Você está na página 1de 62

GREENESOL POWER SYSTEMS PVT.

LIMITED
PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

GREENESOL POWER SYSTEMS (P) LIMITED

PROJECT: M/S.MADHUCON-2X135MW
THERMAL POWER PLANT (Phase-I)

TURBINE INTERLOCK & CLOSED LOOP


WRITE UP

DOCUMENT NO: 1104-113

REV-0

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


1

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------INDEX

1) MOTORS
1. BOILER FEED WATER PUMP-1
2. VFC LUBE OIL PUMP-1
3. BOILER FEED WATER PUMP-2
4. VFC LUBE OIL PUMP-2
5. CONDENSATE EXTRACTION PUMP-1
6. CONDENSATE EXTRACTION PUMP-2
7. CCW PUMP-1
8. CCW PUMP-2
9. VACCUM PUMP MOTOR-1 & 2
10. HOT WATER PUMP-1
11. HOT WATER PUMP-2
12. CLEAN OIL PUMP
13. DIRTY OIL PUMP
14. GLAND STEAM VENT CONDENSER-1
15. GLAND STEAM VENT CONDENSER-2
16. BALL RECIRCULATION PUMP
17. PURIFICATION PUMP
18. OIL MIST FAN-1
19. OIL MIST FAN-2
20. EMERGENCY OIL PUMP(DC MOTOR)
21. OIL RESERVOIR HEATER
22. HP START UP OIL PUMP
23. AUXILIARY OIL PUMP
24. BARRING GEAR MOTOR
25. JACKING OIL PUMP-1
26. JACKING OIL PUMP-2
27. HP OIL PUMP-1
28. HP OIL PUMP-2

2) MOTORISED VALVES
1. HP SIDE MAIN STEAM BYPASS MOV-LIFT (1044)
2. HP SIDE MAIN STEAM BYPASS MOV RIGHT (1045)
3. HP SIDE MAIN STEAM MOV LEFT
4. HP SIDE MAIN STEAM MOV RIGHT
5. START UP VENT HP SIDE
6. LP SIDE MAIN STEAM MOV LEFT
7. LP SIDE MAIN STEAM MOV RIGHT
8. START UP VENT HP SIDE
9. LP SIDE MAIN STEAM DRAIN-LEFT
10. LP SIDE MAIN STEAM DRAIN-RIGHT
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
2

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------11. 1ST BLEED MOV
12. 2ND BLEED MOV
13. 3RD BLEED MOV
14. 4TH BLEED MOV
15. BFP-1 DISCHARGE MOV BYPASS
16. BFP-2 DISCHARGE MOV BYPASS
17. HP HEATER-1 BYPASS MOV BYPASS
18. HP HEATER -1 I/L MOV BYPASS
19. HP HEATER-1 O/L MOV BYPASS
20. HP HEATER-2 BYPASS MOV BYPASS
21. HP HEATER-2 I/L MOV BYPASS
22. HP HEATER-2 O/L MOV BYPASS
23. HP SIDE MAIN STEAM LEFT
24. HP SIDE MAIN STEAM RIGHT
25. COLD RE HEATER HEADER DRAIN-1
26. COLD RE HEATER HEADER DRAIN-2
27. LP SIDE MAIN STEAM LEFT
28. LP SIDE MAIN STEAM RIGHT
29. 5TH BLEED MOV
30. LP HEATER-1 I/L MOV
31. LP HEATER-1 BYPASS MOV
32. LP HEATER-1 O/L MOV
33. LP HEATER-2 I/L MOV
34. LP HEATER-2 BYPASS MOV
35. LP HEATER-2 O/L MOV
36. LP HEATER-3 I/L MOV
37. LP HEATER-3 BYPASS MOV
38. LP HEATER-3 O/L MOV
39. BFP-1 DISCHARGE MOV
40. BFP-2 DISCHARGE MOV
41. HP HEATER-1 I/L MOV
42. HP HEATER-1 BYPASS MOV
43. HP HEATER-1 O/L MOV
44. HP HEATER-2 I/L MOV
45. HP HEATER-2 BYPASS MOV
46. HP HEATER-2 O/L MOV
47. BALL RECIRCULATION SECTION-1
48. BALL RECIRCULATION SECTION-2
49. BALL RECIRCULATION DISCHARGE-1
50. BALL RECIRCULATION DISCHARGE-2
51. VACCUM BREAKER
52. CEP-1 DISCHARGE MOV
53. CEP-2 DISCHARGE MOV
54. MAIN OIL TANK TO DIRTY OIL TANK
55. AUXILIARY STEAM LINE FROM PRDS

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


3

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3) SOLENIDE VALVES
1.
2.
3.
4.
5.
6.
7.
8.

DRAIN SOLENOIDE VALVES: (DCV-01 to DCV-08)


Spray water to Dump SOV
TURBINE EXHAUST HOOD SPRAYING SYSTEM SOV
DEAERATOR TO COMMON SURGE TANK SOV (LCV-909).
BOP (20-1) SOV-230V AC
BOP (20-2) SOV-230V AC
EOP (20-1) SOV-230V AC
EOP (20-2) SOV-230V AC

4) CONTROL VALVES
1. TEMPERATURE CONTROL IN GLAND SEALING LINE(TCV-905)
2. PRESSURE CONTROL IN CLAND SEALING LINE (PCV-901)
3. TEMPERATURE CONTROL IN PEGGING STEAM LINE (TCV-906)
4. PRESSURE CONTROL IN PEGGING STEAM LINE (PCV-902)
5. GLAND SEALING DRAIN TO LH-1 (FCV-000)
6. TEMPERATURE CONTROL IN AUXILLARY STEAM LINE (TCV-907)
7. PRESSURE CONTROL IN AUXILLARY STEAM LINE (PCV-903)
8. MINIMUM RECIRCULATION TO CONDENSER (FCV-941)
9. CONDENSER TO LP-1(LCV-907)
10.FROM EXPORT CONTROL VALVE TO SURGE TANK ) LCV-908)
11.SURGE TANK TO HOT WELL (LCV-907A)
12.CONDENSETE TO LP HEATER-2 (LCV-904)
13.LP HEATER-1 TO HOTWELL (LCV-904A)
14.LP HEATER-3 TO LP HEATER-2 (LCV-902)
15.LP HEATER-3 TO HOT WELL (LCV-902A)
16.LP HEATER-2 TO LP HEATER-1 (LCV-903)
17.LP HEATER-2 TO HOT WELL (LCV-903A)
18.HP HEATER-2 TO HP HEATER-1 (LCV-905A)
19.HP HEATER-2 TO HP FLASH TANK (LCV-905B)
20.HP HEATER-1 TO DEAERATOR (LCV-906)
21.HP HEATER-1 TO HP FLASH TANK (LCV-906A)
22.LUBE OIL PRESSURE REGULATOR (PRV-910)

5) Turbine Trips from DCS to ETS:


6) TURBINE ALARMS (SOE) in DCS:

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


4

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

7) OPEN LOOPS
8) PERFORMANCE CALCULATION
9) DEH LOGICS
10) EMERGENCY TRIP SYSTEM (ETS)

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


5

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

FUNCTIONAL WRITE UP
BOILER FEED WATER PUMP - 1
BFP #1 shall be switched on manually after switching on Aux. Lube
oil pump in auto/Manual:
Start Permissive (VFC Aux. lube oil pump #1)
1. Lube oil temp. Downstream of heat exchanger not high.
a. TE-27A (<55 C)
b. TE-29A (<65 C)
c. TE-33A (<110C)
d. TE-35A (<75C)
2. Bearing temp. Not high (TE-60A, TE-59A, TE-58A, TE-57A, TE56A, TE-42A) <90C.
3. DCS mode selected.
4. Ready to start
5. Local stop not active.
6. CCW discharge pressure (PT-982)>3.5Kg/cm2.
NOTE: For Lube Oil Temperatures and VFC Lube oil pump-1 Bearing
temperatures refer Dovoith coupler document.
VOITH COUPLER document no. 306-74010-13230.
If Start Permissive OK.
Manual Start Mode
1. Start From DCS.
Note: Auto or manual selection shall be made manually by operator
and forced to Auto selection shall made when BFP#1 trip/OFF shall be
auto selection.
Auto Start Mode
1. Lube oil pressure (PT-19.2A) <1.1bar when BFP#1 is running.
Stop Interlocks (VFC Aux. lube oil pump#1)
1. Lube oil pressure (PT-19.2A)>2.9bar when BFP#1 is running.
2. Trip FB from MCC.
3. DCS stop.
Refer Interlock Logic Diagram: 1104-113-A-02.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


