ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 2 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
TABLE OF CONTENTS
DESCRIPTION
PART-1
SL. NO.
REV NO: C1
PAGE NO.
[
]
1.0
[
]
2.0
[
]
3.0
[
]
4.0
QC PROGRAMME REQUIREMENTS
[
]
5.0
[
]
6.0
9 12
[
]
7.0
[
] A, [
] B, [
] C, [
] D, [
] E, [
] F, [
] G, [
] H,[ ] I, [ ] J, [
] K
13 23
[
]
8.0
ADDITIONAL/TECHNICAL NOTES
24 26
[ ]
9.0
SPARE
[ ]
10.0
SPARE
[ ]
11.0
SPARE
[
]
12.0
INDEX TO ATTACHMENT
[ ]
12.1
MECHANICAL
[ ]
12.2
ELECTRICAL
[ ]
12.3
INSTRUMENTATION
[ ]
12.4
PIPING
[ ]
12.5
PROCESS
[
]
12.6
STRUCTURAL
[ ]
12.7
PIPELINES
[
]
12.8
VENDOR DOCUMENTS
56
27
28 58
59 101
PART-2
[ ]
13.1
MECHANICAL
[
]
13.2
ELECTRICAL
102 114
[ ]
13.3
INSTRUMENTATION
[ ]
13.4
PIPING
[ ]
13.5
PROCESS
[ ]
13.6
STRUCTURAL
[ ]
13.7
PIPELINES
[
]
13.8
LEGEND :
115 133
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PAGE : 3 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
REV.
ADDL.
PAGE NO.
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
Attach(28-133)
REV.
PAGE
NO.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
REV.
ADDL.
PAGE NO.
REV NO: C1
REV.
PAGE
NO.
REV.
ADDL.
PAGE NO.
REV.
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
NOTE: IF REVISION REQUIRES ADDITIONAL PAGES TO BE INSERTED IN BETWEEN THE DOCUMENT, THE NUMBER OF THE PAGE
AT INSERTION SHALL BE NUMBERED WITH DECIMAL (e.g. INSERTION BETWEEN PAGE 10 AND 11 SHALL BE NUMBERED AS 10.1,
10.2 ........)
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PAGE : 4 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
REV NO: C1
The following Table gives a brief summary of items of supply covered under this requisition. It is not intended to be
exhaustive or complete. Vendor is bound by the scope of supply as detailed in this Material/Purchase Requisition sheets
and attachments as listed in the table of contents.
SL. NO.
ITEM NO.
QUANTITY
DESCRIPTION
1.
321*
A3560SOSP
JACKET
2.
A3560SOSP
177*
FOR
B-55-5
WELLHEAD
PLATFORM
JACKET
STRUCTURE
3.
250*
A3560SOSP
FOR
B-157
WELLHEAD
PLATFORM
JACKET
STRUCTURE
ZC WELLHEAD PLATFORM
4.
305*
A3560SOSP
LTV5095/0 C12014
ANODE DETAILS:
1)
ANODE MATERIAL
2)
3)
: GALVALUM -III OR
EQUIVALENT
[AL ALLOY (Al-Zn-In)]
: 356.0 Kg
: 413.2 Kg
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PAGE : 5 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
REV NO: C1
Requirement of document/No. of prints to be furnished by Vendor at Bid stage, after placement of Letter of Intent
(LOI)/order and Final document is given in the table below. It should be understood that Vendor has to keep furnishing the
stated no. of copies of document meant for Review/Approval till the document are finally approved.
WITH
BID
DOCUMENT
DESCRIPTION
SL.NO.
FINAL
DOC .IN
DOSSIER
FORMAL SUBMISSION
AFTER LOI/ORDER
MANUFACTURING SCHEDULE
---
---
---
---
DIMENSION
WEIGHT
AND
GENERAL
ARRANGEMENT DRAWINGS INDICATING
MOUNTING ARRANGEMENT DETAILS
---
---
---
---
---
---
---
---
---
---
---
---
---
---
10
---
---
11
---
---
12
---
---
13
---
---
14
---
---
15
---
16
---
17
---
---
18
---
---
REPORTS &
AND
LEGEND:
A
P
W
I
*
S -
LTV5095/0 C12014
M R ** -
MANDATORY DOCUMENTS
WITH DELIVERY
NO. OF REPRODUCIBLES
(REQUIRED FOR SIZES ABOVE A3)
EVERY MONTH
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PAGE : 6 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
DOCUMENT
DESCRIPTION
SL. No.
WITH
BID
REV NO: C1
FINAL
DOC. IN
DOSSIER
FORMAL SUBMISSION
AFTER LOI/ORDER
19
---
---
20
---
---
21
PROGRESS REPORT
---
**
---
22
---
---
23
---
---
24
MECH. WARRANTY
---
---
25
---
---
---
---
---
---
---
---
29
---
---
30
---
---
31
---
---
32
---
---
33
---
---
34
---
---
26
27
28
NOTES:
1.
2.
THE VENDOR SHALL BE HELD RESPONSIBLE FOR FURNISHING ALL DATA / DRAWINGS IN PROPER FORM AND QUALITY
IN ACCORDANCE WITH THESE REQUIREMENTS. THE VENDOR SHALL ALSO BE ACCOUNTABLE FOR DOCUMENTATION
REQUIRED FROM HIS SUB VENDOR.
3.
EACH VENDOR DATA ITEM REQUESTED ABOVE MUST BE IDENTIFIED BY THE PURCHASE ORDER NUMBER AND
EQUIPMENT TAG NUMBER LOCATED ON THE COVER SHEET OR FIRST PAGE OF SAID ITEM AND IN CASE OF
ENGINEERING DRAWING ON EACH AND EVERY DRAWING.
4.
ANY ADDITIONAL DATA / DRAWINGS REQUIRED AS A RESULT OF ISSUING SUPPLEMENTS TO A PURCHASE ORDER OR
DURING ENGINEERING SHALL BE FURNISHED BY VENDOR AND HANDLED IN THE SAME MANNER AS ORIGINAL ORDER.
5.
ALL DRAWINGS AND LITERATURES SHALL BE IN THE ENGLISH LANGUAGE AND SI MEASUREMENT SYSTEM.
6.
THE REPRODUCIBLE DRAWINGS, 297mm X 432mm (11 x 17) SIZE AND FULL SIZE ARE TO BE OF SUCH QUALITY THAT
CLEAR LEGIBLE PRINTS CAN BE MADE WITH REPRODUCTION FACILITIES.
7.
VENDOR TO SUBMIT SOFT COPIES OF ALL DOCUMENTS ALONG WITH EACH SUBMISSION AND ALSO AS BUILT
DRAWINGS IN CD-ROM
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 7 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
QC PROGRAMME REQUIREMENTS
REV NO: C1
The following QC programme is a broad outline of Purchasers Requirement. Vendor should take note of this at
the time of submitting his quotation as these requirements would be valid after placement of order.
1.
(a) Provisional Quality Plan to be submitted with tender documents for
approval/information.
[ ]
Yes
[
]
No
(b) Specific Quality Plan to be submitted after order placement. for approval as
per category
[
]
Yes
[ ]
No
2.
[
]
Yes
[ ]
No
3.
[
]
Yes
[ ]
No
[ ]
Yes
[
]
No
[
]
Yes
[ ]
No
5.
[
]
Yes
[ ]
No
6.
[
]
Yes
[ ]
No
7.
[
]
Yes
[ ]
No
4.
[ ]
[ ]
[
]
[ ]
[ ]
Legends :
CA Certification Agency Appointed by ONGC
Q Quality Control
TPI - Third Party Inspection Agency
TBA To Be Announced
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 8 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 9 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
INSTRUCTIONS TO VENDORS
REV NO: C1
This document outlines general information, instructions and requirements to be complied by Vendors.
1.0
DEFINITIONS
COMPANY/OWNER
PURCHASER/CLIENT
PURCHASER'S CONSULTANT
VENDOR
MATERIAL / PURCHASE
.
REQUISITION
2.0
GENERAL INSTRUCTIONS
2.1
The language for all correspondence, documents, drawings, Instructions, Manuals etc. shall be English and they
shall state the name of Company, Purchaser, Project Title, Contract No., Requisition Number, Item number and
Service, Title / Description of item etc. as appropriate.
