TABEL XII.

ANALISA HARGA SATUAN (AHS) PEKE

No.

Uraian Jenis pekerjaan

Sat.

Koeff.

XII

PEKERJAAN INSTALASI AIR DAN SANITASI

XII.1

1 M' PIPA PVC MASPION ABU DIAMETER 1"


Pipa PVC maspion abu diameter 1" (AW)
Perlengkapan (35% x harga pipa)
Tukang batu
Kepala tukang batu
Pekerja
Mandor

bt
lot
Oh
Oh
Oh
Oh

0.167
1.000
0.060
0.006
0.036
0.002

bt
lot
Oh
Oh
Oh
Oh

0.167
1.000
0.060
0.006
0.036
0.002

bt
lot
Oh
Oh
Oh
Oh

0.167
1.000
0.060
0.006
0.036
0.002

bh
lot
Oh
Oh
Oh
Oh

1.000
1.000
2.700
0.540
1.800
0.110

bh

1.000

Jumlah
XII.2

1 M' PIPA PVC MASPION ABU DIAMETER 3"


Pipa PVC maspion abu diameter 3" (AW)
Perlengkapan (35% x harga pipa)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Jumlah

XII.3

1 M' PIPA PVC MASPION ABU DIAMETER 4"


Pipa PVC maspion abu diameter 4" (AW)
Perlengkapan (35% x harga pipa)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Jumlah

XII.4

1 BUAH BAK MANDI FIBERGLASS 60 x 60


Bak fiberglass
Perlengkapan (35% x harga pipa)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Jumlah

XII.5

1 BUAH BATHTUBE
Bathtube standard

Perlengkapan (35% x harga pipa)


Tukang batu
Kepala tukang batu
Pekerja
Mandor

lot
Oh
Oh
Oh
Oh

1.000
2.700
0.540
1.800
0.110

bh
lot
Oh
Oh

1.000
1.000
0.040
0.040

bh
lot
Oh
Oh
Oh
Oh

1.000
1.000
1.100
0.010
3.300
0.160

bh
lot
Oh
Oh
Oh
Oh

1.000
1.000
1.100
0.010
3.300
0.160

Jumlah
XII.6

1 BUAH KERAN
Kran stainless lokal kait
Perlengkapan (6% x harga pipa)
Pekerja
Mandor
Jumlah

XII.7

1 KLOSET DUDUK
Kloset duduk warna standard TOTO C 240 lengkap
Perlengkapan (6% x harga pipa)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Jumlah

XII.8

1 KITCHEN ZINK STAINLESS 2 LUBANG


Kitchen zink stainless 2 lubang
Perlengkapan (612% x harga pipa)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Jumlah

XII.9

1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA (KANTOR TYPE KECIL)


Galian tanah
M3
Pasir urug
M3
Lantai kerja t = 10 cm
M2
Pas. Bata 1 PC : 2 PS + plesteran
M2
Plat beton penutup dan balok
M3
Pipa PVC 4" jenis AW + sambungan
M1
Pipa GIP 1 1/2"
btg
Galian tanah untuk rembesan
M3
Pas.ijuk
Kg
Urugan kerikil 3,5 cm
M3
Pipa PVC 4" berlobang jenis AW
M1
Urugan kembali perataan tanah
M3
Pekerja
Oh
Tukang batu
Oh

4.500
0.214
2.250
15.000
0.300
5.400
1.200
3.375
5.400
1.050
9.000
1.125
7.078
3.000

Kepala tukang batu


Mandor

Oh
Oh

0.800
0.500

bh
Oh
Oh

1.000
0.250
0.125

Jumlah
XII.10

1 BUAH POMPA ZET PUMP


Pompa zetpump 250 watt sanyo
Pekerja
Mandor
Jumlah

TABEL XII.1
HARGA SATUAN (AHS) PEKERJAAN INSTALASI AIR
Harga Sat.

Jumlah Harga
Upah

Bahan / Upah / Alat

Bahan

Rp.

Rp.

Rp.

Rp.

Rp30,000.00
Rp10,500.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp153,000.00
Rp53,550.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp5,001.00
-

Rp2,880.00
Rp312.00
Rp1,368.00
Rp108.00

Rp5,001.00

Rp4,668.00

Rp25,505.10
Rp25,505.10

Rp235,000.00
Rp82,250.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp39,174.50
Rp39,174.50

Rp95,000.00
Rp33,250.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp95,000.00
Rp95,000.00

Rp2,745,000.00

Rp2,745,000.00

Rp2,880.00
Rp312.00
Rp1,368.00
Rp108.00
Rp4,668.00
Rp2,880.00
Rp312.00
Rp1,368.00
Rp108.00
Rp4,668.00
Rp129,600.00
Rp28,080.00
Rp68,400.00
Rp6,600.00
Rp232,680.00
-

Alat

Rp10,500.00
Rp10,500.00
Rp53,550.00
Rp53,550.00
Rp82,250.00
Rp82,250.00
Rp33,250.00
Rp33,250.00
-

Rp960,750.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp22,000.00
Rp1,320.00
Rp38,000.00
Rp60,000.00

Rp129,600.00
Rp28,080.00
Rp68,400.00
Rp6,600.00

Rp2,745,000.00

Rp232,680.00

Rp22,000.00
Rp22,000.00

Rp2,050,000.00
Rp123,000.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp2,050,000.00
Rp2,050,000.00

Rp425,000.00
Rp51,000.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00

Rp425,000.00
Rp425,000.00

Rp1,520.00
Rp2,400.00
Rp3,920.00
Rp52,800.00
Rp520.00
Rp125,400.00
Rp9,600.00
Rp188,320.00
Rp52,800.00
Rp520.00
Rp125,400.00
Rp9,600.00
Rp188,320.00