6

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Starting permissive (BFP#1)
A. BFP #1 Pump in remote (DCS) mode.
B. BFP #1 Pump not in trip condition.
C. Ready to start permissive from HT breaker
D. Local stop not active.
E. Auxiliary lube oil pump-1 ON feedback.
F. VFC Scoop is in minimum position (<5).
G. Lube oil pressure >0.8bar (PT-19A).
H. Dearator water level (LAL-916) is not low.
I. BFP #1 Pump Suction Valve is in open position (ZSO-3301).
J. BFP #1 Pump Discharge MOV is close Position (ZSC-1034).
K. BFP #1 Pump discharge bypass MOV close position (ZSC-1034A).
L. Boiler Stream Drum Level not high.
If Starting Per missives OK.
Manual Start
1) Start From DCS.
Stop Interlocks (BFP#1)
BFP #1 shall be stopped automatically or manually when in remote
mode of operation, the conditions are:
1) Any Motor Winding Temperature are HI HI(R, Y, B) >120Deg.
2) Any Motor bearing Temperature are HI HI (DE, NDE) >80Deg.
3) Any Pump Bearing Temperature (NDE, DE, THRUST 1 & 2) are
High High (>90deg).
4) Any Vibrations motor or pump (VAHH-901, 902, 903, 904, 905,
906, 907 and 908) are High High.
5) Dearator Water Level (LALL-916) is Low Low.
6) BFP #1 Pump Suction valve is closed (ZSC-3301).
7) BFP #1 Pump Suction Differential Pressure Switch (DPS-901) is
high.
8) Any VFC Coupling Bearing temperatures (TE-60.1A, 59.1A,
58.1A, 57.1A, 56.1A, 40A, 41A and 44A) high high. (>95 deg.)
9) Any VFC lube Oil Temperature are high high
a. TE-27.1A& 27.2A (60 Deg.)
b. TE-29.1A&29.2A (70Deg.)
c. TE-33.1A&33.2A (130Deg.)
d. TE-35.1A & 35.2A (85Deg.)
10) Lube Oil Pressure (PT-19.1A) is less than 0.8bars.
11) Stop from DCS when in remote mode.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
7

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------12) Trip from HT breaker.
13) CCW discharge pressure (PT-982) <2kg/cm2.
Refer Interlock Logic Diagram: 1104-113-A-01.
NOTE: For Lube Oil Temperatures and VFC Lube oil pump-1 Bearing
temperatures refer Dovoith coupler document.
VOITH COUPLER document no. 306-74010-13230.

BOILER FEED WATER PUMP - 2


BFP #2 shall be switched on manually after switching on Aux. Lube
oil pump in auto/Manual:
Start Permissive (VFC Aux. lube oil pump #2)
1. Lube oil temp. Downstream of heat exchanger not high.
a. TE-27B (<55 C)
b. TE-29B (<65 C)
c. TE-33B (<110C)
d. TE-35B (<75C)
2. Bearing temp. Not high (TE-60B, TE-59B, TE-58B, TE-57B, TE56B, TE-42B) <90C.
3. DCS mode selected.
4. Ready to start
5. Local stop not active.
6. CCW discharge pressure (PT-982)>3.5Kg/cm2.
NOTE: For Lube Oil Temperatures and VFC Lube oil pump-2 Bearing
temperatures refer Dovoith coupler document.
VOITH COUPLER document no. 306-74010-13230.
If start Permissive Ok.
Manual Start Mode
1. Start From DCS.
Auto Start Mode
Note: Auto or manual selection shall be made manually by operator
and forced to Auto selection shall made when BFP #2 trip/OFF shall be
auto selection.
1. Lube oil pressure (PT-19.2B) <1.1bar when BFP#2 is running.
Stop Interlocks (VFC Aux. lube oil pump#2)
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
8

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------1. Lube oil pressure (PT-19.2B)>2.9bar when BFP#2 is running.
2. Trip FB from MCC.
3. DCS stop.
Refer Interlock Logic Diagram: 1104-113-A-04.
Starting permissive (BFP#2)
2. BFP #2 Pump in remote (DCS) mode.
3. BFP #2 Pump not in trip condition.
4. Ready to start permissive from HT breaker
5. Local stop not active.
6. Auxiliary lube oil pump-2 ON feedback.
7. VFC Scoop is in minimum position (<5).
8. Lube oil pressure >0.8bar (PT-19B).
9. Dearator water level (LAL-916) is not low.
10. BFP #2 Pump Suction Valve is in open position (ZSO-3302).
11. BFP #2 Pump Discharge MOV is close Position (ZSC-1035).
12. BFP #2 Pump Discharge bypass MOV close position (ZSC1035A).
13. Boiler Stream Drum Level not high.
If starting per missives Ok.
Manual Start
1) Start From DCS.
Stop Interlocks (BFP#2)
BFP #2 shall be stopped automatically or manually when in remote
mode of operation, the conditions are:
1. Any Motor Winding Temperature are HI HI(R, Y, B) >120Deg.
2. Any Motor bearing Temperature are HI HI (DE, NDE) >80Deg.
3. Any Pump Bearing Temperature (NDE, DE, THRUST 1 & 2) are
High High (>90deg).
4. Any Vibrations motor or pump (VAHH-909, 910, 911, 912, 913,
914, 915 and 916) are High High.
5. Dearator Water Level (LALL-916) is Low Low.
6. BFP #1 Pump Suction valve is closed (ZSC-3302).
7. BFP #1 Pump Suction Differential Pressure Switch (DPS-902) is
high.
8. Any VFC Coupling Bearing temperatures (TE-60.1B, 59.1B,
58.1B, 57.1B, 56.1B, 40B, 41B and 44AB high high. (>95 deg.)
9. Any VFC lube Oil Temperature are high high
a. TE-27.1B & 27.2B (60 Deg.)
b. TE-29.1B & 29.2B (70Deg.)
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
9

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------c. TE-33.1B & 33.2B (130Deg.)
d. TE-35.1B & 35.2B (85Deg.)
10. Lube Oil Pressure (PT-19.1B) is less than 0.8bars.
11. Stop from DCS when in remote mode.
12. Trip from HT breaker.
13. CCW discharge pressure (PT-982) <2kg/cm2.
Refer Interlock Logic Diagram: 1104-113-A-03.

NOTE: For Lube Oil Temperatures and VFC Lube oil pump-2 Bearing
temperatures refer VOITH coupler document.
VOITH COUPLER document no. 306-74010-13230.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


10

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

CONDENSATE EXTRACTION PUMP -1


Condensate Extraction Pump-1 shall be switched on from DCS
either in Manual mode or Auto mode, which can be selected by
using soft selector switch.
Starting Per missives (CEP#1)
1) Hot well level (LALL-912) not low low.
2) Condensate Extraction Pump-1 Suction Valve (ZSO-902) is in
open position.
3) CEP Pump-1 in remote (DCS) mode.
4) CEP Pump-1 not in trip condition from VFD.
5) Ready to start permissive from VFD.
6) Local stop not active.
7) Discharge MOV (1023) in close FB.
If Start Per missives are OK.
Manual Start mode
1. Start from DCS
Auto Start mode
1. CEP-2 trip FB from VFD.
2. Discharge header pressure low(PS-941)
3. Hot well level high (LAH-912)

Stop Interlocks (CEP-1)


1)
2)
3)
4)
5)

Hot well level (LALL-912) low low.


CEP #1 Motor any Winding (R, Y and B) temperature>120 Deg.
CEP#1 Motor any Bearing (NDE and DE) temperatures>90 Deg.
Trip FB from VFD
Stop from DCS

Refer Interlock Logic Diagram: 1104-113-A-05.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


11

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

CONDENSATE EXTRACTION PUMP -2


Condensate Extraction Pump-2 shall be switched on from DCS
either in Manual mode or Auto mode, which can be selected by
using soft selector switch.
Starting Per missives (CEP#2)
1. Hot well level (LALL-912) not low low.
1. Condensate Extraction Pump-1 Suction Valve (ZSO-904) is in
open position.
2. CEP Pump-2 in remote (DCS) mode.
3. CEP Pump-2 not in trip condition from VFD.
4. Ready to start permissive from VFD.
5. Local stop not active.
6. Discharge MOV (1024) in close FB.
If start per missives Ok.
Manual Start mode
1. Start from DCS
Auto Start mode
1. CEP-1 trip FB from VFD.
2. Discharge header pressure low(PS-941)
3. Hot well level high (LAH-912)
Stop Interlocks (CEP-2)
1)
2)
3)
4)
5)

Hot well level (LALL-912) low low.


CEP #2 Motor any Winding (R, Y and B) temperature>120 Deg.
CEP #2 Motor any Bearing (NDE and DE) temperatures>90 Deg.
Trip FB from VFD
Stop from DCS

Refer Interlock Logic Diagram: 1104-113-A-06.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


12

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

CCW PUMP -1
CCW Pump-1 shall be switched on from DCS either in Manual mode.
Starting Per missives (CCWP#1)-Manual mode
1.
2.
3.
4.
5.

Common surge tank level (LT-901A) not low (>25%).


CCW Pump-1 in remote (DCS) mode.
CCW Pump-1 not in trip condition from HT Breaker.
Ready to start from HT breaker.
Local stop not active.

If start per missives OK.


Manual Start
1. Start from DCS.
Stop Interlocks (CCWP-1)-Manual Mode
1. Common surge tank level (LT-901A) low (<25%).
2. CCWP #1 Motor any Winding (R, Y and B) temperature>120
Deg.
3. CCWP#1 Motor any Bearing (NDE and DE) temperatures>90
Deg.
4. Trip FB from HT breaker.
5. Stop form DCS.
Refer Interlock Logic Diagram: 1104-113-A-07.

CCW PUMP -2
CCW Pump-2 shall be switched on from DCS either in Manual mode.
Starting Per missives (CCWP#2)-Manual mode
1.
2.
3.
4.
5.

Common surge tank level (LT-901A) not low (>25%).


CCW Pump-2 in remote (DCS) mode.
CCW Pump-2 not in trip condition from HT Breaker.
Ready to start from HT breaker.
Local stop not active.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


13

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------If start per missives are OK.
Manual Mode
1. Start from DCS.
Stop Interlocks (CCWP-2)-Manual Mode
1. Common surge tank level (LT-901A) low (<25%).
2. CCWP #2 Motor any Winding (R, Y and B) temperature>120
Deg.
3. CCWP#2 Motor any Bearing (NDE and DE) temperatures>90
Deg.
4. Trip FB from HT breaker.
5. Stop form DCS.

