MUNICIPAL CORPORATION OF GREATER MUMBAI

Hydraulic Engineers Department


Rate Analysis Format

Important Points

1) The intending tenderer shall consider the various tender conditions

included in the tender regarding the site difficulties while calculating


their rates.
2) The intending tenderer should note that the rate analysis given

herewith is for typical size of valves, water mains, cross connections


etc. The contractor shall carry out the rate analysis in the given
format separately for each size of valves, pipes, cross connections
etc. taking into account tender Bill of Quantities.

MUNICIPAL CORPORATION OF GREATER MUMBAI


Hydraulic Engineers Department
Rate Analysis Format

Code

RW
2.08

Description

Unit

Quantity

Rate Rs

Providing & laying sub base 20 cm


compacted(K.T.R.)thick made of metal
obtained from rock having AIV of not more
than 40% (metal varying in size from 90 mm
to 45mm) and compacting the same to the
satisfaction of the Engineer laid complete in
to two layers the required level and camber,
rolling with 10/12 tonnes roller interstices
being filled with stone dust, watering, rolling
and making each layer waterbound. As per
new Road Specifications Clause no.220.
Unit = sqm
Cost for 1 Sq. M.
Consolidated thickness = 10 cm.
a) Labour

b)

Labour for spreding Metal


Forman
Material

Aggregate 1 0Sq. M. = 0.14 Cu.M.


stone chips/ screening material to fill
Vioids
Binding material stone grit
c)
Rolling Charges for 1 Layers 1.00
Sq. M.
One layer=
Two layer=

day
day
cum
cum
cum
sqm

Profit & overhead charges


Rate per sqm =
say

Cost
Rs

RW
2.13

Supplying & spreading 60mm metal


compacting the same to 10cm. To the
satisfaction of the Engineer by a roller
weighing not less than 10 tonnes to the
required grade,level & camber including
binding with grit,sand stone dust, watering
rolling etc. complete & making the layer
waterbound.As per new Road Specifications
Clause no.220.
Unit = sqm
Cost for 1 Sq. M.
Compacted thickness = 10 cm.
a) Labour

b)

Labour for spreding Metal


Forman
Material = 60 mm.

Aggregate
stone chips/ screening material to fill
Vioids
Binding material stone grit
c)
Rolling Charges for 1 Layers 1.00
Sq. M.
Profit & overhead charges

day
day
cum
cum
cum
sqm

Rate per sqm =


say

RW
2.20

Providing & laying, spreading & compacting


graded crushed stone agreegate to wet mix
macadam satisfaction including premixing
the material with water to OMC in
mechanical mix (pug mill) carriage of mix
material by tipper to site laying in uniform
layer of 75mm to100mm(compacted
thickness each)with sensor paver finisher
on prepared subbase & compacting with
vibratory roller (10 tonne) to achieve desired
density including lighing, guarding
barricating & maintenance of diversion etc.
as directed by the Engineer, ( Rebate for
not using sensor paver should be
taken,(metal gradation from 53mm to 75mm
micron as per MCGM Road Specifications
clause no.240).
Unit = Cu.M
Rate analysis for wet mix macadam for
Qty. 1 M3
Loose Volume = 1 M3 x 1.40 = 1.40 M3
i.e 1.40 x 0.71 = 1.00 M3

Area =
1 / 0.75
mm . Thick)
a) Labour
b)

= 13.33 M2

( for 75

Male Mazdoor
Material

day

Metal No. I+II+III


Stone grit
Water (10% by weight including losses)
c)
Machinery

cum
cum
Lit

Plant charges ( In plant )


Spreading Sensor Paver
Rolling by vibratory roller
Transportation to site or mixed on site
any where in MCGM limits
Profit & overhead charges

MT
sqm
sqm
MT

Rate per Cu.M =


say

RW
2.21

Providing & laying, spreading & compacting


specified crushed stone in granular subbase
course including premixing the material in
mechanical mixer (pug mill or approved
type), spreading of mixed material in
uniform layer of 100mm to 75mm
(compacted thickness each) with motor
grader or paver on prepared murum surface
& compacting with 10 tonne vibratory roller
to achieve desired density including all
material, labour, machinery, lighing
barricating to all lifts & lead maintenance of
diversion etc. complete (metal gradation
from 75mm to 75mm micron as per MCGM
Road Specifications clause no.210).
Unit = Cu.M
Rate Analysis for granular subbase for
Qty. 1 M3
Loose Volume = 1 M3 x 1.40 = 1.40 M3
i.e 1.40 x 0.71 = 1.00 M3
Area =
1 / 0.100 = 10 M2
( for 100
mm . Thick)
a) Labour
b)

Male Mazdoor
Material
Metal No. I+II+III
Stone grit
Water (10% by weight including losses)

day
cum
cum
Lit

c)

Machinery: For mixing 1 m3


MECHANICAL MIXER/ PUG MILL ( In
plant )
Spreading Motor grader/ ordinary Paver
Rolling by vibratory roller
Transportation to site or mixed on site
any where in MCGM limits
Profit & overhead charges

MT
sqm
sqm
MT

Rate per Cu.M =


say

Code

RW
3.11

Description
Providing & fixing 80 mm thick interlocking
unishape concrete pavers ( monolithicsingle layer precast concrete blocks) of
gray cement coloured in the carriageway
having average crushing strength
50N/sq.m.m. as per technical specification,
placed on average compacted thickness of
25 mm, uniformly graded river sand
cushioning with proper compacting with
mechanical compactor with the proper
level, grade and camber etc. complete as
specified and as directed by the Engineer.
Unit = sqm
Cost for 1 sq mtr
a) Labour
Pavior / Tiler
Labour
b) Material
80 mm thick interlocking unishape
concrete pavers
Bedding Sand (screened -for 25 mm
thk & jointing)
c)
Machinery
Vibrator
Profit & overhead charges

Unit

Quantity

Rate Rs

day
day
sqm
cum

day

Rate per sqm =


say

Cost
Rs

RW
3.17

Providing & fixing in the footpath, 60 mm


thick Lacquer coated (Reflective)
interlocking gray cement concrete pavers
in red (Terra Cotta) Black, Brown, Lemon
Yellow or any colour with vermeticular or
any antiskid texture on top surface of
approved pattern/ shape and colour
having average crusting strength 40
N/mm manufactured in double layer
precast concrete blocks. The top layer of
paver block should be 12 to 15 mm thick
and consist cubical shape stone
aggregate 8 mm size sieve 100% passing
and retain on 4.75 mm size sieve , silica
sand and with pure iron oxide ultra voilete
stabilized pigment @ 5% by weight of
cement and should be coated with lacquer
having hard, high abrasive resistance and
water repellent. The bottom layer should
be 45 to 48 mm thick having 12 mm size
sieve 100% passing aggregate as per
technical specification placed on uniformly
graded river sand cushioning of average
compacted thickness 25 mm properly
compacted with mechanical compactor
with required level, grade and camber etc.
complete as specified and as directed by
the Engineer.
Unit = sqm
Cost for 1 sq mtr
a) Labour
Pavior / Tiler
Labour
b) Material

day
day

60 mm thick Lacquer coated (


Reflective) interlocking gray cement
concrete pavers
Bedding Sand (screened -for 25 mm
thk & jointing)
c)
Machinery

sqm

Vibrator
Profit & overhead charges

day

cum

Rate per sqm =


say

RW
3.20

Providing & Fixing in the carriageway


interlocking 100 mm thick gray cement
concrete unishape pavers in Red ( Terra
Cotta), Black, Brown or any colour
unishape (monolithic-single layer precast
concrete blocks) with pigment @ 3% by
weight of cement having average crushing
strength of 50N/sq.m.m., placed on
uniformly graded river sand cushioning of
average compacted thickness 25 mm
with proper compacting with mechanical
compactor with the proper level, grade and
camber etc. complete as specified and as
directed by the Engineer.
Unit = sqm
Cost for 1 sq mtr
a) Labour

b)

Pavior / Tiler
Labour
Material

100 mm thick gray cement concrete


unishape pavers (Terra Cotta)
Bedding Sand (screened -for 25 mm
thk & jointing)
c)
Machinery
Vibrator
Profit & overhead charges

day
day
sqm
cum

day

Rate per sqm =


say

Code

RW
4-01

Description
Providing & Fixing kerb stones 30 cm.to 40
cm. long., 15 cm. wide, 38 cm. deep
medium dressed in all exposed surfaces,
set in cement mortar 1:2 on a 15 cm. thick
and 25 cm. wide RMC M-10 C.C. bed
including filling the joints with 1:2 C.M.
pointing, curing etc. complete.
Unit = Rmt
Cost for 1 RM
b) Material
kerb stone
M-10

Unit

No.
cum

Quantity

Rate Rs

Cost
Rs

Excavation and removal of material


For fixing 50m
a) Labour
Mason
Male Labour
C.M. 1:2

cum

day
day
cum
for 1m

Profit & overhead charges


Rate per Rm=

Code

RW
7-45

Description
Providing and fiixing the barigating in
double row with G.I. Sheets of 22 guage
manufactured by TATA Co. and JINDAL
Co. fixed on 3 inch dia. (75mm.) woden
bullies which will be buried in existing road
sufficeintly. Embossing of TATA/JINDAL
Brand on G.I. Sheet shall be ensured
before painting with yellow and black bands
of Synthetic enamel paint as per the traffic
norms and as directed by the Engineer.
Unit = RM
Basic rates
Ballis 3"
G.I. corrugated sheet of 2.44*0.75 m.
Synth. Enamel paint
Analysis for 500m length
No. of Ballis =500 m. /2.00m.
Nos. =
No.of
G.I.
corrugated
sheets
=
(500/2.440)*2
Nos. =
a) Cost of angle post per running m.
Cost of ballis
b)
Cost of G.I. corrugated sheet per
running m.
2.44*0.75 m. sheet
Considering min. 4 times use of
material reduced cost per m.=

Unit

sheet
sqm
500
i.e.
500
i.e.
mt.

mt.

