may at his sole discretion entertain and approve such requests
partly or completely. Only after receipt of purchasers written approval the vendor should go ahead with the
deviation requested in keeping with the approval received.
If the requested deviation is not accepted by the purchaser the vendor shall be bound by purchase requisition
requirements.

3.3.2

Documents to be furnished after order

a)

All applicable drawings, data sheets, catalogues and other technical documents, in requisite number of copies, as
specified in "vendor data requirement schedule" shall be submitted.
Design calculations for equipment and sizing calculations for control and safety valves etc., shall also be submitted
for approval if specified.

b)

After completion of manufacture, final inspection and release for despatch, vendor shall submit in requisite number,
as specified in vendor data requirement schedule, "as built" drawings, data sheets duly signed by final inspection
authority, for inclusion into operation manual for the project to be compiled by purchaser/ consultant.

c)

Operation and maintenance manual(s) in requisite numbers shall be submitted along with equipment/supplies.

d)

List of spares, tools, tackles, installation aids, chemicals, initial fill of lubricants etc. supplied shall be submitted
along with despatch documents.

e)

Details of any facilities/accessories required for erection and/or pre-commissioning but not included in the vendors
scope of supply shall be furnished well in advance for erection and/or pre-commissioning.

f)

A consolidated list of all deviations raised and approved by purchaser and/or their authorized representatives during
execution of order shall be submitted prior to despatch of equipment. This list will also be attached as an annexure
to the "Operations and Maintenance Manual" to be submitted by vendor.

g)

Details of packing and protection provided for transportation of equipment to site shall be submitted. This
document should also contain detailed instructions for handling and storage at site.

h)

Equipment weight certificate as per Form H (enclosed) including 'COG' shall be sent along with equipment

4.0

SUPPLIES

a)

Vendor shall supply all commissioning spares, tools and tackles, initial fill of lubricants, chemicals and such
consumables along with main equipment.

b)

Items such as gaskets, gland packing seals etc. used during final testing, but needs to be changed before
commissioning shall be separately identified, packed, labelled and supplied along with main equipment.

c)

Any loose items and/or equipment which are to be fitted by vendor at site before commissioning shall be properly
identified, packed, labelled and supplied along with main equipment.

d)

Calibration aids, gases etc. that are in vendor's scope of supply shall also be supplied along with main equipment.

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 12 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

INSTRUCTIONS TO VENDORS

5.0

REV NO: C1

INSPECTION

Vendor shall have a system to ensure that all inspection, measuring and test equipment used to produce the product
ordered are calibrated and fit for use. Vendor shall do all that is necessary to comply with purchase requisition
document with regard to Inspection/Quality Control requirements, submission of reports, certificates etc. and
provide every assistance for inspection / witnessing of tests by purchaser's representative or by a third party
appointed by purchaser.
Company/Purchaser's representative shall have the right to reject any material/equipment that is found to be of
unacceptable quality or workmanship or fails to comply with purchase requisition requirements.
5.1

INSPECTION NOTICE

Vendor shall give purchaser a notice (as agreed during QA/QC review) of forthcoming 'Witness' and 'Hold'
activities.
The notice must be communicated by letter or telex and shall include the following.
-

Plant location and date on which the items will be ready for inspection.

The 'Witness' and/or 'Hold' activities to which the notice relates.

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 13 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 14 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 15 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 17 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 18 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 19 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 20 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 21 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 22 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

LTV5095/0 C12014

PAGE : 23 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT

PAGE : 24 OF 133
CONTRACT No.: C12014

REQN. FOR: CATHODIC PROTECTION SYSTEM

DOC. No.:C12014-75-504

ADDITIONAL/TECHNICAL NOTES
1.

REV NO: C1

SCOPE
The scope of supply shall include design, manufacture, testing, packing and supply of Sacrificial type Cathodic
Protection system without monitoring facility for B55-5, B-157, ZC Platforms Jacket Structures and B-127
Platform Jacket structure and J-Tube complete with Slender Stand Off type Sacrificial Anodes, mounting
accessories in accordance with Functional Specification for Offshore Structures FS 4001, Rev. 6.

2.

CODES AND STANDARDS


The applicable codes and standards to be followed are enlisted in attached specification.

3.

CONFLICT
In the event of conflict between Additional/Technical notes, Specification, Data sheets, Codes & Standards the
following order of priority shall govern.
i)

Additional / Technical notes

ii) Data sheets


iii) Specification
iv) Codes and Standards

4.

GENERAL/TECHNICAL REQUIREMENTS

1.1 Sacrificial Type Cathodic Protection System shall be provided for Offshore Jacket Structure of B55-5, B-157,
ZC Platforms and B-127 Platform comprising Jacket structure and J-Tube. The Cathodic Protection System
shall be without Monitoring Facility.

1.2 The Sacrificial Anode Cathodic Protection System Design, Selection, Installation and Testing shall be in
accordance with relevant standards, Recommended Code of Practices, Specification, Data sheets, Installation
Notes & Drawings. The CP System shall be designed for operating life of twenty five (25) years.

1.3 The basic parameters to be considered in CP system design for jacket structures as follows:
a)

Life of CP system

25 years

b) Sea Water Temperature

22.8C to 30C

c)

30 to 60 mts.(Approximate)

i) Anode Material

Galvalum-III or equivalent Mercury free


Al-Alloy(Al-Zn-In)

ii) Anode Type

Long Slender-Standoff

Water Depth

d) Anode Details

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT

PAGE : 25 OF 133
CONTRACT No.: C12014

REQN. FOR: CATHODIC PROTECTION SYSTEM

iii) Anode Output


(Electrochemical efficiency)
e)

DOC. No.:C12014-75-504

2500 Ah/kg

Current density
i) For steel structure in sea water:

f)

Initial

130 mA / m

Design(Average)

107.65 mA / m

Final

130 mA / m

ii) For steel structure below mudline

43.05 mA / m

iii) Current Drain per well

5A/well

No. of wells/Platform
-

B-127

9 Nos

B55-5

3 Nos

B-157

3 Nos

ZC

12 Nos

g) Sea Water resistivity

20 ohm-cm

h) Sea mud resistivity

40 ohm-cm

i) Initial

250 mV

ii) Design (Average)

150 mV

ii) End Life

250 mV

Anode utilization factor

As per DNV-RP-B401

As per Cl. No. 6.4 and also as per


Table.10-4 Surface Area with Protective of
DNV-RP-B401(Painting Category-III)

i)

j)

Driving Potential

k) Coating Breakdown factor

1.4 Vendor shall consider the Surface area for B-127, B55-5, B-157 and ZC Platforms as indicated in
ANNEXURE-1/2/3/4 attached.

1.5 Vendor shall supply Mounting Accessories as required for slender standoff Anodes. Vendor shall furnish
Anode Installation Drawing along with the Bill of Materials for mounting accessories required for Anode
Installation. The mounting accessories shall be supplied by the Purchaser.

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 26 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

1.6 ANODE MASS CALCULATION


The Total Net Mass (kg) required to maintain Cathodic Protection of Jacket Structure for the specified Design
Life shall be calculated. However Design Calculations to check the capability of Anodes for providing the
required Current Demands for the Jacket Structure Protection at Initial (0% consumed), Midlife (45%
consumed) and Near End Life (90%consumed) shall be carried out considering the Design Current Densities
and Design Utilization Factors indicated above.

1.7 Vendor shall submit Anode Location and Distribution Drawings for Purchaser/Owners Review/Approval.
1.8 Complete calculations shall be submitted to Purchaser/Owner for Review/Approval.

1.9 Vendor shall furnish all Drawings and Documents as listed in Vendor Document Requirement Schedule
(VDRS) for Review/Approval after the Placement of Order.

1.10 Anodes distribution on structural members of jackets shall be based on advanced computer modeling
techniques such as Boundary Element Method (BEM) to ensure uniform current distribution.

1.11 Vendor shall consider 10% contingency on the total Surface Area indicated in the Data sheet while
calculating the total number of anodes.
1.12 The Vendor shall note that the Details of Surface Area of Structure given in the Data sheets are indicative. It
shall be responsibility of Vendor to calculate the Total Surface Area of Structure to be protected from the
detailed Approved for Construction Structural drawings.

1.13 Vendor shall have final and total unit responsibility for the design and performance of all equipment
furnished by him.

LTV5095/0 C12014

L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM

PAGE : 27 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504

INDEX TO ATTACHMENTS

REV NO: C1

Equipment/Material specified in this requisition shall be supplied in strict accordance with the following attachments and
other documents referenced therein except where noted otherwise. Any conflicts shall be brought to the attention of the
purchaser for formal resolution.
SUB
SEC.

Sl.No.

DOCUMENT DESCRIPTION

DOCUMENT
No.

No. OF
SHEETS

DOC.
REV.

04

27

C1

43

FS 4001

13

PART -1
12.6

STRUCTURAL
1.
2.

12.8

ANNEXURE 1/2/3/4: SURFACE AREA OF JACKET


STRUCTURES FOR B-127, B55-5,B-157 & ZC PLATFORMS
JACKET STRUCTURE DRAWINGS FOR B-127, B55-5,B-157 &
ZC PLATFORMS

VENDOR DOCUMENTS

PART -2
13.1

ELECTRICAL
1.

13.8

FUNCTIONAL SPECIFICATION FOR CP SYSTEM FOR


OFFSHORE STRUCTURES

GENERAL SPECIFICATION AND STANDARDS


1.

GENERAL SPECIFICATION FOR DEFINITION

FS 1050

07

2.

GENERAL SPECIFICATION FOR VENDOR DATA


REQUIREMENTS

FS 1060

12

LTV5095/0 C12014

Page 28 of 133

PAGE NO.:
B-127 PLATFORM
JACKET SURFACE AREA

L&T VALDEL
ENGINEERING LTD

CONTRACT NO.: C12014


SHEET 1 OF 1

DOC.NO.:

C12014-SA-002

PROJECT:

B-127 CLUSTER WELL PLATFORM PROJECT

PREPD.:

JGG

CHKD.:

HVS

APPD.:

HVS

DATE:

10/18/2012

DATE:

10/18/2012

DATE:

10/18/2012

Platform Designation:

ANNEXURE-1
B-127 PLATFORM

LOCATION

SURFACE AREA IN SQ.M

REMARKS

A) IN SUBMERGED ZONE EL (-)1.80M to EL (-)46.60M


i) CONDUCTORS
ii) HORIZONTAL FRAMES
iii) ELEV. BRACES + JKT LEGS

1029.85
4819.16

iv) CONDUCTORS GUIDES

164.20

v) MUD MAT-STIFFENERS(above mudline)

400.00

vi) J - TUBE

81.00

TOTAL

Tentative

6494.21

B) IN SPLASH ZONE (Painted Area) EL (+)6.00M to EL (-)1.80M

i) ELEVATION BRACES + JACKET LEGS

470.46

Does not include future facilities


like protectors and conductors

ii) BOAT LANDING

350.00

Tentative

iii) J - TUBE

0.00

iv) CONDUCTORS

172.36

TOTAL

992.82

C) BELOW MUDLINE
i) PILES
ii) LEG EXTENSIONS

2921.28
82.30

iii) MUD MAT PLATES

3500.00

iv) CONDUCTORS

646.35

TOTAL

7149.93

GRAND TOTAL

14636.96

NOTES:
1. 10% contingency shall be added in the surface area listed above.
2. For Piles and Conductors, 30 m length below the mudline is considered.
3. For Skirt Piles, inside surface area has also been considered, as per bid.
4. MUDMAT has not been planned, above nos are assumed.
5. Surface area projected above do not include future facilities.

Tentative

REV. D2

Page 29 of 133

PAGE NO.:
L&T VALDEL
ENGINEERING LTD

SURFACE AREA FOR B-55-5 JACKET CP


SYSTEM

CONTRACT NO.:
SHEET 1 OF 1

DOC.NO.:
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PREPD.:

RL

CHKD.:

NP

APPD.:

VV

DATE:

21/08/2012

DATE:

21/08/2012

DATE:

21/08/2012

ANNEXURE-2
Platform Designation: B55-5 Platform
LOCATION

SURFACE AREA IN SQ.M

A) IN SUBMERGED ZONE EL (-)1.80M to EL (-)31.60M


i) CONDUCTORS

221.1

ii) HORIZONTAL FRAMES

761.1

iii) JKT LEGS

833.7

iv) ELEV. BRACES

800.9

v) CONDUCTORS GUIDES

16.5

vi) MUD MAT-Beam,STIFFENERS(above mudline)

1836

vii) RISERS

17.4

viii) BOAT LANDING

21.6

TOTAL

4508.29

B) IN SPLASH ZONE (Painted Area) EL (+)6.00M to EL (-)1.80M

i) JACKET LEGS

209.00

ii) ELEVATION BRACES

91.30

iii) BOAT LANDING

53.40

iv) RISER GUARD

0.00

v) RISER

3.90

vi) RISER GUIDES

1.00

vii) CAISSONS

0.00

viii) CONDUCTORS

56.10

ix) CONDUCTOR PROTECTOR

0.00

TOTAL

414.70

C) BELOW MUDLINE
i) PILES (EXTERNAL AREA UP TO 30M BELOW
MUDLINE)

746.89

ii) LEG EXTENSIONS

27.11

iii) MUD MAT PLATES

833.01

iv) CONDUCTORS ( EXTERNAL AREA UP TO 30M


BELOW MUDLINE)

215.45

TOTAL

1822.46

Total

6745.44

NOTES:

1. 10% contingency shall be added in the surface area listed above.


2. For Piles and Conductors 30 m length below the mudline is considered.

REMARKS

REV. D1

Page 30 of 133

PAGE NO.:
L&T VALDEL
ENGINEERING LTD

SURFACE AREA FOR B-157 JACKET CP


SYSTEM

CONTRACT NO.:
SHEET 1 OF 1

DOC.NO.:
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PREPD.:

NP

CHKD.:

VV

APPD.:

VV

DATE:

22/08/2012

DATE:

22/08/2012

DATE:

22/08/2012

Platform Designation:

ANNEXURE-3
B-157 PLATFORM

LOCATION

SURFACE AREA IN SQ.M

A) IN SUBMERGED ZONE EL (-)1.80M to EL (-)53.60M


i) CONDUCTORS

372.00

ii) HORIZONTAL FRAMES

893.00

iii) ELEV. BRACES + JKT LEGS

2801.40

iv) CONDUCTORS GUIDES

20.00

v) MUD MAT-STIFFENERS(above mudline)

2531.00

vi) RISERS

28.00

TOTAL

6645.40

B) IN SPLASH ZONE (Painted Area) EL (+)6.00M to EL (-)1.80M

i) ELEVATION BRACES + JACKET LEGS

340.40

ii) BOAT LANDING

75.00

iii) RISER GUARD

iv) RISER

4.22

v) RISER GUIDES

0.00

vi) CAISSONS

vii) CONDUCTORS

57.50

viiI) CONDUCTOR PROTECTOR

TOTAL

477.12

C) BELOW MUDLINE
i) PILES

690.00

ii) LEG EXTENSIONS

25.00

iii) MUD MAT PLATES

1165.00

iv) CONDUCTORS

215.00

TOTAL

2095.00
ALL TOTAL

9217.52

NOTES:

1. 10% contingency shall be added in the surface area listed above.


2. For Piles and Conductors 30 m length below the mudline is considered.
3. Cassions and J tubes not considered.

REMARKS

REV. D1

Page 31 of 133

PAGE NO.:
L&T VALDEL
ENGINEERING LTD

SURFACE AREA FOR ZC JACKET CP SYSTEM CONTRACT NO.: C12014

SHEET 1 OF 1
DOC.NO.: C12014
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PREPD.:

PN

CHKD.:

SJ

APPD.:

HVS

DATE:

9/14/2012

DATE:

9/14/2012

DATE:

9/14/2012

Platform Designation:

ANNEXURE-4
ZC PLATFORM

LOCATION

SURFACE AREA IN SQ.M

REMARKS

A) IN SUBMERGED ZONE EL (-)1.80M to EL (-)78.60M


i) CONDUCTORS

1470.00

ii) HORIZONTAL FRAMES

5660.00

iii) ELEV. BRACES + JKT LEGS


iv) CONDUCTORS GUIDES

236.00

v) MUD MAT-STIFFENERS(above mudline)

150.00

vi) RISERS

183.00

TOTAL

7699.00

Tentative

B) IN SPLASH ZONE (Painted Area) EL (+)6.00M to EL (-)1.80M

i) ELEVATION BRACES + JACKET LEGS


447.00
ii) BOAT LANDING

Does not include future


facilities like protectors and
conductors

282.00

iv) RISER

19.00

vii) CONDUCTORS

150.00

TOTAL

898.00

C) BELOW MUDLINE
i) PILES

772.00

ii) LEG EXTENSIONS

21.00

iii) MUD MAT PLATES

1200.00

iv) CONDUCTORS

575.00

TOTAL

2568.00
ALL TOTAL

11165.00

NOTES:

1. 10% contingency shall be added in the surface area listed above.