Refer Interlock Logic Diagram: 1104-113-A-O8.


VACCUM PUMP MOTOR-1& 2 and Recirculation Motor 1&2:
Please refer document Edwards contract no:
NXP518000&NXP519000.

HOT WATER PUMP -1


Hot water Pump-1 shall be switched on from DCS either in Manual
mode or Auto mode, which can be selected by using soft selector
switch.
Starting Per missives (HWP#1)
1. LP Heater-1 level (LAL-906) not low low.
2. HW Pump-1 in remote (DCS) mode.
3. HWP Pump-1 not in trip condition from MCC.
4. Ready to start permissive from MCC.
5. Local stop not active.
If starting per missives are OK
Manual Start mode
1. Start from DCS
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
14

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Auto Start mode
1. HWP-2 trip FB from MCC.
2. LP Heater level-1 high (LAH-907)
Stop Interlocks (HWP-1)
1. LP Heater-1 level (LAL-906) low low.
2. Trip FB from MCC
3. Stop from DCS
Refer Interlock Logic Diagram: 1104-113-A-09.

HOT WATER PUMP -2


Hot water Pump-2 shall be switched on from DCS either in Manual
mode or Auto mode, which can be selected by using soft selector
switch.
Starting Per missives (HWP#2)
1.
2.
3.
4.
5.

LP Heater-1 level (LAL-906) not low low.


HW Pump-2 in remote (DCS) mode.
HWP Pump-2 not in trip condition from MCC.
Ready to start permissive from MCC.
Local stop not active.

If starting per missives are OK


Manual Start mode
1. Start from DCS
Auto Start mode
1. HWP-1 trip FB from MCC.
2. LP Heater level-1 high (LAH-907)
Stop Interlocks (HWP-2)
1. LP Heater-1 level (LAL-906) low low.
2. Trip FB from MCC
3. Stop from DCS
Refer Interlock Logic Diagram: 1104-113-A-10.

CLEAN OIL PUMP


-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
15

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------COP shall be switched on manually, only when the following
Conditions are satisfied:
Starting Per missives (COP)-Manual mode
1)
2)
3)
4)
5)

Cleaning oil tank level (LAL-901A) not low.


COP in remote mode.
COP not in trip condition.
Ready to start from MCC.
Local stop not active.

If starting per missives are OK


Manual Mode
1) Start from DCS.
Stop Interlocks (COP)
1)
2)
3)
4)

Cleaning oil tank level (LAL-901A) is low.


Unit-1 Main oil tank level high(LTI-133)
Unit-2 Main oil tank level high(LTI-133)
Stop from DCS.

Refer Interlock Logic Diagram: 1104-113-A-11.

DIRTY OIL PUMP


DOP shall be switched on manually, only when the following
Conditions are satisfied:
Starting Per missives (DOP)-Manual mode
1.
2.
3)
4)
5)

Dirty oil tank level (LAL-901) not low.


DOP in remote mode.
DOP not in trip condition.
Ready to start from MCC.
Local stop not active.

If starting per missives are OK


Manual Mode
1) Start from DCS.
Stop Interlocks (DOP)
1. Dirty oil tank level (LAL-901) is low.
2. Unit-1 Main oil tank level high(LTI-133)
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
16

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3. Unit-2 Main oil tank level high(LTI-133)
4. Stop from DCS.
Refer Interlock Logic Diagram: 1104-113-A-12.

Gland steam vents condenser FAN-1:


GSVC-1 shall be switched on manually, only when the following
Conditions are satisfied:
Starting Per missives (GSVC-1)-Manual mode
1.
2.
3.
4.

GSVC-1 in remote mode.


GSVC-1 not in trip condition.
Ready to start from MCC.
Local stop not active.

If starting per missives are OK


Manual Mode
1) Start from DCS.
Stop Interlocks (GSVC-1)
1. GSVC-1 stop from DCS.
Refer Interlock Logic Diagram: 1104-113-A-13.

Gland steam vents condenser FAN-2:


GSVC-2 shall be switched on manually, only when the following
Conditions are satisfied:
Starting Per missives (GSVC-2)-Manual mode
1.
2.
3.
4.

GSVC-2 in remote mode.


GSVC-2 not in trip condition.
Ready to start from MCC.
Local stop not active.

If starting per missives are OK


Manual Mode
1) Start from DCS.
Stop Interlocks (GSVC-2)
1. GSVC-2 stop from DCS.
Refer Interlock Logic Diagram: 1104-113-A-14.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
17

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Ball Recirculation Pump:
This motor is PLC based controlled not from DCS.
Purification Pump:
This motor is PLC based controlled not from DCS.
Oil mist FAN-1:
OMF-1 shall be switched on manually, only when the following
Conditions are satisfied:
Starting Per missives (OMF-1)-Manual mode
1.
2.
3.
4.

OMF-1 in remote mode.


OMF-1 not in trip condition.
Ready to start from MCC.
Local stop not active.

If starting per missives are OK


Manual Mode
1) Start from DCS.
Stop Interlocks (OMF-1)
1. OMF-1 stop from DCS.
Refer Interlock Logic Diagram: 1104-113-A-15.
Oil mist FAN-2:
OMF-2 shall be switched on manually, only when the following
Conditions are satisfied:
Starting Per missives (OMF-2)-Manual mode
1.
2.
3.
4.

OMF-2 in remote mode.


OMF-2 not in trip condition.
Ready to start from MCC.
Local stop not active.

If starting per missives are OK


Manual Mode
1) Start from DCS.
Stop Interlocks (OMF-2)
1. OMF-2 stop from DCS.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
18

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Refer Interlock Logic Diagram: 1104-113-A-16.

EMERGENCY OIL PUMP (DC MOTOR)


Starting Per missives (EOP)-Auto mode
1. EOP DC Supply ON.
2. FFR NOT OPERATED.
3. Local stop not active.
4. Ready to start from EOP panel
If starting per missives are OK
Manual Mode
1) Start from DCS.
Auto Mode
1. EOP inlet Lube Oil Pressure (PS-63/1-EOP) is low.
OR
2. EOP inlet Lube Oil Pressure (PS-23/2-EOP) is low.
Stop Interlocks (EOP)
1. Stop from DCS.
Refer Interlock Logic Diagram: 1104-113-A-17.
OIL RESERVOIR HEATER
Oil reservoir heater shall be switched on from DCS either in Manual
mode or Auto mode, which can be selected by using soft selector
switch.
Starting Per missives (ORH):
1. Ready to start permissive from MCC.
2. Local stop not active.
Manual Start mode
1. Start from DCS
Auto Start mode
1. ORH no trip condition from MCC.
2. Lube oil temperature (TE-22) <23Deg.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
19

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Stop Interlocks (ORH):
1. Lube oil temperature (TE-22) >28Deg.
2. Trip FB from MCC
3. Stop from DCS
Refer Interlock Logic Diagram: 1104-113-A-18.

HP START UP OIL PUMP


SOP shall be started in Manual mode, When SOP shall
Be selected in remote mode of operation. Local / remote selection
Shall be from DCS only.
Starting Per missives (HP SOP)-Manual mode
1. Ready to start from DCS
2. Local stop not active.
If starting per missives are OK
Manual Mode
1) Start from DCS.
Stop Interlocks (HP SOP)
1. Stop from DCS
2. Trip FB from MCC
3. Turbine reaches rated RPM (3000 RPM) with delay of 3S time.
Refer Interlock Logic Diagram: 1104-113-A-19.

AUXILARY OIL PUMP


AOP shall be started in Auto/Manual mode, When AOP shall
Be selected in remote mode of operation. Local / remote selection
Shall be from DCS only.
Starting Permissive (AOP)1. Ready to start from DCS
2. Local stop not active.
If starting pre missives are OK
Manual Start mode
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
20

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------1. Start from DCS.
Auto Start mode
1. AOP Lube Oil Pressure (PS-63/1 BOP) is low.
OR
2. AOP Lube Oil Pressure (PS-63/2 BOP) is low.
NOTE: AOP forcedly shall made select to auto mode when
turbine trips.
Stop Interlocks (AOP)
1. Stop from DCS
2. Trip FB from MCC
Refer Interlock Logic Diagram: 1104-113-A-20.

BARRING GEAR MOTOR

BGM shall be started in Manual mode, When BGM shall


Be selected in remote mode of operation from BGM panel.
BGM shall be switched on manually, only when the following
Conditions are satisfied:
Starting Permissive (BGM)-Manual mode
1. Lube Oil Header Pressure switch (PIS-317) is not low.
2. Turbine Speed Zero (from TSI panel).
If starting per missives are OK
Manual Mode
1. Start from DCS.
Stop Interlocks (AOP)
1. Lube Oil Header Pressure Switch (PIS-317) is low.
2. Stop from DCS.
Refer Interlock Logic Diagram: 1104-113-A-21.

JACKING OIL PUMP-1


JOP #1 shall be started in Auto/Manual mode.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
21

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Starting Permissive (JOP-1)1. Lube oil header pressure (PT-128)>0.9 kg/cm2.
Manual mode
1. Start from DCS.
Auto mode
1) Jacking Oil Device Pressure (PS-505) is Low.
2) Jack Oil Pump-2 Stop.
3) Turbine speed<600RPM
Stop Interlocks (JOP-1)
1) Stop from DCS
2) Lube oil header pressure (PT-128) <0.9 kg/cm2.
3) Turbine speed >1200RPM
Refer Interlock Logic Diagram: 1104-113-A-22.