Rp960,750.00
Rp960,750.00
Rp1,320.00
Rp1,320.00
Rp123,000.00
Rp123,000.00
Rp51,000.00
Rp51,000.00

PE KECIL)
Rp36,900.00
Rp50,000.00
Rp57,084.53
Rp71,656.00
Rp8,591,412.59
Rp40,000.00
Rp294,000.00
Rp36,900.00
Rp7,000.00
Rp36,500.00
Rp58,750.00
Rp9,998.00
Rp38,000.00
Rp48,000.00

Rp166,050.00
Rp10,710.00
Rp128,440.19
Rp1,074,840.00
Rp2,577,423.78
Rp216,000.00
Rp352,800.00
Rp124,537.50
Rp37,800.00
Rp38,325.00
Rp528,750.00
Rp11,247.75
-

Rp268,957.03
Rp144,000.00

Rp52,000.00
Rp60,000.00

Rp5,266,924.22

Rp4,850,000.00
Rp38,000.00
Rp60,000.00

Rp4,850,000.00
Rp4,850,000.00

Rp41,600.00
Rp30,000.00

Rp484,557.03
Rp9,500.00
Rp7,500.00
Rp17,000.00

Rp0.00
Rp0.00

LASI AIR

Jumlah Harga
Bahan + Upah
Rp.
9

Rp20,169.00

Rp83,723.10

Rp126,092.50

Rp360,930.00

Rp3,938,430.00

Rp27,240.00

Rp2,361,320.00

Rp664,320.00

Rp5,751,481.25

Rp4,867,000.00

TABEL XII.2
RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI

NO

URAIAN PEKERJAAN

1
2
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1

Pipa PVC 1''

L.2

Pipa PVC 3''

L.3

Pipa PVC 4"

L.4

Bak

L.5

Bathtub

L.6

Keran

L.7

Kloset Duduk

L.8

Kitchen zink stainless 2 lobang

L.9

Septictank

L.10

Pompa Zet Pump

VOL

SAT

13
7
9
2
2
6
2
1
1
1

m'
m'
m'
bh
bh
bh
bh
bh
unit
unit

HARGA SAT
BAHAN
5

JUMLAH HARGA
Biaya Bahan Bid Price
6

Rp5,001
Rp25,505
Rp39,175
Rp95,000
Rp2,745,000
Rp22,000
Rp2,050,000
Rp425,000
Rp5,266,924
Rp4,850,000

Jumlah

Rp65,013.00
Rp178,535.70
Rp352,570.50
Rp190,000.00
Rp5,490,000.00
Rp132,000.00
Rp4,100,000.00
Rp425,000.00
Rp5,266,924.22
Rp4,850,000.00
Rp21,050,043

RAB UPAH PEKERJAAN INSTALASI AIR DAN SANITASI

NO

URAIAN PEKERJAAN

VOL

SAT

HARGA SAT

JUMLAH HARGA

NO

URAIAN PEKERJAAN

1
L. PEKERJAAN PENGECATAN
L.1

Pipa PVC 1''

L.2

Pipa PVC 3''

L.3

Pipa PVC 4"

L.4

Bak

L.5

Bathtub

L.6

Keran

L.7

Kloset Duduk

L.8

Kitchen zink stainless 2 lobang

L.9

Septictank

L.10

Pompa Zet Pump

Jumlah

VOL

SAT

13
7
9
2
2
6
2
1
1
1

m'
m'
m'
bh
bh
bh
bh
bh
unit
unit

UPAH
5
Rp4,668
Rp4,668
Rp4,668
Rp232,680
Rp232,680
Rp3,920
Rp188,320
Rp188,320
Rp484,557
Rp17,000

Biaya Upah Bid Price


6
Rp60,684.00
Rp32,676.00
Rp42,012.00
Rp465,360.00
Rp465,360.00
Rp23,520.00
Rp376,640.00
Rp188,320.00
Rp484,557.03
Rp17,000.00
Rp2,156,129

TABEL XII.2

KERJAAN INSTALASI AIR DAN SANITASI

JUMLAH HARGA
Biaya Bahan Pelaksanaan
7
Rp65,013.00
Rp178,535.70
Rp352,570.50
Rp190,000.00
Rp5,490,000.00
Rp132,000.00
Rp4,100,000.00
Rp425,000.00
Rp5,266,924.22
Rp4,850,000.00
Rp21,050,043

KERJAAN INSTALASI AIR DAN SANITASI

JUMLAH HARGA

Biaya Upah Pelaksanaan


7
Rp54,615.60
Rp29,408.40
Rp37,810.80
Rp418,824.00
Rp418,824.00
Rp21,168.00
Rp338,976.00
Rp169,488.00
Rp436,101.33
Rp15,300.00
Rp1,940,516

TABEL XII.3
KEBUTUHAN TENAGA KERJA

No.

Uraian Jenis pekerjaan

Sat.

Tukang batu

Oh

0.0600

0.0540

Kepala tukang batu

Oh

0.0060

0.0054

Pekerja

Oh

0.0360

0.0324

Mandor

Oh

0.0018

0.0016

XII
XII.1

Koeff. (Awal) Koeff. (Akhir)

PEKERJAAN INSTALASI AIR DAN SANITASI


Pipa PVC 1''

Jumlah
XII.2

Pipa PVC 3''


Tukang batu

Oh

0.0600

0.0540

Kepala tukang batu

Oh

0.0060

0.0054

Pekerja

Oh

0.0360

0.0324

Mandor

Oh

0.0018

0.0016

Jumlah
XII.3

Pipa PVC 4"


