Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project Report for
upgradation of junction with NH-68 at Sanchore connecting Dhanera and terminating at its junction with NH-27 near Deesa +
Junction with NH-68 near Tharad connecting Dhanera, Panthvada section of NH-168A and NH-168 in the state of Gujrat to
two/four lane with paved shoulder configuraton (Package no - NH/IAHE/19)
BLENDING OF MATERIALS FOR BITUMINOUS CONCRETE
(CHIKANMASS QUARRY, DEESA SITE)
IS Sieve
Size
(mm)
Blending of Materials
Individual Gradation of Aggregate
40 mm
20 mm
10 mm
S.Dust
Combined
Gradation
Specified Limits as
per MoRT&H
Table 500-17,
Grading - 2
40 mm
20 mm
10 mm
S. Dust
0%
15%
23%
62%
26.5
56
100
100
100
0.00
15.00
23.00
62.00
100.0
100
19.0
94
100
100
0.00
14.15
23.00
62.00
99.2
100
13.2
42
100
100
0.00
6.31
23.00
62.00
91.3
90-100
9.5
95
100
0.00
0.99
21.91
62.00
84.9
70-88
4.75
36
98
0.00
0.02
8.36
60.83
69.2
53-71
2.36
94
0.00
0.00
1.46
57.99
59.5
42-58
1.18
74
0.00
-0.02
0.17
45.71
45.9
34-48
0.60
46
0.00
-0.04
0.00
28.55
28.5
26-38
0.30
32
0.00
-0.06
0.00
19.58
19.5
18-28
0.150
-1
21
0.00
-0.08
0.00
12.82
12.7
12-20
0.075
-1
14
0.00
-0.11
0.00
8.64
8.5
4-10
A5.14/1
Annexure 5.14
% Passing
100
90
80
70
60
50
40
30
20
10
0
0.0
0.1
1.0
10.0
Upper Limit
A5.14/2
Theoritical
100.0
Annexure 5.14
Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project Report for upgradation of junction
with NH-68 at Sanchore connecting Dhanera and terminating at its junction with NH-27 near Deesa + Junction with NH-68 near Tharad
connecting Dhanera, Panthvada section of NH-168A and NH-168 in the state of Gujrat to two/four lane with paved shoulder configuraton
(Package no - NH/IAHE/19)
TEST RESULTS OF MARSHALL SPECIMENS FOR BITUMINOUS CONCRETE
2.970
(Gsb)
2.764
(Gse)
2.955
Date of Testing
=
14.10.15 to 17.10.15
Bulk
Density,
(Gmb)
(gm/cc)
g=c/f
Max. Specific
% Voids
% Air Voids % Voids in
Gravity,
Filled by
in Mix, (Va) Mineral Agg.,
Marshall
(Gmm) =
Bitumen,
Stability (KN)
=100 x (h - (VMA) =100100/(b/Gse+a
(VFB) =
g)/h
(gxb/Gsb)
/Gb)
100 x (j - i)/j
Marshall Flow
(mm)
% of
Bitumen
Content by
Wt. of Total
Mix (Pb)
4.50
Average
5.00
Average
% of Agg.
Wt. of
Wt. of
Volume of
by Wt. of
S.S.D. Wt.
Specimen in Specimen in
Specimen
Total Mix
of Specimen
Air
Water
(cc)
(Ps)
(gms.)
(gms.)
(gms.)
f=e-d
b=100-a
95.50
95.00
1251.0
756.0
1253.0
497.0
1238.5
747.5
1239.5
1239.5
746.0
2.517
12.6
1.7
492.0
2.517
13.51
1.8
1240.5
494.5
2.507
11.9
1.6
2.514
12.7
1.7
1246.5
752.5
1247.5
495.0
2.518
12.98
3.0
1243.5
752.0
1244.5
492.5
2.525
13.78
2.6
1246.5
757.5
1248.0
490.5
2.541
13.88
2.4
2.528
13.5
2.7
2.722
2.699
A5.14/3
7.67
6.32
13.16
13.12
1.02
41.75
51.80
Annexure 5.14
% of
Bitumen
Content by
Wt. of Total
Mix (Pb)
5.50
Average
6.00
Average
6.50
% of Agg.
Wt. of
Wt. of
Volume of
by Wt. of
S.S.D. Wt.
Specimen in Specimen in
Specimen
Total Mix
of Specimen
Air
Water
(cc)
(Ps)
(gms.)
(gms.)