2. For Piles and Conductors 30 m length below the mudline is considered.
3. MUDMAT has not been planned, above nos are assumed.
4. Surface area projected above do not include future facilities.

Tentative

REV. D1

Page 32 of 133

Page 33 of 133

Page 34 of 133

Page 35 of 133

Page 36 of 133

Page 37 of 133

Page 38 of 133

Page 39 of 133

Page 40 of 133

Page 41 of 133

Page 42 of 133

Page 43 of 133

Page 44 of 133

Page 45 of 133

Page 46 of 133

Page 47 of 133

Page 48 of 133

Page 49 of 133

Page 50 of 133

Page 51 of 133

Page 52 of 133

Page 53 of 133

Page 54 of 133

Page 55 of 133

Page 56 of 133

Page 57 of 133

Page 58 of 133

Page 59 of 133

VENDOR DOCUMENTS
TABLE OF CONTENTS

SL.No.

DOCUMENT DESCRIPTION

DOCUMENT No.

No.of
SHEETS

1.

Aluminum Anode-A3560SOBp

DWG-AL-SOBP-001

01

2.

Data Sheet for CP System for Offshore Structures

DS 4001 Rev. 0

02

3.

Design Calculation of Sacrificial Anode Cathodic Protection


System

DC-AL-SOBP-LNTONGC-B127

05

4.

Certification of Calibration

UCT/IS-MS/12C386

02

5.

DIMET Cathodic Protection Job Reference List


October 2012

32

Page 60 of 133

Page 61 of 133

Page 62 of 133

Page 63 of 133

TRI-STAR INDUSTRIES PTE LTD

DESIGN CALCULATION
OF SACRIFICIAL ANODE
CATHODIC PROTECTION SYSTEM

Project Name:

ONGC B127 WELLHEAD PLATFORMS PROJECT


Contractor:

LARSEN & TOUBRO LIMITED


Owner:

OIL AND NATURAL GAS CORPORATION LTD , INDIA


Vendor Reference:

DOCUMENT NO. DC-AL-SOBP-LNT-ONGC-B127

A
REV

ISSUED FOR APPROVAL


DESCRIPTION

SAW
BY

CHRIS
CHECK

LHJ
APPR.

02 NOV 2012
DATE

CO. APPR.

Page 64 of 133

Page 65 of 133

Page 66 of 133

Page 67 of 133

Page 68 of 133

Page 69 of 133

Page 70 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

Vung Tau Trading Technical Services


Corporation

Premier Oil Dua Subsea Tie - Back Development Project

YEAR
2012

Supply Sacrificial Aluminium Structure Anodes

PT Gunanusa Utama Fabricators

Total E&P Indonesia

2012

Sisi Nubi Phase 2B and Peciko Phase 7B Development Project


Design and Supply Sacrificial Aluminium Jacket Anodes
Vietsovpetro

Lam Son Joint Operating Company (LSJOC)


Thang Long - Dong Do Field Development Project - EPCI Tang
Long - Dong Do Jackets
Supply of Sacrificial Aluminium Jacket Anodes

2012

PTSC Mechanical & Construction Ltd

Lam Son Joint Operating Company (LSJOC)


Thang Long - Dong Do WHP Topsides and Infield Pipeines EPCI
Project
Supply of Offshore Pipeline Aluminium Bracelet Anodes

2012

Nippon Steel Engineering Co. Ltd

PTTEP
PTTEP Bundled Phase A2B Inst Project
Supply of Offshore Pipeline Aluminium Bracelet Anodes

2012

Hyundai Engineering & Construction Co., Ltd

JTC
Jurong Rock Cavern Project
Design, Supply and Installation Supervision for Underground
Cavern and Aboveground Pipelines

2012

Multi Fibre Sdn Bhd

Shell
Shell Prelude WCS
Supply of Sacrificial Aluminium Jacket Anodes for Deepsea
Structure

2012

Sakhalin Energy Investment Company Ltd

Sakhalin LNG Project


Supply of Sacrificial Aluminium Jacket Anodes

2012

JGC Singapore Pte Ltd

Malaysia LNG Sdn Bhd


MLNG Rose Project
Design and Supply of Sacrificial Anode System for Underground
Pipelines

2012

PT Inti Karya Persada Tehnik (IKPT)


Engineering & Construction

PT Pupuk Kalimantan Timur


Kaltim-5 Project 2500 MTPD Ammonia And 3500 MTPD

2012

Design, Supply, Installation and Commissining Impressed Current


Cathodic Protection System for Buried In-Plant Piping (CP02)

Dolphin Offshore Enterprises (India) Ltd

ONGC - Oil & Natural Gas Corporation Ltd


Offshore Grid Interconnectivity Project(OGIP)-Power to ESP
Project - Cathodic Protection for WIN Cluster, MSP Cluster,
MNW Cluster, ICP Cluster & SHW Cluster
Supply of Sacrificial Aluminium Segmented Bracelet Anodes

2012

PT Bredero Shaw Indonesia

Inpex Browse Ltd


Ichthys Project
Supply of Offshore Pipeline Aluminium Bracelet Anodes

2012

Thai Nippon Steel Engineering & Construction

PTT Exploration and Production Company Limited (PTTEP)

2012

Corp., Ltd

PTTEP Generic Wellhead Platform - Bundle Phase 3K & 4B

Page 71 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Supply Sacrificial Aluminium Jacket Anodes


PT Bakrie Construction

Pertamina Hulu Energy (PHE)


West Madura Offshore Project
Supply of Sacrificial Aluminium Jacket Anodes

2012

PPL Shipyard Pte Ltd

P2037 / P2038/P2039 Jack-Up Rig


Supply of Aluminium Structural Anodes

2012

Technip Asiaflex Products Sdn Bhd

Murphy Sabah Oil Co Ltd


Gumusut Kakap Interim Crude Evacuation System Kikeh Tie
Back
Supply of Aluminium Bracelet Anode for Pipeline and Riser

2012

Subsea Structure Pte Ltd c/w

Shell Philippines Exploration B.V.- Cameron International M'sia


Shell Malampaya Phase II Project
Supply Sacrificial Aluminium Structure Anode for Deepsea
Supply of Sacrificial Aluminium Anodes for Pressure Vessel

2012

PT Tripatra Engineers & Constructors

PT Perta - Samtan Gas


South Sumatra NGL Project
Design, Supply, Installation and Commissioning Sacrificial Anode
Cathodic Protectin System for Underground Pipelines

2012

MODEC Offshore Production Systems (Sing)


Pte Ltd

MODEC / OSX 3 Leasing B.V.

2012

MODEC OSX 3 FPSO Project


Design and Supply Sacrificial Aluminium and High Temperature
Zinc Anode for Tanks, Sea Chests, Seawater LIft Pump Caisson
and Heating Coils
National Petroleum Construction Co. (NPCC)

ONGC
EPC for 5 Well Platforms for Development of WO-16 Cluster
and SB-14 Wellhead Platform Project
Supply of Sacrificial Aluminium Jacket Anodes

2012

Joffren Omar Company Sdn Bhd

Brunei Shell Petroleum Company Sdn Bhd


Chamion Waterflood Project
Supply of Sacrificial Aluminium Jacket Anodes

2012

Joffren Omar Company Sdn Bhd

Brunei Shell Petroleum Company Sdn Bhd


Osprey Development and Bulan-Bulan Development Project
Supply of Sacrificial Aluminium Jacket Anodes

2012

Malaysia Marine and Heavy Engineering S/B

ExxonMobil Exploration & Production Malaysia Inc.(EMEPMI) &


Petronas Carigali Sdn Bhd (PCSB)
Tapis Q Jacket / Telok A & B Jacket Project
Supply of Sacrificial Aluminium Jacket Anodes

Premier Oil Natuna Sea B.V.

Premier Oil Natuna Sea B.V.


Naga Wellhead Platform (NWP) and Pelikan Wellhead Platform
(PWP) Project
Supply of Sacrificial Aluminium Jacket Anodes

2012

Kencana HL Sdn Bhd

Carigali Hess Operating Company Sdn Bhd


EPS Kamelia-A Wellhead Platform & Pipelines
Supply of Sacrificial Aluminium Jacket Anodes

2012

MMHE - ATB Sdn Bhd

Petrofac (Malaysia-PM304) Ltd

2012

2011/2012

Page 72 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Fabrication 5 Unit PV For Cendor CDP-A Project


Kencana HL Sdn Bhd

Murphy Oil
EPC of Serendah & Patricia Satellite (PT-SA) Substructure for
SK309/311 Sarawak Development Project
Supply of Sacrificial Aluminium Jacket Anodes

Karatec Resources Sdn Bhd

SCG Chemicals Co. Ltd


The Extension of RTC Project at Map Ta Phut, Thailand
Supply of Sacrificial Aluminium Jetty Anodes

Vietsovpetro Joint Venture

Vietsovpetro
Anodic Protection of the Uncoated Jacket of Offshore
Platforms GT1 & MT1
Supply of Sacrificial Aluminium Jacket Anodes

2011/2012

2011

2011/2012

Larsen & Toubro Limited

PTTEPI International LImited


Zawtika Development Project Phase 1A
EPCIC of Zawtika Wellhead Platforms 1,2 & 3 with Sea Lines
Supply of Sacrificial Aluminium Jacket Anodes

2011/2012

Larsen & Toubro Limited

Gujarat State Petroleum Corporation Limited (GSPC)


GSPC Deen Dayal Field Development Project
(Process Cum Living Quarter Platform)
Supply of Aluminium Jacket Anodes and Monitoring System

2011/2012

Kencana HL Sdn Bhd

Petrofac (Malaysia-PM304) Limited


EPC of Wellhead Platforms (CDW-B & CDW-C) for
Cendor Phase 2 Development Project
Supply of Sacrificial Aluminium Jacket Anodes

2011

PTSC Mechanical & Construction Joint


Stock Company (PTSC M&C)

Thang Long Joint Operating Company


Hai Su Trang Full Field And Hai Su Den Early Production
System Development Project
Supply of Sacrificial Aluminium Jacket Anodes

2011

BP Exploration Operating Company Limited /


Ranhill WorleyParsons Sdn Bhd

BP Exploration Operating Company Limited


BP Lan Do Development, Block 06.1 Phase III Project
Supply of Sacrificial Aluminium Structure Anodes

2011

AGC Industries Pty Ltd

Chevron Australia Pty Ltd / JP Kenny


Gorgon Upstream Project
Supply of Sacrificial Aluminium Structure Anodes for Gorgon
Adjustable Pipe Support

2011

Carigali Hess Operating Company Sdn Bhd

2011

Thai Nippon Steel Engineering & Construction


Corp., Ltd

Provision of Fabrication, Hook-Up And Commisioning Services


For BUMI-B (BMB) And Cakerawala-D (CKD) Wellhead
Platforms Project
Supply of Sacrificial Aluminium Jacket Anodes

Kencana Torsco Overseas Sdn Bhd

Husky Liwan Offshore, China


Subsea Manifold of Fabrication Works for Husky Liwan
Offshore Development Project, China
Supply of Sacrifical Aluminium Jacket Anodes

2011

Kencana HL Sdn Bhd

Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)

2011

Fabrication of KBB Substructure for Kebabangan Northern Hub


Development Project

Page 73 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Supply of Sacrificial Aluminium Jacket Anodes


KZ Engineering Sdn Bhd

Perbadanan Bekalan Air Pulau Pinang

2011

Design, Supply, Installation & Commissioning of ICCP System


For Underground Water Pipelines from House Pump Berapit
To Bukit Mertajan Power Station
Overseas Technical Engineering and
Construction Pte Ltd

Denka Advantech Pte Ltd


40 KL LP6 Bullet Tank Project

2010/2011

Design, Supply, Installation & Commissioning of SACP System

Thai Nippon Steel Engineering & Construction

PTT Exploration and Production Company Limited (PTTEP)

2011

Corp., Ltd

Bundled Phases EPCI For Wellhead Platforms, Associated


Pipelines And Facilities Project
Supply Sacrificial Aluminium Jacket Anodes

Thai Nippon Steel Engineering & Construction

Carigali-PTTEP Operating Company Sdn Bhd

Corp., Ltd

CPOC Jengka B Remote (JKB) Wellhead Platform Project


Supply Sacrificial Aluminium Jacket Anodes

Keppel Fels Limited

ENSCO International
B329/B330 Super "A" Class Mobile Offshore Drilling Unit
Design & Supply of Sacrificial Anodes

2011/2012

Keppel Fels Limited

Maersk Drilling
B331/B332 Jack-up Rigs
Design & Supply of Sacrificial Anodes

2011/2012

Keppel Fels Limited

Standard Drilling Plc


B324/B325/B337/B338/B339/B340 "B" Class Jack-up Rigs
Design & Supply of Sacrificial Anodes

2011/2012

Keppel Fels Limited

Discovery Offshore
B322 & B323 Super "A" Class Jack-up Rig
Design & Supply of Sacrificial Anodes

PT Bredero Shaw Indonesia

BHP Billition Petroleum Pty Ltd / JP Kenny


Macedon Project
Supply of Sacrificial Aluminium Pipeline Anodes

PTSC Quang Ngai Co., Ltd

PetroVietnam
Bio-Ethanol Underground Pipeline Project

2011

2011

2011/2012

2011

Design, Supply, Installation and commissioning of SACP System


PPL Shipyard Pte Ltd

Atwood
P2033 Jack-Up Rig
Supply of Aluminium Structural Anodes

2011

PPL Shipyard Pte Ltd

P2035 Jack-Up Rig


Supply of Aluminium Structural Anodes

2011

CUEL Limited

Chevron Thailand Exploration & Production Ltd


Chevron Phase 41 / 42 / 43 / 44 Wellhead Platforms Project
Supply of Aluminium Jacket Anodes

Suasana Mentari Engineering services

Brunei LNG Sdn Bhd

2011 / 2012

2011

Page 74 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

BLNG Jetty Project


Supply Sacrificial Aluminium Anodes for Jetty Piles
Vietsovpetro Joint Venture

VSP's Submarine Oil, Gas & Gaslift Pipelines RC5 - RC6,


RC6 - RP1 & RC7 - RC3 Project
Supply Sacrificial Aluminium Pipeline Anodes

2011

PT Punj Lloyd Indonesia

Pertamina Hulu ENergi (PHE) ONWJ Ltd

2011

PT Sempec

APN E/F Pertamina PHE ONWJ New Field Development Project


Supply of Aluminium Jacket Anodes for 3 New NUI Platforms

Keppel Fels Limited

Jasper Investments LImited


B328 & B336 "B" Class Jack-up Rigs
Design & Supply of Sacrificial Anodes

2011

Vietsovpetro Joint Venture

Offshore RC-6 & RC-7 platforms


Supply of Aluminium Jacket Anodes

2011

PPL Shipyard Pte Ltd

Atwood
P2031 Jack-Up Rig
Supply of Aluminium Structural Anodes

2011

PPL Shipyard Pte Ltd

Atwood
P2032 Jack-Up Rig
Supply of Aluminium Structural Anodes

2011

CUEL Limited

PTTEP
CVX39-3204 Chevron Phase 39
Supply of Jacket Anodes

2011

PT McDermott Indonesia

Vetco Gray
Gorgon Upstream Project
Supply of Structural Anodes

2011

Sime Darby Engineering Sdn Bhd

ONGC

2011

ONGC B193 Process Platforms (AP/AQ), HP/LP Tripods Project


Supply of Aluminium Jacket Anodes
Aker Solutions

Petronas Carigali Sdn Bhd


Kanowit Project
Supply of Aluminium Anodes

2011

Keppel Fels Limited

Standard Drilling Ltd


B319 Jack-up Rig
Design & Supply of Sacrificial Anodes

2011

Keppel Fels Limited

Asia Offshore Drilling


B320/B321/B345 Jack-up Rig
Design & Supply of Sacrificial Anodes

2011/2012

Saipem-Leighton Consortium

Chevron Australia Pty Ltd / KBR


Gorgon Project Barrow Island LNG Plant
Supply of Aluminium Anodes & accessories

2011

Kencana HL Sdn Bhd

PCPP Operating Company Sdn Bhd


Fabrication of Dana Light Weight
Support Structure
Supply of Aluminium Anodes

2011

Page 75 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Keppel Fels Limited

Petrobras
P-61 TLWP
Supply of Aluminium Anodes

2010

Keppel Fels Limited

Seafox
B317 Multi-purpose Support Vessel
Design & Supply of Aluminium Anodes

2010

Hyundai Heavy Industry

DEP Myanmar
Shwe Project
Supply of Aluminium Bracelet Anodes

2010/2011

Vietsovpetro Joint Venture

Bracelet Anodes NW-140 & NW-53


Supply of Aluminium Anodes

Saipem Portugal

S10000 Drillship
Supply of Zinc Anodes

PT Cermerang

Bangka Jetty Project


Design and Supply Sacrificial Aluminium Anodes for Jetty

2010

PT Meindo Elang Indah

Betara Complex Development (BCD) 4 Project


Design and Supply ICCP System

2010

PT Sriboga Ratu Raya

Sriboga Jetty Project


Design and Supply of Sacrificial Anodes for Jetty

2010

PT Petromarine Subsea Services

Design and Supply of Sacrificial Anodes for Platforms

2010

PT Gearindo Prakarsa

Natuna Project
Design and Supply Sacrificial Anodes for Jetty

2010

PT Inti Karya Persada Tehnik (IKPT)

PT IKPT
Coal Boiler Plant Project
Design and Supply ICCP System

2010

SBM Offshore Malaysia

Noble Energy EG Ltd


Aseng FPSO - Turret
Supply of Aluminium Structural Andoes

2010

Larsen & Toubro Ltd

Gujarat State Petroleum Co Ltd (GSPC)


Deen Dayal Field Development Project - Wellhead Platform
Supply of Aluminium Jacket Anodes

2010

Kencana HL Sdn Bhd

New Field Peninsula


East Piatu Development Project
Supply of Aluminium Jacket Anodes

2010

PT Gunanusa Utama Fabricators

PTTEP
Bongkot Phase 4A Wellhead Platform
Supply of Aluminium Jacket Anodes

2010

Sapura Acergy Sdn Bhd

Sabah Shell Petroleum Co.