All revised documents/drawings submitted by vendor to the purchaser till final Review/approval is obtained shall
be at no additional cost and/or time to the purchaser.
2.2
2.3
Metric system (MKS/SI Systems) shall be used for documents/drawing/measurement unless otherwise specified.
2.4
2.5
Vendor should send all documents in required number of copies and all other correspondence to
NAME
:RAHUL MORE
DESIGNATION
ADDRESS
:3
RD
Floor EPC block, Gate no.1,Powai Campus, Sakhi Vihar Road, Mumbai 72
2.6
3.0
3.1
GENERAL
3.1.1
Bids shall accompany answers to specific questions and requirements in part A, irrespective of whatever is stated
in the body of Vendor's quotation and/or covering letter.
3.1.2
Similarly, any reservation not explicitly highlighted as an answer to this requirement in part-B will not be binding
on purchaser/purchaser's consultant.
3.2
3.2.1
Vendor shall clearly highlight deviations, if any, from specifications in Form'B' (enclosed) irrespective
of whatever is stated elsewhere in the offer. Any deviation not stated in above form will not be
considered and it will be presumed that vendor will comply with all other requirements stipulated in
the material requisition.
b)
Vendor shall make a specific mention in the covering letter of his bid that "all requirements stipulated in
bid documents of the material requisition, other than those specifically stated in deviation list covered in
Form 'B', shall be met".
c)
Vendor shall furnish answers to questions listed in enclosed Form A-Technical Questionnaire and
submit along with his offer. Also required with bid, Form C to G (as applicable) duly completed.
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 10 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
INSTRUCTIONS TO VENDORS
REV NO: C1
3.2.2
a)
b)
In addition to documents listed in VDRS, the Vendor shall furnish such additional documents which are essential
for safe and guaranteed operation and maintenance of the supplied equipment/material.
c)
It is normally presumed that all work connected with this Material Requisition would be handled at Vendors own
premises. However, if Vendor finds it unavoidable that certain portion be handled elsewhere at sub vendors
premises, then Vendor shall provide (1) names, (2) addresses (3) track records of such sub-vendors along with the
bid. Purchaser/Purchaser's Consultant reserves the right to accept or reject such sub-vendors. If the bid does not
contain this list, it will be presumed that entire work of this Material Requisition will be handled at the Vendors
premises only.
d)
List of bought out items like electric motors, instruments, control panels, valves, fittings, etc. needed for this
Material Requisition along with names, addresses and track records of respective sub-vendors, along with the bid.
Purchaser reserves the right to reject any sub-vendor. Vendor shall not change sub-vendors after placement of
order.
e)
If Vendor intends to avail services of outside party or consultant (s) for design, then the name, address and track
record of such consultant (s) should be submitted.
f)
The Vendor will submit a list of similar jobs handled in past by him along with the details of client, year of
completion and copies of any feedback information received by him from clients regarding the functioning of
equipment/material supplied by him.
g)
Personnel
Vendor shall provide competent and authorized technical and commercial representatives of all disciplines for
technical and commercial discussions at bid evaluation stage. Normally discussions will be held at purchaser's /
Consultant's office. A notice period of about 7 to 10 days for bidders will be given for such discussions.
3.3
3.3.1
a)
Personnel
Vendor shall make available competent and authorized technical and commercial representatives for a kick-off
meeting prior to commencing work as per purchase order.
During design and/or manufacture if Purchaser/Purchaser's Consultant finds it necessary to discuss, some matters
relating to the order, then vendor shall provide competent and authorized technical and/or techno-commercial
personnel for such discussions. Such meetings are normally held at purchaser's/ purchase consultants premises.
Notice for such meetings in the above cases will be given as in Para 'g' above.
b)
If during design/detailed Engineering/manufacture of the ordered items the vendor discovers any
discrepancies/conflicts in the purchase requisition documents, he shall obtain clarification in writing from the
purchaser / purchaser's consultant before proceeding with the work.
In the event of errors occurring during manufacture, vendor shall alert the purchaser immediately giving all details.
c)
Vendors compliance to specification does not relieve him of his responsibility to provide equipment and
accessories of proper design to meet the operations, maintenance and safety requirement of supplied material.
d)
Vendor on whom the purchase order is placed is responsible for the due compliance of the order by himself his
manufacturer, sub-vendor, supplier etc.
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
INSTRUCTIONS TO VENDORS
e)
PAGE : 11 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
REV NO: C1
After placement of Purchase Order, the vendor shall abide by the requirements of the purchase requisition
documents except for the deviations accepted by the purchaser vide 'Form B' enclosed to the purchase requisition.
However during the execution of the order, the vendor feels that additional deviations are necessary for executing
the order, the vendor shall immediately request the approval of the purchaser and purchaser's consultant of the
proposed deviations giving the following details.
P.O. number and description.
P.O. item No., Tag No./Equipment No. etc.
Drawings and documents affected by the request.
Description and reason for request with enclosures as required.
Effect of this request on price and time schedule.
It should be clearly understood that the purchaser is not obliged to entertain and approve such requests from
Vendor. However in the interest of work purchaser may at his sole discretion entertain and approve such requests
partly or completely. Only after receipt of purchasers written approval the vendor should go ahead with the
deviation requested in keeping with the approval received.
If the requested deviation is not accepted by the purchaser the vendor shall be bound by purchase requisition
requirements.
3.3.2
a)
All applicable drawings, data sheets, catalogues and other technical documents, in requisite number of copies, as
specified in "vendor data requirement schedule" shall be submitted.
Design calculations for equipment and sizing calculations for control and safety valves etc., shall also be submitted
for approval if specified.
b)
After completion of manufacture, final inspection and release for despatch, vendor shall submit in requisite number,
as specified in vendor data requirement schedule, "as built" drawings, data sheets duly signed by final inspection
authority, for inclusion into operation manual for the project to be compiled by purchaser/ consultant.
c)
Operation and maintenance manual(s) in requisite numbers shall be submitted along with equipment/supplies.
d)
List of spares, tools, tackles, installation aids, chemicals, initial fill of lubricants etc. supplied shall be submitted
along with despatch documents.
e)
Details of any facilities/accessories required for erection and/or pre-commissioning but not included in the vendors
scope of supply shall be furnished well in advance for erection and/or pre-commissioning.
f)
A consolidated list of all deviations raised and approved by purchaser and/or their authorized representatives during
execution of order shall be submitted prior to despatch of equipment. This list will also be attached as an annexure
to the "Operations and Maintenance Manual" to be submitted by vendor.
g)
Details of packing and protection provided for transportation of equipment to site shall be submitted. This
document should also contain detailed instructions for handling and storage at site.
h)
Equipment weight certificate as per Form H (enclosed) including 'COG' shall be sent along with equipment
4.0
SUPPLIES
a)
Vendor shall supply all commissioning spares, tools and tackles, initial fill of lubricants, chemicals and such
consumables along with main equipment.
b)
Items such as gaskets, gland packing seals etc. used during final testing, but needs to be changed before
commissioning shall be separately identified, packed, labelled and supplied along with main equipment.
c)
Any loose items and/or equipment which are to be fitted by vendor at site before commissioning shall be properly
identified, packed, labelled and supplied along with main equipment.
d)
Calibration aids, gases etc. that are in vendor's scope of supply shall also be supplied along with main equipment.
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 12 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
INSTRUCTIONS TO VENDORS
5.0
REV NO: C1
INSPECTION
Vendor shall have a system to ensure that all inspection, measuring and test equipment used to produce the product
ordered are calibrated and fit for use. Vendor shall do all that is necessary to comply with purchase requisition
document with regard to Inspection/Quality Control requirements, submission of reports, certificates etc. and
provide every assistance for inspection / witnessing of tests by purchaser's representative or by a third party
appointed by purchaser.
Company/Purchaser's representative shall have the right to reject any material/equipment that is found to be of
unacceptable quality or workmanship or fails to comply with purchase requisition requirements.
5.1
INSPECTION NOTICE
Vendor shall give purchaser a notice (as agreed during QA/QC review) of forthcoming 'Witness' and 'Hold'
activities.
The notice must be communicated by letter or telex and shall include the following.
-
Plant location and date on which the items will be ready for inspection.
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 13 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 14 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 15 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 17 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 18 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 19 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 20 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 21 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 22 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
LTV5095/0 C12014
PAGE : 23 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PAGE : 24 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
ADDITIONAL/TECHNICAL NOTES
1.