(gms.)
f=e-d
b=100-a
94.50
94.00
93.50
Average
7.00
93.00
Average
7.50
92.50
Average
Bulk
Density,
(Gmb)
(gm/cc)
g=c/f
1251.5
760.0
1254.0
494.0
1251.5
760.5
1253.0
1248.5
761.0
Max. Specific
% Voids
% Air Voids % Voids in
Gravity,
Filled by
in Mix, (Va) Mineral Agg.,
Marshall
(Gmm) =
Bitumen,
=100 x (h - (VMA) =100Stability (KN)
100/(b/Gse+a
(VFB) =
g)/h
(gxb/Gsb)
/Gb)
100 x (j - i)/j
2.533
14.2
2.6
492.5
2.541
13.79
2.9
1249.5
488.5
2.556
13.45
2.8
2.543
13.8
2.8
1256.5
767.5
1258.0
490.5
2.562
15.18
3.2
1260.5
768.5
1261.5
493.0
2.557
13.22
3.2
1260.5
766.5
1261.0
494.5
2.549
14.0
3.5
2.556
14.1
3.3
1263.0
771.0
1264.5
493.5
2.559
12.89
4.3
1260.5
771.5
1261.5
490.0
2.572
13.93
3.8
1260.5
769.5
1261.0
491.5
2.565
15.88
4.0
2.565
14.2
4.0
1262.5
1271.0
1278.0
1269.0
1281.5
1280.5
-
771.5
776.0
781.5
773.0
782.0
780.0
-
1263.0
1272.0
1279.5
1269.5
1282.0
1281.0
-
491.5
496.0
498.0
496.5
500.0
501.0
-
2.569
2.563
2.566
2.566
2.556
2.563
2.556
2.558
11.96
11.81
13.08
12.3
11.43
10.08
12.05
11.2
3.6
4.4
4.5
4.2
4.9
4.8
4.6
4.8
2.676
2.653
2.630
4.94
3.66
2.47
13.05
13.09
13.23
Marshall Flow
(mm)
62.16
72.08
81.33
2.608
1.63
13.68
88.07
2.587
1.10
14.40
92.35
A5.14/4
Annexure 5.14
Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project
Report for upgradation of junction with NH-68 at Sanchore connecting Dhanera and terminating at its junction
with NH-27 near Deesa + Junction with NH-68 near Tharad connecting Dhanera, Panthvada section of NH-168A
and NH-168 in the state of Gujrat to two/four lane with paved shoulder configuraton (Package no - NH/IAHE/19)
SUMMARY OF TEST RESULTS OF MARSHALL SPECIMENS FOR DRAWN OF TEST PROPERTY CURVES
Bitumen(%)
Bulk Sp.gravity of
Specimen (g/cc)
Voids in Mix
(V.I.M) (%)
Voids in Mineral
Aggregate
(V.M.A) (%)
Marshall
Stability (KN)
Marshall
Flow (mm)
4.50
2.514
7.67
13.16
41.75
12.7
1.7
5.00
2.528
6.32
13.12
51.80
13.5
2.7
5.50
2.543
4.94
13.05
62.16
13.8
2.8
6.00
2.556
3.66
13.09
72.08
14.1
3.3
6.50
2.565
2.47
13.23
81.33
14.2
4.0
7.00
2.566
1.63
13.68
88.07
12.3
4.2
7.50
2.558
1.10
14.40
92.35
11.2
4.8
A5.14/5
Annexure 5.14
Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project Report for
upgradation of junction with NH-68 at Sanchore connecting Dhanera and terminating at its junction with NH-27 near Deesa +
Junction with NH-68 near Tharad connecting Dhanera, Panthvada section of NH-168A and NH-168 in the state of Gujrat to
two/four lane with paved shoulder configuraton (Package no - NH/IAHE/19)
TEST PROPERTY CURVES FOR BC MIX DESIGN DATA BY MARSHALL METHOD
BITUMEN (%) Vs. DENSITY (gm./cc)
2.600
7.50
16.0
7.00
2.580
6.50
15.0
2.560
2.540
STABILITY (Kg.)
5.50
AIRVOID (%)
DENSITY (gm/cc)
6.00
5.00
4.50
4.00
3.50
14.0
13.0
12.0
3.00
2.50
2.520
11.0
2.00
1.50
2.500
4.50
5.00
5.50
6.00
BITUMEN (%)
6.50
7.00
7.50
1.00
4.50
5.00
5.50
6.00
BITUMEN (%)
A5.14/6
6.50
7.00
7.50
10.0
4.50
5.00
5.50
6.00
BITUMEN (%)
6.50
7.00
7.50
Annexure 5.14
15.00
7.0
100.00
6.5
14.50
6.0
90.00
14.00
5.5
13.00
4.5
FLOW (mm)
VFB (%)
VMA (%)
5.0
80.00
13.50
70.00
12.50
4.5
4.0
3.5
3.0
60.00
12.00
2.5
2.0
50.00
11.50
1.5
11.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
40.00
4.50
5.00
BITUMEN (%)
5.50
6.00
6.50
7.00
BITUMEN (%)
S.N0.