Quantity

Rate Rs

Cost Rs

Total (a+b) =
Synth. Enamel paint
Considering min. 2 times use of
material reduced cost per m.=
c)
Labour (fixing & removing the
barricating)
3 nos.carpenter for erect &dismental
50 m length
6 nos. of laboures, for erect &
dismental 50 m.
Toatal =

mt.
mt.

day
day

Profit & overhead charges


Rate per mt. =

Code

RW
1006

Description
Unit
Providing & laying R.C.C. running beam in
M-40 cement concrete including required
formwork mixing, compacting & curing, etc.
complete reinforced with 12mm
dia.(Minimum 4 Nos.)M.S. main bars &
6mm Dia M.S. rings at 15cm/c/c to be
anchored in slipper slab properly with M.S.
reinforcement as per drawing etc.
complete as specified(Steel will not be
paid separately).Contractor has to make
his own arrangement for portable waterfor
construction/curing with hessian cloth, etc.
& will not be paid separately.
Beam Size: b) 23cm. x 30cm.
Unit = RM
Cost for 1 RM
Size of beam 23 cm x 30 cm.
Cost of providing & laying M - 350 C.C
Vol. of runner beam / R.M. = 0.23 x 0.30
Cu.M. / Mt. = cum/mt
Rate for M:40 C.C. per Cu. M.
Rs
a) Rebate
Rebate for not using screed vibrators
Rebate for not using plate vibrators
Total
Sundries 5 %
Total Cost of owing machinary =
(Say. Rs. ) =
after 5 years @ 25 % salvage value

day
day

Quantity

Rate Rs

Cost Rs

Minus the scrap / resale value


Depriciated & Maintanance @ 25 %
per annum
Total 25 % per annum =
Rebate for not using screed vibrators &
plate vibrator
Rebate /50bays*45*3*0.30
After Deduction from rate of Item RW
10.01
Cost for beam of Size 23 cm x 30 cm =
b)
Material
Cost of reinforcement steel
Wt. of reinforcement
4 Nos. 12mm dia. M. S. = 4 x 0.89 =
6/ M.S. Rings @ 15 cm.
C/C
Length of each ring = 2 x 19 + 2 x 26
+ 12
Wt./ ring = 1.02 x 0.22 =
Wt. of reinforcement / mt. = 3.56
+1.57 =
wastage 5 % 0.25 kg = 5.28 kg. say
5.3 kg.
Say
Cost of reinforcement
c)
Labour
Labour for tieing & fixing
labour for bending
Profit & overhead charges

cum

kg

cm
kg

kg
MT
MT
day
day

Rate per RM =
say
Providing & fixing in position M.S. dowel
bars of 32mm dia 55cm long & 30cm C/C
RW whenever directed including handling,
10.17 fixing, etc. complete(no extra payment will
be made for applying bitumen & grease to
dowel bars)
Unit = sqm
a) Labour

b)

Fitter
Labour
Labour for Cutting by machine
Material

32mm. Steel , including wastage


Profit & overhead charges

day
day
day
Nos.

Rate per sqm =


say

P/L R.M.C. M-10 C.C. having avg.


compressive strength 13.5 Mpa grade in
foundation/encasement/pavement with or
without chequered design including
formwork, mixing in batching plant, placing
RW
vibrating with plate or needle curing etc.
10.27
complete as directed by the Engineer. C/s.
has to make his own arrangement for
water for curing with Hessian cloth etc. &
will not be paid separately.(MINIMUM
CEMNT CONTENT 220 Kg/m.)
Unit = cum
a) Labour (for 20 cum)
mukadam
Mason
Mechanic
Unskilled Labour(M)
Unskilled Labour (female)
Bhisti
Total for 20 cum =
Cost per cum =
Material

day
day
day
day
day
day

Cement
Metal I & II
Sand
Water for mixing & curing
Hassan cloth =6.67 M FOR 7
REPETITIONS=
Cost for 20 CUM (c+d)
c) Machinary
Needle Vibrator
Plate Vibrator
d) Formwork
Approx. 20 M3@ 206.64/M
Formwork
Cost / M3 =
e) Cost of transportation.
f)
Fixed cost of the batck mix plant
Total =
Profit & overhead charges

bags
cum
cum
lit
sqm

b)

day
day

sqm

Rate per cum =


say

Providing & laying M-40 C.C.avg.


compressive strength 45 MPa and
avg.flextural strength of 5.0 MPa (As per
IRC 15-2002.N.1.6) procured from
M.C.G.M.approved R.M.C. plant including
use of approved make plasticizer / retarder
& Contractors water with ice flakes and
RW
transported by transit mixer and placing at
10.33
work site. Compacting finishing, initial
curing by approved curing compound &
Contractors water and tarring the sides of
slab with hot bitumen as specified and
directed (w/c ratio o.4 maximum)(vata for
curring will be paid separately.)
(MINIMUM CEMENT CONTENT 350
kg/m)
Unit = cum
a) Labour (for 40.5 cum)

b)

mukadam
Mason
Mechanic
Unskilled Labour(M)
Unskilled Labour (female)
Bhisti
Mistry
Total for 40.5 cum =
Cost per cum =
Material

Cement
Metal I & II
Sand
Ice flakes
Water for mixing & curing
Admixtures
Curing compound
Bitumen
Cost for 40.5 CUM (c+d)
c) Machinary
Needle Vibrator
Screed Vibrator
Plate Vibrator
d) Formwork
Approx. 40.5 M3
Formwork

day
day
day
day
day
day
day

bags
cum
cum
kg
lit
lit
lit
LS

day
day
day

sqm
Cost / M3 =

e)
f)

Cost of transportation.
Fixed cost of the batck mix plant
Total =
Profit & overhead charges
Rate per cum =
say
Extra & over for providing and using
special admitures/ plasticizers to achieve
required crushing & Average flexural
strength 5.0 Mpa of M40 grade concrete in
7 days.
NOTE :1)THIS ITEM SHOULD BE
OPRATED ONLY AFTER SPECIFIC
SANCTION OF DIR(E.S.& P.).
RW
NOTE: 2)FOR SPECIAL ADMIXUERES
10.39
ITEMS SUCH AS ELKEM MICROSILICA,
POLYPROPELYNE FIBER, BSF
GLANIUM SKY,EARLY STRENGTH
SUPER PLASTYSIZER, STEEL FIBER
REINFORCEMENT ETC. ORIGINAL
CHALAN SHOULD BE PRODUCED ,
FAILING WHICH NO PAYMENT TO BE
MADE.
Unit = cum
a) Labour (for 40.5 cum)

b)

Mukadam
Mason
Mechanic
Unskilled Labour(M)
Unskilled Labour (female)
MISTRY
Machinary

day
day
day
day
day
day

Screed Vibrator
Plate Vibrator
Needle Vibrator

day
day
day
Total for 40.5 cum =
Cost per cum =

c)

Material

Cement
Metal I & II
Sand
Ice flakes
Special Admixtures =ELECIUM-51
Special Admixtures =
GLANIUMSKY784

bags
cum
cum
kg
lit
lit

Water for mixing & curing


Curing compound
Bitumen
d)

lit
lit
LS

Formwork
Approx.40.5 M3
Formwork

sqm
Cost / M3 =

e)
f)

Cost of transportation.
Fixed cost of the batck mix plant
Total =
Profit & overhead charges
Rate per cum =
Cost as per RW 10.33 =
Extra & over cost =
say

Item Code: CS-EW-1


Excavation in ordinary soil upto depth 1.5M
Sr. No.

Description

Unit

Quantity

Rate

Details of Cost for : 10.00 Cum


1

HIRE CHARGES:
Hydraulic Excavator (3D) with driver and
fuel (JCB)
Hire and running charges of loader.
Vibro Roller for compaction
5 HP pump for dewatering
LABOUR :
Coolie
Mate/ Female coolie

Total Hire Charge & Labour cost

B
C

Overhead & Proffit % on A


Total (A+B)

Per unit cost

Day
Day
Day
Day
Day
Day

Say Rs.

Amount

Item Code: CS-EW-2-a


Add for each additional lift from 1.5m to 3m
Sr. No.

Description
Details of Cost for : 10.00 Cum
LABOUR :
Mate/ Female coolie
Semi Skilled Labour (Beldar)
Total Labour

B
C
D
E

Total (A)
Overhead & Proffit % on B
Total (B+C)
Per unit cost

Unit

Quantity

Rate

Amount

Day
Day

Say Rs.

Item Code: CS-EW-2-b


Add for each additional lift from 3m to 4.5m
Sr. No.

Description
Details of Cost for : 10.00 Cum
LABOUR :
Mate/ Female coolie
Semi Skilled Labour (Beldar)

Total Labour

B
C
D

Total (A)
Overhead & Proffit % on B
Total (B+C)

Per unit cost

Unit

Quantity

Rate

Day
Day

Say Rs.

Amount

Item Code: CS-EW-2-c


Add for each additional lift from 4.5m to 6m
Sr. No.

Description
Details of Cost for : 10.00 Cum

Unit

LABOUR :
Mate/ Female coolie
Semi Skilled Labour (Beldar)

Total Labour

B
C
D

Total (A)
Overhead & Proffit % on B
Total (B+C)

Per unit cost

Quantity

Rate

Amount

Day
Day

Say Rs.