2010

2010

2010 / 2011

FLR Subsea Structures & Pipeline for Gumusut Kakap Project


Supply of Aluminium Jacket & Bracelet Anodes
CUEL

Chevron Thailand Exploration & Production Ltd


CVX39 Wellhead Platform Project
Supply of Aluminium Jacket Anodes

2010

Page 76 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Jurong Shipyard Ltd

Petrobras Netherland B.V.


P-62 FPSO
Supply of Aluminium Tank & Hull Anodes

2010

PTSC M&C

Hoang Long Joc


Te Giac Trang - H4 Wellhead Platform
Supply of Aluminium Jacket Anodes

2010

PTSC M&C

Bien Dong Petroleum Operating Company


Bien Dong 1 Project
Moc Tinh 1 Wellhead Platform, Hai Thach Wellhead
Platform & Process Quarters Platform
Supply of Aluminium Jacket Anodes

2010

Sime Darby Engineering Sdn Bhd

ONGC
B193 ONGC 5-Wellhead Platform Project
Supply of Aluminium Jacket Anodes

2010

NPCC

ONGC
RS12 ONGC Well Platform Project
Supply of Aluminium Jacket Anodes

2010

PT Gunaunsa Utama Fabricators

HESS
Ujung Pangkah Development Project
CPP & AUP
Supply of Aluminium Jacket Anodes

2010

PPL Shipyard Pte Ltd

P2030 Jack-Up Rig


Supply of Aluminium Structural Anodes

2010

PT Nippon Steel Batam

Petronas Carigali Myanmar (Hongkong) Limited (PCML)


Yetagun Phase 4 Project
Supply of Aluminium Jacket Anodes

2010

Keppel Shipyard Pte Ltd

Petrobras Netherlands B.V.


P58 FPSO Project
Supply of Aluminium and Zinc Anodes

2010

National Petroleum Construction Company


(NPCC)

ONGC
ONGC B22 Field Development Project
Supply of Aluminium Jacket Anodes

2010

Afcons-Gunanusa Joint Venture

ONGC
ONGC 1985 ICP-R Process Platform Pipeline Project
Supply of Aluminium Bracelet Anodes

2010

PT Saipem Indonesia

Premier Oil Natuna Sea BV


Gajah Baru Project - Submarine Pipelines and Platforms
Design and Supply Sacrifical Aluminium Bracelet Anodes,
Jacket Anodes and Structure Anodes

JGC Singapore Pte Ltd

Petrochemical Corporation of Singapore (PCS)


PCS Phase III Project

2009 / 2010

2009

Design, Supply, Installation & Commissioning of SACP System


Larsen & Toubro Ltd

ONGC
MHN Process Plaform & Living Quarters Project
Supply of Aluminium Jacket Anodes for Flare MNF1 & MNF2
Jacket

2009

Page 77 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Kencana HL Sdn Bhd

Shell
Fabrication of Manifold Support Structure (MSS)
Package Project
Supply of Aluminium Jacket Anodes

2009

PT Manferrostaal

Exxon Mobil
Banyu Urip Exxon Mobil Project
Design, Supply, Supervison and Commissioning ICCP system

2009

PT Gunanusa Fabricator

Peciko 6 Project
Design, Supply, Supervison and Commissioning ICCP system

2009

PT Nyndia Karya

CPO Jetty Project


Design, Supply, Installation and commissioning for SACP (Mg)
System

209

PT Terminal Peti Kemas

Terminal Peti Kemas Project


Sypply of Cathodic Protection Sacrifical Anode System

2009

CUEL Limited

Chevron
CVX37 / CVX37B Project
Supply of Aluminium Jacket Anodes

CUEL Limited

PTT Exploration & Production Public Company Limited


Arthit 1C Project
Supply of Aluminium Bracelet and Jacket Anodes

2009

PTSC Mechanical and Construction

Petronas Carigali Vietnam Limited


Topaz Project
Supply of Aluminium Jacket Anodes

2009

PTSC Mechanical and Construction

Hoang Long Joint Operating Company


Te Giac Trang Project
Supply of Aluminium Jacket Anodes

2009

Nippon Steel Engineering Co. Ltd.

PTT Exploration & Production Public Co. Ltd


Northern Arthit 3N Project
Supply of Aluminium Bracelet Anodes

2009

Nippon Steel Engineering Co. Ltd.

PTT Exploration & Production Public Co. Ltd


Bongkok Field Development
Phase 3H/4A Project
Supply of Aluminium Bracelet Anodes

2009

Leaton Construction Sdn Bhd

Malaysia Marine and Heavy Engineering


West Finger Pier Project
Supply and Installation of Aluminium Jetty Anodes

2009

Natco Japan Co. Ltd

MODEC
Jubilee Produced Water Treatment (PWT) System
Design and Supply of Aluminium Anodes

2009

Veolia Water Solutions And Technologies Pte

Total Exploration and Production

2009

Ltd

USAN Deepwater Development Project

2009/2010

Design and Supply of Aluminium Anodes for Pressure Vessels


Laksel EPS Technologies Pte Ltd

Oil & Natural Gas Corporation Ltd


ONGC Offshore Platform Project
Design and Supply of Aluminium Anodes for two Phase

2009

Page 78 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Cyclone Separator
CUEL Limited

PTT Exploration & Production Public Company Limited


Arthit 1C Wellhead Platform Project
Supply of Aluminium Jacket Anodes

2009

CUEL Limited

Carigali-PTTEPI Operating Company


Muda D Wellhead Platform Project
Supply of Aluminium Jacket Anodes

2009

Bredero Shaw (M) Sdn Bhd

Shell Sarawak Berhad


St Joseph Redevlelopment Project
Supply of Aluminium Pipeline Anodes

2009

Brooke Dockyard and Engineering Works


Corporation

Shell Sarawak Berhad


St Joseph Redevelopment Project
Supply of Aluminium Jacket Anodes

2009

PPL Shipyard Pte Ltd

Sinopec (China Petroleum & Chemical Corporation)


P2029 Jack Up Rig Project
Supply of Stand-off and Welded Aluminium Anodes

2009

Bredero Shaw (M) Sdn Bhd

Shell Sarawak Berhad


Gumusut Kakap Project
Supply of Aluminium Bracelet Anodes

2009

Kencana HL Sdn Bhd

Shell Sarawak Berhad


D30 & Dana Wellhead Support Frame (WHSP) D35

2009

Deck Extension and PLEM for D1 Cluster Development Project


Supply of Aluminium Jacket Andoes
Kencana HL Sdn Bhd

New Peninsula Malaysia Inc


West Belumut Development Project
Supply of Aluminium Bracket Anodes

2009

Bredero Shaw (M) Sdn Bhd

Shell Sarawak Berhad


F28 Field Development Project
Supply of Aluminium Bracket Anodes

2009

Technip Geoproduction Sdn Bhd/


MITCO-Japan

Petronas Carigali (Turkmenistan) Sdn Bhd


Turkemistan Main Platform MCR-A Project and
Turmenistan Free Standing Conductor ODP-A
Supply of Aluminium Jacket Anodes

2009

PT Timas Suplindo

Hess (Indonesia - Pangkah) Ltd


Ujung Pangkah Liquids Development Offshore Installation Facilities Project
Supply of Aluminium Bracelet Anodes

2009

Harbourworks Clough Joint Venture

Woodside / Fosterwheeler WorleyParsons


Woodside Pluto LNG Jetty Project
Supply of Aluminium Structure Anodes

Ramunia Fabricators Sdn Bhd

Petronas Carigali Sdn Bhd


Kumang Cluster Development Project - Kanowit CPP Jacket
Supply of Aluminium Jacket Anodes

2009

Ramunia Fabricators Sdn Bhd

Petronas Carigali Sdn Bhd


Kumang Cluster Development Project - KUJT-A Jacket
Supply of Aluminium Jacket Anodes

2009

2008/2009

Page 79 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Ramunia Fabricators Sdn Bhd

Petronas Carigali Sdn Bhd


Tangga Barat Development Project - Melor (MLDP-A) Drilling
Platform Jacket
Supply of Aluminium Jacket Anodes

2009

SMOE Pte Ltd

Maersk Oil OG Gas AS


HBD Platform Topside and Jacket for Halfdan Phase IV
Development Project
Supply of Aluminium Structure Anodes

2009

Vietsovpetro Joint Venture

Vietsovpetro
VT-364 / 2008 - VSP1 for Provision Project

2009

Supply of Aluminium Bracelet and Trapezium Anodes for


RC-4, RC-5 and D01M01 Project
Keppel Fels Limited

SeaDrill Limited
B312 Jack Up Rig Project
Supply of Sacrifical Aluminium Anodes

2009

Keppel Fels Limited

SeaDrill Limited
B311 Jack Up Rig Project
Supply of Sacrifical Aluminium Anodes

2009

Keppel Fels Limited

Qatar General Petroleum


B309 DSS38 Semi - Submersible Drilling
Supply of Sacrifical Aluminium and Zinc Anodes

2008-2009

J.Ray McDermott Asia Pacific Pte Ltd

Chevron Thailand Exploration and Production Ltd


Platong Gas II Project
Supply of Aluminium Jacket Anodes

2008

CUEL Limited

CTEP
CTEP Phase 35 Jacket Project
Supply of Aluminium Jacket Anodes

2008

Grade One Marine Shipyard Sdn Bhd

Tanjung Kapal Services Sdn Bhd


60M Anchor Handling tug / Supply Vessel Project
Design and Supply Zinc Anodes for Vessels

2008

Bredero Shaw (Malaysia) Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Dulang Bekok Pipeline Project
Supply of Aluminium Bracelet Anodes

2008

Kencana HL Sdn Bhd

Petronas Carigali Sdn Bhd


Tangga Barat Cluster Development Project
Supply of Aluminium Jacket Anodes

2008

Kencana HL Sdn Bhd

Shell - FMC - For Deepsea Structure


Gumusut Kakap Project
Supply of Aluminium Jacket Anodes

2008

Jurong Shipyard Pte Ltd

PetroProd D&P 1 Pte Ltd ( GustoMSC )

2008

MSC CJ70 Class Mobil Offshore Jack-Up Drilling & Production


Rig Project
Design and Supply of SACP System for Spud Can, Legs, Tanks
and Sea Chest, etc.
Design and Supply of Aluminium Structure Anodes

Page 80 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

Jurong Shipyard Pte Ltd

Aramco Overseas Company BV

YEAR

2008

Heavy Lift Jack - Up Barge


Design and Supply of SACP System for Spud Can, Legs, Tanks .
and Sea Chest, etc
Design and Supply of Aluminium Structure Anodes
Drydocks World - S.E. Aisa
(Labroy Offshore Engineering Pte Ltd)

Global Maritime - Master Marine AS - Conoco Philips


L206 Jack - Up Drilling Rig Project
Design and Supply of Sacrifical Aluminium Anodes

2008

Drydocks World - S.E. Aisa


(Labroy Offshore Engineering Pte Ltd)

Global Maritime - Master Marine AS - Conoco Philips


L205 Jack - Up Drilling Rig Project
Design and Supply of Sacrifical Aluminium Anodes

2008

Brunei Shell Petroleum Company


Sendirian Berhad

Brunei Shell Petroleum Company


C80035 - Supply of Aluminium Anodes for Line
Pipes, Riser Clamps, Offshore Platforms & Jackets

2008

PPL Shipyard Pte Ltd

Seadrill Limited

2008

P2026 Jack Up Rig Project


Supply of Sacrificial Aluminium Anodes
PPL Shipyard Pte Ltd

Seadrill Limited
P2027 Jack Up Rig Project
Supply of Sacrificial Aluminium Anodes

2008

Otto Marine Limited


PT Batamec Shipyard

120 Ton Bollard Pull AHTS Vessel Project


Hull No H7045 / H7046
Supply of Zinc Vessel Anodes

2008

PT PetroChina

Geragai And Ripah Area Project


Assement Cathodic Protection of ICCP System

2008

PT TJB Power Services

TJB Power Station in Jepara - Central Java - PLN


Design, Supply, Installation and Commissioning of SACP System
For Two Block Stop Log (U1 & U2)

2008

Aker Kvaerner Malaysia Sdn Bhd

ENI
ENI Longhorn Project - Deepwater Platform
Supply of Aluminium Jacket Anodes for Deepwater

2008

Aker Kvaerner Malaysia Sdn Bhd

Reliance
Reliance MA-D6
Supply of Aluminium Jacket Anodes for Deepwater

2007

AGC Industries Pty Ltd

ENI Saipem
Blacktip Development Project Wellhead Platform
Supply of Aluminium Jacket Anodes

2008

PPSC Industreis Sdn BHD

Petronas Carigali Sdn Bhd


SKO Pipeline Replacement Project
Supply of Aluminium Bracelet Anodes

2008

CUEL Limited

Hindustan Oil Exploration Company


PY-1 Gas Field Development Project
Supply of Aluminium Jacket Anodes

2008

Page 81 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

National Petroleum Construction Company

Zakum Development Company (ZADCO)


Zakum Facilities - Replacement of 18" West Oil Trunk Line
Supply of Aluminium Bracelet Anodes

2008

National Petroleum Construction Company

Maersk Oil Qatar AS


AL Shaheem Field Development 2005 - Block 5
GA Wellhead Module, ED,GB & GD Platforms
Supply of Aluminium Jacket Anodes

2008

National Petroleum Construction Company

Maersk Oil Qatar AS


AL Shaheem Field Development 2005 - Block 5
GA Wellhead Module, ED,GB & GD Platforms
Supply of Aluminium Anodes for Pressure Vessels

2008

Thai Nippon Steel & Construction Corpn


Ltd

PTT Exploration & Production Public Co Ltd


Bongkok Field Development Project - Phase 3G
Wellhead Platform WP21 - WP22
Supply of Aluminium Jacket Anodes

ARV - Offshore

SK Construction Corp
SK Project - PLEM
Supply of Aluminium Structural Anodes

2008

CUEL Limited

Carigali - PTTEP Operating Co Sdn Bhd


CPOC Project
Supply of Aluminium Jacket Anodes

2008

J Ray McDermott Asia Pacific P/L

Cuu Long Joint Operation Venture


Su Tu Vang Field Development Project
Supply of Aluminium Bracelet Anodes

2008

Nippon Steel Engineering Co Ltd

PTT Exploration & Production Public Co Ltd


PTTEP Archit 1B Project
Supply of Aluminium Bracelet Anodes

2008

Nippon Steel Engineering Co Ltd

PTT Exploration & Production Public Co Ltd


PTTEP Northern Archit Project
Supply of Aluminium Bracelet Anodes

2008

Barmada McDermott Sdn Bhd

Sarawak Shell Sdn Bhd


SSB - T & I for Offshore Facilities 2007-20
Supply of Aluminium Jacket anodes for 14" SCDRA Crossing

2008

Barmada McDermott Sdn Bhd

Sarawak Shell Sdn Bhd


SSB - T & 1 for Offshore Facilities 2007- 20
Supply of Aluminium Hull Anodes

2008

Petronas MITCO (Japan) Sdn Bhd

Carigali - PTTEP Operating Co Sdn Bhd


CPOC 8 Legged Jackets Project (Deliver to MMHE)
Supply of Aluminium Jacket Anodes

