Você está na página 1de 6

Soil Analysis for Draft Final Geotechnical Report

Zone A (Fill Area) pg 9


ABH No
2
2A

Zone Draft Final Geotecnical Report Analysis


A6 To remove 2-3 m @ mix with good soil to minimize
consolidation settlement

Status of the Area


In progress of removing soft material, 3 meter as
per discussion with SIC

A6
Contain silty sand / loose sand which easily consolidated In progress of filling platform

A7

A5

Contain silty sand / loose sand which easily consolidated In progress of filling platform
To remove 2-3 m @ mix with good soil to minimize
Done and handed over to UEM on March 2011
consolidation settlement

A1

Done and handed over to UEM on March 2011


Contain silty sand / loose sand which easily consolidated

A1

Done and handed over to UEM on March 2011


Contain silty sand / loose sand which easily consolidated

Zone B (Fill Area) pg 11


ABH No

Zone

Draft Final Geotecnical Report Analysis

Status of the Area

BH12

B2-5 To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Currently filling 3rd Layer as per 20.5.2011

B1-8 To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Completed and officially handover.

12

B 2-1 To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Completed, Removal of Soft Material done on


November.

13

B2-2

In progress of filling 26th layer as per 21.5.2011

29
32

Contain silty sand / loose sand which easily consolidated


To remove 2-3 m @ mix with good soil to minimize
Filling up to +10 layers at previously ponding area
consolidation settlement
B1-2 To remove 2-3 m @ mix with good soil to minimize
consolidation settlement

Completed and officially handover.

13

B 2-2 To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

In progress of filling 26th layer as per 21.5.2011

Zone C (Fill Area) pg 13


ABH No
BH 5
16

Zone

Draft Final Geotecnical Report Analysis


To remove 2-3 m @ mix with good soil to minimize
consolidation settlement

Status of the Area


Completed workers camp area.

C1

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Completed and handing over to UEMB

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Completed (toe of slope for batching plant area)

17
19

C5

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Site clearing done at the area

22

C7

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

No activities yet for the area

23

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

No activities yet for the area

24

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

No activities yet for the area

38

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Completed and removed 3 meters at the area

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

In progress

39

C4

Zone C (Fill Area) pg 13


ABH No
BH7

Zone
D11

Draft Final Geotecnical Report Analysis


To remove 2-3 m @ mix with good soil to minimize
consolidation settlement

Status of the Area


In progress, removing 3 meters at the area

27

D7

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

90% completed

33

D5

To remove 2-3 m @ mix with good soil to minimize


consolidation settlement

Site clearing done for the area

Remarks

Future Area Transport Terminal

Remarks

Removed 2 meters by UEMB

Access Road

Remarks
Future Area - Police Station
Minor filling 2 meter
Future Area - Town Center
Flushing method until edge of
access, removed the soft material

Reserve site for future STP


Retention Pond
Access Road B1-7
Flushing method until edge of
access, removed the soft material

Remarks

Flushing method until edge of


access, removed the soft material

Você também pode gostar