REV NO: C1
SCOPE
The scope of supply shall include design, manufacture, testing, packing and supply of Sacrificial type Cathodic
Protection system without monitoring facility for B55-5, B-157, ZC Platforms Jacket Structures and B-127
Platform Jacket structure and J-Tube complete with Slender Stand Off type Sacrificial Anodes, mounting
accessories in accordance with Functional Specification for Offshore Structures FS 4001, Rev. 6.
2.
3.
CONFLICT
In the event of conflict between Additional/Technical notes, Specification, Data sheets, Codes & Standards the
following order of priority shall govern.
i)
4.
GENERAL/TECHNICAL REQUIREMENTS
1.1 Sacrificial Type Cathodic Protection System shall be provided for Offshore Jacket Structure of B55-5, B-157,
ZC Platforms and B-127 Platform comprising Jacket structure and J-Tube. The Cathodic Protection System
shall be without Monitoring Facility.
1.2 The Sacrificial Anode Cathodic Protection System Design, Selection, Installation and Testing shall be in
accordance with relevant standards, Recommended Code of Practices, Specification, Data sheets, Installation
Notes & Drawings. The CP System shall be designed for operating life of twenty five (25) years.
1.3 The basic parameters to be considered in CP system design for jacket structures as follows:
a)
Life of CP system
25 years
22.8C to 30C
c)
30 to 60 mts.(Approximate)
i) Anode Material
Long Slender-Standoff
Water Depth
d) Anode Details
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PAGE : 25 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
2500 Ah/kg
Current density
i) For steel structure in sea water:
f)
Initial
130 mA / m
Design(Average)
107.65 mA / m
Final
130 mA / m
43.05 mA / m
5A/well
No. of wells/Platform
-
B-127
9 Nos
B55-5
3 Nos
B-157
3 Nos
ZC
12 Nos
20 ohm-cm
40 ohm-cm
i) Initial
250 mV
150 mV
250 mV
As per DNV-RP-B401
i)
j)
Driving Potential
1.4 Vendor shall consider the Surface area for B-127, B55-5, B-157 and ZC Platforms as indicated in
ANNEXURE-1/2/3/4 attached.
1.5 Vendor shall supply Mounting Accessories as required for slender standoff Anodes. Vendor shall furnish
Anode Installation Drawing along with the Bill of Materials for mounting accessories required for Anode
Installation. The mounting accessories shall be supplied by the Purchaser.
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 26 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
1.7 Vendor shall submit Anode Location and Distribution Drawings for Purchaser/Owners Review/Approval.
1.8 Complete calculations shall be submitted to Purchaser/Owner for Review/Approval.
1.9 Vendor shall furnish all Drawings and Documents as listed in Vendor Document Requirement Schedule
(VDRS) for Review/Approval after the Placement of Order.
1.10 Anodes distribution on structural members of jackets shall be based on advanced computer modeling
techniques such as Boundary Element Method (BEM) to ensure uniform current distribution.
1.11 Vendor shall consider 10% contingency on the total Surface Area indicated in the Data sheet while
calculating the total number of anodes.
1.12 The Vendor shall note that the Details of Surface Area of Structure given in the Data sheets are indicative. It
shall be responsibility of Vendor to calculate the Total Surface Area of Structure to be protected from the
detailed Approved for Construction Structural drawings.
1.13 Vendor shall have final and total unit responsibility for the design and performance of all equipment
furnished by him.
LTV5095/0 C12014
L&T-VALDEL
ENGINEERING LTD.
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
REQN. FOR: CATHODIC PROTECTION SYSTEM
PAGE : 27 OF 133
CONTRACT No.: C12014
DOC. No.:C12014-75-504
INDEX TO ATTACHMENTS
REV NO: C1
Equipment/Material specified in this requisition shall be supplied in strict accordance with the following attachments and
other documents referenced therein except where noted otherwise. Any conflicts shall be brought to the attention of the
purchaser for formal resolution.
SUB
SEC.
Sl.No.
DOCUMENT DESCRIPTION
DOCUMENT
No.
No. OF
SHEETS
DOC.
REV.
04
27
C1
43
FS 4001
13
PART -1
12.6
STRUCTURAL
1.
2.
12.8
VENDOR DOCUMENTS
PART -2
13.1
ELECTRICAL
1.
13.8
FS 1050
07
2.
FS 1060
12
LTV5095/0 C12014
Page 28 of 133
PAGE NO.:
B-127 PLATFORM
JACKET SURFACE AREA
L&T VALDEL
ENGINEERING LTD
DOC.NO.:
C12014-SA-002
PROJECT:
PREPD.:
JGG
CHKD.:
HVS
APPD.:
HVS
DATE:
10/18/2012
DATE:
10/18/2012
DATE:
10/18/2012
Platform Designation:
ANNEXURE-1
B-127 PLATFORM
LOCATION
REMARKS
1029.85
4819.16
164.20
400.00
vi) J - TUBE
81.00
TOTAL
Tentative
6494.21
470.46
350.00
Tentative
iii) J - TUBE
0.00
iv) CONDUCTORS
172.36
TOTAL
992.82
C) BELOW MUDLINE
i) PILES
ii) LEG EXTENSIONS
2921.28
82.30
3500.00
iv) CONDUCTORS
646.35
TOTAL
7149.93
GRAND TOTAL
14636.96
NOTES:
1. 10% contingency shall be added in the surface area listed above.
2. For Piles and Conductors, 30 m length below the mudline is considered.
3. For Skirt Piles, inside surface area has also been considered, as per bid.
4. MUDMAT has not been planned, above nos are assumed.
5. Surface area projected above do not include future facilities.
Tentative
REV. D2
Page 29 of 133
PAGE NO.:
L&T VALDEL
ENGINEERING LTD
CONTRACT NO.:
SHEET 1 OF 1
DOC.NO.:
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PREPD.:
RL
CHKD.:
NP
APPD.:
VV
DATE:
21/08/2012
DATE:
21/08/2012
DATE:
21/08/2012
ANNEXURE-2
Platform Designation: B55-5 Platform
LOCATION
221.1
761.1
833.7
800.9
v) CONDUCTORS GUIDES
16.5
1836
vii) RISERS
17.4
21.6
TOTAL
4508.29
i) JACKET LEGS
209.00
91.30
53.40
0.00
v) RISER
3.90
1.00
vii) CAISSONS
0.00
viii) CONDUCTORS
56.10
0.00
TOTAL
414.70
C) BELOW MUDLINE
i) PILES (EXTERNAL AREA UP TO 30M BELOW
MUDLINE)
746.89
27.11
833.01
215.45
TOTAL
1822.46
Total
6745.44
NOTES:
REMARKS
REV. D1
Page 30 of 133
PAGE NO.:
L&T VALDEL
ENGINEERING LTD
CONTRACT NO.:
SHEET 1 OF 1
DOC.NO.:
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PREPD.:
NP
CHKD.:
VV
APPD.:
VV
DATE:
22/08/2012
DATE:
22/08/2012
DATE:
22/08/2012
Platform Designation:
ANNEXURE-3
B-157 PLATFORM
LOCATION
372.00
893.00
2801.40
20.00
2531.00
vi) RISERS
28.00
TOTAL
6645.40
340.40
75.00
iv) RISER
4.22
v) RISER GUIDES
0.00
vi) CAISSONS
vii) CONDUCTORS
57.50
TOTAL
477.12
C) BELOW MUDLINE
i) PILES
690.00
25.00
1165.00
iv) CONDUCTORS
215.00
TOTAL
2095.00
ALL TOTAL
9217.52
NOTES:
REMARKS
REV. D1
Page 31 of 133
PAGE NO.:
L&T VALDEL
ENGINEERING LTD
SHEET 1 OF 1
DOC.NO.: C12014
PROJECT: B-127 CLUSTER WELL PLATFORM PROJECT
PREPD.:
PN
CHKD.:
SJ
APPD.:
HVS
DATE:
9/14/2012
DATE:
9/14/2012
DATE:
9/14/2012
Platform Designation:
ANNEXURE-4
ZC PLATFORM
LOCATION
REMARKS
1470.00
5660.00
236.00
150.00
vi) RISERS
183.00
TOTAL
7699.00
Tentative
282.00
iv) RISER
19.00
vii) CONDUCTORS
150.00
TOTAL
898.00
C) BELOW MUDLINE
i) PILES
772.00
21.00
1200.00
iv) CONDUCTORS
575.00
TOTAL
2568.00
ALL TOTAL
11165.00
NOTES:
Tentative
REV. D1
Page 32 of 133
Page 33 of 133
Page 34 of 133
Page 35 of 133
Page 36 of 133
Page 37 of 133
Page 38 of 133
Page 39 of 133
Page 40 of 133
Page 41 of 133
Page 42 of 133
Page 43 of 133
Page 44 of 133
Page 45 of 133
Page 46 of 133
Page 47 of 133
Page 48 of 133
Page 49 of 133
Page 50 of 133
Page 51 of 133
Page 52 of 133
Page 53 of 133
Page 54 of 133
Page 55 of 133
Page 56 of 133
Page 57 of 133
Page 58 of 133
Page 59 of 133
VENDOR DOCUMENTS
TABLE OF CONTENTS
SL.No.