JACKING OIL PUMP-2


JOP #2 shall be started in Auto/Manual mode.
Starting Permissive (JOP-2)1. Lube oil header pressure (PT-128)>0.9 kg/cm2.
Manual mode
1. Start from DCS
Auto mode
1. Jacking Oil Device Pressure (PS-505) is Low.
2. Jack Oil Pump-1 Stop.
3. Turbine speed<600RPM
Stop Interlocks (JOP-2)
1. Stop from DCS
2. Lube oil header pressure (PT-128) <0.9 kg/cm2.
3. Turbine speed >1200RPM
Refer Interlock Logic Diagram: 1104-113-A-23.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


22

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------HP OIL PUMP-1
HOP #1 shall be started when HOP #1 selected to remote mode
from EH panel.
Starting Permissive (HP PUMP-1)
1) DCS mode selected from EH panel
2) 220V AC OK from EH panel
3) Int.lock enable from EH panel
If starting per missives are OK
Manual Start mode
1) Start from DCS
Auto Start mode
1. PS-63/LP.
2. HP Oil Pump-2 Stop.
3. PS-63/MP.
Stop Interlocks (HP PUMP-1)
1. DCS mode not selected
2. EH oil tank level <230mm.
3. EH oil temp <20 Deg.
4. Stop from DCS
Refer Interlock Logic Diagram: 1104-113-A-24.

HP OIL PUMP-2
HOP #2 shall be started when HOP #1 selected to remote mode
from EH panel.
Starting Permissive (HP PUMP-2)1. DCS mode selected from EH panel
2. 220V AC OK from EH panel
3. Int.lock enable from EH panel
If starting per missives are OK
Manual mode
1. Start from DCS
Auto mode
1. PS-63/LP.
2. HP Oil Pump-1 Stop.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
23

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3. PS-63/MP.
Stop
1.
2.
3.
4.

Interlocks (HP PUMP-2)


DCS mode not selected
EH oil tank level <230mm.
EH oil temp <20 Deg.
Stop from DCS

Refer Interlock Logic Diagram: 1104-113-A-25.

TURBINE MOTORISED VALVES


1) HP SIDE MAIN STEAM BYPASS MOV-LEFT (1044)

1)
2)
3)
4)
5)

MOV-1044 in remote (DCS) mode.


MOV-1044 not in trip condition.
MOV-1044 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-04.
2) HP SIDE MAIN STEAM BYPASS MOV-RIGHT (1045)

1)
2)
3)
4)
5)

MOV-1045 in remote (DCS) mode.


MOV-1045 not in trip condition.
MOV-1045 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-05.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


24

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3) HP SIDE MAIN STEAM DRAIN MOV-LEFT (1004)

1)
2)
3)
4)
5)

MOV-1004 in remote (DCS) mode.


MOV-1004 not in trip condition.
MOV-1004 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-06.

4) HP SIDE MAIN STEAM BYPASS MOV-LEFT (1005)

1)
2)
3)
4)
5)

MOV-1005 in remote (DCS) mode.


MOV-1005 not in trip condition.
MOV-1005 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-07.
5) START UP VENT HP SIDE (1015)
1)
2)
3)
4)
5)

MOV-1015 in remote (DCS) mode.


MOV-1015 not in trip condition.
MOV-1015 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
25

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Refer Interlock Logic Diagram: 1104-113-08.
6) LP SIDE MAIN STEAM BYPASS MOV-LEFT (1048)

1)
2)
3)
4)
5)

MOV-1048 in remote (DCS) mode.


MOV-1048 not in trip condition.
MOV-1048 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-09.
7) LP SIDE MAIN STEAM BYPASS MOV-LEFT (1049)

1)
2)
3)
4)
5)

MOV-1049 in remote (DCS) mode.


MOV-1049 not in trip condition.
MOV-1049 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-10.
8) START UP VENT LP SIDE (1015A)

1)
2)
3)
4)
5)

MOV-1015A in remote (DCS) mode.


MOV-1015A not in trip condition.
MOV-1015A Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
26

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-11.
9) LP SIDE MAIN STEAM DRAIN MOV-LEFT (1012)

1)
2)
3)
4)
5)

MOV-1012 in remote (DCS) mode.


MOV-1012 not in trip condition.
MOV-1012 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-12.
10) LP SIDE MAIN STEAM DRAIN MOV-LEFT (1013)

1)
2)
3)
4)
5)

MOV-1013 in remote (DCS) mode.


MOV-1013 not in trip condition.
MOV-1013 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-13.
11) BLEED -1 to HP Heater-2 (MOV-1018 INCHING TYPE)
Bleed#1 MOV shall be opened or closed manually in remote mode
(DCS) when the following conditions are occurred.
Opening Permissive (Bleed-1 MOV)
1. Remote (DCS) mode selected
2. No trip FB.
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
27

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Or
HP Heater-2 level high High (LT-905)
Refer Interlock Logic Diagram: 1104-113-14.

12) BLEED -2 to HP Heater-1 (MOV-1019 INCHING TYPE)


Bleed#2 MOV shall be opened or closed manually in remote mode
(DCS) when the following conditions are occurred.
1. Remote (DCS) mode selected
2. No trip FB.
3. No Stop FB.
4. No Close Command.
5. Local Push Button Release Condition
6.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
OR
HP Heater-1 level high High (LT-906)
Refer Interlock Logic Diagram: 1104-113-15.
13) BLEED -3 to Deaerator (MOV-1020 INCHING TYPE)
Bleed#3 MOV shall be opened or closed manually in remote mode
(DCS) when the following conditions are occurred.
Opening Permissive (Bleed-3 MOV)
1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition
The above Conditions are satisfied
1) Open Command from DCS.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
28

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-16.
14) BLEED -4 to LP Heater-3 (MOV-1021 INCHING TYPE)
Bleed#4 MOV shall be opened or closed manually in remote mode
(DCS) when the following conditions are occurred.
Opening Permissive (Bleed-4 MOV)
1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
OR
LP Heater-3 level High High(LT-902)
Refer Interlock Logic Diagram: 1104-113-17.
15) BFP -1 (Discharge MOV BYPASS-1034A INCHING TYPE)
BFP#1 discharge BY PASS MOV shall be opened or closed on
automatically or manually in remote mode (DCS) when the
following conditions are occurred.
Opening Per missives (BFP#1 discharge BYPASS MOV)1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition
Manual Open
1. Open command from DCS.
Auto Open
1. BFP#1 VFD ON FB with 1s delays open 20% with reference of
position FB.
Closing Per missives (BFP#1 discharge BYPASS MOV)-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
29

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Manual Close
1. Close command from DCS.
Auto Close
1. BFP#1 discharge MOV (1034) open FB with 3s delays BFP-1
discharge Bypass MOV closing.
.
Refer Interlock Logic Diagram: 1104-113-18.
16) BFP -2 (Discharge MOV BYPASS-1035A INCHING TYPE)
BFP #2 discharge BY PASS MOV shall be opened or closed on
automatically or manually in remote mode (DCS) when the
following conditions are occurred.
Opening Per missives (BFP#2 discharge BYPASS MOV)
1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition
Manual Open
1. Open command from DCS.
Auto Open
1. BFP#2 VFD ON FB with 1s delays open 20% with reference of
position FB.
Closing Per missives (BFP#2 discharge BYPASS MOV)
Manual Close
1. Close command from DCS.
Auto Close
2. BFP#2 discharge MOV (1035) open FB with 3s delays, BFP-2
discharge Bypass MOV closing.
Refer Interlock Logic Diagram: 1104-113-19.
17) HP HEATER-1 BYPASS MOV BYPASS (1036A)
Start Permissive
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
30

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------1) MOV-1036A in remote (DCS) mode.
2) MOV-1036A not in trip condition.
3) MOV-1036A Close Command not Active.
4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-20.

18) HP HEATER-1 I/L MOV BYPASS (1037A)

1)
2)
3)
4)
5)

MOV-1037A in remote (DCS) mode.


MOV-1037A not in trip condition.
MOV-1037A Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-21.
19) HP HEATER-1 O/L MOV BYPASS (1038A)

1)
2)
3)
4)
5)

MOV-1038A in remote (DCS) mode.


MOV-1038A not in trip condition.
MOV-1038A Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-22.
20) HP HEATER-2 BYPASS MOV BYPASS (1039A)
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
31

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

1)
2)
3)
4)
5)

MOV-1039A in remote (DCS) mode.


MOV-1039A not in trip condition.
MOV-1039A Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-23.
21) HP HEATER-2 I/L MOV BYPASS (1040A)

1)
2)
3)
4)
5)

MOV-1040A in remote (DCS) mode.


MOV-1040A not in trip condition.
MOV-1040A Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-24.
22) HP HEATER-2 O/L MOV BYPASS (1041A)

1)
2)
3)
4)
5)

MOV-1041A in remote (DCS) mode.


MOV-1041A not in trip condition.
MOV-1041A Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-25.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
32

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------23) HP SIDE MAIN STEAM MOV-LEFT (1042)

1)
2)
3)
4)
5)

MOV-1042 in remote (DCS) mode.


MOV-1042 not in trip condition.
MOV-1042 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-26.
24) HP SIDE MAIN STEAM MOV-RIGHT (1043)

1)
2)
3)
4)
5)

MOV-1043 in remote (DCS) mode.