Item Code: CS-CW-1

Description
A

Details of Cost
for : 1.00 Cum
Unit

MATERIALS :
Stone aggregate 20mm

cum

Coarse sand

cum

Cement

tonne

LABOUR:
Needle Vibrator operator

Day

Beldar

Day

Bhishti

Day

Mixer

Day

Vibrator

Day

Centering & shuttering

Sqm

Overhead & Proffit % on A


Total (A+B+C)

Quantity

Rate

Amount

Item Code: CS-MW-1-a

Description
MATERIALS :
Common
burnt
clay F.P.S (non
modular) Bricks of
class designation
7.5
Cement mortar 1:3
(1 cement : 3
coarse sand).
LABOUR:
Mason 1st Class
Mason IInd Class
Coolie
Bhishti

Details of Cost for : 1.00


Cum
Unit

Quantity

Rate

Amount

Rate

Amount

1000

Day
Day
Day
Day
Add C.P & OH @
% on
Rate per One Cum:

Item Code: CS-MW-1-b

Description
MATERIALS :
Common
burnt
clay F.P.S (non
modular) Bricks of
class designation
7.5
Cement mortar 1:4
(1 cement : 4
coarse sand).
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti

Details of Cost for : 1.00


Cum
Unit

Quantity

1000

Day
Day
Day
Day
Add C.P & OH @
% on
Cost for 1.00
Cum
Rate per One Cum:

Item Code : HE-2-12

Melting
time
Time
No. of reqd.
per
Length of
Electro per
R.M.
weld per
Rate of Cost
des
ele. in
weld in Total day(8hrs) electrode per
Used minute minutes Time
in R.M.
per No. R.M.

Thickne
ss of
Plate in
mm

Dia. of
Electrode
used

4mm

6mm

3.2

19.2

19.2

25

5mm

9mm

3.2

28.8

28.8

16.67

6mm

7mm

3.2

22.4

12mm

12

3.4

40.8

63.2

7.59

Code No

Description
Providing and fixing MS frame and cover with its
complete assembly including supply and fixing of the
same etc complete for sluice valve, butterfly valves
and kinetic air valve chambers and as directed and
specified by Engineer In charge. The MS plate used
for the cover shall be 20 mm thick.The new MS
cover shall have anit skid arrangement.The anti skid
arrangement shall be provided by welding 4mm thick
MS flats of 50 mm width and 300 mm center to
center. The rate for this item is worked out on per
Nos. basis, calcualtion are done considering the
cover of size 900x1200 mm. Note : Tolerance of +/5% of mentioned standard weights acceptable.

HE-2-16

Unit

Material Charges
Mild Steel Plate 20 mm Thick

Kg

Mild Steel Flats 50 mm wide and 4 mm thick

Kg

MS Frame 900x1200 mm

Kg

Cost of Fabrication/ Welding

Kg

Labour Charges

Contra
ct-ors
Profit
and
Overhe
ad
Total Charge
Cost
s

Qty

Rate

Labo
ur &
Mac
hinery
Cost
Per
RM

Total
Rate
per
R.M.
in
Rs.

Amount

Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled


Male Labour)

Shift

Semi Skilled Labour (Beldar)

Shift

Fitter (grade 2) /Gas cutter

Shift

Total Of Material, Labour & Hire

Overhead Sundries Water Charges and Contractors


profit of % on A

Total Cost (A+B)

Per Unit Cost


Code No

HE-2-3

Description
Supplying, transporting MS fabricated material on
site, aligning, fixing in position, tack welding
including marginal cutting, synthetic Rubber
packings etc.
a) Minor fixtures such s man hole frame & covers,
pressure and non-pressure type blank flanges, loose
flanges, rings, small pieces to form saddle pieces,
ladders, platforms, stiffner rings etc.
b) Major fixtures such as tees, domes, bends,
branches, flange ring assembling etc.
Details of cost for 9000 Kgs of MS Fabricated
Material is worked out.

Rs./
Kg
Unit

Assumptions
Cost of MS plates, strips etc is inclusive of excise
duty
Calculation based on fabricating materal weighing
Material Charges
MS Plate 10 mm Thick
Fabrication Charges

Kg
Rs/K
g

Add 20% extra for complexity of fabrication


and minor fitment at site
Labour Charges for Loading & Unloading
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)

Shift

Qty

Rate

Amount

Hire Charges
Mobile crane - with boom length 30m (min output
300 cu.m per shift)

Shift

Lorry Hire Charges

Shift

Total Of Material, Labour & Hire

Overhead Sundries Water Charges and Contractors


profit of 15% on A
Total Cost (A+B)
Rs/M
.T

Per Unit Cost

Item code :- HE-3-16


Description
Details of cost for butterfly valve with flange adapter
MATERIAL
Butterfly Valve of Dia 1500 mm PN 1.0
Flange Adaptor of 1500 mm (PN 1.0)
HIRE CHARGE
LABOUR CHARGE
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector

Each
Each
Shift

Shift

Fitter (grade 2) /Gas cutter


Semi Skilled Labour (Beldar)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Total Labour charge
A
B
C

Unit

Total Material, Labour and Hire Charge


Overhead and Contractors profit on A
Cost of each
Say

Shift
Shift
Shift
Shift
Shift
Shift
Shift

Qty

Rate

Amount

Code:
HE-3-6
Description
Details of cost for 1 sluice valve
MATERIAL
Sluice Valve of dia ___mm PN 1.0
Tail Pieces
HIRE CHARGE
Welding Machine with Generator set

Unit

Qty

Rate

Amount

Qty

Rate

Amount

Each
Each
Shift
Shift
Shift

Total Hire charge


LABOUR CHARGE
Fitter (grade 2) /Gas cutter
Welder
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)

Shift
Shift
Shift
0
Shift

Total Labour charge


A
B
C

Code No

HE-4-1

Total Material, Labour and Hire Charge


Overhead and Contractors profit on A
Cost of each
Say
Description
Making connection on live CI/DI main of various
sizes including cutting of pipes with pipe cutting
machine, providing & fixing, DI pipe upto 1 M. length
of distance peice on live main , specials such as tee
& collar,jointing the pipes with mechanical joint as
per IS 13382 / 1992 sealing with rubber gasket of
SBR, with cast iron follower gland and mild steel zinc
coated nut bolts suitable for CI/DI pipe, pumping out
body water, etc complete in all respect as directed
by Engineer in Charge
Note : (1) The required
excavation, shoring, encasement in cement
concrete, any pipe/specials/sluice valve provided
beyond Tee will be paid separately under relevant
items. Note : (2) Rebate for salvation cost of old pipe
has been considered and old pipes shall be
removed by the contractors as directed.
One Cross Connection can be done in Half Day/Shift
Material Charges
_____ mm Dia. DI K9 Class Pipe

Unit

R.M

____mm x ___mm CI mechanical joint all socket tee


with gasket / No.
_____mm CI mechanical joint collar with gasket /
No.

Nos.
Nos.

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges
Pump for Dewatering 5 Hp
Pipe Cutting Machine____ mm Dia
A

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of __% on A

Rebate for salvation cost of old pipe


Salvage Cost of pipe ___mm Dia( Length of Salvage
pipe = Length of Tee+ 1 m pipe + length of collar)

Shift
Shift
Shift

Shift
Shift

Kg

Total Cost (A+B-C)

Per Unit Cost

Code No

HE-4-3

Description
Making connection on live CI/DI water main of ..
mm dia., including cutting of pipes with cutting
machine, providing & fixing, DI pipe upto 1 M. length
of branch pipe, specials such as saddles, bends,
distance pieces, flanges, collars etc. (suitable for
lead joint), jointing the pipes with lead joint and
pumping out body water etc. complete in all
respects. Note : (1) The required excavation,
shoring, encasement in cement concrete & sluice
valve will be paid separately under relevant items.
One Cross Connection can be done in One Day/Shift
Material Charges
___ mm Dia. DI K9 Class Pipe
Cost of Saddle Piece .. mm x .. mm
mm CI joint collar

Rs/N
os.

Unit

R.M
Nos.
Kg.

Qty

Rate

Amount

CI 90 Deg. Bend . mm
Rubber Gasket .mm

Kg.
Nos.

Zinc coated 16 mm dia.100 mm long bolt with nut,


washers etc.
Fuel Wood
Kerosene
Pig Lead 6.10 x 4 joints
Spun yarn 0.35 x 4 Joints
Labour Charges

Nos.

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor

Shift

Hire Charges
Centrifugal Pump 100 mm inclusive of cost of deisel
Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Code No

HE-4-5

Per Unit Cost


Description
Making connection on live MS water main of various
sizes, including cost of cutting, supplying, loading,
transporting on site, unloading, lowering in trenches,
assembling of required MS specials, MS pipe and
jointing the pipes / specials etc. with butt and lap
welding joint, removing body water etc complete in
all respect as directed by Engineer in Charge. For
following sizes. Note : (1) The required excavation,
shoring, encasement in cement concrete & supply
and fixing of sluice valve will be paid separately
under relevant item.
The Cross Connection can be done in two Day/Shift
Material Charges
Cost Of MS Specials : Flange, Branch Pipe, Stiffner
Plate, Doubler etc. For _____mm x_____ mm
connection
Oxygen - Lumpsum

Kg.
Lts.
Kg.
Kg.

Shift
Shift

Shift

Rs/N
os.
Unit

Nos.
L.S

Qty

Rate

Amount

Acytelene - Lumpsum
Welding rods

L.S
Nos.

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Welder
Hire Charges
Centrifugal Pump 100 mm inclusive of cost of deisel
Welding Machine with Generator Set
Gas Cutter Set
A

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Code No

HE-6-1

Per Unit Cost

Description
Providing and fixing CI Mechanical joint split collars
suitable for repair of cracks/ leakages of CI/ DI pipes
of 150 mm dia. as per MCGM
specifications
complete with sealing rubber gasket made of SBR
and galvanized 'T' bolts and nuts. The whole
assembly mechanically and Hydraulically tested to
the provisions laid
down in IS 1538/1993 or IS
13382/1992 whichever is applicable. This item
includes dewatering of bodywater cleaning of pipe
and arresting leakages etc complete as directed by
Engineer in Charge.
Details of cost for 4 Joints ( 4 joints of 150 mm can
be done in one shift)
Material
-------- mm Dia. Mechanical Collar Split Joint
Labour Charges

Shift
Shift
Shift
Shift

Shift
Shift
Shift

Rs/N
os.