Tukang batu

Oh

0.0600

0.0540

Kepala tukang batu

Oh

0.0060

0.0054

Pekerja

Oh

0.0360

0.0324

Mandor

Oh

0.0018

0.0016

Jumlah
XII.4

Bak
Tukang batu

Oh

2.7000

2.4300

Kepala tukang batu

Oh

0.5400

0.4860

Pekerja

Oh

1.8000

1.6200

Mandor

Oh

0.1100

0.0990

Jumlah
XII.5

Bathtub
Tukang batu

Oh

2.7000

2.4300

Kepala tukang batu

Oh

0.5400

0.4860

Pekerja

Oh

1.8000

1.6200

Mandor

Oh

0.1100

0.0990

Jumlah

XII.6

Keran
Pekerja

Oh

0.0400

0.0360

Mandor

Oh

0.0400

0.0360

Jumlah
XII.7

Kloset Duduk
Tukang batu

Oh

1.1000

0.9900

Kepala tukang batu

Oh

0.0100

0.0090

Pekerja

Oh

3.3000

2.9700

Mandor

Oh

0.1600

0.1440

Jumlah
XII.8

Kitchen zink stainless 2 lobang


Tukang batu

Oh

1.1000

0.9900

Kepala tukang batu

Oh

0.0100

0.0090

Pekerja

Oh

3.3000

2.9700

Mandor

Oh

0.1600

0.1440

Jumlah
XII.9

Septictank
Pekerja

Oh

7.078

6.3700

Tukang batu

Oh

3.000

2.7000

Kepala tukang batu

Oh

0.800

0.7200

Mandor

Oh

0.500

0.4500

Jumlah
XII.10

Pompa Zet Pump


Pekerja

Oh

0.2500

0.2250

Mandor

Oh

0.1250

0.1125

Jumlah

TABEL XII.3

BUTUHAN TENAGA KERJA

Volume

Sat

Kebutuhan Tenaga Kerja

8=5x6

13.000

m'

0.702

13.000

m'

0.070

13.000

m'

0.421

13.000

m'

0.021

Jumlah

1.214
7.000

m'

0.378

7.000

m'

0.038

7.000

m'

0.227

7.000

m'

0.011

Jumlah

0.654
9.000

m'

0.486

9.000

m'

0.049

9.000

m'

0.292

9.000

m'

0.015

Jumlah

0.841
2.000

bh

4.860

2.000

bh

0.972

2.000

bh

3.240

2.000

bh

0.198

Jumlah

Jumlah

9.270
2.000

bh

4.860

2.000

bh

0.972

2.000

bh

3.240

2.000

bh

0.198
9.270

6.000

bh

0.216

6.000

bh

0.216

Jumlah

0.432
2.000

bh

1.980

2.000

bh

0.018

2.000

bh

5.940

2.000

bh

0.288

Jumlah

8.226
1.000

bh

0.990

1.000

bh

0.009

1.000

bh

2.970

1.000

bh

0.144

Jumlah

4.113
1.000

unit

6.370

1.000

unit

2.700

1.000

unit

0.720

1.000

unit

0.450

Jumlah

Jumlah

10.240
1.000

unit

0.225

1.000

unit

0.113
0.338

TABEL XII.4
ANALISIS PRODUKTIVITAS KERJA

No.

Uraian Pekerja

Sat

Kebutuhan
Tenaga Kerja

Upah
5

Biaya Upah

Durasi
(Hari)

6=4x5

1
2
3
XII. PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu
Oh
Kepala tukang batu
Oh
Pekerja
Oh
Mandor
Oh

0.702
0.070
0.421
0.021

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp33,696
Rp3,650
Rp16,006
Rp1,264
Rp54,616

XII. 2 Pipa PVC 3''


Tukang batu
Kepala tukang batu
Pekerja
Mandor

Oh
Oh
Oh
Oh

0.378
0.038
0.227
0.011

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp18,144
Rp1,966
Rp8,618
Rp680
Rp29,408

XII.3 Pipa PVC 4"


Tukang batu
Kepala tukang batu
Pekerja
Mandor

Oh
Oh
Oh
Oh

0.486
0.049
0.292
0.015

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp23,328
Rp2,527
Rp11,081
Rp875
Rp37,811

XII.4 Bak

Harga Satuan

Tukang batu
Kepala tukang batu
Pekerja
Mandor

Oh
Oh
Oh
Oh

4.860
0.972
3.240
0.198

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp233,280
Rp50,544
Rp123,120
Rp11,880
Rp418,824

XII. 5 Bathtub
Tukang batu
Kepala tukang batu
Pekerja
Mandor

Oh
Oh
Oh
Oh

4.860
0.972
3.240
0.198

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp233,280
Rp50,544
Rp123,120
Rp11,880
Rp418,824

XII.6 Keran
Pekerja
Mandor

Oh
Oh

0.216
0.216

Rp38,000
Rp60,000
Jumlah

Rp8,208
Rp12,960
Rp21,168

XII.7 Kloset Duduk


Tukang batu
Kepala tukang batu
Pekerja
Mandor

Oh
Oh
Oh
Oh

1.980
0.018
5.940
0.288

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp95,040
Rp936
Rp225,720
Rp17,280
Rp338,976

XII. 8 Kitchen zink stainless 2 lobang


Tukang batu
Kepala tukang batu
Pekerja
Mandor

Oh
Oh
Oh
Oh

0.990
0.009
2.970
0.144

Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah

Rp47,520
Rp468
Rp112,860
Rp8,640
Rp169,488

XII.9 Septictank
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Oh
Oh
Oh
Oh

6.370
2.700
0.720
0.450

Rp38,000
Rp48,000
Rp52,000
Rp60,000
Jumlah

Rp242,061
Rp129,600
Rp37,440
Rp27,000
Rp436,101

XII.10 Pompa Zet Pump


Pekerja
Mandor

Oh
Oh

0.225
0.113

Rp38,000
Rp60,000
Jumlah

Rp8,550
Rp6,750
Rp15,300

TABEL XII.4

ANALISIS PRODUKTIVITAS KERJA


Volume
Pekerjaan

Sat

13

m'

m'

m'