MOV-1043 not in trip condition.
MOV-1043 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-27.
25) COLD REHEATER HEADER DRAIN-1 (1050B)

1)
2)
3)
4)
5)

MOV-1050B in remote (DCS) mode.


MOV-1050B not in trip condition.
MOV-1050B Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-28.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
33

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------26) COLD REHEATER HEADER DRAIN-2 (1051B)

1)
2)
3)
4)
5)

MOV-1051B in remote (DCS) mode.


MOV-1051B not in trip condition.
MOV-1051B Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-29.
27) LP SIDE MAIN STEAM MOV-LEFT (1046)

1)
2)
3)
4)
5)

MOV-1046 in remote (DCS) mode.


MOV-1046 not in trip condition.
MOV-1046 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-30.
28) LP SIDE MAIN STEAM MOV-LEFT (1047)

1)
2)
3)
4)
5)

MOV-1047 in remote (DCS) mode.


MOV-1047 not in trip condition.
MOV-1047 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
34

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Refer Interlock Logic Diagram: 1104-113-31.
29) BLEED -5 to LP Heater-2 (MOV-1022 INCHING TYPE)
Bleed#5 MOV shall be opened or closed manually in remote mode
(DCS) when the following conditions are occurred.
Opening Permissive (Bleed-5 MOV)-Manual mode
1. Remote (DCS) mode selected
2. Open command from DCS.
3. No trip FB
4. No Stop FB.
5. No Close Command
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
OR
1. LP Heater-2 level high(LT-903)
Refer Interlock Logic Diagram: 1104-113-32.
30) LP HEATER-1 I/L MOV (1025)

1)
2)
3)
4)
5)

MOV-1025 in remote (DCS) mode.


MOV-1025 not in trip condition.
MOV-1025 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-33.
31) LP HEATER-1 BYPASS MOV (1026)

1)
2)
3)
4)

MOV-1026 in remote (DCS) mode.


MOV-1026 not in trip condition.
MOV-1026 Close Command not Active.
Stop - not active.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


35

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-34.
32) LP HEATER-1 O/L MOV (1027)

1)
2)
3)
4)
5)

MOV-1027 in remote (DCS) mode.


MOV-1027 not in trip condition.
MOV-1027 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-35.
33) LP HEATER-2 I/L MOV (1028)

1)
2)
3)
4)
5)

MOV-1028 in remote (DCS) mode.


MOV-1028 not in trip condition.
MOV-1028 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-36.
34) LP HEATER-2 BYPASS MOV (1029)

1) MOV-1029 in remote (DCS) mode.


2) MOV-1029 not in trip condition.
3) MOV-1029 Close Command not Active.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
36

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-37.
35) LP HEATER-2 O/L MOV (1030)

1)
2)
3)
4)
5)

MOV-1030 in remote (DCS) mode.


MOV-1030 not in trip condition.
MOV-1030 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-38.
36) LP HEATER-3 I/L MOV (1031)

1)
2)
3)
4)
5)

MOV-1031 in remote (DCS) mode.


MOV-1031 not in trip condition.
MOV-1031 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-39.
37) LP HEATER-1 BYPASS MOV (1032)

1) MOV-1032 in remote (DCS) mode.


-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
37

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------2) MOV-1032 not in trip condition.
3) MOV-1032 Close Command not Active.
4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-40.
38) LP HEATER-1 O/L MOV (1033)

1)
2)
3)
4)
5)

MOV-1033 in remote (DCS) mode.


MOV-1033 not in trip condition.
MOV-1033 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-41.
39) BFP -1(Discharge MOV-1034 ON & OFF TYPE)

BFP#1 discharge BY PASS MOV shall be opened or closed on


manually in remote mode (DCS) when the following conditions
are occurred.
Opening Per missives (BFP #1 discharge MOV)
1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
38

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Refer Interlock Logic Diagram: 1104-113-42.
40) BFP -2(Discharge MOV-1035 ON & OFF TYPE)
BFP#2 discharge BY PASS MOV shall be opened or closed on
manually in remote mode (DCS) when the following conditions
are occurred.
Opening Per missives (BFP#2 discharge MOV)
1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-43.
41) HP HEATER-1 I/L MOV (1036)

1) MOV-1036 in remote (DCS) mode.


2) MOV-1036 not in trip condition.
3) MOV-1036 Close Command not Active.
4)Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-44.
42) HP HEATER-1 BYPASS MOV (1037)

1)
2)
3)
4)
5)

MOV-1037 in remote (DCS) mode.


MOV-1037 not in trip condition.
MOV-1037 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


39

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-45.
43) HP HEATER-1 O/L MOV (1038)

1)
2)
3)
4)
5)

MOV-1038 in remote (DCS) mode.


MOV-1038 not in trip condition.
MOV-1038 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-46.
44) HP HEATER-2 I/L MOV (1039)

1)
2)
3)
4)
5)

MOV-1039 in remote (DCS) mode.


MOV-1039 not in trip condition.
MOV-1039 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
In release condition.
6) Stop from DCS.
Refer Interlock Logic Diagram: 1104-113-47.
45) HP HEATER-2 BYPASS MOV (1040)

1) MOV-1040 in remote (DCS) mode.


2) MOV-1040 not in trip condition.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
40

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3) MOV-1040 Close Command not Active.
4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-48.
46) HP HEATER-2 O/L MOV (1041)

1)
2)
3)
4)
5)

MOV-1041 in remote (DCS) mode.


MOV-1041 not in trip condition.
MOV-1041 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-49.
47) BALL RECIRCULATION SECTION-1(1052)
1)
2)
3)
4)
5)

MOV-1052 in remote (DCS) mode.


MOV-1052 not in trip condition.
MOV-1052 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-50.
48) BALL RECIRCULATION SECTION-2(1053)

1) MOV-1053 in remote (DCS) mode.


2) MOV-1053 not in trip condition.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
41

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3) MOV-1053 Close Command not Active.
4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-51.
49) BALL RECIRCULATION DISCHARGE-1(1054)

1)
2)
3)
4)
5)

MOV-1054 in remote (DCS) mode.


MOV-1054 not in trip condition.
MOV-1054 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-52.
50) BALL RECIRCULATION DISCHARGE-2(1055)
1)
2)
3)
4)
5)

MOV-1055 in remote (DCS) mode.


MOV-1055 not in trip condition.
MOV-1055 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-53.
51) VACCUM BREAKER (1011)

1) MOV-1011 in remote (DCS) mode.


2) MOV-1011 not in trip condition.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
42

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3) MOV-1011 Close Command not Active.
4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-54.
52) CONDENSATE EXTRACTION PUMP -1(Discharge MOV-1023)
CEP #1 discharge MOV shall be opened or closed on automatically
or manually in remote mode (DCS) when the following conditions
are occurred.
Opening Per missives (CEP#1 discharge MOV)1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in Release Condition.
Manual Open
1. Open command from DCS.
Auto Open
1. CEP#1 VFD ON FB with 3s delays opening.
Closing Per missives (CEP#1 discharge MOV)
Manual Close
1. Close command from DCS.
Auto Close
7. CEP#1 VFD OFF FB with 3s delays closing.
Refer Interlock Logic Diagram: 1104-113-55.
53) CONDENSATE EXTRACTION PUMP -2(Discharge MOV-1024)
CEP #2 discharge MOV shall be opened or closed on automatically
or manually in remote mode (DCS) when the following conditions
are occurred.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
43

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Opening Per missives (CEP#2 discharge MOV)1. Remote (DCS) mode selected
2. No trip FB
3. No Stop FB.
4. No Close Command.
5. Local Push Button is in Release Condition.
Manual Open
1. Open command from DCS.
Auto Open
1. CEP#2 VFD ON FB with 3s delays opening.
Closing Per missives (CEP#2 discharge MOV)
Manual Close
1. Close command from DCS.
Auto Close
1. CEP#2 VFD OFF FB with 3s delays closing.
Refer Interlock Logic Diagram: 1104-113-56.

54) MAIN OIL TANK TO DIRTY OIL TANK (1056)

1)
2)
3)
4)
5)

MOV-1056 in remote (DCS) mode.


MOV-1056 not in trip condition.
MOV-1056 Close Command not Active.
Stop - not active.
Local Push Button is in release condition.

The above Conditions are satisfied


1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-57.
55) AUXILIARY STEAM LINE FROM PRDS (1057)
Start Permissive
1) MOV-1057 in remote (DCS) mode.
2) MOV-1057 not in trip condition.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
44

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3) MOV-1057 Close Command not Active.
4) Stop - not active.
5) Local Push Button is in release condition.
The above Conditions are satisfied
1) Open Command from DCS.
2) Close Command from DCS.
Refer Interlock Logic Diagram: 1104-113-58.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


45

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

SOLENIDE VALVES
1. DRAIN SOLENOIDE VALVES: (DCV-01 to DCV-08) All SOVs
are 230V AC supply, should open or close manually all SOVs
at a time.
2. Spray water to Dump SOV (SOV-941-220VDC):When ever
any of the LP BY PASS Valves 1or2 is open with reference of
position feedback >5%(ZT-903 or ZT-904) should open SOV941 and shall be closed after closing of LP BYPASS VALVES
1&2 with reference of feedback <1% with time delay of 10
Min. in Auto mode.