Unit

Nos.

Qty

Rate

Amount

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)
Operator of Pump Gunite M/C or Compressor

Shift
Shift
Shift

Hire Charges
Pump for Dewatering 5 HP 1 Nos
Tipper truck with 5 cum capacity
A
B
C
D

Code No

HE-6-4

Deisel Generator
Total Of Material, Labour & Hire

Shift
Shift
Shift

Overhead Sundries Water Charges and Contractors


profit of ---------% on A
Total Cost (A+B)
Rs/N
os.

Per Unit Cost

Description
Providing and fixing CI Mechanical joint Double
Socket with Flanged Tees with Branch Flanged
Tees, (dimensionally described inTable - 19 of IS :
13382 / 1992) inclusive of Sealing Rubber Gasket of
SBR (dimensionally described in IS :12820), Cast
Iron Follower Gland and Mild Steel Nut Bolts zinc
coated or otherwise protected from rusting and
suitable for CI/DI Pipes of 150 mm Dia etc complete
as directed by Engineer in Charge
Details of cost for 8 Joints ( 8 joints of ----- mm can
be done in one shift)

Unit

Material
.mm Tees

A
B
C
D

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)
Total Of Material, Labour & Hire

Nos.
Shift
Shift

Overhead Sundries Water Charges and Contractors


profit of ------% on A
Total Cost (A+B)
Per Unit Cost

Rs/N
os.

Qty

Rate

Amount

Code
HE-3-30

Description
Details of cost for Kinetic air valve with sluice valve
MATERIAL
Kinetic Air Valve of Dia 80mm PN 1.0
Sluice Valve
HIRE CHARGE
LABOUR CHARGE
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector

A
B
C
Code No

HE-4-7

Unit

Qty

Rate

Amount

Qty

Rate

Amount

Each
Each

Shift

Fitter (grade 2) /Gas cutter


Fitter (grade 2) /Gas cutter
Welder
Semi Skilled Labour (Beldar)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Total Labour charge
Total Material, Labour and Hire Charge
Overhead and Contractors profit on A
Cost of each
Say

Shift
Shift

Description
Discarding the existing live CI/DI/MS water main of
150 mm Dia. by plugging the same including cost of
pipes and specials, Supplying, loading, transporting
on site, unloading, lowering in trenches, assembling
the CI / MS pipes / specials of required diameter,
etc. complete including cost of mechanical cap or
and with spun yarn and molten lead including
caucking etc complete in all respect as directed by
Engineer in Charge & including cost of lead for
following diameters. The cost of item is for plugging
the water main on either side at one location. Note
:(1) The required excavation, shoring, encasement in
cement cement concrete & sluice valve will be paid
separately under relevant items. Note :(2) Rebate for
salvation cost of old pipe has been considered and
old pipes shall be removed by the contractors as
directed.
Work can be done in one Day/Shift
1 M. pipe will be removed for capping the water main
the exsisting water main will be plugged from both
ends.
Material Charges
CI Mechanical End Cap ---- mm Dia.

Unit

Nos.

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges
Pipe Cutting machine for ---- mm
A
B
C

Pump for Dewatering 5 Hp


Total Of Material Hire Charges & Labour
Overhead and Contractors profit of % on A
Rebate for salvation cost of old pipe

Salvage Cost of pipe ---- mm Dia ( 1 m x 32.18 kg )


Total Cost (A+B-C)

E
Code No

HE-4-1

Per Unit Cost


Description
Making connection on live CI/DI main of various
sizes including cutting of pipes with pipe cutting
machine, providing & fixing, DI pipe upto 1 M. length
of distance peice on live main , specials such as tee
& collar,jointing the pipes with mechanical joint as
per IS 13382 / 1992 sealing with rubber gasket of
SBR, with cast iron follower gland and mild steel zinc
coated nut bolts suitable for CI/DI pipe, pumping out
body water, etc complete in all respect as directed
by Engineer in Charge
Note : (1) The required
excavation, shoring, encasement in cement
concrete, any pipe/specials/sluice valve provided
beyond Tee will be paid separately under relevant
items. Note : (2) Rebate for salvation cost of old pipe
has been considered and old pipes shall be
removed by the contractors as directed.
One Cross Connection can be done in Half Day/Shift
Material Charges
mm Dia. DI K9 Class Pipe

Shift
Shift
Shift
Shift
Shift

Kg
Rs/N
os.
Unit

R.M

mm x mm CI mechanical joint all socket tee


with gasket / No.
mm CI mechanical joint collar with gasket / no.
Labour Charges

Nos.

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges

Shift

Nos.

Shift
Shift

Qty

Rate

Amount

Pump for Dewatering 5 Hp


Pipe Cutting Machine 300 mm Dia
A
B
C

D
E
Code No

HE-7-4

Total Of Material Hire Charges & Labour


Overhead and Contractors profit of 15% on A
Rebate for salvation cost of old pipe
Salvage Cost of pipe 300 mm Dia( Length of
Salvage pipe = Length of Tee+ 1 m pipe + length of
collar)
Total Cost (A+B-C)
Per Unit Cost

Shift
Shift

Kg

Rs/N
os.

Description
The transfer of existing service connections include
cutting the existing connections, plugging the holes,
supplying & fixing new Gun metal ferrules, required
GI fittings(heavy) supplying & fixing new 'C' class
G.I.pipes up to 1 meter length and and making the
hole with hand tools, including necessary excavation
and backfilling etc complete in all respect as directed
by Engineer in Charge . Note : (1) Rebate for
salvation cost of old pipe has been considered and
old pipes may be removed by the contractors as
directed. (2) Only MCGM approved GI pipe brands
shall be used, all pipe and pipe fittings shall be C
class (heavy grade) having ISI marking.
Work will be done in half Day/Shift
Material

Unit

15 mm Dia Class C GI Pipe


15 mm Gun metal ferrule
15 MM GI bend
15 mm GI union coupling
15 mm GI elbow
15 mm plug
15 mm coupling
15 mm double barrel nipple
Spun Yarn
White Zinc
Labour

RM
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Kg
Kg

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Semi Skilled Labour (Beldar)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)

Shift
Shift
Shift

Qty

Rate

Amount

Hire Charges
Hand Held Tools
Total Of Material, Labour & Hire

Overhead Sundries Water Charges and Contractors


profit of --------% on A
Rebate for Salvation of Old Pipe

Rebate for old GI 15 mm Dia Pipe ( Weight of pipe =


1.503 Kg /RM)
Salvation Cost for old ferrule 15 mm dia
Total Cost (A+B-C)

E
Code No

HE-7-2

Per Unit Cost


Description
Supplying, providing laying and jointing GI pipes in
trenches of following class and diameter by wrapping
them by hessian cloth with tar coating and including
any nominal pipe length required to be laid above
ground level, conveyance from stores to site work,
all labour, necessary excavation, backfilling, giving
satisfactory hydraulic test, etc complete in all respect
as directed by Engineer in Charge. Note : Only
MCGM approved GI pipe brands shall be used, all
pipe and pipe fittings shall be C class (heavy grade)
having ISI marking.

LS

Kg
Kg
Rs/N
os.
Unit

Pipe laying and jointing work for 50 M length can be


done in one day/Shift
Material
________ mm Dia Class C GI Pipes (2 % wastage
considered)
Cost of Hesian Cloth for Wrapping @ 5 % of the pipe
cost
Labour

R.M

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled


Male Labour)

Shift

Total Of Material, Labour & Hire

Overhead Sundries Water Charges and Contractors


profit of ___% on A
Total Cost (A+B)

C
D

Per Unit Cost

L.S

Shift

Rs/R
.M

Qty

Rate

Amount

Code No

HE-8-4

A
B
C
D

Code No

HE-8-5

Description
Providing and laying 200 mm thick hand sets dry
rubble soling including filling the interestics with
small chips, ramming etc. complete for foundations
of pedestals, chairs, thrust blocks, etc. complete in
all respect and as directed by Engineer In Charge.
Work of 10 Sqm can be done in one day
Material Charges

Unit

RUBBLE FOR SOLING 10SqmX0.2m = 2 Cum


Rubble chips 2CumX0.2

Cum
Cum

Labour Charges
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)
Semi Skilled Labour (Beldar)
Mason (brick layer) 1st class
Total Of Material, Labour & Hire

Qty

Rate

Amount

Qty

Rate

Amount

Shift
Shift
Shift

Overhead Sundries Water Charges and Contractors


profit of ___ % on A
Total Cost (A+B)
Per Unit Cost
Description
Providing M-20 cement concrete encasement with
sulphur resistance cement to pipes, in thrust blocks
etc., mixing, laying, consolidating by mechanical
vibrator, curing etc. complete in all respect and as
directed by Engineer In Charge.
(M.S. reinforcement if provided will be paid
separately.)
Rate worked out for 1 brass or 2.83 CuM.of concrete
Material Charges
Sulphate Resisting Cement (SRC) 23 Bags = 23X50
= 1150 Kg
Stone Aggregate (Metal II) : 20-32 mm nominal size
Stone Aggregate (Metal I) : 6-12 mm nominal size
Labour Charges
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)
Semi Skilled Labour (Beldar)
Mason (brick layer) 1st class
Supervisor/Mistry/Mukadam / Foreman
Bhisti (Water Man)

Rs/S
qm
Unit

M.T
Cum
Cum
Shift
Shift
Shift
Shift
Shift

A
B
C
D

Code No

HE-8-26

Hire Charges
Total Of Material, Labour & Hire
Overhead Sundries Water Charges and Contractors
profit of ____ % on A
Total Cost (A+B)
Per Unit Cost
Description
Supplying, transporting and fixing S.P. fire hydrants
including mouth piece, duck foot bend, S.V. as per
specifications & drawing, fixing flanged socket,
supplying and laying C.I./ M.S. pipe upto 2 mtrs.
length and jointing the same with spun yarn, molten
lead, including caucking etc. complete as directed &
as specified in tender. (as per IS : 908)
Note: Construction of valve chamber will be paid
separately
Assumptions
Cost of fire hydrant including Valve including
transport (Market rate)
Weight of External hydrant
Number of units
Material Charges
Fire Hydrant
Add 5% for gaskets Hardware etc,
Labour Charges for Loading, Handling Unloading
& Erection
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector

Total Of Material, Labour & Hire

Overhead Sundries Water Charges and Contractors


profit of .% on A
Total Cost (A+B)

C
D

Shift

Per Unit Cost

Rs/C
um
Unit

Nos.
Kg
Nos.
Nos.
L.S

Shift
Shift

Rs/N
os.

