Você está na página 1de 272

PASWORD = rp

*
.
.
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************

************************ ****************
79,794,000.00 ****************
************************ ****************
Tujuh puluh sembilan juta tujuh ratus sembilan puluh
************************ ****************
satu dua
tiga empat lima enam tujuh del
ribu juta milyar
000079794000
************************ ****************
000
1
0
sepuluh
0
0

794

2
7 sembilan puluh
tujuh ratus
empat belas
9 empat
4 sembilan puluh empat
sembilan puluh empat sembilan puluh empat
tujuh ratus sembilan puluh empat ribu

079

0 tujuh puluh
sembilan belas
7 sembilan
9 tujuh puluh sembilan
tujuh puluh sembilan
tujuh puluh sembilan
tujuh puluh sembilan juta

000

4
0
sepuluh
0
0

000

1
0

==
==
==

*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************
*************

sepuluh
0
0

************************ ****************
rupiah
70
tujuh puluh sembilan jut tujuh puluh sembilan juta tuj
tujuh puluh sembilan juta tujuh ratus sembilan puluh
Tujuh puluh sembilan juta tujuh ratus sembilan puluh
************************ ****************

********* ********* *********


ratus sembilan puluh empat ribu rupiah.
********* ********* *********
a enam tujuh delapan s
***
***
***
********* ********* *********
***
***
***
***
***
***
***
***
***
***
***
***
***
n puluh empat
***
n puluh empat
***
***
***
***
***
***
***
***
uluh sembilan
***
uluh sembilan
***
***
***
***
***
***
***
***
***
***
***
***
***
***

***
****
***
***
***
***
********* ********* *********
00
uluh sembilan juta tujuh ratus sembilan puluh empat ribu
ratus sembilan puluh empat ribu rupiah
ratus sembilan puluh empat ribu rupiah.
********* ********* *********

REKAPITULASI
ENGINEER'S ESTIMATE ( EE )
KEGIATAN
PEKERJAAN
LOKASI
T. A

:
:
:
:

APBD 2015

No.
I
II
III
IV

URAIAN PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

PERSIAPAN
PONDASI
STRUKTUR
ASESORIS LAPANGAN

JUMLAH
DIBULATKAN
PPN 10 %
JUMLAH TOTAL

###

Terbilang :

Tujuh puluh sembilan juta tujuh ratus sembilan puluh empat ribu

REKAPITULASI
ENGINEER'S ESTIMATE ( EE )

JUMLAH HARGA
700,000.00
19,626,251.48
50,526,032.18
1,692,871.72

72,545,155.38
72,540,000.00
7,254,000.00
79,794,000.00

ta tujuh ratus sembilan puluh empat ribu rupiah.

DAFTAR KUANTITAS DAN HARGA


ENGINEER'S ESTIMATE (EE)
KEGIATAN
PEKERJAAN
LOKASI
T. A

:
:
:
:

APBD 2015

No.

Uraian

Satuan

Perkiraan /
Kuantitas
d

I
1

PEKERJAAN PERSIAPAN
Pek. Pengukuran

Ls

1.00

Papan Plank Nama

Ls

1.00

Jumlah Harga
II

PEKERJAAN PONDASI

Pek. Galian Tanah pondasi

M3

6.51

Pek. Pasir Urug 5 Cm

M3

1.09

Pek. Lantai Kerja K-175 5 cm

1.09

Pek. Pondasi 1 Bata Camp. 1:2

M2

29.76

Pek. Plasteran Camp. 1:2

43.40

Pek. Timbunan Tanah Urug 28 cm

M2

57.33

Pek. Pemasangan Tiang Pipa Besi dia 4"

M'

6.00

Jumlah Harga
III

PEKERJAAN STRUKTUR

Pek. Plastik Alas

M2

220.00

Pek. Pembesian dgn wiremesh M-6A

Kg

675.40

Pek. Bekisting

9.30

Pek. Cor beton K-225 (Molen)