Kebutuhan Tenaga Kerja


(Per Hari)
10 = 4 7

0.351
0.035
0.211
0.011

0.189
0.019
0.113
0.006

0.243
0.024
0.146
0.007

Produktivitas Kerja
(Per Hari)
11 = 8 10

Sat

6.500

m'

3.500

m'

4.500

m'

12

bh

bh

bh

bh

bh

2.430
0.486
1.620
0.099

1.620
0.324
1.080
0.066

0.216
0.216

0.990
0.009
2.970
0.144

0.990
0.009
2.970
0.144

1.000

bh

0.667

bh

6.000

bh

1.000

bh

1.000

bh

1.000

unit

unit

3.185
1.350
0.360
0.225

0.225
0.113

0.500

unit

1.000

unit

TABEL XII.5

ANALISIS BAHAN DAN K

No.

Uraian Jenis pekerjaan

Sat.

Koeff.

Volume

bt

0.1667

13.00

bt

0.1667

7.00

bt

0.1667

9.00

bh

1.0000

2.00

XII
XII.1

PEKERJAAN INSTALASI AIR DAN SANITASI


Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW)

XII.2

Pipa PVC 3''


Pipa PVC maspion abu diameter 3" (AW)

XII.3

Pipa PVC 4"


Pipa PVC maspion abu diameter 4" (AW)

XII.4

Bak
Bak fiberglass

XII.5

Bathtub

Bathtube standard
XII.6

bh

1.0000

2.00

bh

1.0000

6.00

bh

1.0000

2.00

bh

1.0000

1.00

Galian tanah

M3

4.5000

1.00

Pasir urug

M3

0.2142

1.00

Lantai kerja t = 10 cm

M2

2.2500

1.00

Pas. Bata 1 PC : 2 PS + plesteran

M2

15.0000

1.00

Plat beton penutup dan balok

M3

0.3000

1.00

Pipa PVC 4" jenis AW + sambungan

M1

5.4000

1.00

Pipa GIP 1 1/2"

btg

1.2000

1.00

Galian tanah untuk rembesan

M3

3.3750

1.00

Pas.ijuk

Kg

5.4000

1.00

Keran
Kran stainless lokal kait

XII.7

Kloset Duduk
Kloset duduk warna standard TOTO C 240 lengkap

XII.8

Kitchen zink stainless 2 lobang


Kitchen zink stainless 2 lubang

XII.9

Septictank

XII.10

Urugan kerikil 3,5 cm

M3

1.0500

1.00

Pipa PVC 4" berlobang jenis AW

M1

9.0000

1.00

Urugan kembali perataan tanah

M3

1.1250

1.00

bh

1.0000

1.00

Pompa Zet Pump


Pompa zetpump 250 watt sanyo

TABEL XII.5
ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Sat

Kebutuhan Bahan

Sat

Harga
Satuan
Bahan

RAB Bahan

Durasi
(Hari)

Kebutuhan
Bahan/Hari

Sat

7=5x4

10

11

12

m'

2.167

bt

Rp30,000

1.084

bt

0.583

bt

0.750

bt

0.667

bh

Jumlah
m'

1.167

bt

Rp153,000
Jumlah

m'

1.500

bt

Rp235,000
Jumlah

bh

2.000

bh

Rp95,000
Jumlah

Rp65,013
Rp65,013
Rp178,536
Rp178,536
Rp352,571
Rp352,571
Rp190,000
Rp190,000

bh

2.000

bh

Rp2,745,000
Jumlah

bh

6.000

bh

Rp22,000
Jumlah

bh

2.000

bh

Rp2,050,000
Jumlah

bh

1.000

bh

Rp425,000
Jumlah

Rp5,490,000
Rp5,490,000
Rp132,000
Rp132,000
Rp4,100,000
Rp4,100,000
Rp425,000
Rp425,000

0.667

bh

6.000

bh

1.000

bh

1.000

bh

unit

4.500

M3

Rp36,900

Rp166,050

2.250

M3

unit

0.214

M3

Rp50,000

Rp10,710

0.107

M3

unit

2.250

M2

Rp57,085

Rp128,440

1.125

M2

unit

15.000

M2

Rp71,656

Rp1,074,840

7.500

M2

unit

0.300

M3

Rp8,591,413

Rp2,577,424

0.150

M3

unit

5.400

M1

Rp40,000

Rp216,000

2.700

M1

unit

1.200

btg

Rp294,000

Rp352,800

0.600

btg

unit

3.375

M3

Rp36,900

Rp124,538

1.688

M3

unit

5.400

Kg

Rp7,000

Rp37,800

2.700

Kg

unit

1.050

M3

Rp36,500

Rp38,325

0.525

M3

unit

9.000

M1

Rp58,750

Rp528,750

4.500

M1

unit

1.125

M3

Rp9,998

Rp11,248

0.563

M3

1.000

unit

Jumlah
bh

1.000

unit

Rp4,850,000
Jumlah

Rp5,266,924
Rp4,850,000
Rp4,850,000

Produktivitas/
Hari

Sat

13

14

6.50

m'

3.50

m'

4.50

m'