3. TURBINE EXHAUST HOOD SPRAYING SYSTEM SOV:


Whenever the temperature of exhaust hood temperature
increases to 80deg C with reference of TE-941 should open
SOV and shall close SOV when temperature reaches 45 Deg C
in auto mode.
4. DEAERATOR TO COMMON SURGE TANK SOV (LCV-909-220V
DC): Whenever the level of Deaerator reaches to 90% should
open SOV and shall close when level reaches to 80% with
reference of LT-908, LT-909.
5. BOP (20-1) SOV-230V AC: Test block of BOP#1 Manual
operation only, open and close shall be made from DCS to
test the AOP Motor start with activation of PS (BOP63-1).

6. BOP (20-2) SOV-230V AC: Test block of BOP#2 Manual


operations only, open and close shall be made from DCS to
test the AOP motor start with activation of PS (BOP63-2).
7. EOP (20-1) SOV-230V AC: Test block of EOP#1 Manual
operation only, open and close shall be done from DCS to
test the EOP Motor start with activation of PS (EOP63-1).

8. EOP (20-2) SOV-230V AC: Test block of EOP#2 Manual


operation only, open and close shall be made from DCS to
test the EOP Motor start with activation of PS (EOP63-2).

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


46

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

Closed Loops:
1) PRDS Temperature control steam to Gland Sealing (TCV905): This control loop is used to control the PRDS temperature. The
temperature element (TE-916) senses the PRDS line temperature. The
output temperature signal from temperature element is fed to a
temperature indicating controller (TIC-916) as a process variable. The
process variable signal is compared with the operator feed manual set
point in the temperature indicating controller. The output of the
temperature controller operates the temperature control valve (TCV905) on the PRDS line to control the PRDS temperature.
Refer closed loop logic diagram: 1104-02-2820-2
2) PRDS PRESSURE CONTROL STEAM TO GLAND SEALING (PCV901): This control loop is used to control the PRDS pressure. The
pressure transmitter (PT-916) senses the PRDS line pressure. The
output pressure signal is fed to a pressure indicating controller (PIC916) as a process variable. The process variable signal is compared
with the fixed set point in the pressure indicating controller. The
output of the pressure controller operates the PRDS pressure control
valve (PCV-901) on the PRDS line to control the PRDS pressure.
Refer closed loop logic diagram: 1104-02-2820-3
3) PRDS TEMPERATURE CONTROL STEAM TO PEGGING STEAM
(TCV-906): This control loop is used to control the PRDS
temperature. The temperature element (TE-917) senses the PRDS line
temperature. The output temperature signal from temperature
element is fed to a temperature indicating controller (TIC-917) as a
process variable. The process variable signal is compared with the
operator feed manual set point in the temperature indicating
controller. The output of the temperature controller operates the
temperature control valve (TCV-906) on the PRDS line to control the
PRDS temperature.
Refer closed loop logic diagram: 1104-02-2820-4
4) PRDS PRESSURE CONTROL STEAM TO PEGGING STEAM (PCV902): This control loop is used to control the PRDS pressure. The
pressure transmitter (PT-917) senses the PRDS line pressure. The
output pressure signal is fed to a pressure indicating controller (PIC917) as a process variable. The process variable signal is compared
with the fixed set point in the pressure indicating controller. The
output of the pressure controller operates the PRDS pressure control
valve (PCV-902) on the PRDS line to control the PRDS pressure.
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
47

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Refer closed loop logic diagram:p 1104-02-2820-5
5) GLAND SEALING DRAIN TO LP HEATER-1 (FCV 000): This
control loop is used to control GLAND SEALING STAM. The pressure
transmitter (PT-919) senses GLAND SEALING STEAM PRESSURE is
given as process variable to level controller. The process variable
signal is compared with the operator feed manual set point in the
controller. When the GLAND SEALING STEAM PRESSURE comes above
the set point, controller will open FCV-000 to maintain the pressure.
Refer closed loop logic diagram: 1104-02-2820-6
6) PRDS TEMPERATURE CONTROL STEAM TO AUXILIARY STEAM
HEADER (TCV-907): This control loop is used to control the PRDS
temperature. The temperature element (TE-59) senses the PRDS line
temperature. The output temperature signal from temperature
element is fed to a temperature indicating controller (TIC-59) as a
process variable. The process variable signal is compared with the
operator feed manual set point in the temperature indicating
controller. The output of the temperature controller operates the
temperature control valve (TCV-907) on the PRDS line to control the
PRDS temperature.
Refer closed loop logic diagram: 1104-02-2820-7
7) PRDS PRESSURE CONTROL STEAM TO AUXILIARY STEAM
HEADER (PCV-903): This control loop is used to control the PRDS
pressure. The pressure transmitter (PT-60) senses the PRDS line
pressure. The output pressure signal is fed to a pressure indicating
controller (PIC-60) as a process variable. The process variable signal is
compared with the fixed set point in the pressure indicating controller.
The output of the pressure controller operates the PRDS pressure
control valve (PCV-903) on the PRDS line to control the PRDS
pressure.
Refer closed loop logic diagram: 1104-02-2820-8
8) MINIMUM RECIRCULATION TO CONDENSER (FCV-941): This
control loop is used to control minimum recirculation to condenser.
The flow transmitter (FT-942) senses the line flow from GLAND STEAM
VENT CONDESER. The output of flow signal is fed to a flow indicating
controller (FIC-941) as a process variable. The process variable signal
is compared with the fixed set point in the flow indicating controller.
The output of the flow controller operates the flow control valve (FCV941) on the minimum recirculation line.
Refer closed loop logic diagram: 1104-02-2820-9
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
48

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------9) Hot Well LEVEL CONTROL (LCV-907): This control loop is used
to control the LP HEATER level. The level transmitter (LT-907A, LT907B and LT-907C senses the hot well tank level. These signals from
three level transmitters are given to a 2 out of 3 logic block. This
block output is given to process variable to level controller LIC907.The process variable signal is compared with the operator feed
manual set point in the controller.
When the hot well level comes above the set point, controller will
open LCV-907 to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-10
10) CONDENSATE FROM EXPORT CONTROL VALVE TO COMMON
SURGE TANK (LCV-908): This control loop is used to control the
Common surge tank level. Two numbers of level transmitters (LT-908
& LT-909) senses the Deaerator tank level. The signals from two level
transmitters are given to a 1 out of 2 logic block. The 1 out of 2 output
is given as process variable to level controller. The process variable
signal is compared with the operator feed manual set point in the
controller. When the surge tank level comes below the set point,
controller will open LCV-908 to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-11
11) COMMON SURGE TANK TO HOT WELL (LCV-907A): This
control loop is used to control the hot well level. The level transmitter
(LT-907A, LT-907B, and LT-907C (2 OUT OF 3 LOGIC)) senses the
hot well level is given as process variable to level controller. The
process variable signal is compared with the operator feed manual set
point in the controller. When the surge tank level comes above the set
point, controller will open LCV-907A to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-12
12) CONDENSATE TO LP HEATER-2 (LCV-904): This control loop is
used to control the level in LP HEATER-2. The level transmitter (LT903) senses the LP HEATER-2 level is given as process variable to level
controller. The process variable signal is compared with the operator
feed manual set point in the controller. When the LP HEATER-2 level
comes above the set point, controller will open LCV-904 to maintain
the level.
Refer closed loop logic diagram: 1104-02-2820-13
13) LP HEATER-1 LEVEL CONTROL (LCV-904A): This control loop
is used to control the LP HEATER-1 level. The level transmitter (LT904) senses the LP HEATER-1 level is given as process variable to level
controller. The process variable signal is compared with the operator
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
49

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------feed manual set point in the controller. When the LP HEATER-1 level
comes above the set point, controller will open LCV-904A to maintain
the level.
Refer closed loop logic diagram: 1104-02-2820-14
14) LP HEATER-3 DRAIN TO LP HEATER-2 CONTROL (LCV-902):
This control loop is used to control the LP HEATER-3 level. The level
transmitter (LT-902) senses the LP HEATER-3 level is given as process
variable to level controller. The process variable signal is compared
with the operator feed manual set point in the controller. When the LP
HEATER-3 level comes above the set point, controller will open LCV902 to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-15
15) LP HEATER-3 TO HOT WELL CONTROL (LCV-902A): This
control loop is used to control the LP HEATER-3 level. The level
transmitter (LT-902) senses the LP HEATER-3 level is given as process
variable to level controller. The process variable signal is compared
with the operator feed manual set point in the controller. When the LP
HEATER-3 level comes above the set point, controller will open LCV902A to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-16
16) LP HEATER-2 DRAIN TO LP HEATER-1 CONTROL (LCV-903):
This control loop is used to control the LP HEATER-2 level. The level
transmitter (LT-903) senses the LP HEATER-2 level is given as process
variable to level controller. The process variable signal is compared
with the operator feed manual set point in the controller. When the LP
HEATER-2 level comes above the set point, controller will open LCV903 to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-17
17) LP HEATER-2 TO LP HOT WELL CONTROL (LCV-903A): This
control loop is used to control the LP HEATER-2 level. The level
transmitter (LT-903) senses the LP HEATER-2 level is given as process
variable to level controller. The process variable signal is compared
with the operator feed manual set point in the controller. When the LP
HEATER-2 level comes above the set point, controller will open LCV903A to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-18
18) HP HEATER-2 DRAIN TO LP HP HEATER-1 CONTROL (LCV905A): This control loop is used to control the HP HEATER-2 level. The
level transmitter (LT-905) senses the HP HEATER-2 level is given as
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
50