M3

26.40

Pek. Acian

220.00

Jumlah Harga
IV

PEKERJAAN ASESORIS LAPANGAN

Pek. Pengecatan Lapangan

M3

12.15

Pek. Pengadaan Net Bolla Volly

Ls

1.00

Pek. Pembersihan Lokasi

Ls

1.00

Jumlah Harga

KUANTITAS DAN HARGA

GINEER'S ESTIMATE (EE)

Kode
AHSP

Harga Satuan

Jumlah

(Rupiah)

Harga-Harga

f = (d x e)

400,000.00

400,000.00

300,000.00

300,000.00

Jumlah Harga Pekerjaan


T.01a

700,000.00
56,237.50

366,106.13

180,895.00

196,271.08

B.20a

1,123,347.50

1,218,832.04

P.09a

256,091.00

7,621,268.16

P.12b

54,295.82

2,356,438.76

T.13

122,402.50

7,017,335.33

141,666.67

850,000.00

T.11

Jumlah Harga Pekerjaan


-

19,626,251.48
2,400.00

528,000.00

B.19b

14,813.34

10,004,929.32

Li.07

158,961.00

1,478,337.30

B.07b

1,217,671.80

32,146,535.56

P.12x

28,946.50

6,368,230.00

Jumlah Harga Pekerjaan


c.14

50,526,032.18
22,870.10

277,871.72

1,200,000.00

1,200,000.00

215,000.00

215,000.00

Jumlah Harga Pekerjaan

1,692,871.72

BACK UP DATA PERHITUNGAN VOLUM


NO
1
I

HARGA SATUAN
URAIAN PEKERJAAN
2

PEKERJAAN PERSIAPAN
1 Pek. Pengukuran
2 Papan Plank Nama

II

PEKERJAAN PONDASI
1 Pek. Galian Tanah pondasi
2 Pek. Pasir Urug 5 Cm
3 Pek. Lantai Kerja K-175 5 cm
4 Pek. Pondasi 1 Bata Camp. 1:2
5 Pek. Plasteran Camp. 1:2
6 Pek. Timbunan Tanah Urug 28 cm
7 Pek. Pemasangan Tiang Pipa Besi dia 4"

III

PEKERJAAN STRUKTUR
1 Pek. Plastik Alas
2 Pek. Pembesian dgn wiremesh M-6A
3 Pek. Bekisting
4 Pek. Cor beton K-225 (Molen)
5 Pek. Acian

IV

PEKERJAAN ASESORIS LAPANGAN


1 Pek. Pengecatan Lapangan
2 Pek. Pengadaan Net Bolla Volly
3 Pek. Pembersihan Lokasi

( Rp )
3

VOLUME PEKERJAAN
JUMLAH HARGA
HITUNGAN LUAS
4

( Rp )
5

13.15 m2
1.00 ls

=(11+20+11+20)*0,35*0,3

6.51 m3

=(11+20+11+20)*0,05*0,35

1.09 m3

=(11+20+11+20)*0,05*0,35

1.09 m3

=(11+11+20+20)*0,48

29.76 m2

=(11+11+20+20)*0,35*2

43.40 m2

=(10,5*19,5)*0,28

57.33 m2

=3*2

6.00 m'

=11*20

220.00 m2

=11*20*3,07

675.40 Kg

=(11+11+20+20)*0,15
=11*20*0,12
=11*20

=(18+18+9+9)*0,2+9*3*0,05

9.30 m2
26.40 m3
220.00 m2

12.15 m2

=1

1.00 Ls

=1

1.00 Ls

236.25
1

ANALISA HARGA SATUAN PEKERJAAN (A


DINAS PEKERJAAN UMUM KOTA DUM
BIDANG CIPTA KARYA
TAHUN 2015

NO.
1
A
1
2
2
3
4
5
6
7
8
B
B.1
1
2
B.2
1
B.3
1
2
3
4
5
6
7
9
11
12
C
1
2
11
12
13
14
15
16

NO.
1
D
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

NO.
1
50
51
52
60
61
62
66
17
E
1

NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
F
1
2
3
7
8
9
16
17
G
2
4
14
15
24
H
1
2
3
4
5
6
7