Parameters
Bitumen Content
(%)
Requirements as
per MORT&H
Table-500-10
5.9
5.5
5.9
5.7
6.35
6.75
6.0
Min.9 .0 KN
2-4 mm
3-5%
Min.12%
65-75 %
Min. 5.4%
A5.14/7
7.50
1.0
4.50
5.00
5.50
6.00
BITUMEN (%)
6.50
7.00
7.50
Annexure 5.14
Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project Report for upgradation of junction with NH-68 at Sanchore
connecting Dhanera and terminating at its junction with NH-27 near Deesa + Junction with NH-68 near Tharad connecting Dhanera, Panthvada section of NH-168A and NH-168 in the state of
Gujrat to two/four lane with paved shoulder configuraton (Package no - NH/IAHE/19)
DETERMINATION OF OPTIMUM BITUMEN CONTENT FROM BAR CHART
( As per MS - 2 )
Description
All criteria passes from Test Property Curves in given range of Bitumen
Content
3-5
5.5-6.0%
VMA (%)
Min. 12
4.5-7.5%
VFB (%)
65 - 75
6.00%
Min. 9.0KN
4.5-7.5%
2-4
5.0-6.5%
Min.5.4%
6.0%
VMA (%)
VFB (%)
Flow (mm)
4.50
5.00
5.50
6.00
6.50
Bitumen Content (%)
Too High
Passing all criteria
Too Low
A5.14/8
7.00
7.5
Annexure 5.14
Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project Report for upgradation of junction with NH-68 at Sanchore
connecting Dhanera and terminating at its junction with NH-27 near Deesa + Junction with NH-68 near Tharad connecting Dhanera, Panthvada section of NH-168A and
NH-168 in the state of Gujrat to two/four lane with paved shoulder configuraton (Package no - NH/IAHE/19)
TEST RESULTS OF MARSHALL SPECIMENS AT OPTIMUM BITUMEN CONTENT ( Confirmatory Test )
2.970
(Gsb)
2.764354
(Gse)
2.955
Max.
Specific
% Air Voids
Gravity,
in Mix, (Va)
(Gmm) =
=100 x (h 100/(b/Gse+a g)/Gmm
/Gb)
Date of Testing
=
16.10.15
to 17.10.15
1.02
% of
Bitumen
Content by
Wt. of Total
Mix (Pb)
% of Agg.
by Wt. of
Total Mix
(Ps)
b=100-a
Wt. of
Specimen
in Air
(gms.)
Wt. of
Specimen
in Water
(gms.)
S.S.D. Wt.
of
Specimen
(gms.)
Volume of
Specimen
(cc)
f=e-d
Bulk
Density,
(Gmb)
(gm/cc)
g=c/f
1264.5
770.5
1266.0
495.5
2.552
13.2
2.8
1269.5
777.0
1271.0
494.0
2.570
14.3
3.2
1268.5
773.0
1269.0
496.0
2.557
13.6
3.4
2.560
13.7
3.1
6.00
Average
94.00
2.653
A5.14/9
3.51
% Voids in
Mineral Agg.,
(VMA) =100(gxb/Gsb)
% Voids Filled by
Bitumen, (VFB) =
100 x (j - i)/j
Marshall
Stability (KN)
mxn
12.96
72.93
Annexure 5.14
Project/Road: Consultancy Services for Project Manager Phase-I including preparation of Detailed Project Report for
upgradation of junction with NH-68 at Sanchore connecting Dhanera and terminating at its junction with NH-27 near Deesa
+ Junction with NH-68 near Tharad connecting Dhanera, Panthvada section of NH-168A and NH-168 in the state of Gujrat to
two/four lane with paved shoulder configuraton (Package no - NH/IAHE/19)
Summary of Test Results at OBC
Parameter
S.No
Result Achieved at
Results from graphs at
Optimum Bitumen
Bitumen Content 6.0%
Content (6.0%)
Requirements as per
MORT&H Table-500-10
1.
14.1 KN
13.7KN
Min.9 .0 KN
2.
Marshall Flow
3.3 mm
3.1 mm
2-4 mm
3.
3.66 %
3.51%
3-5%
4.
13.09 %
13.02%
Min.11.5%
5.
72.08 %
72.93%
65-75 %
6.
Bulk Density
2.556 gm/cc
2.560 g/cc
A5.14/10