DOCUMENT DESCRIPTION
DOCUMENT No.
No.of
SHEETS
1.
Aluminum Anode-A3560SOBp
DWG-AL-SOBP-001
01
2.
DS 4001 Rev. 0
02
3.
DC-AL-SOBP-LNTONGC-B127
05
4.
Certification of Calibration
UCT/IS-MS/12C386
02
5.
32
Page 60 of 133
Page 61 of 133
Page 62 of 133
Page 63 of 133
DESIGN CALCULATION
OF SACRIFICIAL ANODE
CATHODIC PROTECTION SYSTEM
Project Name:
A
REV
SAW
BY
CHRIS
CHECK
LHJ
APPR.
02 NOV 2012
DATE
CO. APPR.
Page 64 of 133
Page 65 of 133
Page 66 of 133
Page 67 of 133
Page 68 of 133
Page 69 of 133
Page 70 of 133
October 2012
CUSTOMER
JOB
YEAR
2012
2012
2012
2012
PTTEP
PTTEP Bundled Phase A2B Inst Project
Supply of Offshore Pipeline Aluminium Bracelet Anodes
2012
JTC
Jurong Rock Cavern Project
Design, Supply and Installation Supervision for Underground
Cavern and Aboveground Pipelines
2012
Shell
Shell Prelude WCS
Supply of Sacrificial Aluminium Jacket Anodes for Deepsea
Structure
2012
2012
2012
2012
2012
2012
2012
Corp., Ltd
Page 71 of 133
October 2012
CUSTOMER
JOB
YEAR
2012
2012
2012
2012
2012
2012
ONGC
EPC for 5 Well Platforms for Development of WO-16 Cluster
and SB-14 Wellhead Platform Project
Supply of Sacrificial Aluminium Jacket Anodes
2012
2012
2012
2012
2012
2012
2011/2012
Page 72 of 133
October 2012
CUSTOMER
JOB
YEAR
Murphy Oil
EPC of Serendah & Patricia Satellite (PT-SA) Substructure for
SK309/311 Sarawak Development Project
Supply of Sacrificial Aluminium Jacket Anodes
Vietsovpetro
Anodic Protection of the Uncoated Jacket of Offshore
Platforms GT1 & MT1
Supply of Sacrificial Aluminium Jacket Anodes
2011/2012
2011
2011/2012
2011/2012
2011/2012
2011
2011
2011
2011
2011
2011
2011
Page 73 of 133
October 2012
CUSTOMER
JOB
YEAR
2011
2010/2011
2011
Corp., Ltd
Corp., Ltd
ENSCO International
B329/B330 Super "A" Class Mobile Offshore Drilling Unit
Design & Supply of Sacrificial Anodes
2011/2012
Maersk Drilling
B331/B332 Jack-up Rigs
Design & Supply of Sacrificial Anodes
2011/2012
2011/2012
Discovery Offshore
B322 & B323 Super "A" Class Jack-up Rig
Design & Supply of Sacrificial Anodes
PetroVietnam
Bio-Ethanol Underground Pipeline Project
2011
2011
2011/2012
2011
Atwood
P2033 Jack-Up Rig
Supply of Aluminium Structural Anodes
2011
2011
CUEL Limited
2011 / 2012
2011
Page 74 of 133
October 2012
CUSTOMER
JOB
YEAR
2011
2011
PT Sempec
2011
2011
Atwood
P2031 Jack-Up Rig
Supply of Aluminium Structural Anodes
2011
Atwood
P2032 Jack-Up Rig
Supply of Aluminium Structural Anodes
2011
CUEL Limited
PTTEP
CVX39-3204 Chevron Phase 39
Supply of Jacket Anodes
2011
PT McDermott Indonesia
Vetco Gray
Gorgon Upstream Project
Supply of Structural Anodes
2011
ONGC
2011
2011
2011
2011/2012
Saipem-Leighton Consortium
2011
2011
Page 75 of 133
October 2012
CUSTOMER
JOB
YEAR
Petrobras
P-61 TLWP
Supply of Aluminium Anodes
2010
Seafox
B317 Multi-purpose Support Vessel
Design & Supply of Aluminium Anodes
2010
DEP Myanmar
Shwe Project
Supply of Aluminium Bracelet Anodes
2010/2011
Saipem Portugal
S10000 Drillship
Supply of Zinc Anodes
PT Cermerang
2010
2010
2010
2010
PT Gearindo Prakarsa
Natuna Project
Design and Supply Sacrificial Anodes for Jetty
2010
PT IKPT
Coal Boiler Plant Project
Design and Supply ICCP System
2010
2010
2010
2010
PTTEP
Bongkot Phase 4A Wellhead Platform
Supply of Aluminium Jacket Anodes
2010
2010
2010
2010 / 2011
2010
Page 76 of 133
October 2012
CUSTOMER
JOB
YEAR
2010
PTSC M&C
2010
PTSC M&C
2010
ONGC
B193 ONGC 5-Wellhead Platform Project
Supply of Aluminium Jacket Anodes
2010
NPCC
ONGC
RS12 ONGC Well Platform Project
Supply of Aluminium Jacket Anodes
2010
HESS
Ujung Pangkah Development Project
CPP & AUP
Supply of Aluminium Jacket Anodes
2010
2010
2010
2010
ONGC
ONGC B22 Field Development Project
Supply of Aluminium Jacket Anodes
2010
ONGC
ONGC 1985 ICP-R Process Platform Pipeline Project
Supply of Aluminium Bracelet Anodes
2010
PT Saipem Indonesia
2009 / 2010
2009
ONGC
MHN Process Plaform & Living Quarters Project
Supply of Aluminium Jacket Anodes for Flare MNF1 & MNF2
Jacket
2009
Page 77 of 133
October 2012
CUSTOMER
JOB
YEAR
Shell
Fabrication of Manifold Support Structure (MSS)
Package Project
Supply of Aluminium Jacket Anodes
2009
PT Manferrostaal
Exxon Mobil
Banyu Urip Exxon Mobil Project
Design, Supply, Supervison and Commissioning ICCP system
2009
PT Gunanusa Fabricator
Peciko 6 Project
Design, Supply, Supervison and Commissioning ICCP system
2009
PT Nyndia Karya
209
2009
CUEL Limited
Chevron
CVX37 / CVX37B Project
Supply of Aluminium Jacket Anodes
CUEL Limited
2009
2009
2009
2009
2009
2009
MODEC
Jubilee Produced Water Treatment (PWT) System
Design and Supply of Aluminium Anodes
2009
2009
Ltd
2009/2010
2009
Page 78 of 133
October 2012
CUSTOMER
JOB
YEAR
Cyclone Separator
CUEL Limited
2009
CUEL Limited
2009
2009
2009
2009
2009
2009
2009
2009
2009
PT Timas Suplindo
2009
2009
2009
2008/2009
Page 79 of 133
October 2012
CUSTOMER
JOB
YEAR
2009
2009
Vietsovpetro
VT-364 / 2008 - VSP1 for Provision Project
2009
SeaDrill Limited
B312 Jack Up Rig Project
Supply of Sacrifical Aluminium Anodes
2009
SeaDrill Limited
B311 Jack Up Rig Project
Supply of Sacrifical Aluminium Anodes
2009
2008-2009
2008
CUEL Limited
CTEP
CTEP Phase 35 Jacket Project
Supply of Aluminium Jacket Anodes
2008
2008
2008
2008
2008
2008
Page 80 of 133
October 2012
CUSTOMER
JOB
YEAR
2008
2008
2008
2008
Seadrill Limited
2008
Seadrill Limited
P2027 Jack Up Rig Project
Supply of Sacrificial Aluminium Anodes
2008
2008
PT PetroChina
2008
2008
ENI
ENI Longhorn Project - Deepwater Platform
Supply of Aluminium Jacket Anodes for Deepwater
2008
Reliance
Reliance MA-D6
Supply of Aluminium Jacket Anodes for Deepwater
2007
ENI Saipem
Blacktip Development Project Wellhead Platform
Supply of Aluminium Jacket Anodes
2008
2008
CUEL Limited
2008
Page 81 of 133
October 2012
CUSTOMER
JOB
YEAR
2008
2008
2008
ARV - Offshore
SK Construction Corp
SK Project - PLEM
Supply of Aluminium Structural Anodes
2008
CUEL Limited
2008
2008
2008
2008
2008
2008
2008
2008
BCD3 Project
Design and Supply of ICCP Materials
2008
PT Pertamina (Persero)
Terminal Trasit Utama Tuban Dan Pipanisasi Jawa Timur
Design, Supply and Supervision of Installation of Sacrificial
