5. Select the option which match the objectives of a project to the corresponding standards.
1. Time
A. OHSAS 18001:2007
2. Quality
B. IS 15883 (Part-2)
3. Safety
C. ISO 14001:2004
4. Environment
D. ISO 9001:2008
a.
b.
c.
d.
6. In the business of Construction Project Management all objectives finally relate back to:
a. Time
b. Quality
c. Cost
d. Safety
7. Safety is not given priority in many parts of the world because:
a. Little enforcement from Govt agencies.
b. No penalty for lack of safety practises.
c. Perceived higher cost of safety
d. All of the above
8. The ISO standard for project management is:
a. ISO 9001:2008
b. ISO 14001:2004
c. ISO 21500:2012
d. ISO 18001:2007
9. The contribution of Construction to Indian GDP is about:
a. 20 %
b. 4 %
c. 8 %
d. 10 %
10. The key stakeholder who has maximum influence on the project is:
a. Contractor
b. Consultant
c. Owner
d. Designer
11. The typical phases of a construction project and the sequence are
a. Order acceptance, Job design, Job engineering, Production.
b. Perform business planning, Pre-project planning, Execute project, Operate facility
c. Design, sourcing, storage, construction
d. None of the above
12. Project nature in which overlapping of Engineering, Procurement and Construction phases to
achieve shorter time duration is called:
a. Conventional Construction
b. Concurrent Construction
c. Phased Construction
d. Fast Track Construction
13. The Influence vs cost across the phases of a project graph is given below. Read the statements
below and choose the best option:
I.
II.
III.
IV.
Major changes can be done during Mid phase of a project with minimal cost implications.
The cost implications of decisions is minimal during Start phase of a project.
The ability to influence a project is high towards the end of the project.
The rate of cost expenditure is high during Mid Phase of a project
a. Craft team
b. Scheduling engineer
c. Execution team
d. Owner
e. Project Manager