2008

PT Tuban LPG Indonesia / JGC

Trans Pacific Petrochemical Industries (PT TPPI)


LPG Recovery Project
Supply of SACP Materials for Underground Pipeline

2008

PetroChina International Jabung Ltd

BCD3 Project
Design and Supply of ICCP Materials

2008

PT Inti Karya Persada Tehnik (IKPT)

PT Pertamina (Persero)
Terminal Trasit Utama Tuban Dan Pipanisasi Jawa Timur
Design, Supply and Supervision of Installation of Sacrificial

2008

2007/2008

Page 82 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Magnesium Anodes for BBM Underground Pipeline and


Aluminium Bracelet Anodes for BBM Submarine Pieline
PT Tripatra Engineers & Constructors

Hess (Indonesia - Pangkah) Ltd


Ujung Pangkah Project - Cathodic Protection System for
Closed Darin and Open Drain Piping
Design, Supply, Installation and Commissioning of SACP System

2008

PT Surya Besindo

Chevron Project
Supply of Sacrificial Zinc Anodes

2008

Ramunia Fabricators Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Angsi Phase IV Development Project
Supply of Aluminium Jacket Anodes

2008

JGC Corp

Design, Supply Cathodic Protection System for Tuban Aromatic


Project

2008

Single Buoy Moorings Inc

Talisman Energy Norge AS


YME - Mobile Production Unit with Storage (MOPUstor) Project
Supply of Aluminium Jacket Anodes

2007-2008

McDermott Caspian Contractors, Inc

Lukoil Nizhnevolzhskneft LLC - Russia


Lukoil Project Yuri Korchagin Field Development Project
Supply of Aluminium Bracelet Anodes

2007

National Petroleum Construction Company


(NPCC)

Saudi Aramco
Fabrication & Transportation of Offshore Tie-In Platforms
& Scraper Decks (OOK)
Supply of Aluminium Jacket Anodes

2007

Qatar Engineering & Construction


Company WLL

Maersk Oil Qatar AS


Block 5 Field Development Project, Package 12 Accomodation
Platforms BF,CF, DC, EF, GC & HC
Supply of Aluminium Jacket Anodes for CF & EF

2007

Qatar Engineering & Construction


Company WLL

Maersk Oil Qatar AS


Block 5 Field Development Project, Package 12 Accomodation
Platforms BF,CF, DC, EF, GC & HC
Supply of Aluminium Jacket Anodes for BF & GC

2007

Hoan Vu Joint Operating Company

Vietsovpetro
Block 9 - 2, Ca Ngu Vang Field Development Project
Supply of Aluminium Jacket Anodes

2007

Shell Timur Sdn Bhd

Shell Timur Sdn Bhd


Design, Supply, Installation and Commissioning CP System
For Shell Jetty in Labuan, Sabah - Aluminium Jetty Anodes

2007

Bredero Shaw Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Angsi Phase IV Development Project
For Angsi - TCOT Crude Oil Pipeline
Supply of Aluminium Bracelet Anodes

2008

Bredero Shaw Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Angsi D Project
Supply of Aluminium Bracelet Anodes

2007

Bredero Shaw Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Betty (BEP-A to BNG-B) Project

2007

Page 83 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Supply of Aluminium Bracelet Anodes


Bredero Shaw Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - J4 Field Development Project - J4DP-A to D35R-A
Supply of Aluminium Bracelet Anodes

2007

Bredero Shaw Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Labuan Gas Terminal Upgrade (LGAST)
Supply of Aluminium Bracelet Anodes

2007

Bredero Shaw Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Puteri Field Development Project
Supply of Aluminium Bracelet Anodes

2007

Bredero Shaw Sdn Bhd

Talisman
Talisman PM3 - CAA Northern Field Development Project
Supply of Aluminium Bracelet Anodes

2007

Brooke Dockyard

Sarawak Shell Sdn Bhd


SSB - Saderi Tie-In Modifications Project
Supply of Aluminium and Zinc Structure Anodes

2007

Kencana HL Sdn Bhd

Australia Woollbutt South Project - 1 Unit Manifold - WB4


Supply of Aluminium Structure Anodes

2007

Kencana HL Sdn Bhd

Murphy Oil
Murphy - Maari Wellhead Platform Project
Supply of Aluminium Structure Anodes

2007

Kencana HL Sdn Bhd

Murphy - Sustructures of Phase 1 SK-309/SK311


Gas Field Development Project
Supply of Aluminium Jacket Anodes

2007

Kencana HL Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - J4 Wellhead Platform for J4 Field development Project
Supply of Aluminium Jacket Anodes

2007

Kencana HL Sdn Bhd

Sarawak Shell Sdn Bhd


Sarawak Gas Dev Ph 1 - Substructure Phase 1 - SK 309/SK311
Supply of Aluminium Jacket Anodes

2007

Kencana HL Sdn Bhd

Petronas Carigali Sdn Bhd


PCSB - Bumi, Bulan & Suriya Gas Field Dev - Sleeper Fabrications
Supply of Aluminium Jacket Anodes

2007

Mach3 Engineering Consultants

JIMAH Coal Fired Power Plant Project - Kuala Lukut


Mukim Jimah - Aluminium Sacrificial Anodes

2007

Oil Fab Sdn Bhd

Carigali - PTTEP Operating Co Sdn Bhd


2007
CPOC JDA Block B-17 Development Project for 4 Wellhead & Jackets
Supply of Aluminium Jacket Anodes

PEC (Malaysia) Sdn Bhd

Design, Supply, Installation and Commissioning for


Underground Pipeline at Johor, Malaysia

2007

Ramunia Fabricators Sdn Bhd

East Belumut -A (Jacket) Project


Supply of Aluminium Jacket Anodes

2007

Ramunia Fabricators Sdn Bhd

Murphy Oil
Murphy Kikeh Gas Pipe Project for Offshore
Supply of Aluminium Jacket Anodes

2007

Page 84 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Ramunia Fabricators Sdn Bhd

Sumandak - SUJTC Project


Supply of Aluminium Jacket Anodes

2007

Ramunia Fabricators Sdn Bhd

ONGC
Vasai East Dev. Project for Sump Caisson
Supply of Aluminium Anodes

2007

Sapura Acergy Sdn Bhd

Murphy Oil
Murphy Kikeh Gas Pipeline - Pipeline Anodes
Supply of Aluminium Jacket and Bracelet Anodes for Deepwater

2007

Shell Malaysia Trading Sdn Bhd

CP Commissioning Survey at Shell Jetty

2007

Sime Darby Engineering Sdn Bhd

Qatar Petroleum (QP) Project - Topside


Supply of Aluminium Jacket Anodes

2007

Toyo Engineering & Construction Sdn Bhd

Design, Supply, Installation and Commissioning for


Underground Pipeline - Sacrificial Anode System

2007

Shell Timur Sdn Bhd

Design, Supply, Installation and Commissioning for


Shell Sandakan Jetty - Sacrificial Aluminium Anodes

2007

Ramunia Fabricators Sdn Bhd

Talisman
Talisman Bunga Okid B, C & D Projects
Supply of Aluminium Jacket Anodes

2007

Kencana HL

Aker Kvaerner - Reliance KDG 6 Project


Supply of Aluminium Jacket Anodes

2007

PTSC Mechanical & Construction

PetroVietnam
DungGuat Refinery 5B Project
Supply of Aluminium Jetty Anodes

2007

Kencana HL

Petronas Carigali Sdn Bhd


Puteri Field Development Project
Supply of Aluminium Jacket Anodes

2007

Bredero Shaw Sdn Bhd

Sarawak Shell
SSB F13W-E11PB Project
Supply of Aluminium Bracelet Anodes

2007

PPL Shipyard Pte Ltd

Deep Drilling Inc


P2015 Rig Project
Design and Supply of Aluminium Structure Anodes

2007

PetroChina International Jabung Ltd

PCJL Betara Gas Plant, Pematang Lumut, Jambi


Supply of ICCP Materials

2007

PT Hanjung Indonesia

Hanjung Facilities Project (Jetty Facilities)


Cathodic Protection Inspection for Jetty Facilities

2007

PT TJB Power Services

TJB Power Station in Jepara - Central Java - PLN


Cathodic Protection Assement In CW Line, Inspection Internal

2007

PT TJB Power Services

TJB Power Station in Jepara - Central Java - PLN


Cathodic Protection Inspection for U2 Outage

2007

PT TJB Power Services

TJB Power Station in Jepara - Central Java - PLN


Supply of Aluminiun Anodes for Bar Screen, Tray & Stop Log

2007

Page 85 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

PT Rekayasa Industri

PT Medco Ethanol Lampung


BioEthanol Plant for Gasohol Tank Project
Design, Supply, Installation and Commissioning of ICCP
System for Tank Bottom

PT Istana Putra Agung

Indonesia Port
Pelindo Semarang Project - Central Java
Design, Supply, Installation and Commissioning of CP
System for Jetty

PT. Surya Besindo

Caltex Project
Design, Supply and Commissioning CP System for Internal Tank

2006

PT Gunanusa Fabricator

TOTAL
SISI NOBI TOTAL Project
Design, Supply and Commissioning CP System for Internal Tank

2006

PT. Pelindo

Design, Supply and Commissioning CP System for Breakwater


Pelindo Project

2006

FMC SOFEC

FMC Stybarrow Project


Supply of Aluminium Structure Anodes

2006

Thai Nippon Steel Engineering


& Construction Corporation Ltd

Nang Nuan Field Project


Supply of Aluminium Jacket Anodes

2006

Bredero Shaw Sdn Bhd

Sarawak Shell
SSB F13 & Shallow Clastic Pipeline and Bends Project
Supply of Aluminium Bracelet Anodes

2006

Harbourworks Clough JV

Woodsides LNG Jetty Berth - No 2 Project


Supply of Aluminium Jacket Anodes

2006

Chevron Thailand Exploration &


Production Co Ltd

JKWE Platform Strengthening Project


Supply of Aluminium Jacket Anodes

2006

Sime Darby Engineering Sdn Bhd

Talisman
Talisman Bunga Orkid A - Jacket Project
Supply of Aluminium Jacket Anodes

2006

Oil Fab Sdn Bhd

Chemingat A Platform Project


Supply of Aluminium Jacket Anodes

2006

Otto Marine Limited


PT Batamec Shipyard

120 Ton Bollard Pull AHTS Vessel Project


Hull No H7029 / H7030
Supply of Aluminium Vessel Anodes

2006

Technip Oceania Pty Ltd

Stybarrow Field Development Project


Supply of Aluminium Bracelet Anodes

2006

Clough Projects International Pty Ltd

Maari Development Wellhead Platform Project


Supply of Aluminium Jacket Anodes

2006

National Petroleum Construction


Company (NPCC)

Maersk Oil Qatar AS


MOQ Block 5 Field Development Project - Wellhead Jackets
for BD, CD, GA, HA & IA and Bridges BA-BD & CA-CD
Supply of Aluminium Jacket Anodes

2006

J Ray McDermott Asia Pacific Pte Ltd

Cuu Long Joint Operating Company


Su Tu Field Development - Su Tu Vang Project
Supply of Aluminium Jacket Anodes

2006

2007

2006/2007

Page 86 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

PT Technip Indonesia

ConocoPhillips Indonesia Inc. Ltd


North Belut Development Project - C27 Platform
Supply of Aluminium Jacket Anodes

2006

Aker Kvaerner

Petrobras MODEC
RJS 409 FPSO Seperator
Supply of Sacrificial Aluminium Vessel Anodes

2006

Keppel FELS Limited

AWILCO
B285 Project
Supply of Aluminium Vessel Anodes

2006

CUEL Limited

BG NRPOD
Tapti Expansion Project
Supply of Aluminium Jacket Anodes

2006

CUEL Limited

COTL Stage 4 WHP Project


Supply of Aluminium Jacket Anodes

2006

CUEL Limited

CTEP
CTEP Phase 32 Jacket Project
Supply of Aluminium Jacket Anodes

2006

CUEL Limited

CTEP
CTEP Phase 32 Jacket Project
Supply of Aluminium Jacket Anodes

2006

PPL Shipyard Pte Ltd

Japan Drilling Co Ltd


P2010 Rig Project
Supply of Aluminium Structure Anodes

2006

PPL Shipyard Pte Ltd

AWILCO
P2012 Rig Project
Supply of Aluminium Structure Anodes

2006

PPL Shipyard Pte Ltd

AWILCO
P2016 Rig Project
Supply of Aluminium Structure Anodes

2006

Talisman Malaysia Ltd

Bunga Raya A Annexe Project


Supply of Aluminium Structure Anodes

2006

Bredero Shaw (M) Sdn Bhd

Sarawak Shell Berhad


SSB SF-SJ Replacement Project
Supply of Aluminium Bracelet Anodes

2006

Aker Kvaerner Process Systems

Moho Bilondo Separator


Supply of Aluminium Pressure Vessel Anodes

2006

Amalgamated Metal Corporation

Technip AKPO Field Development Project


Supply of Aluminum Vessel Anodes

2006

TL Offshore Sdn Bhd

EMEPMI Tabu Gas Pipeline (Flange Protectors)


Supply of Aluminium Pressure Vessel Anodes

2006

Bredero Shaw (M) Sdn Bhd

Sarawak Shell Sdn Bhd


SSB-E11 Hub 3 & 4 (F13/SC)
Supply of Aluminium Bracelet Anodes

2006

Malaysian International Trading

HULL S053

2006

Page 87 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Corporation (Japan) Sdn Bhd

Supply of Aluminum Vessel Anodes

Ramunia Fabricators Sdn Bhd

Petronas Carigali Sdn Bhd


ABU-A Mirripp/ABU Cluster Project
Supply of Aluminum Jacket Anodes

2006

Santa Fe Drilling Co

GSF Rig 134 Anodes


Supply of Mg Anodes for Drill Water Tanks

2006

BKT Fraser Thermal Tech

Provision of MOPU for Santos


Madura Offshore Pte Ltd

2006

Mach3 Engineerinng Consultants

2x700MW Jimah Coal Fired Power Plant


Supply of Aluminium Structure Anodes

2006

Kencana HL

Sarawak Shell Berhad


Fabrication of F13-E Substructure
Supply of Aluminium Jacket Anodes

2006

PT Saipem indonesia

BP
BP Tangguh Platform & Pipeline Project
Supply of Aluminium Bracelet & Jacket Anodes

CUEL Limited

Pearl Energy
Jasmine Pearl B&C Project
Supply of Aluminium Jacket Anodes

2006

CUEL Limited

UCU Phase 30 Project


Supply of Aluminium Bracelet Anodes

2006

PT Inti Karya Persada Tehnik (IKPT)

Amerada Hess (Indonesia - Pangkah) Limited


Ujung Pangkah Development Project
Design, Supply, Installation and Commissioning ICCP System
for Onshore Processing Facility And Sales Gas Pipeline, and SACP
System for Seawater Intake and Internal Vessels

2006

WAIJO
(Pers Wika AdhiKarya IKPT Joint Operation)

Trans Pacific Petrochemical Industries (PT TPPI)


Tuban Aromatic Project
Design, Supply, Installation and Commissioning for
ICCP System for 3 Berths and SACP System for Seawater Intake

2005/2006

PT Inti Karya Persada Tehnik (IKPT)

PT Pertamina (Persero)
Proyek Pembangunan Fasilitas Transmisi Gas Dan Kompresi
Musi Barat - Pagardewa Pagardewa Daerah Operasi Hulu
Sumbagsel (Paket II)
Design, Supply, Installation and Commissioning of ICCP & SACP
System for Underground Pipelines

2005

PT Inti Karya Persada Tehnik (IKPT)

PT Pertamina (Persero)
Proyek Pembangunan Fasilitas Pengumpul Gas Merbau Dan
Fasilitas Penyerahan Gas Pagardewa Daerah Operasi Hulu
Sumbagsel (Paket III)
Design, Supply, Installation and Commissioning of SACP System
for Underground Pipeline

2005

PetroChina International Ltd

Design and Supply of SACP System for Underground Pipeline


Supply of CP Materials - Prepacked Magnesium Anodes

2005

PT Kali - Dwi - Bangun - Inti - Konsorsium

KDBI-TTU Bangun Project

2005

2005/2006

Page 88 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Design, Supply, Installation and Commissioning of SACP System


for Underground Pipeline
PPL Shipyad Pte Ltd

Deep Drilling Inc


P2008 Rig Project
Supply of Aluminum Structure Anodes

2005

PPL Shipyard Pte Ltd

AWILCO
P2009 Rig Project
Supply of Aluminum Structure Anodes

2005

PPL Shipyard Pte Ltd

Seadrill Limited
P2011 Rig Project
Supply of Aluminum Structure Anodes

2005

Aker Kvaerner Process Systems

Murphy Oil
Murphy Kikeh Subsea Project
Supply of Aluminium Jacket Anodes

2005

Baxtech Resources (PBJV Group)

Petronas Carigali Sdn Bhd


Ledang ANOA Devt Project
Supply of Aluminum Structure Anodes

2005

IEV Malaysia

Lekir Bulk Terminal Project


Supply of Aluminium Jetty Anodes

2005

Safemal Drilling

Drill Water Tank Anodes at Rig


Supply of Magnesium Anodes (Mg25)

2005

Shell Refining Company

E7203 & E7325 - Project at Refining


Supply of Magnesium Disc Anodes

2005

Keppel FELS Limited

R293-Ocean Endeavor Ultra Deep


Water Drilling Conversion - Diamond Offshore
Supply of Aluminium Marine Anodes

2005

Jurong Shipyard Pte Ltd

PetroBras - MODEC
RJS-409 FPSO (Bright Jewel)
Supply of Sacrificial Zinc Anodes

2005

Shibata Asia

Singaore MJ2A - PSA


Australia Bunburry Project - Supply of Aluminium Anodes
Sri Lanka Replacement Project - Aluminium Anode

2005

HL Engineering Sdn Bhd

Sarawak Shell Berhad


SBM 1160 Overhaul Project - Aluminium Anodes

2005

Murphy Sarawak Oil

West Patricia Production Operation.