0.67

bh

0.67

bh

6.00

bh

1.00

bh

1.00

bh

0.50

unit

0.50

unit

1.00

unit

TABEL XII.6
REKAPITULASI
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR

No.
1
2
3
4

Jenis Pekerja
Pekerja
Tukang batu
Kepala tukang batu
Mandor

Sat

Jumlah Pekerja

Sat

Oh
Oh
Oh
Oh

23.141
16.956
2.848
1.653

Oh
Oh
Oh
Oh

Harga Satuan
Upah
Rp38,000
Rp48,000
Rp52,000
Rp60,000

Jumlah

REKAPITULASI BAHAN PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR

No.
1
2
3
4
5
6
7
8
9
10
11

Jenis Bahan
Pipa PVC maspion abu diameter 1" (AW)
Pipa PVC maspion abu diameter 3" (AW)
Pipa PVC maspion abu diameter 4" (AW)
Bak fiberglass
Bathtube standard
Kran stainless lokal kait
Kloset duduk warna standard TOTO C 240 lengkap
Kitchen zink stainless 2 lubang
Galian tanah
Pasir urug
Lantai kerja t = 10 cm

Sat

Jumlah Bahan

Sat

bt
bt
bt
bh
bh
bh
bh
bh
M3
M3
M2

2.167
1.167
1.500
2.000
2.000
6.000
2.000
1.000
4.500
0.214
2.250

bt
bt
bt
bh
bh
bh
bh
bh
M3
M3
M2

Harga Satuan
Bahan
Rp30,000
Rp153,000
Rp235,000
Rp95,000
Rp2,745,000
Rp22,000
Rp2,050,000
Rp425,000
Rp36,900
Rp50,000
Rp57,085

12
13
14
15
16
17
18
19
20
21

Pas. Bata 1 PC : 2 PS + plesteran


Plat beton penutup dan balok
Pipa PVC 4" jenis AW + sambungan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas.ijuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Pompa zetpump 250 watt sanyo

M2
M3
M1
btg
M3
Kg
M3
M1
M3
bh
Jumlah

15.000
0.300
5.400
1.200
3.375
5.400
1.050
9.000
1.125
1.000

M2
M3
M1
btg
M3
Kg
M3
M1
M3
bh

Rp71,656
Rp8,591,413
Rp40,000
Rp294,000
Rp36,900
Rp7,000
Rp36,500
Rp58,750
Rp9,998
Rp4,850,000

DAN AIR KOTOR

RAB Upah
Rp879,344
Rp813,888
Rp148,075
Rp99,209
Rp1,940,516

Biaya
Upah/Hari

Jumlah
Pekerja/Hari
2.571
1.884
0.316
0.184
Jumlah

Rp97,705
Rp90,432
Rp16,453
Rp11,023
Rp215,613

Jumlah
Bahan/Hari
0.241
0.130
0.167
0.222
0.222
0.667
0.222
0.111
0.500
0.024
0.250

Biaya
Bahan/Hari
Rp7,224
Rp19,837
Rp39,175
Rp21,111
Rp610,000
Rp14,667
Rp455,556
Rp47,222
Rp18,450
Rp1,190
Rp14,271

R KOTOR

RAB Bahan
Rp65,013
Rp178,536
Rp352,571
Rp190,000
Rp5,490,000
Rp132,000
Rp4,100,000
Rp425,000
Rp166,050
Rp10,710
Rp128,440

Rp1,074,840
Rp2,577,424
Rp216,000
Rp352,800
Rp124,538
Rp37,800
Rp38,325
Rp528,750
Rp11,248
Rp4,850,000
Rp21,050,043

1.667
0.033
0.600
0.133
0.375
0.600
0.117
1.000
0.125
0.111
Jumlah

Rp119,427
Rp286,380
Rp24,000
Rp39,200
Rp13,838
Rp4,200
Rp4,258
Rp58,750
Rp1,250
Rp538,889
Rp2,338,894

RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI

NO

URAIAN PEKERJAAN

1
2
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1

Pipa PVC 1''

L.2

Pipa PVC 3''

L.3

Pipa PVC 4"

L.4

Bak

L.5

Bathtub

L.6

Keran

L.7

Kloset Duduk

L.8

Kitchen zink stainless 2 lobang

L.9

Septictank

L.10

Pompa Zet Pump

VOL

SAT

47
47
60
3
2
6
4
1
1
1

m'
m'
m'
bh
bh
bh
bh
bh
unit
unit

HARGA SAT
BAHAN
5

JUMLAH HARGA
Biaya Bahan Bid Price
6

Rp5,001
Rp25,505
Rp39,175
Rp95,000
Rp2,745,000
Rp22,000
Rp2,050,000
Rp425,000
Rp5,266,924
Rp4,850,000

Rp235,047.00
Rp1,198,739.70
Rp2,350,470.00
Rp285,000.00
Rp5,490,000.00
Rp132,000.00
Rp8,200,000.00
Rp425,000.00
Rp5,266,924.22
Rp4,850,000.00
Rp28,433,181

Jumlah
RAB UPAH PEKERJAAN INSTALASI AIR DAN SANITASI

NO
1
L. PEKERJAAN PENGECATAN
L.1

Pipa PVC 1''

L.2

Pipa PVC 3''

L.3

Pipa PVC 4"

L.4

Bak

L.5

Bathtub

L.6

Keran

L.7

Kloset Duduk

URAIAN PEKERJAAN

VOL

SAT

47
47
60
3
2
6
4

m'
m'
m'
bh
bh
bh
bh

HARGA SAT
UPAH
5
Rp4,668
Rp4,668
Rp4,668
Rp232,680
Rp232,680
Rp3,920
Rp188,320

JUMLAH HARGA
Biaya Upah Bid Price
6
Rp219,396.00
Rp219,396.00
Rp280,080.00
Rp698,040.00
Rp465,360.00
Rp23,520.00
Rp753,280.00

L.8

Kitchen zink stainless 2 lobang

L.9

Septictank

L.10

Pompa Zet Pump

1
1
1

bh
unit
unit

Rp188,320
Rp484,557
Rp17,000

Jumlah

Rp188,320.00
Rp484,557.03
Rp17,000.00
Rp3,348,949

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
No.

