Question Text:
A person is said to be not employed in the mine
Options:
(1) who works as a manager
(2) who works under appointment by the Manager
(3) who works in any office of the mine
(4) who works as a pump operator in a residential colony belonging to the mine
(5) who works in siding with in premises of the mine
Correction Answer : Option No.(4)
Question Text:
For every mine whrere in more than ______persons are ordinarly employed, the owner. agent or
manager shall consititute a safety committee.
Options:
(1) 100
(2) 300
(3) 500
(4) 1000
(5) 1500
Correction Answer : Option No.(1)
Question Text:
For every mine employing more than ______persons on any day of the preceding calender year
there shall be provided a suitable First Aid Room.
Options:
(1) 100
(2) 150
(3) 200
(4) 250
(5) 500
Correction Answer : Option No.(2)
Question Text:
For every mine employing more than ______persons ordinarily there shall be provided a suitable
shelter.
Options:
(1) 50
(2) 75
(3) 100
(4) 150
(5) 200
Correction Answer : Option No.(1)
Question Text:
For every mine where in ______ or more persons are ordinarily employed, the owner, agent or
manager shall appoint a suitable qualified person as Welfare officer

SMC-Mine Management, Legislation & General Safety


Options:
(1) 150
(2) 200
(3) 500
(4) 600
(5) 700
Correction Answer : Option No.(3)
Question Text:
The floor area of the rest shelter shall not be less than______sq.mts.
Options:
(1) 10
(2) 14
(3) 15
(4) 20
(5) 25
Correction Answer : Option No.(2)
Question Text:
Registers of daily attendance of persons employed in Below ground workings shall be maintained
in
Options:
(1) Form-C
(2) Form-D
(3) Form-E
(4) form-F
(5) Form-B
Correction Answer : Option No.(1)
Question Text:
Persons of ________ years age shall not be deployed as apprehtices or trainees except under
supervision
Options:
(1) 14-16
(2) 16-18
(3) 15-18
(4) 14-18
(5) 18-20
Correction Answer : Option No.(2)
Question Text:
Registers of leave with wages of every employee shall be maintained in
Options:
(1) Form-G&H
(2) Form-C&D
(3) Form-A&B
(4) Form-C&B

SMC-Mine Management, Legislation & General Safety


(5) Form-B&D
Correction Answer : Option No.(1)
Question Text:
Notice of commencement of any mining operation shall be given so as to reach the persons
concerned at least ______ months before commencement of mining operations
Options:
(1) 3
(2) 1
(3) 6
(4) 2
(5) 12
Correction Answer : Option No.(2)
Question Text:
Notice of abondanment shall be given when it is intended to abandon the mine for a period
exceeding ________days
Options:
(1) 10
(2) 20
(3) 30
(4) 60
(5) 40
Correction Answer : Option No.(4)
Question Text:
Notice of accident shall be submitted to the concerned authorities within _________ of any such
occurrence
Options:
(1) 3 days
(2) 15 days
(3) 24 hours
(4) 48 hours
(5) 1 month
Correction Answer : Option No.(3)
Question Text:
Every application for competency examinations shall be accompanied by the following certificates/
documents except
Options:
(1) Certificate of Age
(2) Certificate of Fitness
(3) Character Certificate
(4) Experience Certificate
(5) Domicile Certificate
Correction Answer : Option No.(5)

SMC-Mine Management, Legislation & General Safety


Question Text:
Authorization to act as a Manager of a mine shall have effect for a period not exceeding ______
except with previous consent in writing of CIM
Options:
(1) 60 days
(2) 30 days
(3) 90 days
(4) 1 year
(5) 45 days
Correction Answer : Option No.(2)
Question Text:
Which of one of the following statements is incorrect:
In case of a fatal accident in a mine, the Manager must
Options:
(1) inspect the site of accident
(2) notify to RIM
(3) conduct investigation himself
(4) ensure that the place of accident is not disturbed
(5) get a plan of site of accident prepared
Correction Answer : Option No.(3)
Question Text:
The Electrical Supervisor shall be appointed by
Options:
(1) Manager
(2) CMD of the company
(3) Engineer
(4) Director Personnel of the Company
(5) Central Government
Correction Answer : Option No.(1)
Question Text:
A mine or part there of may be treated as naturally wet if the roadway dust sample
contain_______or more of moisture by weight.
Options:
(1) 10%
(2) 15%
(3) 20%
(4) 5%
(5) 30%
Correction Answer : Option No.(5)
Question Text:
The thickness of ventilation stopping constructed of masonary or brickwork shall be _______cms
in thickness