Supply of Aluminium Anodes to Bintulu

2005

CUEL Limited

Unocal Phase 30 Project - Supply Jacket Anodes


Unocal ERMRP Project - Supply Jacket Anodes
Unocal Yala, Kaphong Project - Submarine Pipeline Anodes

2005

Mach3 Engineering Consultants Tanks

Melut Basin Sudan Project for Alumunium Anodes

2005

Ramunia Fabricators Sdn Bhd

Hyundai Heavy Industries


Stinger PTT Project - Supply Aluminium Anodes

2005

Keppel FELS Limited

Awilco Drilling Project (B269)


Marine Anodes

2005

Page 89 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

Malaysian International Trading Co


Corporation (Japan) Sdn Bhd

MISC Hull 1590


Zinc Marine Anodes

2005

Sime Darby Enginering Sdn Bhd

Petronas Carigali Sumandak


Drilling Platform (SUDP-A) - Aluminium Platform Anodes

2005

CUEL Limited

Unocal Surat Trunkline Project


Aluminium Submarine Pipeline Anodes

2005

Bredero Shaw (M) Sdn Bhd

Petronas Carigali Baram South


Pipeline Anode Replacement Project
Aluminium Submarine Pipeline Anodes

2005

Keppel FELS Limited

Petro Bras (P51)


Marlim SUL Field Development Project (B266)
Supply of Marine Anodes for P51

2005

HL Engineering (M) Sdn Bhd

Fabrication of Baram Wellhead Platform BAJT-H


South Development Project - Aluminium Sacrifical Anodes

2005

PT McDermott Indonesia

McDermott Marine Dock


ICCP System

2005

HL Engineering (M) Sdn Bhd

ROC Oil (WA) Pty Ltd


Cliffhead 'A' Platform - Jacket Anodes

2005

PT Nippon Steel Batam

Premier Oil Natuna Sea B.V.


West Lobe Wellhead - Jacket Anodes

2005

Saipem Asia Sdn Bhd

PTT Public Company Ltd


Third Transmission Pipeline Project - Jacket Anodes

2005

Kvaerner Process Systems France

Esso Exploration and Production - Nigeria Limited


ERHA FPSO Development Project - Oil Tanker
Vessel Anodes

2005

CUEL Limited

Unocal Phase 28 Project


Submarine Pipeline Anodes

2005

Malaysian International Trading


Corporation (Japan) Sdn Bhd

MISC Hull 1589


Zinc Marine Anodes

2005

CUEL Limited

Unocal Phase 29 Project


Jacket Anodes

2005

Modec International LLC

Amerada Hess Equatorial - Guinea


Northern Block G TLPs Project - Aluminium Hull Anodes

2005

Malaysian Shipyard & Engineering


Sdn Bhd

Talisman Energy Sdn Bhd


FPSO PM-305 South Angsi A Development Project
Zinc & Aluminium Marine Anodes

2005

CUEL Limited

Chevron Offshore (Thailand) Limited


COLT Stage 3 WHP - Jacket Anodes

2005

Transfield Worley Woodside Alliance

Woodside Energy Ltd - Australia


North Rankin 'A' Platform Life Extension Project
Aluminium Jacket Anodes for Guy Wire Anchor Box Retrofit

2005

Design, Supply and Commissioning CP System for Internal

2005

PT. Timas S

YEAR

Page 90 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Tank - Caltex Project


PT Kaligangun

PT PERTAMINA
Design, Supply and Commissioning CP System for TTU
Balongan and Pipeline Citarik to Cikampek Project

2005

PT Bakrie

Design, Supply and Commissioning CP System for Power


Station Tarahan

2005

PT. Technip

Design, supply Cathodic Protection System for BBSD Phase II


Pipeline ConocoPhillips Projects

2004 / 2005

PT. Technip

Design, supply Cathodic Protection System for BBSD Phase II


Platform ConocoPhillips Projects

2004

Mach3 Engineering Consultants

Malakoff
Tanjong Bin Power Plant Project
Aluminium Anodes

2004

Santa Fe Drilling Co

ExxonMobil - Kemaman Supply Base


Magnesium Anodes for Rig,

2004

ExxonMobil Exploration &


Production Malaysia Inc

EMEPM - Terengganu Crude Oil Treatment Project (TCOT)


Effluent Tank Bottom Project - ICCP
Design, Supply, Installation and Commissioning of ICCP System

Ramunia Fabricators Sdn Bhd

Sarawak Shell Berhad


SSB E8DR-A & E11P-B - Jacket Anodes

2004

Mach3 Engineering Consultants

Ranhill International Berhad


Melut Basin Oil Sudan Project - Pressure Vessel Alu. Anodes

2004

KNM Process Systems

ExxonMobil Devt Company/Saipem SPA


Erha EPC1 FPSO Devt Project For Pressure Vessels
Sacrificial Aluminium Anodes

2004

Sante Fe Drilling Co

ExxonMobil - Kemaman Supply Base


Aluminium Anodes for Rig,

2004

Alstom Export Sdn Bhd

TenagaNasional Berhad
(ICCP) for Manjung Power - Platinised Titanium Anodes

2004

Muhibbah Steel Industries

Shell Bukom - Singapore


Zinc Anodes for Shell Bukom

2004

Muhibbah Steel Industries

North Port
Zinc Anodes for North Port

2004

Apache Energy Ltd

John Brookes Development Project


Bracelet Anodes

2004

China Offsore Oil Egrg Co Ltd /Shenzhen


Chiwan Sembawang Egrg Co Ltd

CACT HJ21-1B Platform Project


Jacket Anodes

2004

CUEL Limited

Unocal Phase 28
Aluminium Jacket Anodes

2004

PPL Shipyard Pte Ltd

Kristiansand
P2006 Project - Structural Anodes

2004

PPL Shipyard Pte Ltd

Drilling Pte Ltd

2004

2004/2005

Page 91 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

P2007 Project - Structural Anodes


HL Engineering Sdn Bhd

Sarawak Shell Berhd


SSB E11V-B - Jacket Anodes

2004

Japan Vietnam Petroleum Company Ltd

Rang Dong Field Development Project


Jacket & Bracelet Anodes

2004

Petroleum Technical Services Company

Petronas Carigali Vietnam


Ruby B Development Project - Jacket Anodes

2004

CUEL Limitd

Unocal Phase 28 Project


Jacket Anodes

2004

Keppel Fels Ltd

Petrobras 52 (P-52)
Roncador Field Development Project (B262)
Supply of Marine Anodes for P52

2004

Malaysian Shipyard Engineering


Sdn Bhd

Talisman Energy Limited


Bunga Raya Field PM3 - BR-E Vent Jacket, Jacket Anodes

2004

Worldwide Piping Products (M) Sdn Bhd

Murphy Sarawak Oil Co Ltd


West Patricia Development Project - Phase 11
Submarine Pipeline Anodes

2004

CUEL Limited

Unocal Phase 27 Project


Supply of Sacrifical Jacket Anodes and Submarine Pipeline Anodes

2004

CUEL Limited

Unocal PLOCPP2 Project


Jacket Anodes

2004

CUEL Limited

Pearl Oil Thailand Ltd


Pearl Phase 1 - Jacket Anodes

2004

Malaysian International Trading


Corporation (Japan) Sdn Bhd

SAMSUNG Heavy Inustries - Korea


MISC LNG Vessel 1503 - Zinc Anodes

2004

Kvaerner Process Systems Sdn Bhd

Esso Exploration & Production - Nigeria Ltd/Saipem S.A.


Erha Multimedia Filters Pressure Vessels
Aluminium Anodes

2004

KNM Process Systems Sdn Bhd

ExxonMobil Exploration and Production Malaysia Inc.


Guntong E Thin Wall Project (Pressure Vessels)
Aluminium and Zinc Anodes

2004

Brooke Dockyard and Engineering


Works Corporation

Sarawak Shell Berhad


Sabah Shell Petroleum Company Ltd
SFK-A Jacket - Jacket Anodes

2004

Muscat Overseas Oilfield Supplies Co


L.L.C.

Petroleum Development Oman LLC


Barik Gharif Main Development Project
Transformer Rectifier

2004

Clough-Unithai Engineering Limited

Unocal Wellhead Installation Project - Phase 26/4,5


Jacket Anodes

2004

Sime Sembcorp Engineering Sdn Bhd

Sarawak Shell Berhad


F13 Substructure Project Phase 2 - Jacket Anodes

2004

J Ray McDermott Middle East Inc

Dophin Energy Ltd


Dophin Project - Upstream Offshore Facilities

2004

Page 92 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Jacket Anodes
PowerGas Ltd

Supply & Installation of Mixed


Metal Oxide Anodes in deepwell for Offshore Gas Pipeline

2004

Muscat Overseas Oilfield Supplies Co


L.L.C.

Petroleum Development Oman LLC Sah Rawl & Barik


LNG Upstream Facilities - ICCP
Transformer Rectifier

2004

Kvaerner Process Systems Sdn Bhd

Mitsui Engrg Shipbuilding Co Ltd


Mutineer Exerter Project - Injection WaterFine Filters
Aluminium Anodes

2004

Muhibbah Steel Industries Sdn Bhd

Bridgestone - Power Seraya


Zinc Anodes

2004

KNM Process Systems Sdn Bhd

Esso Exploration & Prod. / Negeria Ltd/Saipem S.A.


ERHA EPC / FPSO Project - Pressure Vessel
ExxonMobile / Saipem SPA - Aluminium Anodes

2004

PT Nippon Steel Batam

Jintan Project - Buckle Triggers & Piled Anchor Structures


Sarawak Shell Berhad - Aluminium Jacket Anodes

2004

Clough-Unithai Engineering Limited

Unocal Wellhead Installation Project - Phase 26/4,5


Jacket Anodes

2004

PT Profab Indonesia

Total Fina ELF


Betara Complex Development Project
Supply of Jacket Anodes

2004

Malaysian International Trading


Corporation (Japan) Sdn Bhd

Samsung Heavy Industries Korea


MISC LNG vessel 1502 - Zinc Anodes

2004

Malaysian International Trading


Corporation (Japan) Sdn Bhd

MISC VLCC NB project H014 at Universal Shipbuilding Japan


Zinc Anodes

2004

Malaysian International Trading


Corporation (Japan) Sdn Bhd

MISC Refurbishment Project at MHI Shipyard Yokohama


LNG Tanker Tenaga Lima - Zinc Anodes

2004

Power Gas Ltd

Supply & Install Magnesium anodes at Macpherson Road

2004

Clough-Unithai Engineering Limited

Unocal PLOCPP2 Project


Aluminium Jacket Anode

2004

Sime Sembcorp Engineering Sdn Bhd

Amenam Phase II Project


Aluminium Jacket Anode

2004

Malaysian Shipyard And


Engineering Sdn Bhd

Talisman Malaysia Ltd


Bunga Raya (BR-E) Co2
Removal Platform Jacket
Aluminium Jacket Anode

2004

Jurong Engineering Ltd

KBR/MAERSK OLIE OG GAS


Dan FG Field Development Project
Pressure Vessel

2004

Alstom Export Sdn Bhd

Sacrificial Anodes for Manjung Power Plant


Zinc Anodes

2004

Malaysian International Trading


Corporation (Japan) Sdn Bhd

Samsung Heavy Industries Korea


MISC Hull 1471, 1472, 1517 & 1518 - Zinc Anodes

2003

Page 93 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Malaysian International Trading


Corporation (Japan) Sdn Bhd

MISC Refurbishment project at MHI Shipyard Yokohama


LNG Tanker Tenaga Empat Project
Zinc Anodes

2003

Malaysian International Trading


Corporation (Japan) Sdn Bhd

MISC VLCC Hull 5004 at Hitachi Zosen Osaka, Japan


Zinc Anodes

2002

Petra Fabricators Sdn Bhd

Qatar - Knock Out Drum for ISND Phase 11


Pressure Vessels - Aluminium Anodes

2004

Antara Koh Pte Ltd

Changi Naval Base


Design, Supply, Installation and Commission of Jetty Anodes

2003/2004

PT Astina Putera Perkasa

Total FinalELF Enp


Tunu Field Development Project Phase 9
Design, Supply and survey of Cathodic Ptotection System

2003/2004

PT Inti Karya Persada Tehnik


PT IKPT / Chiyoda

Betara Complex Development Project (BCD) Project


Design, Supply, Installation Supervison and Commissioning
Impressed Current Cathodic Protection (ICCP) System

2003/2004

Kvaerner Process Systems Asia


Pacific Sdn Bhd

ExxonMobil Development Company/Saipem SPA


ERHA EPC1 FPSO Development Project
Sacrificial Aluminium Anodes for Pressure Vessel

2003

Unocal Thailand Ltd

Unocal Wellhead Installation Project - Phase 26/1-3


Jacket Anodes

2003

Saipem (Portugal)Comercio Maritimo

BHP Billiton Minerva Project


Sacrificial Bracelet Anodes

2003

SMOE Pte Ltd

Occidental Petroleum of Qatar Ltd


Sacrificial Aluminium Bracelet Anodes
IDD El Shargi North Dome Field Dev. Phase 11
Expansion Project

2003

Origin Energy /AWE Petroleum Pty Ltd /

BassGas Project

2003

CalEnergy Gas(UK) Ltd /Santos Limited

Yolla Gas Fields Development

2003

Pelindo

Design, Supply, Installation and Commissioning Cathodic


Protection System for Breakwater

2003

PT McDermott Indonesia

SMOE / MAERSK OLIE OG


GAS AS
MAERSK DanFG Jackets & Piles Anodes

2003

Pelabuhan Indonesia III

Pengadaan Dan Pemasangan Cathdic Protection Tiang


Break Water Tahap 1 Di Pelabuhan
Tanjung Emas Semarang - Aluminium Jetty Anodes

2003

Master Tech Diving Services Pte Ltd

Batu Hijan Jetty in Indonesia


Sacrificial Anodes

2003

PT Technip Indonesia

Conoco Indonesia Inc Ltd


BBSD Development Project

2003

PT. Dwipayana

Design, Supply Cathodic Protection System of Internal Tank


for Caltex

2003

Page 94 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Clough-Unithai Engineering Limited

Unocal Wellhead Installation Project


Phase 25 - Jacket Anodes

2003

Thai Petroleum Pipeline Co Ltd

Close Interval Potential Survey of 320km Buried


Buried Petroleum Pipeline

2003

Dayang Enterprise Pte Ltd

Zinc Anode

2003

Universal Compression (Thailand)


Ltd

Unocal Project #GC/SFI/97/701


Aluminium Anodes

2003

Italian-Thai Development Public


Company Ltd

Breast Dolphin for Sriracha Silo at Laem Chabang


Aluminium Anodes

2003

PT Cipta Serbajaya Abadi

Pt/Ti Anode Assy


Platinum / Titanium Anodes

2003

APECS Offshore Pte Ltd

APECS Offshore - SPM Buoy


Aluminium Anodes

2003

Shell Malaysia Ltd

Bagan Luar Installation


Jetty Anodes

2003

HSC Pipeline Engineering Pte Ltd

Singapore Power Gas Transmission Pipeline at


Upper Paya Lebar Road
Magnesium Anodes

2003

PT Profab Indonesia

Calm Buoy Project


Aluminium Anodes

2003

PT McDermott Indonesia

Dominion Spar Hull Fabrication Aluminium Anodes for Centerwell

2003

KNM Process Systems Sdn Bhd

Nigeria National Petroleum Corpn/Mobil Producing


Nigeria JV/Saipem S.A.
Yoho Development Project Pressure Vessels - Aluminium & Zinc Anodes

2003

Kvaerner Process Systems Sdn Bhd

Nigeria National Petroleum Corpn/Mobil Producing


Nigeria JV/Saipem S.A.
Yoho Development Project Test Separator/ Oil Treater - Pressure Vessels
Aluminium Anodes

2003

Alstom Export Sdn Bhd

Manjung Cooling Water Band Screen


3 x 700MW Coal Fire Power Plant)
Manjung Power Plant - Aluminium Anodes

2003

Mach3 Engineering Sdn Bhd

PT Tanla Tesco Welindo


Aluminium Anodes

2003

Bredero Shaw (Malaysia) Sdn Bhd

ConocoPhillips - Bayu Darwin Pipeline Project


Bracelet Anodes

2003

Snamprojeti, Italy /
PPSC Industries Sdn Bhd

Agip North Africa B.V.