2008
2007/2008
Page 82 of 133
October 2012
CUSTOMER
JOB
YEAR
2008
PT Surya Besindo
Chevron Project
Supply of Sacrificial Zinc Anodes
2008
2008
JGC Corp
2008
2007-2008
2007
Saudi Aramco
Fabrication & Transportation of Offshore Tie-In Platforms
& Scraper Decks (OOK)
Supply of Aluminium Jacket Anodes
2007
2007
2007
Vietsovpetro
Block 9 - 2, Ca Ngu Vang Field Development Project
Supply of Aluminium Jacket Anodes
2007
2007
2008
2007
2007
Page 83 of 133
October 2012
CUSTOMER
JOB
YEAR
2007
2007
2007
Talisman
Talisman PM3 - CAA Northern Field Development Project
Supply of Aluminium Bracelet Anodes
2007
Brooke Dockyard
2007
2007
Murphy Oil
Murphy - Maari Wellhead Platform Project
Supply of Aluminium Structure Anodes
2007
2007
2007
2007
2007
2007
2007
2007
Murphy Oil
Murphy Kikeh Gas Pipe Project for Offshore
Supply of Aluminium Jacket Anodes
2007
Page 84 of 133
October 2012
CUSTOMER
JOB
YEAR
2007
ONGC
Vasai East Dev. Project for Sump Caisson
Supply of Aluminium Anodes
2007
Murphy Oil
Murphy Kikeh Gas Pipeline - Pipeline Anodes
Supply of Aluminium Jacket and Bracelet Anodes for Deepwater
2007
2007
2007
2007
2007
Talisman
Talisman Bunga Okid B, C & D Projects
Supply of Aluminium Jacket Anodes
2007
Kencana HL
2007
PetroVietnam
DungGuat Refinery 5B Project
Supply of Aluminium Jetty Anodes
2007
Kencana HL
2007
Sarawak Shell
SSB F13W-E11PB Project
Supply of Aluminium Bracelet Anodes
2007
2007
2007
PT Hanjung Indonesia
2007
2007
2007
2007
Page 85 of 133
October 2012
CUSTOMER
JOB
YEAR
PT Rekayasa Industri
Indonesia Port
Pelindo Semarang Project - Central Java
Design, Supply, Installation and Commissioning of CP
System for Jetty
Caltex Project
Design, Supply and Commissioning CP System for Internal Tank
2006
PT Gunanusa Fabricator
TOTAL
SISI NOBI TOTAL Project
Design, Supply and Commissioning CP System for Internal Tank
2006
PT. Pelindo
2006
FMC SOFEC
2006
2006
Sarawak Shell
SSB F13 & Shallow Clastic Pipeline and Bends Project
Supply of Aluminium Bracelet Anodes
2006
Harbourworks Clough JV
2006
2006
Talisman
Talisman Bunga Orkid A - Jacket Project
Supply of Aluminium Jacket Anodes
2006
2006
2006
2006
2006
2006
2006
2007
2006/2007
Page 86 of 133
October 2012
CUSTOMER
JOB
YEAR
PT Technip Indonesia
2006
Aker Kvaerner
Petrobras MODEC
RJS 409 FPSO Seperator
Supply of Sacrificial Aluminium Vessel Anodes
2006
AWILCO
B285 Project
Supply of Aluminium Vessel Anodes
2006
CUEL Limited
BG NRPOD
Tapti Expansion Project
Supply of Aluminium Jacket Anodes
2006
CUEL Limited
2006
CUEL Limited
CTEP
CTEP Phase 32 Jacket Project
Supply of Aluminium Jacket Anodes
2006
CUEL Limited
CTEP
CTEP Phase 32 Jacket Project
Supply of Aluminium Jacket Anodes
2006
2006
AWILCO
P2012 Rig Project
Supply of Aluminium Structure Anodes
2006
AWILCO
P2016 Rig Project
Supply of Aluminium Structure Anodes
2006
2006
2006
2006
2006
2006
2006
HULL S053
2006
Page 87 of 133
October 2012
CUSTOMER
JOB
YEAR
2006
Santa Fe Drilling Co
2006
2006
2006
Kencana HL
2006
PT Saipem indonesia
BP
BP Tangguh Platform & Pipeline Project
Supply of Aluminium Bracelet & Jacket Anodes
CUEL Limited
Pearl Energy
Jasmine Pearl B&C Project
Supply of Aluminium Jacket Anodes
2006
CUEL Limited
2006
2006
WAIJO
(Pers Wika AdhiKarya IKPT Joint Operation)
2005/2006
PT Pertamina (Persero)
Proyek Pembangunan Fasilitas Transmisi Gas Dan Kompresi
Musi Barat - Pagardewa Pagardewa Daerah Operasi Hulu
Sumbagsel (Paket II)
Design, Supply, Installation and Commissioning of ICCP & SACP
System for Underground Pipelines
2005
PT Pertamina (Persero)
Proyek Pembangunan Fasilitas Pengumpul Gas Merbau Dan
Fasilitas Penyerahan Gas Pagardewa Daerah Operasi Hulu
Sumbagsel (Paket III)
Design, Supply, Installation and Commissioning of SACP System
for Underground Pipeline
2005
2005
2005
2005/2006
Page 88 of 133
October 2012
CUSTOMER
JOB
YEAR
2005
AWILCO
P2009 Rig Project
Supply of Aluminum Structure Anodes
2005
Seadrill Limited
P2011 Rig Project
Supply of Aluminum Structure Anodes
2005
Murphy Oil
Murphy Kikeh Subsea Project
Supply of Aluminium Jacket Anodes
2005
2005
IEV Malaysia
2005
Safemal Drilling
2005
2005
2005
PetroBras - MODEC
RJS-409 FPSO (Bright Jewel)
Supply of Sacrificial Zinc Anodes
2005
Shibata Asia
2005
2005
2005
CUEL Limited
2005
2005
2005
2005
Page 89 of 133
October 2012
CUSTOMER
JOB
2005
2005
CUEL Limited
2005
2005
2005
2005
PT McDermott Indonesia
2005
2005
2005
2005
2005
CUEL Limited
2005
2005
CUEL Limited
2005
2005
2005
CUEL Limited
2005
2005
2005
PT. Timas S
YEAR
Page 90 of 133
October 2012
CUSTOMER
JOB
YEAR
PT PERTAMINA
Design, Supply and Commissioning CP System for TTU
Balongan and Pipeline Citarik to Cikampek Project
2005
PT Bakrie
2005
PT. Technip
2004 / 2005
PT. Technip
2004
Malakoff
Tanjong Bin Power Plant Project
Aluminium Anodes
2004
Santa Fe Drilling Co
2004
2004
2004
2004
Sante Fe Drilling Co
2004
TenagaNasional Berhad
(ICCP) for Manjung Power - Platinised Titanium Anodes
2004
2004
North Port
Zinc Anodes for North Port
2004
2004
2004
CUEL Limited
Unocal Phase 28
Aluminium Jacket Anodes
2004
Kristiansand
P2006 Project - Structural Anodes
2004
2004
2004/2005
Page 91 of 133
October 2012
CUSTOMER
JOB
YEAR
2004
2004
2004
CUEL Limitd
2004
Petrobras 52 (P-52)
Roncador Field Development Project (B262)
Supply of Marine Anodes for P52
2004
2004
2004
CUEL Limited
2004
CUEL Limited
2004
CUEL Limited
2004
2004
2004
2004
2004
2004
2004
2004
2004
Page 92 of 133
October 2012
CUSTOMER
JOB
YEAR
Jacket Anodes
PowerGas Ltd
2004
2004
2004
2004
2004
2004
2004
PT Profab Indonesia
2004
2004
2004
2004
2004
2004
2004
2004
2004
2004
2003
Page 93 of 133
October 2012
CUSTOMER
JOB
YEAR
2003
2002
2004
2003/2004
2003/2004
2003/2004
2003
2003
2003
2003
BassGas Project
2003
2003
Pelindo
2003
PT McDermott Indonesia
2003
2003
2003
PT Technip Indonesia
2003
PT. Dwipayana
2003
Page 94 of 133
October 2012
CUSTOMER
JOB
YEAR
2003
2003
Zinc Anode
2003
2003
2003
2003
2003
2003
2003
PT Profab Indonesia
2003
PT McDermott Indonesia
2003
2003
2003
2003
2003
2003
Snamprojeti, Italy /
PPSC Industries Sdn Bhd
Clough Engineering
2002/2003
2002
Page 95 of 133
October 2012