Jenis Pekerja

Sat Jumlah Pekerja

Sat

Pekerja

Oh

34.751

Oh

Rp38,000

Tukang batu

Oh

28.116

Oh

Rp48,000

Kepala tukang batu

Oh

4.027

Oh

Rp52,000

Mandor

Oh

2.243

Oh

Rp60,000

Harga Satuan Upah

Jumlah
REKAPITULASI BAHAN PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
No.

Jenis Bahan

Sat Jumlah Bahan

Sat

Harga Satuan Bahan

Pipa PVC maspion abu diameter 1" (AW)

bt

7.835

bt

Rp30,000

Pipa PVC maspion abu diameter 3" (AW)

bt

7.835

bt

Rp153,000

Pipa PVC maspion abu diameter 4" (AW)

bt

10.002

bt

Rp235,000

Bak fiberglass

bh

3.000

bh

Rp95,000

Bathtube standard

bh

2.000

bh

Rp2,745,000

Kran stainless lokal kait

bh

6.000

bh

Rp22,000

Kloset duduk warna standard TOTO C 240 lengkap

bh

4.000

bh

Rp2,050,000

Kitchen zink stainless 2 lubang

bh

1.000

bh

Rp425,000

Galian tanah

M3

4.500

M3

Rp36,900

10

Pasir urug

M3

0.214

M3

Rp50,000

11

Lantai kerja t = 10 cm

M2

2.250

M2

Rp57,085

12

Pas. Bata 1 PC : 2 PS + plesteran

M2

15.000

M2

Rp71,656

13

Plat beton penutup dan balok

M3

0.300

M3

Rp8,591,413

14

Pipa PVC 4" jenis AW + sambungan

M1

5.400

M1

Rp40,000

15

Pipa GIP 1 1/2"

btg

1.200

btg

Rp294,000

16
17
18
19
20
21

Galian tanah untuk rembesan


Pas.ijuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Pompa zetpump 250 watt sanyo

M3
Kg
M3
M1
M3
bh

3.375
5.400
1.050
9.000
1.125
1.000

M3
Kg
M3
M1
M3
bh

Rp36,900
Rp7,000
Rp36,500
Rp58,750
Rp9,998
Rp4,850,000
Jumlah

LAH HARGA
Biaya Bahan Pelaksanaan
7
Rp235,047.00
Rp1,198,739.70
Rp2,350,470.00
Rp285,000.00
Rp5,490,000.00
Rp132,000.00
Rp8,200,000.00
Rp425,000.00
Rp5,266,924.22
Rp4,850,000.00
Rp28,433,181

LAH HARGA
Biaya Upah Pelaksanaan
7
Rp197,456.40
Rp197,456.40
Rp252,072.00
Rp628,236.00
Rp418,824.00
Rp21,168.00
Rp677,952.00

Rp169,488.00
Rp436,101.33
Rp15,300.00
Rp3,014,054
AIR KOTOR
RAB Upah

Jumlah
Pekerja/
Hari

Biaya
Upah/Hari

Rp1,320,524

4.964

Rp188,646

Rp1,349,568

4.017

Rp192,795

Rp209,383

0.575

Rp29,912

Rp134,579

0.320

Rp19,226

Rp3,014,054

Jumlah

Rp430,579

RAB Bahan

Jumlah
Bahan/H
ari

Biaya
Bahan/Hari

Rp235,047

1.119

Rp33,578

Rp1,198,740

1.119

Rp171,249

Rp2,350,470

1.429

Rp335,781

Rp285,000

0.429

Rp40,714

Rp5,490,000

0.286

Rp784,286

Rp132,000

0.857

Rp18,857

Rp8,200,000

0.571

Rp1,171,429

Rp425,000

0.143

Rp60,714

Rp166,050

0.643

Rp23,721

Rp10,710

0.031

Rp1,530

Rp128,440

0.321

Rp18,349

Rp1,074,840

2.143

Rp153,549

Rp2,577,424

0.043

Rp368,203

OTOR

Rp216,000

0.771

Rp30,857

Rp352,800

0.171

Rp50,400

Rp124,538
Rp37,800
Rp38,325
Rp528,750
Rp11,248
Rp4,850,000

0.482
0.771
0.150
1.286
0.161
0.143

Rp17,791
Rp5,400
Rp5,475
Rp75,536
Rp1,607
Rp692,857

Rp28,433,181

Jumlah

Rp4,061,883

KEBUTUHAN TENAGA KERJA


No.

Uraian Jenis pekerjaan

Sat.

Tukang batu

Oh

0.0600

0.0540

Kepala tukang batu

Oh

0.0060

0.0054

Pekerja

Oh

0.0360

0.0324

Mandor

Oh

0.0018

0.0016

Tukang batu

Oh

0.0600

0.0540

Kepala tukang batu

Oh

0.0060

0.0054

Pekerja

Oh

0.0360

0.0324

Mandor

Oh

0.0018

0.0016

Tukang batu

Oh

0.0600

0.0540

Kepala tukang batu

Oh

0.0060

0.0054

Pekerja

Oh

0.0360

0.0324

Mandor

Oh

0.0018

0.0016

Tukang batu

Oh

2.7000

2.4300

Kepala tukang batu

Oh

0.5400

0.4860

Pekerja

Oh

1.8000

1.6200

Mandor

Oh

0.1100

0.0990

Tukang batu

Oh

2.7000

2.4300

Kepala tukang batu

Oh

0.5400

0.4860

Pekerja

Oh

1.8000

1.6200

Mandor

Oh

0.1100

0.0990

Pekerja

Oh

0.0400

0.0360

Mandor

Oh

0.0400

0.0360

Tukang batu

Oh

1.1000

0.9900

Kepala tukang batu

Oh

0.0100

0.0090

Pekerja

Oh

3.3000

2.9700

XII
XII.1

Koeff. (Awal) Koeff. (Akhir)