SMC-Mine Management, Legislation & General Safety


Options:
(1) 20 cm
(2) 15 cm
(3) 25 cm
(4) 10 cm
(5) 18 cm
Correction Answer : Option No.(3)
Question Text:
M.V.T. Rules 1966 shall not apply to the following persons
Options:
(1) Timber man
(2) Coal driller
(3) Track Layers
(4) Mine Managers
(5) Haulage attendents
Correction Answer : Option No.(4)
Question Text:
As per III'rd schedule of V.T. Rules 1966, additional training for entrants to gassy mines shall be
given for _________days
Options:
(1) 3
(2) 2
(3) 1
(4) 0
(5) Not required
Correction Answer : Option No.(1)
Question Text:
As per M.V.T. Rules 1966 every person holding a gast testing certificate shall once in __________
undergo a course of training as detailed in 8th schedule of M V T Rules 1966.
Options:
(1) 5 years
(2) 1 year
(3) 2 years
(4) 3years
(5) 4years
Correction Answer : Option No.(2)
Question Text:
Main Mechanical Ventilator of a mine shall be installed on the surface at a distance of not less
than _____ from the opening of the shaft or inlcine
Options:
(1) 10m
(2) 8m
(3) 7m

SMC-Mine Management, Legislation & General Safety


(4) 5m
(5) 4m
Correction Answer : Option No.(1)
Question Text:
_______ days' prior notice of installation of a booster fan shall be sent to _____
Options:
(1) 15 & RIM
(2) 15 & CIM
(3) 7 & RIM
(4) 7 & CIM
(5) 30 & RIM
Correction Answer : Option No.(3)
Question Text:
Auxiliary fan shall not be installed at a location unless the quantity of air available at that location
is at least ________ the capacity of the auxiliary fan
Options:
(1) double
(2) equal
(3) half
(4) one and half
(5) three-fourth
Correction Answer : Option No.(1)
Question Text:
The following items are not considered as a part of personal protective equipment
Options:
(1) Safety goggles
(2) resuable ear plugs
(3) visible harness
(4) dust respirators
(5) mobile phones
Correction Answer : Option No.(5)
Question Text:
Which of the following statements is true- Auxiliary fan means
Options:
(1) a forcing fan used in belowground
(2) forcing fan used in aboveground
(3) a booster fan used in belowground
(4) a booster fan used in aboveground
(5) a main mechanical ventilator
Correction Answer : Option No.(1)
Question Text:
Which of the following is not an essential requirement of permitted explosives?

SMC-Mine Management, Legislation & General Safety


Options:
(1) Approval by CIM
(2) Notified in official gazettee
(3) Tested by approved laboratory
(4) To be used with an electronic detonator
(5) To be used with detonating fuse
Correction Answer : Option No.(5)
Question Text:
Which one of the following is not a notified disease under the provisions of Mines Act, 1952
Options:
(1) Pneumoconiosis
(2) Silicosis
(3) Asbestosis
(4) Noise Induced Hearing Loss
(5) Tuberculosis
Correction Answer : Option No.(5)
Question Text:
Requirement of practical experience for candidates at any examination for First Class or Second
Class shall not be less than________ and ______ years respectively who does not posess any
degree or diploma in mining engineering
Options:
(1) 4 & 3
(2) 6 & 5
(3) 2 & 1
(4) 5 & 4
(5) 3 & 2
Correction Answer : Option No.(2)
Question Text:
Which of the following activities are not included as a function of Rescue Station
Options:
(1) Imparting initial training in rescue & recovery
(2) Imparting refresher training to rescue trained person
(3) Providing support during rescue & recovery
(4) Carry out functin of resuce room
(5) Imparting vocational training
Correction Answer : Option No.(5)
Question Text:
All unused workings connected to the surface through walkable entrance which is not
permanently closed, shall once atleast in every ________ days be inspected by a competent
person for signs of illicit distillation.
Options:
(1) 45