CUSTOMER
JOB
YEAR
2002
Lumut Project
Platform Anodes
2002
Esso Early Production FPSO Process Engineering & Supply to Vessel Internal Zinc Anodes
2002
2002
PT Technip Indonesia
Technip Far East Sdn Bhd
2002
2002
2002
2002
2002
RCC Exchange
2002
Underground Pipeline
Coating Survey
2002
PT Clough Petrosea
2002
Talisman Energy
BR-A Wellhead Riser Platform - Lundin - Jacket Anodes
2002
Talisman Energy
BR-B Wellhead Riser Platform - Lundin - Jacket Anodes
2002
2002
PT McDermott Indonesia
Dominion Project
Structure / Jacket Anodes
2002
2002
2002
2002
2002
Page 96 of 133
October 2012
CUSTOMER
JOB
YEAR
2002
2002
2002
2002
2001/2002
2001/2002
2001
2001
2001
PT Santa Fe
2001
PT Amarta
2001
PT Deltamas Pratama
Pertamina - Surabaya
Underground Pipeline - Magnesium Anodes
2001
PT Hanjung
Hanjung Jetty
Sacrificial Anodes
2001
PT Transbakri
2001
PT Gearindo
2001
2001
2001
2001
3/2/2001
Page 97 of 133
October 2012
CUSTOMER
JOB
YEAR
2001
2001
2000
2000
2000
2000
Zinc Anodes
2000
2000
2000
2000
Kellogg
2000
Celanese
Pulau Sakra
ICCP for Underground Fire Water Pipeline
2000
PT Ballast
2000
2000
PT McDermott Indonesia
2000
PT McDermott Indonesia
2000
2000
Unocal Limited
2000
2000
Clough Offshore
2000
Semarang Submarine
Pipeline Anodes
2000
2000
Page 98 of 133
October 2012
CUSTOMER
JOB
YEAR
2000
Sante Fe
2000
2000
2000
2000
Pathfinder M & E
1999
1999
Duplex
1999
1999
1999
1999
1999
1999
1999
Angsi Project
Supply of Aluminium Bracelet Anodes
1999
Zinc Anodes
1999
1999
1999
1999
1999
1999
1999/2000
Page 99 of 133
October 2012
CUSTOMER
JOB
YEAR
Sacrificial Anodes
The Polyolefin Company (S) Pte Ltd
Underground Pipeline
Sacrificial Anodes
1999
Underground Pipeline
Sacrificial Anodes
1999
1999
1999
1999
NF Energy-Sumatec-Hileigh
Consortium Construction
1998
1998
PT McDermott Indonesia
1998
Clough Offshore
1998
1998
1998
Power Seraya
Pt/Ti Anodes
1998
1998
1997/1998
1997/1998
1997/1998
PT McDermott Indonesia
1997/1998
1997/1998
1998/1999
October 2012
CUSTOMER
JOB
YEAR
1997
1997
1997
1997
1997
1997
1997
Penta Ocean
1997
1997
Onshore Pipeline
Sacrificial Anodes
1996/1997
1996/1997
1996/1997
1996/1997
Indocast Engineering
1996
1996
1996
Platform Anodes
1996
Jurong Shipyard
Jetty Anodes
1996
Pertamina
1996
Petro-Pipe Socotherm
1996
Karimun Shipyard
1996
October 2012
CUSTOMER
JOB
YEAR
1995
Petro-Pipe Socotherm
Huade Submarine
Pipeline Anodes
1995
Petro-Pipe Socotherm
Yukong Submarine
Pipeline Anodes
1995
1995
1995
Petrochemical Corporation of
Singapore (PCS II)
1994
1994
1994
1995/1996
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
FUNCTIONAL
SPECIFICATION
FOR
CP SYSTEM FOR OFFSHORE STRUCTURES
PREPARED /
REVISED
BY
REVIEWED
BY
APPROVED BY
TOTAL NO. OF
PAGES
DATE
REV.
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
" #$
!
%
&
! '(
&'&'
!
)$&' &
* % &
+ $" "
, -
. $% $ '
.
%
& '
. &
//&) '
. $
'&)
) '
. $
'&'
(0
1
-%
2
3
2#$
!
*
+
4%
!
%
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
OFFSHORE
DESIGN
SECTION
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
1. SCOPE
This specification defines the minimum requirements for the material selection,
design, manufacture, supply and installation of a sacrificial type cathodic
protection system with monitoring facilities (wherever required) for offshore
structures. The structures include all offshore structures like platform jackets,
clamp-on structures on existing platforms, flare or bridge support tripods, SPM
including PLEM and other appurtenances permanently attached to any of the
structure.
2. CODES & STANDARDS
2.1. Design and installation of the cathodic protection system shall be in
accordance with good marine engineering practice in corrosion protection and
compliance with the latest revisions of following Codes & Standards:
Det Norske Veritas:
API RP 5L
NEC
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
i)
ii)
iii)
5.2.3. Design Life: same as the design of the platform specified elsewhere in
the bid package.
5.2.4. Cathodic protection method: sacrificial anodes
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$&
5.2.8. Interference
Suitable arrangement to prevent interference in cathodic protection
system on bridge-connected structures shall be made by the vendor.
5.2.9. Clamp-on structures:
Vendor shall calculate the exact surface area based on structural
drawings and furnish details of the same. The surface area of all the
components as defined in section 5.2.3 shall be considered for cathodic
protection. External surface area only shall be considered for
conductors, conductor guide support framings, clamps including
stiffeners, stubs and anode clamps. Both external and internal surface
area shall be considered for conductor guides and conical plates. In
addition to the above, 10% contingency, especially for fasteners and
other fixtures of clamps, shall be included in total surface area to be
protected.
5.2.10. The complete surface area of PLEM shall be considered for cathodic
protection.
5.2.11. Submerged surface area and splash zone surface of SPM shall be
considered for cathodic protection.
5.3.Anode Material
Anodes shall be GALVALUM-III or Equivalent (Al-Zn-In) alloy suitable for
protection of steel in submerged marine environment. They shall not have any
mercury content. The potential of the sacrificial alloy material shall be (-)
1.08V or more negative referred to a silver/silver chloride reference electrode.
The Electro-chemical efficiency of anode material shall be minimum 2500
AH/Kg after four (4) days of operation as per DNV RP B 401.
6. TESTING AND INSPECTION
6.1. Anode Composition analysis:
Anode composition analysis shall be undertaken by methods agreed upon in
advance. Two samples from each melt shall be taken for chemical analysis.
The samples shall be taken in the beginning and at the end of casting from
the pouring string. Checking of closed circuit potential and practical mass
consumption shall be done for each 15 ton produced anodes. The test
samples may be separately casted or cut directly from an anode. Amperehour capacity test shall be carried out be weight loss method only.