PEKERJAAN INSTALASI AIR DAN SANITASI


Pipa PVC 1''

Jumlah
XII.2

Pipa PVC 3''

Jumlah
XII.3

Pipa PVC 4"

Jumlah
XII.4

Bak

Jumlah
XII.5

Bathtub

Jumlah
XII.6

Keran

Jumlah
XII.7

Kloset Duduk

Mandor

Oh

0.1600

0.1440

Tukang batu

Oh

1.1000

0.9900

Kepala tukang batu

Oh

0.0100

0.0090

Pekerja

Oh

3.3000

2.9700

Mandor

Oh

0.1600

0.1440

Pekerja

Oh

7.078

6.3700

Tukang batu

Oh

3.000

2.7000

Kepala tukang batu

Oh

0.800

0.7200

Mandor

Oh

0.500

0.4500

Pekerja

Oh

0.2500

0.2250

Mandor

Oh

0.1250

0.1125

Jumlah
XII.8

Kitchen zink stainless 2 lobang

Jumlah
XII.9

Septictank

Jumlah
XII.10

Pompa Zet Pump

Jumlah

ANAL
No.

Uraian Jenis pekerjaan

Sat.

Koeff.

Volume

bt

0.1667

47.00

bt

0.1667

47.00

bt

0.1667

60.00

bh

1.0000

3.00

bh

1.0000

2.00

bh

1.0000

6.00

bh

1.0000

4.00

XII
XII.1

PEKERJAAN INSTALASI AIR DAN SANITASI


Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW)

XII.2

Pipa PVC 3''


Pipa PVC maspion abu diameter 3" (AW)

XII.3

Pipa PVC 4"


Pipa PVC maspion abu diameter 4" (AW)

XII.4

Bak
Bak fiberglass

XII.5

Bathtub
Bathtube standard

XII.6

Keran
Kran stainless lokal kait

XII.7

Kloset Duduk
Kloset duduk warna standard TOTO C 240 lengkap

XII.8

Kitchen zink stainless 2 lobang


Kitchen zink stainless 2 lubang

XII.9

XII.10

bh

1.0000

1.00

Galian tanah

M3

4.5000

1.00

Pasir urug

M3

0.2142

1.00

Lantai kerja t = 10 cm

M2

2.2500

1.00

Pas. Bata 1 PC : 2 PS + plesteran

M2

15.0000

1.00

Plat beton penutup dan balok

M3

0.3000

1.00

Pipa PVC 4" jenis AW + sambungan

M1

5.4000

1.00

Pipa GIP 1 1/2"

btg

1.2000

1.00

Galian tanah untuk rembesan

M3

3.3750

1.00

Pas.ijuk

Kg

5.4000

1.00

Urugan kerikil 3,5 cm

M3

1.0500

1.00

Pipa PVC 4" berlobang jenis AW

M1

9.0000

1.00

Urugan kembali perataan tanah

M3

1.1250

1.00

bh

1.0000

1.00

Septictank

Pompa Zet Pump


Pompa zetpump 250 watt sanyo

Volume
6

Sat
7

Kebutuhan Tenaga
Kerja
8=5x6

No.

Uraian Pekerja

Sat

XII. PEKERJAAN INSTALASI AIR DAN SANITASI


XII.1 Pipa PVC 1''
Tukang batu

Oh

47.000

m'

2.538

Kepala tukang batu

Oh

47.000

m'

0.254

Pekerja

Oh

47.000

m'

1.523

Mandor

Oh

47.000

m'

0.076
4.391

XII. 2 Pipa PVC 3''


Tukang batu

Oh

47.000

m'

2.538

Kepala tukang batu

Oh

47.000

m'

0.254

Pekerja

Oh

47.000

m'

1.523

Mandor

Oh

47.000

m'

0.076
4.391

XII.3 Pipa PVC 4"


Tukang batu

Oh

60.000

m'

3.240

Kepala tukang batu

Oh

60.000

m'

0.324

Pekerja

Oh

60.000

m'

1.944

Mandor

Oh

60.000

m'

0.097
Tukang batu

Oh

5.605

XII.4 Bak

3.000

bh

7.290

Kepala tukang batu

Oh

3.000

bh

1.458

Pekerja

Oh

3.000

bh

4.860

Mandor

Oh

3.000

bh

0.297
Tukang batu

Oh

13.905

XII. 5 Bathtub

2.000

bh

4.860

Kepala tukang batu

Oh

2.000

bh

0.972

Pekerja

Oh

2.000

bh

3.240

Mandor

Oh

2.000

bh

0.198
Pekerja

Oh

Mandor

Oh

9.270
6.000

bh

0.216

6.000

bh

0.216
0.432

XII.6 Keran

XII.7 Kloset Duduk


Tukang batu

Oh

4.000

bh

3.960

Kepala tukang batu

Oh

4.000

bh

0.036

Pekerja

Oh

4.000

bh

11.880

Mandor

Oh

4.000

bh

0.576
16.452

XII. 8 Kitchen zink stainless 2 lobang


Tukang batu

Oh

1.000

bh

0.990

Kepala tukang batu

Oh

1.000

bh

0.009

Pekerja

Oh

1.000

bh

2.970

Mandor

Oh

1.000

bh

0.144
4.113

XII.9 Septictank
Pekerja

Oh

1.000

unit

6.370

Tukang batu

Oh

1.000

unit

2.700

Kepala tukang batu

Oh

1.000

unit

0.720

Mandor

Oh

1.000

unit

0.450
10.240

1.000

unit

0.225

1.000

unit

0.113

XII.10 Pompa Zet Pump


Pekerja

Oh

Mandor

Oh

0.338
ANALISIS BAHAN DAN KEBUTUHAN BAHAN
Sat

Kebutuhan Bahan

Sat

Harga Satuan
Bahan

RAB Bahan

Durasi
(Hari)