SMC-Mine Management, Legislation & General Safety


(2) 90
(3) 40
(4) 30
(5) 60
Correction Answer : Option No.(4)
Question Text:
Which one of the following cannot be detected by flame safety lamp?
Options:
(1) CO
(2) CO2
(3) O2
(4) CH4
(5) Black damp
Correction Answer : Option No.(1)
Question Text:
The permissible concentration of air borne respirable dust containing 10% of free silica should be
______mg/m3
Options:
(1) 5
(2) 1.5
(3) 3
(4) 2
(5) 6
Correction Answer : Option No.(2)
Question Text:
Width of strip samples shall not be less than
Options:
(1) 100 mm
(2) 25 mm
(3) 50 mm
(4) 75 mm
(5) 60 mm
Correction Answer : Option No.(1)
Question Text:
Height of extraction in single lift is restricted to 4.8m due to following reasons:
Options:
(1) poor quality and paucity of long props
(2) difficulty in dressing and checking
(3) difficulty in supporting the roof
(4) difficulty in checking accumulation of gas
(5) higher rate of production
Correction Answer : Option No.(5)
Question Text:

SMC-Mine Management, Legislation & General Safety


The auxiliary fan shall be _______ with the switchgear controlling power supply to the in-bye face
equipment
Options:
(1) Independent
(2) Interlocked
(3) dependent
(4) All the Options
(5) None of the Options
Correction Answer : Option No.(2)
Question Text:
The flexible cable for portable apparatus shall be covered with insulating meterial to protect from
Options:
(1) Accidental disconnection
(2) shock
(3) transmission alongwith the apparatus
(4) mechanical injury
(5) short circuit
Correction Answer : Option No.(4)
Question Text:
What minimum %age of installed bolts shall be subjected to the anchorage testing ?
Options:
(1) 1%
(2) 10%
(3) 5%
(4) 7%
(5) 3%
Correction Answer : Option No.(2)
Question Text:
In case of approaching water logged working, the advancing bore holes shall be drilled in such a
way that a distance of _________ always maintained to prevent accidental holing through water
logged working
Options:
(1) 1.5m
(2) 3m
(3) 0.5m
(4) 1.2m
(5) 2.5m
Correction Answer : Option No.(2)
Question Text:
While dealing with a misfired shot the relieving hole shall be drilled in such a way that at no point
shall it be nearer than ______ cm from the misfired hole.
Options:

SMC-Mine Management, Legislation & General Safety


(1) 15
(2) 20
(3) 25
(4) 30
(5) 10
Correction Answer : Option No.(4)
Question Text:
The sheath of the metal-seathed cables shall be of thickness as prescribed in
Options:
(1) DGMS Standards
(2) BIS Standards
(3) Central Electricity Authority
(4) Manual of the manufacturer
(5) Requirement of the mining company
Correction Answer : Option No.(2)
Question Text:
All insulation tester circuit shall be
Options:
(1) FLP
(2) Intrinsically Safe
(3) Both FLP and Intrinsically Safe
(4) None
(5) 30 v
Correction Answer : Option No.(2)
Question Text:
Atmospheric condition behind the isolation stopping except explosion proof stoppings and unit to
seal off agoaf shall be ascertained once at least in every _____ days
Options:
(1) 90
(2) 60
(3) 30
(4) 45
(5) 1 year
Correction Answer : Option No.(3)
Question Text:
Quartz content in respirable airborne dust sample shall be determined by _______
Options:
(1) Area Laboratory
(2) Rescue Station
(3) Central Institute of Mining & Fuel Research
(4) National mineral laboratory
(5) Central Mechanical Engineering Research Institute

SMC-Mine Management, Legislation & General Safety


Correction Answer : Option No.(3)
Question Text:
Which of the the following statement is wrong . The incumbustible dust used for treatment of
coal dust shall
Options:
(1) not contain more than 5% of free silica content
(2) be readily dispersible in air
(3) not cake
(4) be light in colour
(5) be able to absorb moisture
Correction Answer : Option No.(5)
Question Text:
The check board provided near each stone dust barrier shall have the following information
recorded
a) Cross section of the roadway
b) total dust loading of the barrier
c)number of loading shelves
d) _______________________________
which of the following information is not required to be provided on the check board
Options:
(1) date of last removal of stone dust
(2) reference number of of the barrier
(3) date of last inspection by VO
(4) signature of VO
(5) date of supply of stone dust
Correction Answer : Option No.(5)
Question Text:
Which of the following factors do not have any influence in the decision of fixing the danger mark
or withdrawal level due to danger of inundation from sufrface water
Options:
(1) Rate of rise of water level in the river adjacent to the mine
(2) Time taken in reaching withdrawal order to farthest working points of the mine
(3) Time taken for withdrawal of persons to surface
(4) Pumping capacity of the mine
(5) Margin of safety
Correction Answer : Option No.(4)
Question Text:
What shall be the minimum velocity of air current in the Immediate outbye ventilation connection
from the face in 1st degree
Options:
(1) 15m/m
(2) 20m/min
(3) 30m/min
(4) 25m/min