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$(
6.2. After casting, the inspection of the anodes shall be done to ensure that:
6.2.1. AH capacity of anodes shall not be less than the figures considered for
design i.e. no negative tolerance shall be permitted.
6.2.2. Closed circuit potential shall be within (+) 10 mV and (-) 50mV of the
guaranteed value. For example, for design value of (-) 1.08 volts,
anodes having closed circuit potential less negative than (-) 1.07 Volts
shall be rejected.
6.2.3. The anodes shall have minimum net weight (Gross weight minus core
weight) within a tolerance of + 2.0% to 1.0%. However, overall
negative tolerance shall be 0% to ensure that is no short fall in total
alloy weight.
6.2.4. Dimensions shall be within tolerance limits indicated in the approved
drawings. No negative tolerance shall be allowed in standoff
dimensions.
6.2.5. At least one anode per delivery or at least 0.5 percent of the anodes
shall be subjected to destructive testing to check that the casting is to
an acceptable standard, each anode shall be cut at 3 of the most
relevant locations. The cut surface shall generally be free from visible
pores and slag/dross inclusions. The lack of bond or void between
anode core and anode material shall not exceed 5%.
As an alternate to a destructive testing, a non-destructive testing by
radiography may be used to check for lack of bond or slag/dross
inclusions if so permitted by the Company or its authorized
representative.
6.2.6. Anode to steel insert shall be checked for electrical continuity. The
resistance between the connector and the body of the anode shall not
exceed 0.005 ohm.
6.2.7. The anodes shall be free from mechanical defects like cracks,
shrinkages, excessive flash, surface projections, laminations, cold laps,
surface slag etc. as consistent with good casting practice. Criteria for
accepting these shall be as per NACE STANDARD RP 0387-99.
6.2.8. All the above Inspection / tests shall be witnessed by Company or its
authorized representative.
6.2.9. All anodes shall be delivered with material certificate from the Vendor
stating batch identification number and chemical analysis.
6.3. All work, materials, and equipments shall be subjected to inspection by
Company at all reasonable times. However inspection by the Company shall
not relieve the Vendor of his responsibility under terms of contract.
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
6.4. The monitoring system shall be inspected after completion of fabrication and
prior to load out. These checks shall include:
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$'
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
9.3.1. The monitoring system shall also include four monitored anodes which
shall be located at two different elevations on the structure with two
anodes at each elevation.
9.3.2. The monitored anodes shall be identical to those supplied for the
structural protection system and have the same physical characteristics
but suitably modified so that current outputs can be electrically
measured at the monitoring panel. The anodic material of the
monitoring anodes shall be electrically insulated for those parts of the
anode core to be welded to the structure with an insulation resistance,
of not less than one mega ohm(when dry) and reducing to not less than
one thousand ohms(when wet). Prefabricated isolating joints with
suitable mechanical properties shall be utilized.
9.4. Monitoring panel
The monitoring panel shall be located in the switchgear room or other
suitable location in safe area. The panel shall be of sheet steel (14 SWG)
construction with an enclosure protection equivalent of IP-51 or NEMA-12.
The monitoring panel, as a minimum, shall contain the following;
a) Selector Switches, manually operated, one for each reference electrode
and monitoring anode.
b) Voltmeter with capability to measure the potential difference between
the structure and each of the reference electrodes.
c) Ammeter with capability to measure the current output of each of the
monitored anodes.
d) Built in Meter calibration facility for checking the calibration and
accuracy of the instruments.
e) Mimic diagram showing the platform jackets to be cathodically
protected shall be included on the front of the panel. Positioning of all
reference electrodes and monitored anodes shall be marked distinctly
on it. Different colours shall be used for marking structures, monitored
anodes and reference electrodes. The positions of reference electrodes
and monitoring anodes get illuminated when they are selected for
voltage or current readings respectively. LED displays may be used for
this purpose.
f) Recording unit provisions
g) Painting in accordance to Spec no 2005
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
Power supply for the panel shall be provided by the contractor and the vendor
shall specify the total power required for the panel.
10. CABLING
All cabling from each reference electrode and monitored anode shall be brought to
a metallic waterproof junction box, mastic filled and mounted on the
jacket/walkway level in unclassified area. The cables shall be double insulated,
abrasion, ozone and weather resistant and suitable for total immersion in seawater. The cable shall be routed through a conduit and supported from the jacket
by welded bracket. The main raiser conduit shall be clamped at frequent intervals
for adequate supporting.
11. SERVICE AFTER INSTALLATION
11.1. The vendor shall provide necessary test equipments, material and services of
a corrosion specialist and carryout performance tests at the site after jacket
installation and verify that required protection level has been achieved.
11.2. The contractor shall carry out CP survey to ascertain the effectiveness of the
cathodic protection system provided for the jacket structure. The survey
shall be carried out after 60 days of the launching of jacket (and before 180
days maximum) to ensure that the structures are sufficiently polarized.
11.3. During detailed engineering, the contractor shall develop and submit
procedure for carrying out CP survey, for Companys approval. However,
the survey procedure shall comply with the requirements of DNV standard
RP B-403. If the survey results show that the protection level is not
sufficient on any one or more than one location of the jacket member, the
contractor shall provide additional new anodes on all deficient locations so
as to raise the protection potential to required level and cost of all these shall
be borne by the contractor. The basis of redesign/redistribution and all
relevant back-up documents, as required by the Company, shall be made
available by the contractor for review and approval
12. SPARES:
12.1. Vendor shall provide spare parts needed for start-up. In addition, Vendor shall
furnish a separate priced list of recommended spares for two (2) years normal
operation and maintenance. Recommended spares shall take into account the
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
%
OFFSHORE
DESIGN
SECTION
FUNCTIONAL
SPECIFICATION FOR
CATHODIC
PROTECTION SYSTEM
FOR OFFSHORE
STRUCTURES
SPEC. No.
FS 4001
Rev. No.
!"
Elect
#
$
14.12. Routine and type certificates for cable glands, junction boxes, pull boxes
etc.
14.13. Vendor shall confirm and provide guarantee for the design life (minimum)
for reference anodes with necessary back up calculation and other relevant
data.
15. CONFLICT :
In the event of conflict between this specification & other documents listed herein,
the following order of priority shall govern:
i).
Basic Bid work
ii).
Design criteria, drawings and data sheet (Whichever applicable).
iii).
This specification .
iv).
General Specification.
v).
Codes & Standards.
16. CERTIFICATION:
All offered plug and sockets or those of similar design manufactured by same
vendor:
Shall have been type tested by an authority approved by the company
Shall have been in continuous satisfactory service on offshore for a
minimum period of two years.
Shall be having current certification/approval/listing by an agency approved
by company or UL or FM.
17. PACKING AND TRANSPORATION:
The offered equipment along with their accessories shall be shipped to site packed
in wooden crates. They shall be wrapped with polythene sheets, before being
placed in the crates to prevent damage to finish. Crates shall have skid bottom for
handling.
%
OFFSHORE DESIGN
SECTION
REV. NO. 0
FOR DEFINITION
MUMBAI REGION
GENERAL SPECIFICATION
FOR
DEFINITION
J.S.M.
J.S.M.
BY
APPD
13.01.2005
7
NO. OF
20.11.2001
DATE
0
REV.
PAGES
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
SECTION
MUMBAI REGION
REV. NO. 0
SPEC. NO. 1050
SHEET NO 2 OF 7
CONTENTS
FORMAT No.
ODS/SOF/004A
1.0
SCOPE
2.0
3.0
4.0
5.0
WARRANTIES
6.0
7.0
SAFETY PROVISIONS
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
SECTION
MUMBAI REGION
REV. NO. 0
SPEC. NO. 1050
SHEET NO 3 OF 7
1.0
SCOPE
Individual specifications and/or drawings, when furnished, are to be used with the
general specifications.
All equipment and materials supplied or installed under these specifications shall
be installed in accordance with sound engineering principles and good fabrication
and construction practice. No omission from these specifications shall relieve the
Contractor from this responsibility.
2.0
All equipment and materials fabricated and installed under these specifications
shall conform to the latest editions of the applicable codes and standards cited in
the bid documents. No omission in the project instructions shall be construed as
relieving the Contractor of his responsibility to ascertain these requirements, to
perform work and furnish material in accordance with the codes specified.