Qty

Rate

Amount

Code No

HE-6-3

Description
Providing and fixing CI Mechanical joint Double
Socket any degree bends, (dimensionally described
in IS :13382 /1992) inclusive of Sealing Rubber
Gasket of SBR (dimensionally described in IS :
12820), Cast Iron Follower Gland and Mild Steel Nut
Bolts zinc coated or otherwise protected from rusting
and suitable for CI/DI pipe of size 150 mm Dia etc
complete as directed by Engineer in Charge. NOTE :
The averge out rate for MJ double socket 90 45 22.5
and 11.25 has been considered for " All Degree
Bend" the ratio taken is 1:1:3:5 taking into
consideration the usage of the joint.
Details of cost for 12 Joints ( 12 joints of ...mm can
be done in one shift)

Unit

Qty

Rate

Amount

Qty

Rate

Amount

Material

B
C
D
Code No

HE-8-27-a

.. mm dia. CI Mechanical joint Double Socket any


degree bend
Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male abour)
Total Of Material, Labour & Hire

Per Unit Cost


Description
Cutting of exsisting cement concrete road upto350
mm depth by using Diamond Saw machine etc.
complete in all respects and as directed by Engineer
In Charge. Note : The charges for supplying water
and electricity are exclusive of the rate worked out.

Total Of Material, Labour & Hire

Overhead Sundries Water Charges and Contractors


profit of ...% on A
Total Cost (A+B)

Shift
Shift

Overhead Sundries Water Charges and Contractors


profit of ..% on A
Total Cost (A+B)

20 m Cutting work can be done in one day/shift


HireCharges for Generator
Cost of Water Required for the job

Nos.

Per Unit Cost

Rs/N
os.
Unit

L.S
L.S

Rs/N
os.

Item
CodeHE-2-9
Description
A

Material

Pipe
Inner Diameter
Outer Diameter
Dimensions of plate
Length of plate
Thickness of plate
Weight of plate/RM (additional 5% for wastages,
spiders) including taxes
Labour

D
E
F

Sr No.
SWD-142

Helper
Welder
Supervisor
Total - Labour Cost (including 1% labour cess)
Hire Charges
Mobile crane charges
Truck charges
Welding set with generators
Gas cutting machine
Total - Hire charges

Qty.

Unit

Rate
(Rs)

Amount
(Rs)

m
m
m
m
m
MT
day
day
day

day
day
day
day

Sub Total(B+C)
Overheads and profit @ %
Total/RM

Description
water entrances
clear size of chamber

Unit

Bed concrete (M15 CC)


1.18 x 1.28 x 0.15
CC Cap (M 20 CC) including shuttering
2x(0.75+0.85) x0.23 x0.10

Cu.M

Precast RC Runner Beam (M.200 CC)

R. M

B.M.in cement mortar 1:4

Cu. M

0.5

Cu. M

Qty

Rate
0.6

Amt

2x (0.75+0.85)x0.23x0.93 -(0.25*3.14x0.3x0.3x0.23)
12 mm thk plaster in C.M.1:2
( 2 x(0.52 +0.62) x0.93 )- (0.25 x3.14 x0.3 x0.3 )

Sq.M.

Overheads and profit @ ..%


Total cost
Per unit
cost

Code No
HE-2-1

Description
Supplying mild steel pipes to site of work / any municipal
store fabricated in any ISI/ ISO certified company, from mild
steel plates of approved quality and thickness, confirming to
IS 3589 . The M.S. plates shall bare corresponding ISI mark.
The item includes marking, cutting, rolling bending, welding
using automatic submerged arc type welding machine,
factory testing of pipes, loading at fabrication yard/ factory
transportation to site of work/ any municipal store using
truck/ trailer, unloading and stacking near place of work etc
complete as specified and as directed by Engineer in
Charge. . Each pipe shall be about 5 to 7.5 mtr. long,
fabricated as per IS:3589 and suitable for 10 kg/cm2
working pressure( spirally welded pipes fabricated from
strips are not acceptable)
Details of cost for MS pipe . mm .. mm thick
Assumptions
Pipe Dia (NB)
Pipe thickness
Pipe Length (each pipe piece)
Number of pipes installed in one shift
Total pipe Length
Pipe weight

Unit

mm
mm
Mtr
Nos.
Mtr
Kg

Material Charges
MS Plate ... mm Thick
Fabrication Charges

Kg
Rs/K
g

Labour Charges for Loading & Unloading


Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled Male
abour)

Shift

Qty

Rate

Amt

Hire Charges
Mobile crane - with boom length 30m (min output 300 cu.m
per shift)
Lorry Hire Charges
A

Total Of Material, Labour & Hire

B
C

Overhead Sundries Water Charges and Contractors profit of


% on A
Total Cost (A+B)

Per Unit Cost

Shift
Shift

Rs/R.
M

Item Code- WSP-2-19


12.5 mm cement plaster of mix in CM1:1 (1 cement: 1 fine sand)

Code

Details of Cost for : 10.00 Sqm


Description
MATERIALS :
Cement mortar 1:1 (1 cement : 1 fine sand)
MACHINERY
40% of cost of material
LABOUR :
Nozzleman
Helper
Bhisthi

Unit

Qty

Rate

Cum

Day
Day
Day
Total
:

Add water charges @ % on


Add C.P & OH @ % on
Cost for 10.00 Sqm
Rate per One Sqm:

Rs.

Amt

Code: FMR-7.57/2011
Structural Steel Barricading.
A.-Material Requirement:Sr.
No
1
2
3
4

Description
Flats
ISA 40 X 40 X 5
ISMB 250 X 125
2.5 M X 2 M X 1.25 mm thk
M.S.Sheet

Length /
area /
volume
3.5
14.43
3.26

Unit Wt
in Kg
/m
1.57
3
37.3

9.8125

Unit
R.mt
R.Mt
R.mt
Sq.M
.

Say
Consider wastage @ 5%

Weight in
Kgs

Rate

Amount

Rate

Amount

5.495
43.290
121.598
49.0625
219.446
219.500
10.975
230.475

Say-

Fabrication

Discription

231

219.500

Skilled
Labour /
Machine

Quantity
Nos

Unit

For 8 boards fabrication


requirement:Fitter
Black
Smith
Welder
Helper
Supervisior
Welding
Machine
DG set
33KVA
DG
Operator

Nos

6
2
6
1

Nos
Nos
Nos
Nos

6
2
6
1

32

Hr

32

16

Hr

16

no

0.5

Add for sundries,welding


roads etc @ 5 %
Total=

Add 15 % overheads
Total=
Per Board Rate=
Per Kg Rate=
Say :-

Transportation ,Loading / unloading within lead of 10 Km up to


site location
219.5

Discription
For 14 nos of Barricades

Skilled Labour /
Machine

Nos

Tipper
Hydra
Mazdoor

1
8
8

Unit

Quan
tity

Rate

Amount

Day
Hr
Nos

CP & Overheads

Per Board Rate=


Per Kg Rate=
Say=
D

Erection by Hydra Crane at site location


(Including Cost of Drill bit ,Drilling Machine ,DG Set ,tools
etc.)
219.5

Discription
For 32 Barricading Boards

Skilled Labour /
Machine
Tata 407
Hydra
Helper
Driller
Drill Bit
Drill Machine
Consumebles
,Sundries etc.

Nos
1
8
6
4
4
1.5

Unit
Day
Hour
Nos
Nos
Nos
10
Hrs
L.S.

Quan
tity

Rate

Amount

Add 15 % overheads
Total=
For one board=
per kg rate
Say=
E

Painting

Discription

Skilled Labour /
Machine

Nos

Unit

Quan
tity

Rate

Amount

For two Barricades :(10Sq.M.)


Painter
Helper

1.5
2

Material Requirement
Paint Synthetic enamal
Primer Red Oxide
Brush Sandpaper etc.
Add 15 % overheads
Total=
Lettering with black Japan
Paint
Per Sq.M. of board=

Days
Days

lit
lit
L.S.

no

1.63
0.8

60

say
F

Less Scrap Value


Discription

90% of total weight

Skilled Labour /
Machine

Nos

Unit

Quan
tity

Rate

207.9

Rate for 1 board 2.5 X 2 M


size=
Per running meter rate=
Considering at least 8
repetetions =
Say=

Amount

Code No.