Libya Gas Transmission System
Sacrificial Pipeline Anode

Clough Engineering

Cairns Energy India Pty Ltd


Lakshmi Field Development
ICCP of Pipeline - Sacrificial Systems for Tanks

2002/2003

2002

Page 95 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

TL Offshore Sdn Bhd

Petronas Carigali Sdn Bhd


MLNG - 3 Sacrificial Systems Onshore 32" Gas Line

2002

IEV Malaysia Sdn Bhd

Lumut Project
Platform Anodes

2002

Kaverner Process System


Asia Pacific Sdn Bhd

Esso Early Production FPSO Process Engineering & Supply to Vessel Internal Zinc Anodes

2002

PT J Ray McDermott Indonesia

Conoco Belanak Project - 460 km


Submarine Pipeline - Anodes

2002

PT Technip Indonesia
Technip Far East Sdn Bhd

Conoco Indonesia Subsea


Protection Project (ADGF) - Structural Anodes

2002

Diamond Offshore General Company

Sacrificial Aluminium Anodes for Ocean General Rig 102


Structural Anodes

2002

Phillips Petroleum (91-12) Pty Ltd

Bayu-Undan Gas Recycle Project


Aluminium Bracelet Anodes

2002

Pembinaan Dong Guan Enterprise Sdn Bhd

Tentera Laut Diraja Malaysia


Pangkalan Tentera Laut Diraja
Malaysia @ Semporna, Sabah

2002

National Petroleum Construction


Company

Abu Dhabi Marine Operating Company


Offshore Khuff Gas Development - Aluminium Anodes

2002

Singapore Refining co Pte Ltd

RCC Exchange

2002

PTT Public Company Limited


(Thailand)

Underground Pipeline
Coating Survey

2002

PT Clough Petrosea

Unocal West Seno Field Production Facilities &


Pipeline Project - Pipeline Anodes

2002

Malaysian Shipyard Engineering


Sdn Bhd

Talisman Energy
BR-A Wellhead Riser Platform - Lundin - Jacket Anodes

2002

Malaysian Shipyard Engineering


Sdn Bhd

Talisman Energy
BR-B Wellhead Riser Platform - Lundin - Jacket Anodes

2002

PT J Ray McDermott Indonesia

Conoco Belanak Field Development


WHP A & B Jacket Anodes

2002

PT McDermott Indonesia

Dominion Project
Structure / Jacket Anodes

2002

ExxonMobil Exploration &


Production Malaysia Inc

Pipeline Anodes for Palas-A to


Guntong-D

2002

ExxonMobil Exploration &


Production Malaysia Inc

Pipeline Anodes for Tapis-F

2002

Ramunia Fabricators Sdn Bhd

Petronas Carigali Sdn Bhd


Kinarut Jacket - Jacket Anodes

2002

Alstom Export Sdn Bhd

Manjung Power Plant


3 x 700MW - Rectification Work

2002

Page 96 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

TL Offshore Sdn Bhd

Petronas Carigali Sdn Bhd


MASA Pipeline Anodes Retrofit Year 2002

2002

TL Offshore Sdn Bhd

Petronas Carigali Sdn Bhd


Transportation & Installation of Offshore Facitities
Year 2002-03 - MLNG 111
CP System for Onshore Pipeline - Magnesium Anodes

2002

ExxonMobil Exploration &


Production Malaysia Inc

Pipeline Anodes for Bintang-A


& Bintang-B

2002

PPSC Industries Sdn Bhd

Petronas Carigali Sdn Bhd


Angsi Development Project - Pipeline Anodes

2002

Eurporean Marine Contractors Limited


(U.K.)

BP Nam Con Son Gas Project


Supply of Aluminium Bracelet Anodes (Deliver to Bredero Shaw)

2001/2002

Philips Petroleum (91-12) Pty Ltd TIGA Joint Venture

Bayu-Undan Gas Recycle Project


Submarine Pipeline Anodes

2001/2002

Malaysia Shipyard and Engineering


Sdn Bhd

Petronas Carigali Sdn Bhd


Samarang Kechil Project - Zinc Bracelet Anodes

2001

Malaysia Shipyard and Engineering


Sdn Bhd

Petronas Carigali Sdn Bhd


E-11 R-C Project - Aluminium Jacket Anodes

2001

PPSC Industries Sdn Bhd

Umbrella Contract for Linepipe


Coating Services for Petronas Carigali Sdn Bhd
MLNG 3 Project - Submarine Pipeline Anodes

Sime Sembcorp Engineering Sdn Bhd

Sarawak Shell Berhad


Jintan Dra Jacket Project- B11 DR-A Jacket Project
Jacket Anodes

2001

PT Santa Fe

Upgrading of External Storage Tand in Irian Jaya


ICCP System

2001

PT Amarta

Pertamina - Cilacap Underground Pipeline


ICCP System

2001

PT Deltamas Pratama

Pertamina - Surabaya
Underground Pipeline - Magnesium Anodes

2001

PT Hanjung

Hanjung Jetty
Sacrificial Anodes

2001

PT Transbakri

YPF Maxus Intan - Widuri B C Platform


Sacrificial Anodes

2001

PT Gearindo

Internal Tank - Caltex


Magnesium Anodes

2001

Kokusai Keiso Co Ltd

Tuas A Power Station


ICCP System Installation

2001

Alstom Export Sdn Bhd

Manjung Power Plant - ICCP


System Supply

2001

Clough-Unithai Engineering Ltd


(Thailand)

Thailand - Unocal UCU Phase 23


Jacket Anodes

2001

3/2/2001

Page 97 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Clough-Unithai Engineering Ltd


(Thailand)

Unocal UCU Phase 22 Pipelines & Subsea Assembly


Pipeline Anodes

2001

Clough-Unithai Engineering Ltd


(Thailand)

Unocal UCU Phase 22 Wellhead Platforms


Structure Anodes

2001

Esso Production Malaysia Inc

TAWI Pipeline Replacement Project


Pipeline Anodes

2000

Malaysian Shipyard & Engineering


Sdn Bhd

Larut-A CPP Topsides


Cathodic Protection for Vessel

2000

NF Energy - Sumatra-Higleig Consortium

Field Surface Facilities Project, Sudan


ICCP System

2000

Hyundai Heavy Industry

Conoco Block 'B' Facilities


West Natuna Sea Gas Development

2000

Banner (M) Sdn Bhd

Zinc Anodes

2000

Kejurubuhan Sdn Bhd

Johor Port - Aluminium Anodes

2000

Tenaga Nasional Berhad

ICCP System for Kapar Power


Station Phase 3

2000

Malaysia Shipyard and Engineering


Sdn Bhd

Nippon Oil Helang Jacket Jacket Anodes

2000

Kellogg

Singapore Syngas Pte Ltd - Jurong Island, S'pore


ICCP for Underground Pipeline Gasification Hub Project

2000

Celanese

Pulau Sakra
ICCP for Underground Fire Water Pipeline

2000

PT Ballast

Pan United Jetty, Batam


- Anodes

2000

PT Wilson Walton Indonesia

Total Tunu Phase 7


Sacrificial Anodes

2000

PT McDermott Indonesia

Power Gas 12 km Submarine


Pipeline Anodes (Singapore)

2000

PT McDermott Indonesia

Conoco Indonesia Inc /


West Natuna Submarine 600km - Pipeline Anodes

2000

PPSC Industries Sdn Bhd

TL Offshore Sdn Bhd


Seligi A to Andr A Gas Line - Submarine Pipeline Anodes

2000

Unocal Limited

Req 17420 (#57) - Structural Anodes

2000

Unocal Thailand Ltd

Yapla Pipeline Project - Aluminium Bracelet Anodes

2000

Clough Offshore

Kakap Gas Compression Station


Submarine Pipeline Anodes

2000

PPSC Industries Sdn Bhd

Semarang Submarine
Pipeline Anodes

2000

Technip Geoproduction (M) Sdn Bhd

Cakerawala Gas Field Development


Jacket Anodes

2000

Page 98 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

ESSO Production Malaysia Inc

Irong Barat Project A


Jacket Anodes

2000

Sante Fe

Oil Rig 134 Anodes

2000

Hyundai Engineering & Construction

Aluminium Anodes for


ENV Pipeline to Jurong Island

2000

Hyundai Engineering & Construction

Aluminium Anodes for


Gas Pipeline to Jurong Island

2000

Hyundai Engineering & Construction

Aluminium Anodes for PUB


Water Pipeline to Jurong Island

2000

Samsung Engineering (M) Sdn Bhd

Malaysia Olefins Underground Pipeline


ICCP System

Pathfinder M & E

Magnesium Anodes for


Putrajaya Parcel - U/G Pipe

1999

Hyundai-Koon Joint Venture

Jurong Island Road Link Project for ENV Pipeline


ICCP System

1999

Duplex

Aluminium Anodes for Kertih Port

1999

PPSC Industries Sdn Bhd

D35JT to D35R Pipeline Anodes

1999

The Polyolefin Company (S) Pte Ltd

ICCP for U/G Pipeline

1999

Chiwan Sembawang Engineering Co Ltd

SZ35-1 Platform Project - Aluminium Jacket Anodes

1999

Giman Construction Sdn Bhd

Manjung Town Water Supply Power Plant


to Manjung Coal 2100MW - ICCP System

1999

National Petroleum Construction

Qatar General Petroleum Corpn


QGPC BH & MM Platform
Supply of Aluminium Jacket Anodes

1999

Clough Engineering Ltd

BHP Petroleum Pty Ltd


Buffalo Field Development Structure & Pipeline Anodes

1999

Petronas Carigali Sdn Bhd

Angsi Project
Supply of Aluminium Bracelet Anodes

1999

VCI (M) Sdn Bhd

Zinc Anodes

1999

Algotech (M) Sdn Bhd

Natural Gas Distribution Lateral Pipeline


CUF, Gebeng - Sacrificial Anodes

1999

Pathfinder M & E Sdn Bhd

Putra Jaya - Parcel C - Underground Cilled Water


Pipeline Sacrificial Anodes

1999

Labtec (M) Sdn Bhd

Putra Jaya - Parcel D - Underground Cilled Water


Pipeline Sacrificial Anodes

1999

TL Offshore Sdn Bhd

Petronas Carigali Sdn Bhd


Resak Submarine Pipeline Anodes

1999

TL Offshore Sdn Bhd

EPMI Bekok C Riser Upgrade

1999

1999/2000

Page 99 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Sacrificial Anodes
The Polyolefin Company (S) Pte Ltd

Underground Pipeline
Sacrificial Anodes

1999

National Oxygen Pte Ltd

Underground Pipeline
Sacrificial Anodes

1999

Brown & Root Far East Engineers

Oil and Natural Gas Corporation Ltd


NF Platform Riser
Replacement Project
Supply of Bracelet Anodes

1999

Kvaerner RJ Brown Pte Ltd

Shell Eastern Pte Ltd


Bundle Pipeline/Cables between Pulau Ultar/Seraya
Submarine Pipeline Anodes

1999

MMC Engineering Service

Natural Gas Distribution


Lateral Pipeline to KR2 & CUF Petrochemical Plant
Kertih - ICCP System

1999

NF Energy-Sumatec-Hileigh
Consortium Construction

FSF, Muglad Oil, Basin, Sudan


ICCP System

Shell Eastern Petroleum Pte Ltd

Wharf 9 Aluminium Anodes

1998

Sumatec Corporation Sdn Bhd

FSF Underground Pipelines


Project, Sudan

1998

PT McDermott Indonesia

Premier Oil /PTTEP /Myanmar


Oil & Gas Enterprise Yetagun B - Jacket Anodes

1998

Clough Offshore

Varanus 2nd Trunkline Project


Submarine Pipeline Anodes

1998

Sankyu (S) Pte Ltd

Inspection for PCS Seawater


Intake

1998

Antara Koh Pte Ltd

Pulau Semakau Landfill Project


Sacrificial Anodes

1998

Power Seraya

Pt/Ti Anodes

1998

Petro-Pipe Socotherm Coating Sdn Bhd

Petronas Carigali Sdn Bhd


Masa Pipeline Submarine Anodes

1998

Overseas Technical Engineering &


Construction

Fuji Oil Jetty Anodes

1997/1998

Lama International Contractors Ltd

SAPREP SBM Pipeline


Replacement Submarine Pipeline Anodes

1997/1998

Chiwan Sembawang Engineering Co Ltd

China Offshore Oil Development


& Engineering Corporation
Aluminium Anodes for JZ9-3 Project

1997/1998

PT McDermott Indonesia

Mobil "NSO" Platform &


320 km Pipeline Anodes

1997/1998

Christiani & Nielsen Construction (S)


Pte Ltd

Tuas A Power Station (Singapore)


Oil Unloading Jetty in Tuas A

1997/1998

1998/1999

Page 100 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Power Station Sacrificial Anodes & Pile Gard Splash


Zone Wrapping System
ESSO (S) Pte Ltd

ESSO Jurong Marketing Terminal


Bulk Pier - Sacrificial Anodes

1997

Shell Eastern Petroleum Pte Ltd

Wharf 10, 10A, 10B, 10C


Sacrificial Anodes

1997

Mobil Oil (S) Pte Ltd

ICCP System for ExxonMobil


Berths 8 & 9

1997

Sumatec Corporation Sdn Bhd

Petronas Carigali Sdn Bhd


Onshore Gas Terminal, Sabah - ICCP System

1997

Ipco Constructors Sdn Bhd

Lahad Datu, Sabah Water Supply System


Magnesium Anodes

1997

Sarawak Shell Berhad

St Joseph Submarine Pipeline


Zinc Anodes

1997

Sembawang Marine & Offshore


Engineering Pte Ltd

Maersk Oil Qatar, Al-Shaheen


Field BA & CA Jacket Anodes

1997

Penta Ocean

Van Omeran Tank Terminals


Jetty #5, Pulau Sebarok - Sacrificial Anodes

1997

Sime Sembawang Engineering Sdn Bhd

Esso Production Malaysia Inc


Raya 'A' / Seligi 'F' - Jacket Anodes

1997

National Oxygen of Singapore

Onshore Pipeline
Sacrificial Anodes

1996/1997

Sonat Offshore Drilling Inc

Aluminium Anodes for


Polyportia Rig

1996/1997

Hoechst Acetyls (S) Pte Ltd

Onshore Pipeline - ICCP System

1996/1997

Sembawang Projects Engineering Co


Pte Ltd

Aluminium Anodes for Pulau


Sakra Jetty / Intake (SUT)

1996/1997

Indocast Engineering

Aluminium Anodes for


Sarawak Cement Jetty

1996

Duplex Technology Sdn Bhd

Aluminium Anodes Tanjong


Malai Jetty, Langkawi

1996

IHM / SBM Group

Zinc Anodes for Rig

1996

Federal Hardware Engineering

Platform Anodes

1996

Jurong Shipyard

Jetty Anodes

1996

Pertamina

Pt/Ti Anodes for Refinery


Project

1996

Petro-Pipe Socotherm

Sabah Gas Pipeline


Submarine Pipeline Anodes

1996

Karimun Shipyard

Pile Gard System

1996

Page 101 of 133

DIMET Cathodic Protection Job Reference List

October 2012
CUSTOMER

JOB

YEAR

Penang Shipbuilding & Construction

EPMI Lawit A Riser


Jacket Anodes

Loh & Loh Construction

PUB Senoko Gas Work


Jetty Anodes

1995

Petro-Pipe Socotherm

Huade Submarine
Pipeline Anodes

1995

Petro-Pipe Socotherm

Yukong Submarine
Pipeline Anodes

1995

DM Diving (S) Pte Ltd

Penang Port Jetty Anodes

1995

Keppel Tuas Dockyard

Pile Gard System

1995

Petrochemical Corporation of
Singapore (PCS II)

Personnel Jetty 7 Barge Ram


CP System

1994

S'pore Shipbuilding & Engrg Tuas Yard

Pile Gard System

1994

Keppel Shipyard Tuas

Pile Gard System

1994

1995/1996

Page 102 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 

FUNCTIONAL
SPECIFICATION
FOR
CP SYSTEM FOR OFFSHORE STRUCTURES



PREPARED /
REVISED
BY

REVIEWED
BY

APPROVED BY

TOTAL NO. OF
PAGES

DATE

REV.