3.0
The facility shall be laid out and constructed for convenience and safety of
operation and maintenance. Similar equipment shall be grouped together as much
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
SECTION
MUMBAI REGION
REV. NO. 0
SPEC. NO. 1050
SHEET NO 4 OF 7
as possible so as to best conform with good engineering practice and fulfil accepted
standards of process simplicity, safety and economy.
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
SECTION
MUMBAI REGION
REV. NO. 0
SPEC. NO. 1050
SHEET NO 5 OF 7
4.0
Evaluation and selection of Vendors shall be done from the viewpoint of both
supply and maintenance, and all suppliers must be willing and capable of providing
service for their goods.
5.0
WARRANTIES
5.1
Contractor shall -
Warrant all material and equipment to be free from defects in design, material and
workmanship.
Warrant that all equipment will satisfy the requirements of the intended use and be
suitable for the application.
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
SECTION
MUMBAI REGION
REV. NO. 0
SPEC. NO. 1050
SHEET NO 6 OF 7
Agree to repair or replace any equipment under this warranty which proves to be
defective within a period of 12 months after being placed in operation, but no
exceeding 18 months from the date of shipment.
5.2
6.0
Unless other wise specified, all materials and equipment shall be new. All materials
supplied under these specifications shall be adequate for the proposed service.
Proper consideration shall be given to their function with regard to corrosion,
chemical attack and other process hazards and precautions to avoid these hazards
shall be taken. Such precautions shall include but not be limited to the following.
6.1
6.2
6.3
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
SECTION
REV. NO. 0
FOR DEFINITION
MUMBAI REGION
6.4
Corrosion allowance and safety factor Within good engineering practice with a
minimum as stated in the relevant General Specifications.
7.0
SAFETY PROVISIONS
Recommended
Practice for Analysis, Design, Installation and Testing of Basic Surface Safety
Systems on Offshore Protection Platforms, latest edition.
-------------------------
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/210/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 1 OF 12
GENERAL SPECIFICATION
FOR
VENDOR DATA REQUIREMENTS
12
14.01.200
JSM
PREPD BY APPROVED BY
FORMAT No.
ODS/SOF/004A
REMARK
ISSUE No.
01
TOTALPAGE
REV. No.
01
DATE
REV No.
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 2 OF 12
CONTENTS
PROFORMA
SPECIAL NOTES TO VENDORS
Note:
S.
Data/
Drawings
No.
No. of
1.
Manufacturing
Schedule
2.
3.
Leaflets/
Catalogues
(Main Equip.
& Aux. Equip.)
4.
Catalogues for
Components in
Vendor's scope
FORMAT No.
ODS/SOF/004A
Prints
With
Reproproposal ducibles
For Approval
Prints
(No. of)
Copies
5
ISSUE No.
01
Date
needed
(Weeks)
Reproducibles
REV. No.
01
For Dossier
Date
Prints
(No. of) needed
Copies (Weeks)
8
REV. DATE:
15/10/2003
S.
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
5.
Deviation
list (s)
Completed Data
Sheets (Main/
Aux. Equip.)
7.
Auxiliary
Equipment
Sheet (s)
Data/
No. Drawings
No. of
Prints
With
proposal
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 3 OF 12
7A
8.
Motor Data
Sheet (s)
(Main & Aux.)
9.
Performance
Curves
10.
Motor Characteristic
Curves
Prints
(No.of)
Copies
5
ReproDate
ducibles
Needed
(Weeks)
For Dossier
Prints
(No.of)
Copies
8
Utility
Requirements
(Characteristics &
Quantity)
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
Date
needed (
Weeks)
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
12.
Lubricants
List with
Specifications
13.
14.
Auxiliary
System (s)
P&ID's & Bill
of Materials,
(such as lube/
seal oil, cooling water, Inst.
air/gas diag.,
fuel system.
unloading comp.,
seal, flushing/
quenching, wash
water, flushing/
quenching, wash
water. Fire system
etc.).
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 4 OF 12
15. G. A. Drawing
including auxiliary all piping
including
valving & Other
accessories, and
purchasers
piping connection at battery
limits (Separate
G. A. drgs. for
Auxiliaries &
aux. systems
also to be give).
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
16.
Loading Data
(Main Equipment
& Auxiliaries).
17.
Design details
of Structural
base.
18.
19.
20.
Component
cross-sectional
Drawings including mech. seals.
21.
22.
Sub-vendor drg.
with complete
Bill of Materials.
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 5 OF 12
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
25.
Allowable forces
and moments on
nozzles.
26.
Piping Bill
of Material.
27.
Purchaser's
piping connections (with flange
details).
28.
29.
Instrument
Data Sheet
with sizing
Calculations.
30.
Instrument
Dimensional
Drgs. with
Mounting
Details.
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 6 OF 12
Instrument
Tubing, Wiring
& Junction Box
Schedule.
Control Schematic including:
Alarms. Trips &
Interlocks Logic
Diagrams with
Description:
Alarms, Trips
& Interlocks
Wiring Diagram.
For all panels).
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
33.
Impulse piping
hook up with
Bill of Materials.
34.
Local Panel
G. A. Drgs. with
Fixing Details.
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 7 OF 12
Remote Control
Panel G. A. Drawing with Fixing
Details.
37.
Dimensional
Semigraphic
Flow Plans.
38.
Terminal
Details of
Interface with
Telemetry
Equipment.
Electrical
(General Arrangement &
Layout
Drawings.
40.
Electrical
Load List
41.
Electrical
Scheme Drawing/Writing &
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 8 OF 12
Interconnection Diagram.
42.
Terminal Box
Dimensional
Drawings.
42A. Write up on
automatic
control of
Turbo-Generator and the
same when
units are run
in parallel.
43.
44.
Mechanical
Run Layout
& Procedure
of Main &
Aux. Equpments.
Performance
Test Layout
& Procedure
(Main & Aux.
Equip. Systems).
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 9 OF 12
of any other
test(s) specified
by Company.
Motor gear
box main pump).
46A. Layout & Procedure of any other
test(s) specified
by Company
Motor gear
box main pump).
46B. Layout & Procedure of any other
test(s) specified
by Company).
47. Lateral and
Torsional
Analysis
Report.
48.
Mill Test
Reports.
49.
Record Showing
Location
of Heat Numbers.
50.
Test Certificates/records
for all nondestructive
tests specified
in spec. /data
sheets such as
radiography,
ultrasonic etc.
51.
Stress Relief
Charts.
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
52.
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 10 OF 12
Welding
Procedures.
Inspection &
Test Reports.
(i.e. Hydrostatic
test performance
test etc. )
Manufacturer's
Test Certificates
for suborder
items.
Final Acceptacne Testing &
performance
Test Reports.
Vendor quality
assurance
practices
Standard &
Special Tools
List including
tools required
for overhaul/
calibration.
Installation
Operating
Instructions.
Maintenance
Instructions.
Shop Repair
Manual including Assembly
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 11 OF 12
Mechanical
Catalogue
containing
all items
except those
marked with
asterisk (*)
*64. Painting
Procedure
*65. Name Plate
Rubbing.
*66. List of Similar
Installations.
67.
FORMAT No.
ODS/SOF/004A
G. A. drg. For
fire & gas
detection
system of
power
generator
unit.
Ref. PROCEDURE No.
ODS/SOP/008 TO 015
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003
OFFSHORE DESIGN
GENERAL SPECIFICATION
SECTION
MUMBAI REGION
REQUIREMENT
VOL. NO.III
REV. NO. 0
Spec 1060
SHEET 12 OF 12
The Vendor shall be held accountable for furnishing all data/drawings in proper
form and quantity in accordance with these requirements. The Vendor shall also
be accountable for the documentation required from his sub-vendor.
2.
Each Vendor data item requested above must be identified by the Purchase Order
number and equipment tag number located on the cover sheet or First page of said
item and in the case of engineering drawings, on each and every drawing.
3.
4.
All drawings and literatures shall be in the English language and the Metric
Measurement System.
5.
The reproducible drawings, 279 mm x 432 mm (11" x 17") size and full size are to
be of such quality that Clear Legible prints can be made with Osalid type
reproduction facilities.
-------------------
FORMAT No.
ODS/SOF/004A
ISSUE No.
01
REV. No.
01
REV. DATE:
15/10/2003