Description

Unit

BW-2-21-a

Providing and placing in position controlled


cement concrete of M-25 grade for foundation
work with minimum cement 400 kg./cum. and
water cement ratio not exceeding 0.4 for RCC
raft foundation slab with V notches Sloped /
flat / strlp footings, pile caps tie beams to
required lines / levels including leveling,
compacting by vibrators, curing including
shuttering, centering as necessary and
required etc. complete as specified and as
directed but excluding reinforcement.
Using Concrete Mixer
Unit = cum
Taking output = 15 cum
a) Material
Cement
Coarse sand
20 mm Aggregate
10 mm Aggregate
b)
Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator 33 KVA
Per Cum Basic Cost of Labour, Material &
Machinery (a+b+c)
d)
Formwork @ % of a+b+c.
e)
Contractor's profit & Overhead charges
@ .% on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15

tonne
cum
cum
cum

Quantity

Rate
Rs

day
day
day
hour
hour

say

BW-5-8

Providing Fusion Bonded Epoxy Coating


(FBEC) to reinforcing steel bars as per IS
13620: 1993 specifications for a coating
thickness of 175 microns ( with permissible
variation of 50 microns) including testing
at plant etc. complete as per specifications.
Unit - MT
a) Material
Fusion Bonded Epoxy Coating (FBEC) for
8 mm to 32 mm dia

MT

Cost
Rs

Wastage in cut length @ %


P.V.C coated G.I wires
Repairs to cut ends and damages with special
liquid epoxy & Carefull handling

MT
kg
cum

Transportation
c)
Contractor's profit & Overhead charges
@......% on (a+b)
Cost per sqm =
say

CS-CW-35-b

Reinforcement for R.C.C. work all


complete:- . Fe415
Details of Cost for : 100.00 Kg
Description
MATERIALS:
Deformed twisted steel bars = 1.00 q
Add % wastage =
Total = 1.05 q
Cover block
LABOUR:
For straightening, cutting, bending, binding
and placing in positionBlaks smith I Class
Beldar
Sundries and binding wire L.S.

Unit

Quantity

Rate

Amount

quint
L.S.

Day
Day
L.S.
Total:

Add C.P & OH @ % on


Cost for 1000.00 Kg
Rate per One MT:

CS-CW-1-b

P/L CC including centering - All level:


1:2:4 - Coarse sand, 20mmstone aggregate.
Details of Cost for : 1.00 Cum
Description
MATERIALS:
Stone aggregate 20mm
Coarse sand
Cement
LABOUR:
Needle Vibrator operator
Beldar
Bhishti
Mixer

Unit
cum
cum
tonne
Day
Day
Day
Day

Quantity

Rate

Amount

Vibrator
Centering & shuttering

Day
Sqm
Total:

Add C.P & OH @ % on


Cost for 1.00 Cum
Rate per One Cum:

CS-FL-04-a

A
B
C

Providing & laying rough shahbad stone


flooring with 25mm thk. C.M. beding of
proportion 1:4 and pointing.
Description
Details of Cost for : 20.00 Sqm
MATERIAL:
Rough shahbad
Cost of cement mortar 1:4
Cement mortar 1:2 for pointing
LABOUR :
Foreman
Mason
Beldar (M)
Waterman
Total Material & Labour cost
Total of A =
Overhead & Proffit % on A
Total (A+B)

Unit

Quantity

Rate

Sqm
Cum
Cum
Day
Day
Day
Day

D Per unit cost


Say
Rs.
HE-1-3

Supplying, lowering, laying and jointing in


trenches C.I. Class 'LA' , S/S pipes conforming
to IS:1536 with CI / MS specials of following
diameter including chamfering cut edges of
pipes for specials and fixing with Styrene
Butadiene Rubber (SBR) gaskets conforming
to IS:5382 & IS:12820 in proper position,
grade and alignment etc complete in all
respect and as directed by Engineer in Charge
including conveyance of material from any
municipal stores in Greater Mumbai to site of
work, including cost of jointing materials and
rubber rings labour, giving hydraulic testing
upto 6 kg/sqm pressure etc complete as
directed by Engineer in Charge
---- mm Dia
Per Unit Cost of Pipe

Amount

Lowering Laying & Jointing Cost


Total Cost for Supply Lowering Laying &
Jointing

CS-WP-33

WATER PROOFING TREATMENT TO BASEMENT


LIFT PITS
Description
QUANTITY FOR CALCULATION : 1 SQM
FOR FLOOR TREATMENT
MATERIALS
ROUGH SHAHABAD 20-25 mm
CEMENT
SAND
WATER PROOFING COMPOUND
LABOUR
PAVIOR
MALE MAZDOOR
FEMALE MAZDOOR
FOR SIDE FACE
MATERIALS
CEMENT
SAND
WATER PROOFING COMPOUND
LABOUR
PLASTERER
MALE MAZDOOR
FEMALE MAZDOOR

Rs/R.M

Unit

Quantity

Rate

Amount

Rate

Amount

sqm
BAGS
CU.M.
KG
DAY
DAY
DAY

BAGS
CU.M.
KG
DAY
DAY
DAY
Total

Add C.P & OH @15% on


QUANTITY FOR 1 SQM
Rate per One SQM :

CS-EW-10

Dewatering

Sr. No.

Description
Details of Cost for 3HP pump for dewatering
1 Hire Charges

Unit

Quantity

Pump of 3 HP Capacity

Day

2 Labour
Coolie for cleaning slush
Total Labour & eqipments

Day

B
C
D
E

Add for tools, hire charges of pipe & it's fixtures


etc.
Total (A+B)
Overhead & Proffit 15% on C
Total (C+D)

Per unit cost (i. e. per Hr/HP)

Say Rs.

RW
3.18

Providing & fixing in the footpath, 80 mm


thick Lacquer coated (Reflective)
interlocking gray cement concrete pavers
in red (Terra Cotta) Black, Brown, Lemon
Yellow or any colour with vermeticular or
any antiskid texture on top surface of
approved pattern/ shape and colour
having average crusting strength 40
N/mm manufactured in double layer
precast concrete blocks. The top layer of
paver block should be 12 to 15 mm thick
and consist cubical shape stone
aggregate 8 mm size sieve 100% passing
and retain on 4.75 mm size sieve , silica
sand and with pure iron oxide ultra voilete
stabilized pigment @ 5% by weight of
cement and should be coated with lacquer
having hard, high abrasive resistance and
water repellent. The bottom layer should
be 45 to 48 mm thick having 12 mm size
sieve 100% passing aggregate as per
technical specification placed on uniformly
graded river sand cushioning of average
compacted thickness 25 mm properly
compacted with mechanical compactor
with required level, grade and camber etc.
complete as specified and as directed by
the Engineer.
Unit = sqm
Cost for 1 sq mtr
a) Labour

b)

Pavior / Tiler
Labour
Material

day
day

60 mm thick Lacquer coated (


Reflective) interlocking gray cement
concrete pavers
Bedding Sand (screened -for 25 mm
thk & jointing)
c)
Machinery

sqm

Vibrator
Profit & overhead charges

day

cum

Rate per sqm =


say

RW
3.19

Providing & fixing in the carriageway


interlocking , 100 mm thick grey cement
concrete unishape pavers in red (Terra
Cotta) Black, Brown, Lemon Yellow or any
colour with vermeticular or any antiskid
texture on top surface of approved pattern/
shape and colour having average crusting
strength 50 N/mm manufactured in double
layer precast concrete blocks, as per
technical specification placed on uniformly
graded river sand cushioning of average
compacted thickness 25 mm properly
compacted with mechanical compactor
with required level, grade and camber etc.
complete as specified and as directed by
the Engineer.
Unit = sqm
Cost for 1 sq mtr
a) Labour

b)

Pavior / Tiler
Labour
Material

day
day

60 mm thick Lacquer coated (


Reflective) interlocking gray cement
concrete pavers
Bedding Sand (screened -for 25 mm
thk & jointing)
c)
Machinery

sqm

Vibrator
Profit & overhead charges

day

cum

Rate per sqm =


say

Item code :- HE-3-16-e


Description
HE-3-16
Details of cost for butterfly valve with flange adapter
MATERIAL
Butterfly Valve of Dia ---- mm PN 1.0
Flange Adaptor of --- mm (PN 1.0)
HIRE CHARGE
LABOUR CHARGE
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector

Qty

Rate

Amount

Qty

Rate

Amount

Each
Each
Shift

Shift

Fitter (grade 2) /Gas cutter


Semi Skilled Labour (Beldar)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Total Labour charge
A
B
C

Unit

Shift
Shift
Shift
Shift
Shift
Shift
Shift

Total Material, Labour and Hire Charge


Overhead and Contractors profit on A
Cost of each
Say

Item code :- HE-3-16-f


Description
HE-3-16
Details of cost for butterfly valve with flange adapter
MATERIAL
Butterfly Valve of Dia --- mm PN 1.0
Flange Adaptor of ---- mm (PN 1.0)
HIRE CHARGE
LABOUR CHARGE
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector

Unit

Each
Each
Shift

Shift

Fitter (grade 2) /Gas cutter


Semi Skilled Labour (Beldar)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled
Male Labour)
Total Labour charge
A
B
C

Shift
Shift
Shift
Shift
Shift
Shift
Shift

Total Material, Labour and Hire Charge


Overhead and Contractors profit on A
Cost of each
Say

Code No

HE-7-3-ab-c-d &e

Description
Removing and replacing existing GI pipes with new
GI pipes in trenches of following class and diameter
by wrapping them by hessian cloth with tar coating
and including any nominal pipe length required to be
laid above ground level, conveyance from stores to
site work, all labour, necessary excavation,
backfilling, giving satisfactory hydraulic test, etc
complete in all respect as directed by Engineer in
Charge. Note :1)Rebate for salvation cost of old pipe
has been considered and old pipe may be removed
as directed. 2) Only MCGM approved GI pipe
brands shall be used, all pipe and pipe fittings shall
be C class (heavy grade) having ISI marking.

Unit

Pipe laying and jointing work for 50 M length can be


done in one day/Shift
Material

________ mm Dia Class C GI Pipes (2 % wastage


considered)
Cost of Hesian Cloth for Wrapping @ 5 % of the pipe
cost
Labour

R.M

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled


Male Labour)

Shift

Total Of Material, Labour & Hire

L.S

Shift

Qty

Rate

Amount

B
C
D

CS-CW-1c

Overhead Sundries Water Charges and Contractors


profit of ___% on A
Total Cost (A+B)
Per Unit Cost

Rs/R.M

P/L CC including centering - All level: 1:3:6 Coarse sand, 20mm stone
Details of Cost for : 1.00 Cum
Description
MATERIALS:
Stone aggregate 20mm
Coarse sand
Cement
LABOUR:
Needle Vibrator operator
Beldar
Bhishti
Mixer
Vibrator
Centering & shuttering

Unit

Quantity Rate

Amount

cum
cum
tonne
Day
Day
Day
Day
Day
Sqm
Total:

Add C.P & OH @ % on


Cost for 1.00 Cum
Rate per One Cum:

Code No
Code No

HE-10-1-a

Description
Description
Taking access opening on C.I./ D.I.Water main by
machine cut ( 2m / 3m length) and reinstating the
same by using mechanical joint collar and SBR
rings, including dewatering of body water and subsoil
water, etc. complete in all respect and as directed by
the Engineer In Charge for following diameters of
CI/DI water mains: In case pipe is damaged,
replacement pipe to be paid as per item rate

Unit
Unit

For 150 mm Dia Pipe line


Material Charges
CI mechanical joint collar
Rubber Gasket 150 mm Dia

Nos.
Nos.