  
 









PDF processed with CutePDF evaluation edition www.CutePDF.com


 



Page 103 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


 


  
 
  
  
 " #$ 
!  %
& 
!  '(
 &' &' 
! 
)$ &' &
* %  &
+ $"   "   
, - 
. $% $ '
.  %
& '
. &
// &) '
. $
' &)
) '
. $
' &'
(0
 
1
-% 

2  

 

3  

2#$ 
!
  
*
  
+
 4% 




!





%


  
 










 



Page 104 of 133

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

OFFSHORE
DESIGN
SECTION

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


1. SCOPE
This specification defines the minimum requirements for the material selection,
design, manufacture, supply and installation of a sacrificial type cathodic
protection system with monitoring facilities (wherever required) for offshore
structures. The structures include all offshore structures like platform jackets,
clamp-on structures on existing platforms, flare or bridge support tripods, SPM
including PLEM and other appurtenances permanently attached to any of the
structure.
2. CODES & STANDARDS
2.1. Design and installation of the cathodic protection system shall be in
accordance with good marine engineering practice in corrosion protection and
compliance with the latest revisions of following Codes & Standards:
Det Norske Veritas:

DNV RP B 401, DNV RP B 403

National Association of Corrosion Engineers:


NACE STANDARD RP 0176-03,
NACE STANDARD RP 0387-99,
American Petroleum Institute:

API RP 5L

American Society for Testing and Materials: ASTM A36


National Electrical Code:

NEC

National Electrical Manufacturers Association: NEMA


2.2. Electrical Design Criteria in Vol-II of Bid Package may also be referred.
3. SITE CONDITIONS:
All the equipment shall be designed to withstand the conditions specified in the
General Design Criteria enclosed in the bid package.
4. SCOPE OF SUPPLY
The scope of supply through this specification includes the following items:


%


  
 










 



Page 105 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


i)
ii)
iii)

Sacrificial type Anode materials for cathodic protection.


Reference electrodes & monitoring anodes.
Monitoring panel including all control & monitoring instruments /
devices (for Process Platform).
iv)
Cables required along with cable glands and lugs, junction boxes,
filling compound, conduits etc.
The required details (quality and quantity) for above items are as indicated
below.
5. TECHNICAL REQUIREMENTS
5.1. General
Cathodic protection system shall be made up of anodes with a configuration
and anodic material composition suitable for use in seawater. All raw
materials finished products and components of the CP system and
monitoring assemblies specified herein shall be new and unused, of current
manufacture, of highest grade and free from all defects and imperfections
that could adversely affect the performance of the system.
5.2. Design Criteria:
5.2.1. The cathodic protection system for the Jacket structure shall be
designed in accordance with DNV RP B4011993 and the
requirements of this Specification.
5.2.2. For C.P. System design following current density and driving potential
shall be considered.
1. Current Density in sea water (initial)
:130 mA/m2
2. Current Density in sea water (average)
: 107.65 mA/m2
3. Current Density in sea mud
: 43.05 mA/m2
4. Driving potentials (initial and near end life) : 250 mV
5. Driving potential (mid life)
:150 mV

For calculation of Anode mass, electrochemical efficiency shall be


taken as 2500 AHr/Kg.

5.2.3. Design Life: same as the design of the platform specified elsewhere in
the bid package.
5.2.4. Cathodic protection method: sacrificial anodes

%


  
 










 



Page 106 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


5.2.5. Coating breakdown factor shall be considered as per clause 6.4 of


DNV RP B401 for painted structures.
5.2.6. Surface Areas Definition for CP system design:
The system shall be adequately designed to protect all exposed steel
surface of the structure along with its various metallic components in
the submerged zone and in the splash zone area. The submerged zone
and splash zone for CP system design have been defined in Table 4
of structural design criteria Part-II enclosed in the bid package.
The contractor shall, however, prepare a comprehensive list covering
all structural members/assemblies considered for cathodic protection
along with their individual surface area calculation and total surface
area calculation and submit it to Company, along with jacket drawings,
for review and approval. An allowance of 10% shall be added to the
calculated area during designing phase to account for the structural
design variations. Anode requirements shall be based on the above
details. The following factors shall also be taken into consideration5.2.6.1. Piles from mud line up to a depth of 30 meters shall be
considered.
5.2.6.2. Pile surface areas are to be calculated taking into account
apparent batter.
5.2.6.3. Internal surface area of the main pile is not required to be
considered.
5.2.6.4. For skirt piles, internal surface area is also to be considered as per
Clause 7.5.4 of DNV RP B401.
The estimated exposed surface area of the structure including the
structure below sea bed shall be indicated in the attached CP system
data sheet.
5.2.7. Current Load for Well casing & Tubing
Wherever it exists, a current drain of 5A shall be included for each
well to account for protection of buried portion of well casing and
tubing. However, surface area of conductor and conductor guide in
seawater shall be included in total surface area of the structures to be
protected by CP system. Proper electrical contacts shall be ensured
between conductor and the jacket structure.

%


  
 










 



Page 107 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$& 


5.2.8. Interference
Suitable arrangement to prevent interference in cathodic protection
system on bridge-connected structures shall be made by the vendor.
5.2.9. Clamp-on structures:
Vendor shall calculate the exact surface area based on structural
drawings and furnish details of the same. The surface area of all the
components as defined in section 5.2.3 shall be considered for cathodic
protection. External surface area only shall be considered for
conductors, conductor guide support framings, clamps including
stiffeners, stubs and anode clamps. Both external and internal surface
area shall be considered for conductor guides and conical plates. In
addition to the above, 10% contingency, especially for fasteners and
other fixtures of clamps, shall be included in total surface area to be
protected.
5.2.10. The complete surface area of PLEM shall be considered for cathodic
protection.
5.2.11. Submerged surface area and splash zone surface of SPM shall be
considered for cathodic protection.
5.3.Anode Material
Anodes shall be GALVALUM-III or Equivalent (Al-Zn-In) alloy suitable for
protection of steel in submerged marine environment. They shall not have any
mercury content. The potential of the sacrificial alloy material shall be (-)
1.08V or more negative referred to a silver/silver chloride reference electrode.
The Electro-chemical efficiency of anode material shall be minimum 2500
AH/Kg after four (4) days of operation as per DNV RP B 401.
6. TESTING AND INSPECTION
6.1. Anode Composition analysis:
Anode composition analysis shall be undertaken by methods agreed upon in
advance. Two samples from each melt shall be taken for chemical analysis.
The samples shall be taken in the beginning and at the end of casting from
the pouring string. Checking of closed circuit potential and practical mass
consumption shall be done for each 15 ton produced anodes. The test
samples may be separately casted or cut directly from an anode. Amperehour capacity test shall be carried out be weight loss method only.

%


  
 










 



Page 108 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$( 


6.2. After casting, the inspection of the anodes shall be done to ensure that:
6.2.1. AH capacity of anodes shall not be less than the figures considered for
design i.e. no negative tolerance shall be permitted.
6.2.2. Closed circuit potential shall be within (+) 10 mV and (-) 50mV of the
guaranteed value. For example, for design value of (-) 1.08 volts,
anodes having closed circuit potential less negative than (-) 1.07 Volts
shall be rejected.
6.2.3. The anodes shall have minimum net weight (Gross weight minus core
weight) within a tolerance of + 2.0% to 1.0%. However, overall
negative tolerance shall be 0% to ensure that is no short fall in total
alloy weight.
6.2.4. Dimensions shall be within tolerance limits indicated in the approved
drawings. No negative tolerance shall be allowed in standoff
dimensions.
6.2.5. At least one anode per delivery or at least 0.5 percent of the anodes
shall be subjected to destructive testing to check that the casting is to
an acceptable standard, each anode shall be cut at 3 of the most
relevant locations. The cut surface shall generally be free from visible
pores and slag/dross inclusions. The lack of bond or void between
anode core and anode material shall not exceed 5%.
As an alternate to a destructive testing, a non-destructive testing by
radiography may be used to check for lack of bond or slag/dross
inclusions if so permitted by the Company or its authorized
representative.
6.2.6. Anode to steel insert shall be checked for electrical continuity. The
resistance between the connector and the body of the anode shall not
exceed 0.005 ohm.
6.2.7. The anodes shall be free from mechanical defects like cracks,
shrinkages, excessive flash, surface projections, laminations, cold laps,
surface slag etc. as consistent with good casting practice. Criteria for
accepting these shall be as per NACE STANDARD RP 0387-99.
6.2.8. All the above Inspection / tests shall be witnessed by Company or its
authorized representative.
6.2.9. All anodes shall be delivered with material certificate from the Vendor
stating batch identification number and chemical analysis.
6.3. All work, materials, and equipments shall be subjected to inspection by
Company at all reasonable times. However inspection by the Company shall
not relieve the Vendor of his responsibility under terms of contract.

%


  
 










 



Page 109 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


6.4. The monitoring system shall be inspected after completion of fabrication and
prior to load out. These checks shall include:

Polarity checks on all monitored anodes.


Insulation and continuity test of all cables.
Calibration tests shall subsequently be carried out on all
instrumentation and reference electrodes.

7. ANODE DIMENSIONS AND PHYSICAL CHARACTERISTICS


Anode shall be standoff type. The steel core of the anode and stub pipes or
brackets provided for mounting the anode on the platform structure shall conform
to ASTM-A36 (for structural shapes) and API-5L Gr. B Seamless (for pipes) or
equivalent.
7.1. The core shall be of nominal 4 inch schedule 80 seamless steel pipe or
equivalent structural shape. Anode material shall surround the core.
7.2. Stand off-legs shall be of nominal 4 inch schedule 80 size. Stand off
separation between the underside of the anode alloy and the cathode surface
(member to be protected) should be in the range of 250 to 450 mm. Distance
between the two legs shall be less than the anode length. The free ends of the
legs shall be welded to the gusset plates superimposing the member.
7.3. For clamp-on structures, anodes shall be of bracelet-segmented type
8. ANODE DISTRIBUTION:
8.1. Anode distribution on the structural members of jackets shall be based on
advanced computer modeling techniques such as Boundary Element Method
(BEM) to ensure uniform current distribution. The contractor shall submit all
relevant details of the techniques used/ procedures adopted, datasheets,
results, drawings etc, for Companys review and approval during detailed
engineering and prior to commencement of the installation of anodes over the
structural members.
8.2. Anode locations shall ensure early polarization of structures to provide
adequate protection at node welds. Anode for SPM chains and piles shall be
mounted on SPM whereas those for PLEM piles shall be put on PLEM itself.
Anode to be installed on PLEM shall be suitable for saline mud as well.

%


  
 










 



Page 110 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$' 


8.3. Clamp-on structures:


8.3.1. Anode distribution for clamp-on structures shall be based on the results
of survey carried out by successful bidder shall generally be located
on the structural members in direct proportion to the
protected
surface area distribution.
8.3.2. Anode distribution shall ensure that the interference effects, with
already existing standoff anodes or adjacent anodes being installed,
are minimum.
9. MONITORING SYSTEM
9.1. General
Monitoring system shall be required only for the cathodic protection of
process platform jackets and shall be designed to provide the following as
minimum requirements:
a) The measurement of the effectiveness of the cathodic protection
system as judged by potential measurements.
b) The performance of the sacrificial anodes as judged by measurements
of current output of monitored anodes.
c) Cathodic protection system for unmanned well platforms, clamp-on
structures, Flare tripod, SPM, PLEM shall be unmonitored.
9.2. Reference Electrodes
9.2.1. 12 Nos of reference electrodes shall be provided on the Jacket, out of
which 4 will be used for vertical plane potential measurement and 8 for
horizontal plane potential measurement. The electrodes shall be
located in areas where the potential is expected to be least negative.
The vertical plane electrodes shall be installed at two different planes
with two electrodes in each plane and the horizontal plane electrodes
shall be installed in two different elevations with four electrodes in
each elevation.
9.2.2. The electrodes shall be of high purity (99.99%) Zinc to ASTM B418
Type 2. each reference electrode shall be supplied with sufficient cable
length to run between the selected location and the junction box.
9.3. Monitored Anodes


%


  
 










 



Page 111 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


9.3.1. The monitoring system shall also include four monitored anodes which
shall be located at two different elevations on the structure with two
anodes at each elevation.
9.3.2. The monitored anodes shall be identical to those supplied for the
structural protection system and have the same physical characteristics
but suitably modified so that current outputs can be electrically
measured at the monitoring panel. The anodic material of the
monitoring anodes shall be electrically insulated for those parts of the
anode core to be welded to the structure with an insulation resistance,
of not less than one mega ohm(when dry) and reducing to not less than
one thousand ohms(when wet). Prefabricated isolating joints with
suitable mechanical properties shall be utilized.
9.4. Monitoring panel
The monitoring panel shall be located in the switchgear room or other
suitable location in safe area. The panel shall be of sheet steel (14 SWG)
construction with an enclosure protection equivalent of IP-51 or NEMA-12.
The monitoring panel, as a minimum, shall contain the following;
a) Selector Switches, manually operated, one for each reference electrode
and monitoring anode.
b) Voltmeter with capability to measure the potential difference between
the structure and each of the reference electrodes.
c) Ammeter with capability to measure the current output of each of the
monitored anodes.
d) Built in Meter calibration facility for checking the calibration and
accuracy of the instruments.
e) Mimic diagram showing the platform jackets to be cathodically
protected shall be included on the front of the panel. Positioning of all
reference electrodes and monitored anodes shall be marked distinctly
on it. Different colours shall be used for marking structures, monitored
anodes and reference electrodes. The positions of reference electrodes
and monitoring anodes get illuminated when they are selected for
voltage or current readings respectively. LED displays may be used for
this purpose.
f) Recording unit provisions
g) Painting in accordance to Spec no 2005


%


  
 










 



Page 112 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


Power supply for the panel shall be provided by the contractor and the vendor
shall specify the total power required for the panel.
10. CABLING
All cabling from each reference electrode and monitored anode shall be brought to
a metallic waterproof junction box, mastic filled and mounted on the
jacket/walkway level in unclassified area. The cables shall be double insulated,
abrasion, ozone and weather resistant and suitable for total immersion in seawater. The cable shall be routed through a conduit and supported from the jacket
by welded bracket. The main raiser conduit shall be clamped at frequent intervals
for adequate supporting.
11. SERVICE AFTER INSTALLATION
11.1. The vendor shall provide necessary test equipments, material and services of
a corrosion specialist and carryout performance tests at the site after jacket
installation and verify that required protection level has been achieved.
11.2. The contractor shall carry out CP survey to ascertain the effectiveness of the
cathodic protection system provided for the jacket structure. The survey
shall be carried out after 60 days of the launching of jacket (and before 180
days maximum) to ensure that the structures are sufficiently polarized.
11.3. During detailed engineering, the contractor shall develop and submit
procedure for carrying out CP survey, for Companys approval. However,
the survey procedure shall comply with the requirements of DNV standard
RP B-403. If the survey results show that the protection level is not
sufficient on any one or more than one location of the jacket member, the
contractor shall provide additional new anodes on all deficient locations so
as to raise the protection potential to required level and cost of all these shall
be borne by the contractor. The basis of redesign/redistribution and all
relevant back-up documents, as required by the Company, shall be made
available by the contractor for review and approval
12. SPARES:
12.1. Vendor shall provide spare parts needed for start-up. In addition, Vendor shall
furnish a separate priced list of recommended spares for two (2) years normal
operation and maintenance. Recommended spares shall take into account the


%


  
 










 



Page 113 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


related factors of system reliability, effect of downtime upon production,


safety, cost of parts and availability of equipment service facilities.
12.2. All spares furnished by vendor shall be wrapped and packaged so that they
could be preserved in original as new condition under the normal conditions of
storage prevailing in India and shall be properly tagged and coded to facilitate
future identification. They shall be packaged separately, clearly marked as
"Spare Parts" and shipped along with main unit. Packing lists shall be
furnished so that the parts can be handled without uncrating, if required.
13. WARRANTY:
Vendor shall have final and total responsibility for the design and performance of
all equipments supplied and guarantee the equipment / anode for their design life.
Vendor shall warrant the equipments furnished by him and their performance in
accordance with this specification and `General Specification- Definition.(Spec
No. 1050)
14. VENDOR DATA REQUIREMENTS
Vendor shall furnish the following information relative to the anodes
14.1. Dimensional drawings of sacrificial anodes, monitored anodes and reference
anodes and supporting parts or accessories along with separate as well as
assembled drawings for their supporting parts and other accessories
14.2. Guaranteed minimum electrochemical value in ampere-hour per kg
14.3. Net, gross, and buoyant weight of anodes.
14.4. Minimum closed-circuit potential in volts.
14.5. Recommended means of anode support.
14.6. Anode alloying compositions (% age by weight and volume)
14.7. Testing method of anodes and details of the test procedure. The test shall
establish the guaranteed minimum electro-chemical value of the anode
material and its potential w.r.t. Ag/AgCl reference electrode under site
conditions.
14.8. Analytical information regarding the location of reference electrode (which
has to be located in least negative potential area.).
14.9. Calculation of anode quantity and weight based on current and weight basis
for the designated design life
14.10. Cable type /specification along with routine and type test certificates.
14.11. Type test certificate for monitoring panel (IP-51)


%


  
 










 



Page 114 of 133

OFFSHORE
DESIGN
SECTION

FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES

SPEC. No.