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------process variable to level controller. The process variable signal is
compared with the operator feed manual set point in the controller.
When the HP HEATER-2 level comes above the set point, controller will
open LCV-905A to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-19
19) HP HEATER-2 TO LP HP FLASH TANK CONTROL (LCV-905B):
This control loop is used to control the HP HEATER-2 level. The level
transmitter (LT-905) senses the HP HEATER-2 level is given as process
variable to level controller. The process variable signal is compared
with the operator feed manual set point in the controller. When the HP
HEATER-2 level comes above the set point, controller will open LCV905B to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-20
20) HP HEATER-1 DRAIN TO DEAERATOR CONTROL (LCV-906):
This control loop is used to control the HP HEATER-1 level. The level
transmitter (LT-906) senses the HP HEATER-1 level is given as process
variable to level controller. The process variable signal is compared
with the operator feed manual set point in the controller. When the HP
HEATER-1 level comes above the set point, controller will open LCV906 to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-21
21) HP HEATER-1 DRAIN TO HP FLASH TANK CONTROL (LCV906A): This control loop is used to control the HP HEATER-1 level. The
level transmitter (LT-906) senses the HP HEATER-1 level is given as
process variable to level controller. The process variable signal is
compared with the operator feed manual set point in the controller.
When the HP HEATER-1 level comes above the set point, controller will
open LCV-906A to maintain the level.
Refer closed loop logic diagram: 1104-02-2820-22
22) LUBE OIL OVER PRESSURE CONTROL (PRV-910):
This control loop is used to control LUBE OIL OVER PRESSURE. This
pressure transmitter (PT-128) Senses LUBE OIL HEADER PRESSURE
and consider as a process variable to pressure controller. The process
variable signal is compared with the operated feed manual set point in
the controller. When the LUBE OIL HEADER PRESSURE comes above
the set point, controller will open PRV-910 to maintain the pressure.
Refer Closed Loop Logic Diagram: 1104-02-2820-23

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


51

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------Turbine Trips from DCS to ETS:
All turbine trips are derived in ETS logics some important
trips related to process derived in DCS and turbine trip
command shall issued to ETS PLC to trip turbine, the
conditions are:
1.
2.
3.
4.

LP HEATER-1 LEVEL HI HI(LT-904)-95%


METAL TEMPERATURE OF BEARING-1(TE-114A)-100DEG.
METAL TEMPERATURE OF BEARING-1(TE-114B)-100DEG.
WORKING PAD TEMPERATURE OF TRUST BEARING (TE100)-100DEG.
5. WORKING PAD TEMPERATURE OF TRUST BEARING (TE101)-100DEG.
6. WORKING PAD TEMPERATURE OF TRUST BEARING (TE102)-100DEG.
7. WORKING PAD TEMPERATURE OF TRUST BEARING (TE103)-100DEG.
8. WORKING PAD TEMPERATURE OF TRUST BEARING (TE104)-100DEG.
9. WORKING PAD TEMPERATURE OF TRUST BEARING (TE105)-100DEG.
10. WORKING PAD TEMPERATURE OF TRUST BEARING (TE106)-100DEG.
11. WORKING PAD TEMPERATURE OF TRUST BEARING (TE107)-100DEG.
12. WORKING PAD TEMPERATURE OF TRUST BEARING (TE108)-100DEG.
13. WORKING PAD TEMPERATURE OF TRUST BEARING (TE109)-100DEG.
14. RETURN OIL TEMPERATURE OF LOCATING PAD (TE-110)100DEG.
15. METAL TEMPERATURE OF BEARING-2(TE-115)-100DEG.
16. WORKING PAD TEMPERATURE OF TRUST BEARING (TE112)-100DEG.
17. WORKING PAD TEMPERATURE OF TRUST BEARING (TE113)-100DEG.
18. METAL TEMPERATURE OF BEARING-3(TE-116A)-100DEG.
19. METAL TEMPERATURE OF BEARING-3(TE-116B)-100DEG.
20. EGERGENCY PUSH BUTTON 1&2 OPERATED FROM
CONSOLE.
21. TURBINE INLET TEMPERATURE HIGH.
22. TURBINE INLET PRESSURE HIGH.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


52

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

TURBINE ALARMS (SOE) in DCS:


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

EH OIL PRESSURE LOW.


LUBE OIL PRESSURE LOW.
VACUUM LOW.
TRUST POSITION TRIP.
TSI OVER SPEED.
BEARING VIBRATION TRIP.
SHAFT VIBRATION TRIP.
GENERATOR FAULT TRIP.
HP EXHAUST STEAM TEMPERATURE HIGH.
MANAUL TRIP.
ON LINE TEST.
DEH POWER LOST.
DIFFRENTIAL EXPANSION TRIP.
MFT TRIP.
ASP-1.
ASP-2
OPC DISABLE.
DEH OVER SPEED.
ETS TURBINE TRIPPED-1.
ETS TURBINE TRIPPED-2.
ETS TURBINE TRIPPED-3.
ETS TURBINE TRIPPED-4.
ETS TURBINE TRIPPED-5.
ETS TURBINE TRIPPED-6.
ETS TURBINE TRIPPED-7.
ETS TURBINE TRIPPED-8.
220 VDC-A ALARM FROM ETS.
220 VAC-A ALARM FROM ETS.
220 VAC-B ALARM FROM ETS.
24V DC-A ALARM FROM ETS.
24V DC-B ALARM FROM ETS.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


53

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

OPEN LOOPS:
1. QCNRV TO COLD RE HEATER TO HEADER: This QCNRV
shall be open or close manually from DCS.
2. QCNRV TO HP HEATER-2: This QCNRV shall be open or
close manually from DCS.
3. QCNRV TO HP HEATER-1: This QCNRV shall be open or
close manually from DCS.
4. QCNRV TO HP HEATER-2: This QCNRV shall be open or
close manually from DCS.
5. QCNRV TO DEAERATOR: This QCNRV shall be open or
close manually from DCS.
6. QCNRV TO LP HEATER-3: This QCNRV shall be open or
close manually from DCS.
7. QCNRV TO LP HEATER-2: This QCNRV shall be open or
close manually from DCS.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


54

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

8) PERFORMANCE CALCULATION
Turbine Heat Rate =Q1 (h1-h2) + Q2 (h3-h4)
P
Q1= Main Steam Inlet Flow-TPH
Q2= Reheat Steam Inlet Flow-TPH
h1= Enthalpy of Main Steam Inlet kj/kg
h2= Enthalpy of Feed Water at Inlet of Economizer-kj/kg
h3= Enthalpy of Hot Reheat Inlet-kj/kg
h4= Enthalpy of Cold Reheat Steam-kj/kg
P = Output Power of Generator-KW
Turbine heat rate-in kj/kw hr
For Q1=Flow of Main Steam Flow Nozzle (FE 902 + FE 904)
Q2=Flow of Hot Reheat Steam Flow Nozzle (FE 906 + FE
908)
h1=Main Steam Enthalpy Considering Temperature &
Pressure (PT-921, PT-922 & TE-901A, TE-902A)
h2=Feed Water Enthalpy Considering Pressure &
Temperature (PT-973 & TE-973)
h3=Hot Reheat Steam Enthalpy Considering Pressure &
Temperature (PT-905, PT-906 & TE-907, TE-908)
h4=Cold Reheat Steam Enthalpy Considering Pressure &
Temperature (PT-905, PT-906 & TE-905, TE-906)
Specific Steam Consumption = Main Steam Flow / MW.

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


55

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
--------------------------------------------------------------

EMERGENCY TRIP SYSTEM (ETS) and Automatic


Turbine tester:
Turbine tripping has been derived in ETS panel through
independent two PLCs all critical signals are connected to each PLC in
ETS panel to trip Turbine immediately when any abnormal conditions
are happened and further it has been derived for any fault to display in
DCS as SOE inputs and as well as annunciation which provide in ETS
panel.
1.There are three levels of voltages are provided for channel-1 and
channel-2,230V AC,220V DC and 24V DC the healthiness of these
voltages will be monitored on ETS panel.
2. The following signals are connected to ETS panel and then it has
been connected to each PLC from field.
1. EH OIL PRESSURE LOW 63/LP-1
2. EH OIL PRESSURE LOW 63/LP-3

3. LUBE PRESSURE LOW 63/LBO-1


4. LUBE PRESSURE LOW 63/LBO-3
5. VACUUM LOW 63/LV1
6. VACUUM LOW 63/LV3

7. GENERATOR FAULT TRIP12TWO CHANNELS

8. HP EXHAUST STEAM TEMPERATURE HIGH 12TWO CHANNELS


9. ASP-1

10. EH OIL PRESSURE LOW 63/LP-2


11. EH OIL PRESSURE LOW 63/LP-4
12. LUBE PRESSURE LOW 63/-2
13. LUBE PRESSURE LOW 63/-4
14. VACUUM LOW 63/LV2
15. VACUUM LOW 63/LV4

16. ASP-2
THE FOLLOWING SIGNALS WERE DERIVED FROM TSI PANEL.
1. THRUST POSITION TRIP12TWO CHANNELS
2. TSI OVERSPEED TRIP12TWO CHANNELS

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


56

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3. BEARING VIBRATION TRIP12TWO CHANNELS
4. SHAFT VIBRATION TRIP12TWO CHANNELS

5. DIFFERENTIAL EXPENSION TRIP 12TWO CHANNELS

THE FOLLOWING SIGNALS WERE DERIVED FROM DEH PANEL.