Qty
Qty

Rate
Rate

Amount
Amount

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper (Unskilled


Male abour)
Hire Charges
Dewatering Pump of 5HP 1 Pump for 2 shifts
required

Shift

Hire Charges for Pipe Cutting machine for 150 mm


Dia.

Shift

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Shift

Shift

Rs/Nos.

Code No

HE-10-1-b

Description
Taking access opening on C.I./ D.I.Water main by
machine cut ( 2m / 3m length) and reinstating the
same by using mechanical joint collar and SBR
rings, including dewatering of body water and
subsoil water, etc. complete in all respect and as
directed by the Engineer In Charge for following
diameters of CI/DI water mains: In case pipe is
damaged, replacement pipe to be paid as per item
rate
For 250 mm Dia Pipe line
Material Charges
CI mechanical joint collar
Rubber Gasket 250 mm Dia

Unit

Qty

Rate

Amount

Qty

Rate

Amount

Nos.
Nos.

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper


(Unskilled Male abour)
Hire Charges
Dewatering Pump of 5HP 1 Pumps for 2 shifts
required

Shift

Hire Charges for Pipe Cutting machine for 250 mm


Dia.

Shift

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-1-c

Description
Taking access opening on C.I./ D.I.Water main by
machine cut ( 2m / 3m length) and reinstating the
same by using mechanical joint collar and SBR
rings, including dewatering of body water and
subsoil water, etc. complete in all respect and as
directed by the Engineer In Charge for following
diameters of CI/DI water mains: In case pipe is
damaged, replacement pipe to be paid as per item
rate

Shift

Shift

Rs/Nos.

Unit

For 300 mm Dia Pipe line


Material Charges
CI mechanical joint collar
Rubber Gasket 300 mm Dia.

Nos.
Nos.

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper


(Unskilled Male abour)
Hire Charges
Dewatering Pump of 5HP 1 Pumps for 0.5 shifts
required

Shift

Hire Charges for Pipe Cutting machine for 300 mm


Dia.

Shift

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-1-e

Description
Taking access opening on C.I./ D.I.Water main by
machine cut ( 2m / 3m length) and reinstating the
same by using mechanical joint collar and SBR
rings, including dewatering of body water and
subsoil water, etc. complete in all respect and as
directed by the Engineer In Charge for following
diameters of CI/DI water mains: In case pipe is
damaged, replacement pipe to be paid as per item
rate

Shift

Shift

Rs/Nos.

Unit

For 600 mm Dia Pipe line


Material Charges
CI mechanical joint collar
Rubber Gasket 600 mm Dia.
Labour Charges

Nos.
Nos.

Qty

Rate

Amount

Fitter (grade 1) / Drilling M/c Operator / Grinding


Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper


(Unskilled Male abour)
Hire Charges
Dewatering Pump of 5HP 1Pumps for 0.75 shifts
required

Shift

Hire Charges for Pipe Cutting machine for 600 mm


Dia.
Hire Charges for Chain Pulley Block and Jack
Total Of Material Hire Charges & Labour

Shift

Shift

Shift

Shift

Overhead and Contractors profit of 15% on A


Total Cost (A+B)
Per Unit Cost

Code No

HE-10-1-g

Description
Taking access opening on C.I./ D.I.Water main by
machine cut ( 2m / 3m length) and reinstating the
same by using mechanical joint collar and SBR
rings, including dewatering of body water and
subsoil water, etc. complete in all respect and as
directed by the Engineer In Charge for following
diameters of CI/DI water mains: In case pipe is
damaged, replacement pipe to be paid as per item
rate

Rs/Nos.

Unit

For 900 mm Dia Pipe line


Material Charges
CI mechanical joint collar
Rubber Gasket 900 mm Dia.

Nos.
Nos.

Labour Charges
Fitter (grade 1) / Drilling M/c Operator / Grinding
Machine operator / Erector
Semi Skilled Labour (Beldar)

Shift

Coolie/Mazdoor / Needle Vibrator / Helper


(Unskilled Male abour)
Hire Charges

Shift

Shift

Qty

Rate

Amount

Dewatering Pump of 5HP 1 Pumps for 0.75 shifts


required

Hire Charges for Pipe Cutting machine for 900 mm


Dia.
Painting Machine
Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-2-a

Description
Scrapping and cleaning the internal surface of
water main by mechanical scrapper including
support machinary, manpower, fuel and transport
of equipment etc complete in all respect and as
directed by the Engineer In Charge and removing
the scrapped material by plugging and preparing
the pipe for lining for following diameters of C.I./D.I.
pipes, including dewatering of body water and
subsoil water, including removing scrap and debris.

Shift
Shift
Shift

Rs/Nos.

Unit

For 150 mm Dia Pipe line


60 M length of pipe line can be cleaned in one day

Material Charges
Deisel for Tractor & other machinery
Engine Oil

Lts
Lts

Labour Charges
Supervisor/Mistry/Mukadam / Foreman
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges
Pipe cleaning equipment set (set of scrapers and
rubber pads , PVC rods, Steel cable etc) for 8
hours

Shift
Shift
Shift

Shift

Qty

Rate

Amount

Dewatering Pump of 5HP


Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel &


Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-2-b

Description
Scrapping and cleaning the internal surface of
water main by mechanical scrapper including
support machinary, manpower, fuel and transport
of equipment etc complete in all respect and as
directed by the Engineer In Charge and removing
the scrapped material by plugging and preparing
the pipe for lining for following diameters of C.I./D.I.
pipes, including dewatering of body water and
subsoil water, including removing scrap and debris.

Shift

Rs/RM

Unit

For 250 mm Dia Pipe line


65 M length of pipe line can be cleaned in one day

Material Charges
Deisel for Tractor & other machinery
Engine Oil

Lts
Lts

Labour Charges
Supervisor/Mistry/Mukadam / Foreman
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges
Pipe cleaning equipment set (set of scrapers and
rubber pads , PVC rods, Steel cable etc) for 8
hours

Shift
Shift
Shift

Shift

Qty

Rate

Amount

Dewatering Pump of 5HP


Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel &


Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift
Shift

Total Of Material Hire Charges & Labour


Overhead and Contractors profit of 15% on A
Total Cost (A+B)
Per Unit Cost

Code No

HE-10-2-c

Description
Scrapping and cleaning the internal surface of
water main by mechanical scrapper including
support machinary, manpower, fuel and transport
of equipment etc complete in all respect and as
directed by the Engineer In Charge and removing
the scrapped material by plugging and preparing
the pipe for lining for following diameters of C.I./D.I.
pipes, including dewatering of body water and
subsoil water, including removing scrap and debris.

Rs/RM

Unit

For 300 mm Dia Pipe line


70 M length of pipe line can be cleaned in one day

Material Charges
Deisel for Tractor & other machinery
Engine Oil

Lts
Lts

Labour Charges
Supervisor/Mistry/Mukadam / Foreman
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges
Pipe cleaning equipment set (set of scrapers and
rubber pads , PVC rods, Steel cable etc) for 8
hours

Shift
Shift
Shift

Shift

Qty

Rate

Amount

Dewatering Pump of 5HP


Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel &


Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-2-e

Description
Scrapping and cleaning the internal surface of
water main by mechanical scrapper including
support machinary, manpower, fuel and transport
of equipment etc complete in all respect and as
directed by the Engineer In Charge and removing
the scrapped material by plugging and preparing
the pipe for lining for following diameters of C.I./D.I.
pipes, including dewatering of body water and
subsoil water, including removing scrap and debris.

Shift

Rs/RM

Unit

For 600 mm Dia Pipe line


60 M length of pipe line can be cleaned in one day

Material Charges
Deisel for Tractor & other machinery
Engine Oil
Labour Charges
Supervisor/Mistry/Mukadam / Foreman
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor

Hire Charges
Pipe cleaning equipment set (set of scrapers and
rubber pads , PVC rods, Steel cable etc) for 8
hours

Lts
Lts

Shift
Shift
Shift

Shift

Qty

Rate

Amount

Dewatering Pump of 5HP


Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel &


Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift
Shift

Total Of Material Hire Charges & Labour


B

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-2-g

Description
Scrapping and cleaning the internal surface of
water main by mechanical scrapper including
support machinary, manpower, fuel and transport
of equipment etc complete in all respect and as
directed by the Engineer In Charge and removing
the scrapped material by plugging and preparing
the pipe for lining for following diameters of C.I./D.I.
pipes, including dewatering of body water and
subsoil water, including removing scrap and debris.

Rs/RM

Unit

For 900 mm Dia Pipe line


50 M length of pipe line can be cleaned in one day

Material Charges
Deisel for Tractor & other machinery
Engine Oil

Lts
Lts

Labour Charges
Supervisor/Mistry/Mukadam / Foreman
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges

Shift
Shift
Shift

Qty

Rate

Amount

Pipe cleaning equipment set (set of scrapers and


rubber pads , PVC rods, Steel cable etc) for 8
hours

Shift

Dewatering Pump of 5HP


Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel &


Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-4

Description
Providing in situ internal cement mortar lining as
per AWWA C 602- 76 standards to distributory
CI/DI water mains, with cement sand ratio 1:1
(Cement 43 grade : Godhra special sand) with
the use of mortar lining machine including
support machinary, manpower, fuel and transport
of equipment, dewatering of body water and
subsoil water etc complete in all respect and as
directed by the Engineer In Charge , for following
diameters and thickness of mortar lining.