FS 4001

Rev. No.

 !"
 Elect
#
$ 


14.12. Routine and type certificates for cable glands, junction boxes, pull boxes
etc.
14.13. Vendor shall confirm and provide guarantee for the design life (minimum)
for reference anodes with necessary back up calculation and other relevant
data.
15. CONFLICT :
In the event of conflict between this specification & other documents listed herein,
the following order of priority shall govern:
i).
Basic Bid work
ii).
Design criteria, drawings and data sheet (Whichever applicable).
iii).
This specification .
iv).
General Specification.
v).
Codes & Standards.
16. CERTIFICATION:
All offered plug and sockets or those of similar design manufactured by same
vendor:
Shall have been type tested by an authority approved by the company
Shall have been in continuous satisfactory service on offshore for a
minimum period of two years.
Shall be having current certification/approval/listing by an agency approved
by company or UL or FM.
17. PACKING AND TRANSPORATION:
The offered equipment along with their accessories shall be shipped to site packed
in wooden crates. They shall be wrapped with polythene sheets, before being
placed in the crates to prevent damage to finish. Crates shall have skid bottom for
handling.




%


  
 










 



Page 115 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION

REV. NO. 0

FOR DEFINITION

MUMBAI REGION

SPEC. NO. 1050


SHEET NO 1 OF 7

GENERAL SPECIFICATION
FOR
DEFINITION

OIL AND NATURAL GAS CORPORATION LTD.


INDIA

Note: Reproduced from Rev. 0 issued earlier.

J.S.M.
J.S.M.
BY

APPD

ISSUED FOR BID

13.01.2005

ISSUED FOR BID


REMARKS

7
NO. OF

20.11.2001
DATE

0
REV.

PAGES

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 116 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION
FOR DEFINITION

MUMBAI REGION

REV. NO. 0
SPEC. NO. 1050
SHEET NO 2 OF 7

CONTENTS

FORMAT No.
ODS/SOF/004A

1.0

SCOPE

2.0

CODES AND STANDARDS

3.0

LAYOUT AND OPERABILITY

4.0

MANUFACTURERS AND VENDORS

5.0

WARRANTIES

6.0

MATERIALS OF CONSTRUCTION AND METALLURGY

7.0

SAFETY PROVISIONS

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 117 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION
FOR DEFINITION

MUMBAI REGION

REV. NO. 0
SPEC. NO. 1050
SHEET NO 3 OF 7

1.0

SCOPE

Specifications referred to as General for a specific category indicate a minimum


standard of quality for materials, fabrication and/or erection of the proposed
equipment. Responsibility for the proper interpretation of these specifications shall
rest with appointed representatives of the Contractor and the Company. It will be
Contractors responsibility to obtain clarification from Companys representative,
which in all cases shall be final and binding.

Individual specifications and/or drawings, when furnished, are to be used with the
general specifications.

If conflict exists, the individual specifications and/or

drawings shall govern.

All equipment and materials supplied or installed under these specifications shall
be installed in accordance with sound engineering principles and good fabrication
and construction practice. No omission from these specifications shall relieve the
Contractor from this responsibility.

2.0

CODES AND STANDARDS

All equipment and materials fabricated and installed under these specifications
shall conform to the latest editions of the applicable codes and standards cited in
the bid documents. No omission in the project instructions shall be construed as
relieving the Contractor of his responsibility to ascertain these requirements, to
perform work and furnish material in accordance with the codes specified.

3.0

LAYOUT AND OPERABILITY

The facility shall be laid out and constructed for convenience and safety of
operation and maintenance. Similar equipment shall be grouped together as much

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 118 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION
FOR DEFINITION

MUMBAI REGION

REV. NO. 0
SPEC. NO. 1050
SHEET NO 4 OF 7

as possible so as to best conform with good engineering practice and fulfil accepted
standards of process simplicity, safety and economy.

All equipment shall be

oriented to permit servicing in such a way as to require a minimum of dismantling.


For offshore platform facilities, conservation of space shall also be taken into
account.

Contractor shall provide adequate design measures to handle all predictable


occurrences resulting from weather, process upsets or operational failures, or
interruption of utilities. All such features shall be provided unless brought to
Companys attention and a specific agreement is reached to forgo such measures.

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 119 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION
FOR DEFINITION

MUMBAI REGION

REV. NO. 0
SPEC. NO. 1050
SHEET NO 5 OF 7

4.0

MANUFACTURERS AND VENDORS

Evaluation and selection of Vendors shall be done from the viewpoint of both
supply and maintenance, and all suppliers must be willing and capable of providing
service for their goods.

No provision of these specifications shall imply rejection of a Vendors standard


designed and purchased equipment, provided this equipment is equivalent to or
better than that specified and approved by Company.

All equipment shall be of proven design. Prototypes new designs, or extensive


modifications of standard designs are unacceptable.

Unless otherwise specified, the naming of a specific manufacturers product


indicates, in general, a standard of quality only. An equivalent specification may
be substituted according to the practice of the industry; however, such substitutions
shall be approved in writing by Company.

5.0

WARRANTIES

5.1

Contractor shall -

Warrant all material and equipment to be free from defects in design, material and
workmanship.

Warrant that all equipment will satisfy the requirements of the intended use and be
suitable for the application.

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 120 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION
FOR DEFINITION

MUMBAI REGION

REV. NO. 0
SPEC. NO. 1050
SHEET NO 6 OF 7

Agree to repair or replace any equipment under this warranty which proves to be
defective within a period of 12 months after being placed in operation, but no
exceeding 18 months from the date of shipment.

Assume responsibility for obtaining manufacturers performance warranty for all


equipment purchased.

5.2

Where materials of construction or the application of equipment recommended by


Contractor do not conform with the manufacturers recommendations, the
Contractor shall assume the equivalent of the equipment manufacturers warranty
and in the event of malfunction or damage resulting from this misapplication, the
Contractor will not be released from this warranty.

6.0

MATERIALS OF CONSTRUCTION AND METALLURGY

Unless other wise specified, all materials and equipment shall be new. All materials
supplied under these specifications shall be adequate for the proposed service.
Proper consideration shall be given to their function with regard to corrosion,
chemical attack and other process hazards and precautions to avoid these hazards
shall be taken. Such precautions shall include but not be limited to the following.

6.1

Selection Adequate to meet process requirements, together with foreseeable


contingencies.

6.2

Heat treatment Suitable treatment of materials to minimize corrosion, prevent


hydrogen embrittlement, and for strength considerations per applicable codes.

6.3

Protective coating Suitable as required to preserve the utility, efficiency, and


appearance of the equipment under offshore operating conditions where applicable.

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 121 of 133

OFFSHORE DESIGN
SECTION

VOL. NO. III


GENERAL SPECIFICATION

REV. NO. 0

FOR DEFINITION

MUMBAI REGION

SPEC. NO. 1050


SHEET NO 7 OF 7

6.4

Corrosion allowance and safety factor Within good engineering practice with a
minimum as stated in the relevant General Specifications.

Particular attention shall be given to the metallurgy and arrangement of equipment


in contact with fluid and which is likely to be exposed internally and externally to
corrosive media.

All phases of the process and mechanical design of the facility

must be thoroughly checked to assure that unsatisfactory conditions such as


freezing, plugging and /or undesirable chemical reactions will not occur.

7.0

SAFETY PROVISIONS

It is the intent of the Company that operational hazards be reduced to a mini-mum.


Contractor shall use sound engineering judgment to complete an installation that
will perform the required process function without compromising this aim. The
platform shall be designed in accordance with API RP 14C.

Recommended

Practice for Analysis, Design, Installation and Testing of Basic Surface Safety
Systems on Offshore Protection Platforms, latest edition.
-------------------------

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/210/2003

Page 122 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 1 OF 12

GENERAL SPECIFICATION
FOR
VENDOR DATA REQUIREMENTS

OIL AND NATURAL GAS CORPORATION LTD.


INDIA
NOTE: Reproduced from earlier issued revision

ISSUED FOR BID

12

14.01.200

ISSUED FOR BID

JSM
PREPD BY APPROVED BY

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

REMARK
ISSUE No.
01

TOTALPAGE

REV. No.
01

DATE

REV No.
REV. DATE:
15/10/2003

Page 123 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 2 OF 12

CONTENTS

PROFORMA
SPECIAL NOTES TO VENDORS
Note:

Contractor to complete the attached Vendor Data Requirements form as required.


Contractor shall include the requirements for approval before furnishing this to
Vendors. Minimum8 No. sets of dossier shall be included for the
Purchaser/Consultant.
Vendor shall furnish the following
data in the number of copies indicated with
proposal/after purchaser order. Number of weeks indicated are following receipt of
Purchase Order.

S.

Data/
Drawings

No.

No. of

1.

Manufacturing
Schedule

2.

Monthly Progress Report

3.

Leaflets/
Catalogues
(Main Equip.
& Aux. Equip.)

4.

Catalogues for
Components in
Vendor's scope

FORMAT No.
ODS/SOF/004A

Certified information after Purchase Order

Prints
With
Reproproposal ducibles

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

For Approval

Prints
(No. of)
Copies
5

ISSUE No.
01

Date
needed
(Weeks)

Reproducibles

REV. No.
01

For Dossier
Date
Prints
(No. of) needed
Copies (Weeks)
8

REV. DATE:
15/10/2003

Page 124 of 133

S.

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

5.

Deviation
list (s)

Completed Data
Sheets (Main/
Aux. Equip.)

7.

Auxiliary
Equipment
Sheet (s)

Data/

No. Drawings

No. of

Prints
With
proposal

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 3 OF 12

Certified information after Purchase Order


For Approval
Reproducibles

7A

Data & Drgs.


for Couplings,
Gear Boxes,
Heat Exchangers,
Lube Oil
Tanks ect.

8.

Motor Data
Sheet (s)
(Main & Aux.)

9.

Performance
Curves

10.

Motor Characteristic
Curves

Prints
(No.of)
Copies
5

ReproDate
ducibles
Needed
(Weeks)

For Dossier
Prints
(No.of)
Copies
8

Utility
Requirements
(Characteristics &
Quantity)
FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

Date
needed (
Weeks)

REV. DATE:
15/10/2003

Page 125 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

12.

Lubricants
List with
Specifications

13.

Main P& ID'S


& Bill of
Materials

14.

Auxiliary
System (s)
P&ID's & Bill
of Materials,
(such as lube/
seal oil, cooling water, Inst.
air/gas diag.,
fuel system.
unloading comp.,
seal, flushing/
quenching, wash
water, flushing/
quenching, wash
water. Fire system
etc.).

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 4 OF 12

15. G. A. Drawing
including auxiliary all piping
including
valving & Other
accessories, and
purchasers
piping connection at battery
limits (Separate
G. A. drgs. for
Auxiliaries &
aux. systems
also to be give).

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 126 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

16.

Loading Data
(Main Equipment
& Auxiliaries).

17.

Design details
of Structural
base.

18.

Parts list with


Cross Sectional
Drawings
giving critical
clearances for
main & aux. equipments

19.

Component outLine Drawings.

20.

Component
cross-sectional
Drawings including mech. seals.

21.

Assembly drawings including


Auxiliary Eqpt.
Assembly
Drawings.

22.

Sub-vendor drg.
with complete
Bill of Materials.

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 5 OF 12

23. Vessel Design


Calculations.
24.

FORMAT No.
ODS/SOF/004A

Vessel Fabrication drawings.

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 127 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

25.

Allowable forces
and moments on
nozzles.

26.

Piping Bill
of Material.

27.

Purchaser's
piping connections (with flange
details).

28.

Complete Instrument and


Annunciator List

29.

Instrument
Data Sheet
with sizing
Calculations.

30.

Instrument
Dimensional
Drgs. with
Mounting
Details.

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 6 OF 12

Instrument
Tubing, Wiring
& Junction Box
Schedule.
Control Schematic including:
Alarms. Trips &
Interlocks Logic
Diagrams with
Description:
Alarms, Trips
& Interlocks
Wiring Diagram.
For all panels).

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 128 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

33.

Impulse piping
hook up with
Bill of Materials.

34.

Local Panel
G. A. Drgs. with
Fixing Details.

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 7 OF 12

35. Local Panel/


Remote Panel
Wiring Diagram
identifying
external
connections.
36.

Remote Control
Panel G. A. Drawing with Fixing
Details.

37.

Dimensional
Semigraphic
Flow Plans.

38.

Terminal
Details of
Interface with
Telemetry
Equipment.
Electrical
(General Arrangement &
Layout
Drawings.

40.

Electrical
Load List

41.

Electrical
Scheme Drawing/Writing &

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 129 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 8 OF 12

Interconnection Diagram.
42.

Terminal Box
Dimensional
Drawings.

42A. Write up on
automatic
control of
Turbo-Generator and the
same when
units are run
in parallel.
43.

Test Certificate (Instruments).

44.

Mechanical
Run Layout
& Procedure
of Main &
Aux. Equpments.
Performance
Test Layout
& Procedure
(Main & Aux.
Equip. Systems).

45A. String test


Layout & Procedure (Gas Turbine, Gear box
Generator &
Motor gear
box main pump).
46
FORMAT No.
ODS/SOF/004A

Layout & Procedure


Ref. PROCEDURE No.
ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 130 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 9 OF 12

of any other
test(s) specified
by Company.
Motor gear
box main pump).
46A. Layout & Procedure of any other
test(s) specified
by Company
Motor gear
box main pump).
46B. Layout & Procedure of any other
test(s) specified
by Company).
47. Lateral and
Torsional
Analysis
Report.
48.

Mill Test
Reports.

49.

Record Showing
Location
of Heat Numbers.

50.

Test Certificates/records
for all nondestructive
tests specified
in spec. /data
sheets such as
radiography,
ultrasonic etc.

51.

Stress Relief
Charts.

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 131 of 133

52.

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 10 OF 12

Welding
Procedures.
Inspection &
Test Reports.
(i.e. Hydrostatic
test performance
test etc. )
Manufacturer's
Test Certificates
for suborder
items.
Final Acceptacne Testing &
performance
Test Reports.
Vendor quality
assurance
practices
Standard &
Special Tools
List including
tools required
for overhaul/
calibration.
Installation
Operating
Instructions.
Maintenance
Instructions.
Shop Repair
Manual including Assembly

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 132 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 11 OF 12

showing critical clearances.


*61. Spare Parts
List (for
2 years
operations)
61A. List of spare
parts for First
overhaul.
*62. Start-up and
Commissioning
Spares List.
63.

Mechanical
Catalogue
containing
all items
except those
marked with
asterisk (*)

*64. Painting
Procedure
*65. Name Plate
Rubbing.
*66. List of Similar
Installations.
67.

FORMAT No.
ODS/SOF/004A

G. A. drg. For
fire & gas
detection
system of
power
generator
unit.
Ref. PROCEDURE No.
ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003

Page 133 of 133

OFFSHORE DESIGN

GENERAL SPECIFICATION

SECTION

FOR VENDOR DATA

MUMBAI REGION

REQUIREMENT

VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 12 OF 12

SPECIAL NOTES TO VENDOR


1.

The Vendor shall be held accountable for furnishing all data/drawings in proper
form and quantity in accordance with these requirements. The Vendor shall also
be accountable for the documentation required from his sub-vendor.

2.

Each Vendor data item requested above must be identified by the Purchase Order
number and equipment tag number located on the cover sheet or First page of said
item and in the case of engineering drawings, on each and every drawing.

3.

Any additional data/drawings required as a result of issuing supplements to a


purchase order or during detailed engineering shall be furnished by Vendor and
handled in the same manner as the original order.

4.

All drawings and literatures shall be in the English language and the Metric
Measurement System.

5.

The reproducible drawings, 279 mm x 432 mm (11" x 17") size and full size are to
be of such quality that Clear Legible prints can be made with Osalid type
reproduction facilities.

-------------------

FORMAT No.
ODS/SOF/004A

Ref. PROCEDURE No.


ODS/SOP/008 TO 015

ISSUE No.
01

REV. No.
01

REV. DATE:
15/10/2003