ANALISA HARGA SATUAN PEKERJAAN (AHSP)


DINAS PEKERJAAN UMUM KOTA DUMAI
BIDANG CIPTA KARYA
TAHUN 2015

URAIAN PEKERJAAN
2
PEKERJAAN PERSIAPAN
Mobilisasi dan demobilisasi
1 M2 Papan Nama Proyek
1 M1 Pengukuran dan Pasang Bouwplank
1 m2 Membersihkan lapangan dan perataan
1 m2 membuat jalan sementara
Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Pembongkaran 1 m3 beton bertulang
Pembongkaran 1 m3 dinding tembok bata
Penyiapan Badan Jalan (Manual)
PEKERJAAN TANAH
Galian Tanah Struktur
Penggalian 1 m3 tanah biasa sedalam 1 m
Penggalian 1 m3 tanah biasa sedalam 2 m
Galian Tanah Drainase
Menggali 1 m3 tanah biasa sedalam < 1 m
Pekerjaan Timbunan dan Pemadatan
Pengerjaan stripping 1m2 tanah tebing setinggi 1 meter
Pembuangan 1 m3 tanah sejauh 30 meter
Pengurugan Kembali 1 m3 galian tanah biasa sedalam 1 m
Pengurugan Kembali 1 m3 galian tanah biasa sedalam 2 m
Pengurugan Kembali 1 m3 galian tanah biasa sedalam 3 m
Pemadatan tanah 1 m3 tanah (per 20 cm)
Pengurugan 1 m3 dengan pasir urug
1 m3 Urugan Tanah
1 m1 Pasang kayu cerucuk dia. 12 - 15 cm
1 m1 pasang kayu cerucuk dia. 8 - 10 cm
PEKERJAAN PONDASI
Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 PP
Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 4 PP
Pemasangan 1 m3 pondasi sumuran, diameter 100 cm
Pengadaan tiang pancang (ukuran 25 x 25 x 6 m')
Handling tiang pancang (dilapangan)
1 m Pemancangan Tiang Pancang
1 Titik Penyambungan Tiang Pancang
1 Titik Pemotongan tiang pancang

URAIAN PEKERJAAN
2
PEKERJAAN BETON
Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78 (Manual)
Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78 (Molen)
Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 2) cm, w/c = 0,72 (Manual)
Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 2) cm, w/c = 0,72 (Molen)
Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3 - 6) cm, w/c = 0,87
Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66 (Manual)
Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66 (Molen)
Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 2) cm, w/c = 0,61 (Manual)
Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 2) cm, w/c = 0,61 (Molen)
Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58 (Manual)
Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58 (Molen)
Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56 (Manual)
Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56 (Molen)
Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 2) cm, w/c = 0,53 (Manual)
Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 2) cm, w/c = 0,53 (Molen)
Membuat 1 m3 beton kedap air dengan strorox - 100
Pemasangan 1 m PVC Waterstop lebar 150 mm
Pemasangan 1 m PVC Waterstop lebar 200 mm
Membuat 1 m PVC Waterstop lebar 230 mm - 320 mm
Pembesian 10 Kg dengan besi polos
Pembesian 1 Kg dengan besi polos
Pembesian 10 Kg dengan besi ulir
Pembesian 1 Kg dengan besi ulir
Pembesian 10 Kg kabel presstressed polos
Pembesian 10 Kg kabel presstressed ulir
Pemasangan 1 m2 bekisting untuk pondasi
Pemasangan 1 m2 bekisting untuk sloof
Pemasangan 1 m2 bekisting untuk kolom
Pemasangan 1 m2 bekisting untuk balok
Pemasangan 1 m2 bekisting untuk lantai
Pemasangan 1 m2 bekisting untuk dinding
Pemasangan 1 m2 bekisting untuk tangga
Pemasangan 1 m2 jembatan untuk pengecoran beton
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Membuat 1 m kolom praktis beton bertulang (11 x 11) cm