SMC-Mine Management, Legislation & General Safety


(5) 10m/min
Correction Answer : Option No.(3)
Question Text:
What shall be the minimum velocity of air current at 4.5 m from any face on the intake side in 1st
and 2nd degree mines
Options:
(1) 13m/min
(2) 20m/min
(3) 30m/min
(4) 25m/min
(5) 10m/min
Correction Answer : Option No.(3)
Question Text:
Standing order specifying action to be taken for withdrawal of persons in the event of stopage of
main mechanical venilator shall be submitted by ____________ within__________ days of
installation of main mechanical ventilator
Options:
(1) GM, 25 day
(2) agent, 21 days
(3) manager, 30 days
(4) ventilation officer, 30 days
(5) Safety officer, 21 days
Correction Answer : Option No.(3)
Question Text:
A shovel operator is required to undergo theoretical and on the job training of not less
than___________ Days
Options:
(1) 10
(2) 12
(3) 15
(4) 24
(5) 20
Correction Answer : Option No.(4)
Question Text:
A welder/gas cutter is required to undergo theoretical and on the job training of not less
than___________ Days
Options:
(1) 10
(2) 15
(3) 24
(4) 20
(5) 18

SMC-Mine Management, Legislation & General Safety


Correction Answer : Option No.(3)
Question Text:
Air in the return airway of every depillaring district shall be completely analysed once at least
_____ with a view to determine__________
Options:
(1) 45 days & Graham's ratio
(2) 30 days & Graham's ratio
(3) 60 days & Yomeg's ratio
(4) 30 days & Black damp
(5) 45 days & black damp
Correction Answer : Option No.(2)
Question Text:
What should be the permissible limit of respirable airborne dust in mines having 12 hours working
every shift.
Options:
(1) 3 mg/m3
(2) 4.5mg/m3
(3) 6mg/m3
(4) 2 mg/m3
(5) 3.5 mg/m3
Correction Answer : Option No.(2)
Question Text:
During drilling operation, the production of dust may be reduced by __________ , keeping suitable
pressure, keeping the holes clear of cuttings, directing a jet of water to the cutter edge.
Options:
(1) increasing rpm of the drill motor
(2) using sharp bits
(3) increasing the voltage of drill machine
(4) reducing the dia of drill bit
(5) decreasing the r.p.m.
Correction Answer : Option No.(2)
Question Text:
The thickness of concrete dam to be constructed for a head of water of 90 m where the height of
gallery is 4.8 m. and crushing strength of concrete is 42 Kg/cm 2
Options:
(1) 2.75m
(2) 2.81m
(3) 2.5m
(4) 1.8m
(5) 2.0m
Correction Answer : Option No.(2)
Question Text:
What shall the thickness of the retaining wall made by 1st class brick & cement to be constructed

SMC-Mine Management, Legislation & General Safety


to arrest water in a 4.8 m wide gallery and having a head of 20 m. The crushing strenght of 1st
class brick is 17.5 Kg/cm2
Options:
(1) 1.5m
(2) 1.44m
(3) 1.8m
(4) 1.0m
(5) 1.75
Correction Answer : Option No.(3)
Question Text:
What is Effluent Treatment Plant?
Options:
(1) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and pump it into rivers nearby.
(2) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and make it into an effluent
(3) The effulent treatment plant is a plant to treat the water coming from different sources
(4) The effulent treatment plant is a plant to treat the waste materials coming from different areas
of the plant and make it into a cleaner.
(5) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and make it into a cleaner and more environmental fiendly effluent
Correction Answer : Option No.(5)
Question Text:
What is Mine closure plan?
Options:
(1) Involves planning all activities required before, during, and after the operating of a mine to
reclaim land socially and economically.
(2) Involves planning all activities required before operating of a mine to reclaim land.
(3) Involves planning all activities required during and after the operating of a mine to reclaim
land.
(4) Involves planning all activities required after the operating of a mine to reclaim land socially
and economically.
(5) Involves planning of all activities required before, during, and after the operating of a mine.
Correction Answer : Option No.(1)
Question Text:
Safety management plan must be ________ and _________system
Options:
(1) Rule based and reactive
(2) Documented and reactive
(3) Auditable and Docmented
(4) Risk based and Reactive
(5) Auditable and reactive
Correction Answer : Option No.(3)