1. DEH POWER SUPPLY LOST TRIP 12TWO CHANNELS


2. DEH OVERSPEED TRIP 12TWO CHANNELS

THE FOLLOWING SIGNALS WERE DERIVED FROM MANUAL PANEL


MOUNTED IN ETS PANEL.
1. AST1
2. AST2
3. AST3
4. AST4

5. MANUAL TRIP

THE FOLLOWING SIGNALS ARE DERIVED FROM DCS


1. MANUAL TRIP

NOTE:
NOTE RESET OF TRIPPINGS CAN BE DONE FROM MANUAL PANEL OR
FROM DCS.

FOLLOWING ARE THE ON LINE TEST WHICH CAN BE PREFORMED FROM


ETS PANEL

1. ON LINE TEST-TO TEST THE OPERATION OF SOLENOIDE VALVES


IN ON LINE.

2. LAMP TEST-TO TEST LAMPS GLOWING ON ETS PANEL.

AUTOMATIC TURBINE TESTER


TESTER:
STER:

1. LPTLPT-1(CH(CH-1)OR LPTLPT-2(CH
2(CH-2)2)-EH OIL TEST:-TEST BLOCK OF EH
OIL PRESSURE:DURING NORMAL RUNNING CONDITION ANY

MAIN OIL PUMP(HP1 OR HP2)WILL BE IN RUNNING CONDITION

AND IF THE DISCHARGE PRESSURE IS LOW TURBINE WILL TRIP


WITH REFRENCE OF PRESSURE SWITCHS(LP63-1&LP63-3

CONNECTED TO PLC1 AND LP63-2&LP63-4 CONNECTED TO PLC-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


57

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------2)AND THIS FUNTION CAN BE TESTED DURING ON LINE AT ANY
TIME BY SELECTING TO ON LINE TEST POSITION IN MANAL

PANEL AND THEN PRESS TO CH1 LP TEST OR CH2 LP TEST


FROM MANUAL PANEL, BY DEPRESSING OF CH1 LP

TEST,SOV(LPT20-1)WILL ACTUATE AND WILL GIVE ALARM OF


PRESSURE SWITHCES LP 63-1 AND LP 63-3 INDICATION IN
ANNOUNCIATION PANEL AND IN DCS ALSO AND BY

DEPRESSING OF CH2 LP TEST,SOV(LPT20-2)WILL ACTUATE AND


WILL GIVE ALARM OF PRESSURE SWITHCES LP 63-2 AND LP 634 INDICATION IN ANNOUNCIATION PANEL AND IN DCS ALSO

2. LBOTLBOT-1(CH(CH-1) OR LBOTLBOT-2(CH2(CH-2)2)-TEST BLOCK OF BEARING


BEARING

OIL PRESSURE: DURING NORMAL RUNNING CONDITION ANY


AOP (DURING START UP) AND MOP(DURING TURBINE

RUNNING)WILL BE IN RUNNING CONDITION AND IF THE

DISCHARGE PRESSURE IS LOW TURBINE WILL TRIP WITH


REFRENCE OF PRESSURE SWITCHS(LBO63-1&LBO63-3

CONNECTED TO PLC1 AND LBO63-2&LBO63-4 CONNECTED TO

PLC-2)AND THIS FUNTION CAN BE TESTED DURING ON LINE AT

ANY TIME BY SELECTING TO ON LINE TEST POSITION IN MANAL


PANEL AND THEN PRESS TO CH1 LBO TEST OR CH2 LBO TEST
FROM MANUAL PANEL, BY DEPRESSING OF CH1 LBO

TEST,SOV(LBOT20-1)WILL ACTUATE AND WILL GIVE ALARM OF


PRESSURE SWITHCES LBO 63-1 AND LBO 63-3 INDICATION IN
ANNOUNCIATION PANEL AND IN DCS ALSO AND BY

DEPRESSING OF CH2 LBO TEST,SOV(LBOT20-2)WILL ACTUATE

AND WILL GIVE ALARM OF PRESSURE SWITHCES LBO 63-2 AND


LBO 63-4 INDICATION IN ANNOUNCIATION PANEL AND IN DCS
ALSO

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


58

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------3. LVTLVT-1(CH(CH-1)OR LVTLVT-2(CH2(CH-2)2)-CONDENSER VACUUME TEST:
TEST:
DURING NORMAL RUNNING CONDITION VACCUME WILL BE

NORMAL CONDITION AND IF THE VACUUME IS LOW TURBINE


WILL TRIP WITH REFRENCE OF PRESSURE SWITCHS(LV631&LV63-3 CONNECTED TO PLC1 AND LV63-2&LV63-4

CONNECTED TO PLC-2)AND THIS FUNTION CAN BE TESTED

DURING ON LINE AT ANY TIME BY SELECTING TO ON LINE TEST

POSITION IN MANAL PANEL AND THEN PRESS TO CH1 LBO TEST


OR CH2 LBO TEST FROM MANUAL PANEL, BY DEPRESSING OF
CH1 LV TEST,SOV(LVT20-1)WILL ACTUATE AND WILL GIVE
ALARM OF PRESSURE SWITHCES LV 63-1 AND LV 63-3

INDICATION IN ANNOUNCIATION PANEL AND IN DCS ALSO AND


BY DEPRESSING OF CH2 LV TEST,SOV(LVT20-2)WILL ACTUATE
AND WILL GIVE ALARM OF PRESSURE SWITHCES LV 63-2 AND
LV 63-4 INDICATION IN ANNOUNCIATION PANEL AND IN DCS
ALSO.

4. 20/AST20/AST-1 TRIP SOLENOID VAVLE


VAVLE AND 20/AST20/AST-3 TRIP

SOLENOID VAVLE:
VAVLE:THESE TWO SOVS ARE DERIVED FROM CH-

1 OF PLC IF ANY ABNORMAL IN THE SYSTEM TURBINE WILL

THROUGH THESE SOVS AND SAME CAN BE TESTED DURING

ON LINE AND RESPECTIVE PRESSURE SWITHCHES(AST1&AST3)


WILL GENERATE ALARMS IN ANNOCIATION PANEL AND IN DCS
ALSO.

5. 20/AST20/AST-2 TRIP SOLENOID VAVLE AND 20/AST20/AST-4 TRIP

SOLENOID VAVLE:
VAVLE:THESE TWO SOVS ARE DERIVED FROM CH2 OF PLC IF ANY ABNORMAL IN THE SYSTEM TURBINE WILL

THROUGH THESE SOVS AND SAME CAN BE TESTED DURING

ON LINE AND RESPECTIVE PRESSURE SWITHCHES(AST2&AST4)


-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
59

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------WILL GENERATE ALARMS IN ANNOCIATION PANEL AND IN DCS
ALSO.

6. ALARMS:
ALARMS:

THE FOLLOWING ALARMS ARE PROVIDED ON ETS MANUAL


PANEL.

1. EH OIL PRESSURE LOW 63/LP-1


2. EH OIL PRESSURE LOW 63/LP-3

3. LUBE PRESSURE LOW 63/LBO-1


4. LUBE PRESSURE LOW 63/LBO-3
5. VACUUM LOW 63/LV1
6. VACUUM LOW 63/LV3

7. THRUST POSITION TRIP


8. TSI OVERSPEED TRIP

9. BEARING VIBRATION TRIP


10. SHAFT VIBRATION TRIP

11. GENERATOR FAULT TRIP

12. HP EXHAUST STEAM TEMPERATURE HIGH


13. ASP1

14. MANUAL TRIP


15. ETS TRIPPED

16. EH OIL PRESSURE LOW 63/LP-2


17. EH OIL PRESSURE LOW 63/LP-4

18. LUBE PRESSURE LOW 63/LBO-2


19. LUBE PRESSURE LOW 63/LBO-4
20. VACUUM LOW 63/LV2

21. VACUUM LOW 63/LV4


22. DEH POWER LOST
23. DEH OVERSPEED

24. DIFFERENTIAL EXPENSION TRIP


25. MFT

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


60

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------26. LOW RATIO

27. BEARING TEMPERATURE HIGH TRIP


28. ASP2

29. OPC DISABLE


30. ONLINE TEST

THE FOLLOWING SIGNALS ARE DERIVED FROM ETS TO DCS


1. EH OIL PRESSURE LOW
2. LUBE PRESSURE LOW
3. VACUUM LOW

4. THRUST POSITION TRIP


5. TSI OVERSPEED

6. BEARING VIBRATION TRIP


7. SHAFT VIBRATION TRIP

8. GENERATOR FAULT TRIP

9. HP EXHAUST STEAM TEMPERATURE HIGH


10. ASP1

11. MANUAL TRIP


12. ONLINE TEST

13. DEH POWER LOST


14. DEH OVERSPEED

15. DIFFERENTIAL EXPENSION TRIP


16. MFT

17. LOW RATIO


18. ASP2

19. OPC DISABLE

20. TURBINE TRIPPED-1


21. TURBINE TRIPPED-2
22. TURBINE TRIPPED-3
23. TURBINE TRIPPED-4
24. TURBINE TRIPPED-5
-------------------------------------------------------------TURBINE INTERLOCK WRITE UP
61

GREENESOL POWER SYSTEMS PVT.LIMITED


PROJECT: M/S.MADHUCON-2X135MW
-------------------------------------------------------------25. TURBINE TRIPPED-6
26. TURBINE TRIPPED-7
27. TURBINE TRIPPED-8
28. 220VDC ALARM A
29. 220VAC ALARM A
30. 24VDC ALARM A

31. 220VDC ALARM B


32. 220VAC ALARM B
33. 24VDC ALARM B

-------------------------------------------------------------TURBINE INTERLOCK WRITE UP


62