7=5x4

10

m'

7.835

bt

Rp30,000

Rp235,047

Jumlah
m'

7.835

Rp153,000

bt

10.002

Rp235,000

bt

3.000

Rp95,000

bh

2.000

bh

Rp2,745,000

6.000

Rp22,000

bh
Jumlah

bh

4.000

bh

Rp5,490,000
Rp5,490,000

Jumlah
bh

Rp285,000
Rp285,000

Jumlah
bh

Rp2,350,470
Rp2,350,470

Jumlah
bh

Rp1,198,740
Rp1,198,740

Jumlah
m'

Rp235,047

Rp2,050,000

Rp132,000
Rp132,000
Rp8,200,000

Rp8,200,000

Jumlah
bh

1.000

Rp425,000

bh

Rp425,000
Rp425,000

Jumlah
unit

4.500

M3

Rp36,900

Rp166,050

unit

0.214

M3

Rp50,000

Rp10,710

unit

2.250

M2

Rp57,085

Rp128,440

unit

15.000

M2

Rp71,656

Rp1,074,840

unit

0.300

M3

Rp8,591,413

Rp2,577,424

unit

5.400

M1

Rp40,000

Rp216,000

unit

1.200

btg

Rp294,000

Rp352,800

unit

3.375

M3

Rp36,900

Rp124,538

unit

5.400

Kg

Rp7,000

Rp37,800

unit

1.050

M3

Rp36,500

Rp38,325

unit

9.000

M1

Rp58,750

Rp528,750

unit

1.125

M3

Rp9,998
Jumlah

bh

1.000

unit

Rp4,850,000
Jumlah

Rp11,248
Rp5,266,924
Rp4,850,000
Rp4,850,000

ANALISIS PRODUKTIVITAS KERJA


Kebutuhan
Tenaga Kerja
4

Harga
Satuan
Upah
5

Biaya Upah

Durasi
(Hari)

Volume
Pekerjaan

Sat

6=4x5

47

m'

47

m'

60

m'

bh

bh

bh

4.000

bh

SI
2.538

Rp48,000

Rp121,824

0.254

Rp52,000

Rp13,198

1.523

Rp38,000

Rp57,866

0.076

Rp60,000

Rp4,568

Jumlah

Rp197,456

2.538

Rp48,000

Rp121,824

0.254

Rp52,000

Rp13,198

1.523

Rp38,000

Rp57,866

0.076

Rp60,000

Rp4,568

Jumlah

Rp197,456

3.240

Rp48,000

Rp155,520

0.324

Rp52,000

Rp16,848

1.944

Rp38,000

Rp73,872

0.097

Rp60,000

Rp5,832

Jumlah

Rp252,072

7.290

Rp48,000

Rp349,920

1.458

Rp52,000

Rp75,816

4.860

Rp38,000

Rp184,680

0.297

Rp60,000

Rp17,820

Jumlah

Rp628,236

4.860

Rp48,000

Rp233,280

0.972

Rp52,000

Rp50,544

3.240

Rp38,000

Rp123,120

0.198

Rp60,000

Rp11,880

Jumlah

Rp418,824

0.216

Rp38,000

Rp8,208

0.216

Rp60,000

Rp12,960

Jumlah

Rp21,168

3.960

Rp48,000

Rp190,080

0.036

Rp52,000

Rp1,872

11.880

Rp38,000

Rp451,440

0.576

Rp60,000

Rp34,560

Jumlah
Rp48,000

Rp47,520

0.009

Rp52,000

Rp468

2.970

Rp38,000

Rp112,860

0.144

Rp60,000

Rp8,640

Rp38,000

Rp242,061

2.700

Rp48,000

Rp129,600

0.720

Rp52,000

Rp37,440

0.450

Rp60,000

Rp27,000

bh

1.000

unit

1.000

unit

Rp436,101

0.225

Rp38,000

Rp8,550

0.113

Rp60,000

Rp6,750

Jumlah

bh

Rp169,488

6.370

Jumlah

4.000

Rp677,952

0.990

Jumlah

Rp15,300

Kebutuhan
Bahan/Hari

Sat

Produktivitas/Hari

Sat

11

12

13

14

3.917

bt

23.50

m'

3.917

bt

23.50

m'

5.001

bt

30.00

m'

1.000

bh

1.00

bh

0.667

bh

0.67

bh

6.000

bh

6.00

bh

2.000

bh

2.00

bh

1.000

bh

2.250

M3

0.107

M3

1.125

M2

7.500

M2

0.150

M3

2.700

M1

0.600

btg

1.688

M3

2.700

Kg

0.525

M3

4.500

M1

0.563

M3

1.000

unit

1.00

bh

0.50

unit

1.00

unit

Kebutuhan
Tenaga Kerja Produktivitas
Sat
(Per Hari)
Kerja (Per Hari)
10 = 4 7
11 = 8 10
12

1.269
0.127
0.761

23.500

m'

23.500

m'

30.000

m'

1.500

bh

0.667

bh

6.000

bh

2.000

bh

0.038

1.269
0.127
0.761
0.038

1.620
0.162
0.972
0.049

3.645
0.729
2.430
0.149

1.620
0.324
1.080
0.066

0.216
0.216

1.980
0.018
5.940
0.288

2.000

bh

1.000

bh

0.500

unit

1.000

unit

0.990
0.009
2.970
0.144

3.185
1.350
0.360
0.225

0.225
0.113

Você também pode gostar