Shift

Rs/RM

Unit

Qty

Rate

Amount

Dia

Thk

Length

Volume of
Cement
Mortar

150
250
300
450
600
750
900

4.65
4.65
4.65
7
7
7
7

60
65
70
60
60
55
50

0.13148
0.23739
0.30678
0.59376
0.79168
0.90713
0.98960

Assumptions Made.

150 mm diameter with 4.65 mm lining thickness


250 mm diameter with 4.65 mm lining thickness
300 mm diameter with 7.0 mm lining thickness
450 mm diameter with 7.0 mm lining thickness
600 mm diameter with 7.0 mm lining thickness
750 mm diameter with 7.0 mm lining thickness
900 mm diameter with 7.0 mm lining thickness

Material Required for Cement Mortar Lining


For 1 cu.m lining cement = 1030 kg and Sand
0.7125 cum (Ref Nabhi Pub Vol 1 Page 577)
For hose pipe 50 mm dia and 120 m L
(considering Hopper) Cum of Cement

Code No

HE-10-4-a

0.23562
Total
Vol. of
Cement

Cement
in Kg

No. of
bags of
Cement

Total Vol.
of Sand

150 mm diameter with 4.65 mm lining thickness


250 mm diameter with 4.65 mm lining thickness
300 mm diameter with 7.0 mm lining thickness
450 mm diameter with 7.0 mm lining thickness
600 mm diameter with 7.0 mm lining thickness
750 mm diameter with 7.0 mm lining thickness
900 mm diameter with 7.0 mm lining thickness

0.36710
0.47301
0.54240
0.82938
1.02730
1.14275
1.22522

378.11
487.2
558.67
854.26
1058.1
1177
1262

7.5622
9.744
11.173
17.085
21.162
23.541
25.24

0.09
0.17
0.22
0.42
0.56
0.65
0.71

Description
Providing in situ internal cement mortar lining as
per AWWA C 602- 76 standards to distributory
CI/DI water mains, with cement sand ratio 1:1
(Cement 43 grade : Godhra special sand) with
the use of mortar lining machine including
support machinary, manpower, fuel and transport
of equipment, dewatering of body water and
subsoil water etc complete in all respect and as
directed by the Engineer In Charge , for following
diameters and thickness of mortar lining.
For 150 mm Dia Pipe line

Unit

Qty

Rate

Amount

60 M length of mortar lining work can be done in


one day
Material Charges
Cement for Mortar Lining Work
Plaster Sand
Deisel for Tractor & other machinery
Engine Oil

Bag
Cum
Lts
Lts

Labour Charges
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor

Shift
Shift

Hire Charges
Cement Mortar Lining machine

Shift

Tractor with trolley


Water Tanker 5 to 6 KL capacity

Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel


& Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift

Concrete Pump of 45 & 30 cum capacity


Concrete Mixer - 1 cum

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-4-b

Description
Providing in situ internal cement mortar lining as
per AWWA C 602- 76 standards to distributory
CI/DI water mains, with cement sand ratio 1:1
(Cement 43 grade : Godhra special sand) with
the use of mortar lining machine including
support machinary, manpower, fuel and transport
of equipment, dewatering of body water and
subsoil water etc complete in all respect and as
directed by the Engineer In Charge , for following
diameters and thickness of mortar lining.
For 250 mm Dia Pipe line

Shift
Shift
Shift

Rs/RM

Unit

65 M length of mortar lining work can be done in


one day
Material Charges
Cement for Mortar Lining Work
Plaster Sand
Deisel for Tractor & other machinery
Engine Oil

Bag
Cum
Lts
Lts

Labour Charges
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor
Hire Charges

Shift
Shift

Qty

Rate

Amount

Cement Mortar Lining machine


Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel


& Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift

Concrete Pump of 45 & 30 cum capacity


Concrete Mixer - 1 cum

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-4-c

Description
Providing in situ internal cement mortar lining as
per AWWA C 602- 76 standards to distributory
CI/DI water mains, with cement sand ratio 1:1
(Cement 43 grade : Godhra special sand) with
the use of mortar lining machine including
support machinary, manpower, fuel and transport
of equipment, dewatering of body water and
subsoil water etc complete in all respect and as
directed by the Engineer In Charge , for following
diameters and thickness of mortar lining.

Shift
Shift
Shift

Rs/RM

Unit

For 300 mm Dia Pipe line


70 M length of mortar lining work can be done in
one day
Material Charges
Cement for Mortar Lining Work
Plaster Sand
Deisel for Tractor & other machinery
Engine Oil

Bag
Cum
Lts
Lts

Labour Charges
Semi Skilled Labour (Beldar)
Operator of Pump Gunite M/C or Compressor

Shift
Shift

Qty

Rate

Amount

Hire Charges
Cement Mortar Lining machine
Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel


& Driver)
Trolley mounted CC TV probe per shift of 8 hours

Shift

Concrete Pump of 45 & 30 cum capacity


Concrete Mixer - 1 cum

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-4-e

Description
Providing in situ internal cement mortar lining as
per AWWA C 602- 76 standards to distributory
CI/DI water mains, with cement sand ratio 1:1
(Cement 43 grade : Godhra special sand) with
the use of mortar lining machine including
support machinary, manpower, fuel and transport
of equipment, dewatering of body water and
subsoil water etc complete in all respect and as
directed by the Engineer In Charge , for following
diameters and thickness of mortar lining.

Shift
Shift
Shift

Rs/RM

Unit

For 600 mm Dia Pipe line


60 M length of mortar lining work can be done in
one day
Material Charges
Cement for Mortar Lining Work
Plaster Sand
Deisel for Tractor & other machinery
Engine Oil
Labour Charges

Bag
Cum
Lts
Lts

Qty

Rate

Amount

Semi Skilled Labour (Beldar)


Operator of Pump Gunite M/C or Compressor

Shift
Shift

Hire Charges
Cement Mortar Lining machine
Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel


& Driver)
Trolley mounted CC TV probe per shift of 8 hours
Concrete Pump of 45 & 30 cum capacity
Concrete Mixer - 1 cum

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

Code No

HE-10-4-g

Description
Providing in situ internal cement mortar lining as
per AWWA C 602- 76 standards to distributory
CI/DI water mains, with cement sand ratio 1:1
(Cement 43 grade : Godhra special sand) with
the use of mortar lining machine including
support machinary, manpower, fuel and transport
of equipment, dewatering of body water and
subsoil water etc complete in all respect and as
directed by the Engineer In Charge , for following
diameters and thickness of mortar lining.

Shift
Shift
Shift
Shift

Rs/RM
Unit

For 900 mm Dia Pipe line


50 M length of mortar lining work can be done in
one day
Material Charges
Cement for Mortar Lining Work
Plaster Sand
Deisel for Tractor & other machinery
Engine Oil
Labour Charges

Bag
Cum
Lts
Lts

Qty

Rate

Amount

Semi Skilled Labour (Beldar)


Operator of Pump Gunite M/C or Compressor

Shift
Shift

Hire Charges
Cement Mortar Lining machine
Tractor with trolley
Water Tanker 5 to 6 KL capacity

Shift
Shift
Hr

Hire Charges for Jeep ( Inclusive of Cost of Fuel


& Driver)
Trolley mounted CC TV probe per shift of 8 hours
Concrete Pump of 45 & 30 cum capacity
Concrete Mixer - 1 cum

Total Of Material Hire Charges & Labour

Overhead and Contractors profit of 15% on A

Total Cost (A+B)

Per Unit Cost

RW 5.10

Shift
Shift
Shift
Shift

Rs/RM

P/L hot mixed graded Bituminous macadam with


3.30% ( with tolderance of +0.3) of 60/70 pen.
Bitumen by weight of mix to the required grade,
level and camber, rolling with 10/12 tones
power roller,vibratory roller & sensor paver etc.
complete as specified and as directed, using
grading of II 'MORTH" and adding anti stripping
agent 1.00% of by weight of bitumen )do--do-to thickness of 50mm.(using new material).(As
per New Road Specifications Clause No. 351)
Unit = cum
Cost for 1 MT
a)

Labour

Labours For sprading & laying


b) Material
Fine Aggregate Grit/Stone dust
Coarse Aggregate Metal
Bitumen 60/70 {(3.30% of material (3%
tolerance)}

day
cum
cum
kg

Antistriping Agent
L.D.O (300Lits. For 50 M.T. )
c)
Plant charges
d)
Machinery
Paver & Roller
e) Electricity
f) Transport
g)
Contractor's profit and Overhead
charges @ 15% on (a+b+c+d+e+f)
Rate for 1 MT =
Rate per cum =
Rate for 50 mm thickness =

kg
lit
MT
sqm
LS
MT

say

RW 5.38

P/L Premix Bituminous concrete with 6.00%


rubberished modified bitumen surface coat to
thickness of 40mm (compacted thickness)
using new material to the required grade, level &
camber rolling with vibratory roller ,power roller,
& pnumatic roller as specified as directed with
addition of lime filler etc.complete.(bitumen of
grade CRMB-60) (As per new Road
Specification clause no.364)
Unit = cum
Cost for 1 MT
a) Labour
Labours For sprading & laying
b) Material
Fine Aggregate Grit/Stone dust
Coarse Aggregate Metal
Bitumen CRMB-60
Antistriping Agent
Lime filler
L.D.O (350Lits. For 50 M.T. )
c)
Plant charges
d)
Machinery
Paver & Roller
e) Electricity
f) Transport
g)
Contractor's profit and Overhead
charges @ 15% on (a+b+c+d+e+f)
Rate for 1 MT =
Rate per cum =
Rate for 40 mm thick =

day
cum
cum
kg
kg
kg
lit
MT
sqm
LS
MT

say