URAIAN PEKERJAAN
2
Membuat 1 m ring balok beton bertulang (10 x 15) cm
Pemasangan 10 Kg Jaring Kawat Baja dilas (Wiremesh M-6A)
Pemasangan 1 Kg Jaring Kawat Baja dilas (Wiremesh M-6A)
1 M3 Beton K-175 (Ready Mix)
1 M3 Beton K-225 (Ready Mix)
1 M3 Beton K-250 (Ready Mix)
1 M3 Menggunakan peralatan pompa beton
1 M3 Melangsir beton pada setiap penambahan jarak 25 m
PEKERJAAN BESI & ALUMINIUM
Pemasangan 1 kg besi profil

URAIAN PEKERJAAN
2
Pemasangan 1 kg rangka kuda-kuda IWF
Pengerjaan 100 kg pekerjaan perakitan
Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku
Pengerjaan 10 cm pengelasan dengan las listrik
Pengerjaan 1 m2 rangka jendela besi scuare tube (25 x 5) cm
Pemasangan 1 m2 pintu rolling door besi
Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
Pemasangan 1 m2 sunscreen aluminium
Pemasangan 1 m2 rolling door aluminium
Pemasangan 1 m kusen pintu alluminium
Pemasangan 1 m2 pintu alluminium strip lebar 8 cm
Pemasangan 1 m2 pintu kaca rangka alluminium
Pemasangan 1 m2 venetions blinds dan Vertical blinds
Pemasangan 1 m2 terali besi strip (2 x 3) mm
Pemasangan 1 m2 kawat nyamuk
Pemasangan 1 m2 jendela nako & tralis
Pemasangan 1 m talang datar / jurai seng bjls 28 lebar 90 cm
Pemasangan 1 m talang 1/2 lingkaran D-15 cm, seng plat Bjls 30 lebar 45 cm
Pemasangan 1 m2 rangka kuda - kuda baja ringan
Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, dinding partisi
Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafon
PEKERJAAN DINDING PASANGAN
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 2 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 3 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 4 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 2 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 3 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 4 PP
Pemasangan 1 m2 dinding terawang (rooster) ukuran (12 x 11 x 24) cm, campuran 1 SP : 3 PP
Pemasangan 1 m2 dinding terawang (rooster) ukuran (12 x 11 x 24) cm, campuran 1 SP : 4 PP
PEKERJAAN PLESTERAN
Pemasangan 1 m2 plesteran 1 SP : 2 PP tebal 15 mm
Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 15 mm
Pemasangan 1 m2 plesteran 1 SP : 3PP tebal 20 mm
Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm
Pemasangan 1 m2 acian
PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING
Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40 cm x 40 cm
Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x 30 cm
Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm
Pemasangan 1 m2 lantai ubin teraso ukuran 40 cm x 40 cm
Pemasangan 1 m2 lantai ubin teraso ukuran 30 cm x 30 cm
Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm
Pemasangan 1 m2 lantai ubin granit ukuran 30 cm x 30 cm

AHSP)
AI

SATUAN

KODE
AHSP

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5

Ls
Unit
m1

A.01
A.02
A.03

965,387.50
87,400.50

m2

A.04

12,375.00

A.05

201,795.00

A.06

350,779.00

A.07

511,489.00

A.08

16,390.00

m2

A.09

8,750.50

m3

T.01a

56,237.50

T.01b

69,052.50

m3

T.05a

46,137.85

m2

T.07

4,097.50

T.08

24,640.00

m3
m3

T.09a
T.09b

18,745.83
23,017.50

m3

T.09c

27,358.83

T.10

40,975.00

T.11

180,895.00

m
m1

T.13
T.15

122,402.50
7,408.50

m1

T.16

5,758.50

2
2
3

m3

P.01a

###
###
1,188,022.00

P.01b

1,142,878.00

P.03

835,433.50

P.04

356,647.50

P.05

12,936.00

P.06

144,969.00

Titik
Titik

P.07
P.08

89,380.50
393,992.50

3
3
1
1
1

SATUAN

KODE
AHSP

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5

m3

B.02a

1,089,247.18

B.02b

1,123,858.68

B.03a

1,111,566.24

B.03b

1,146,177.74

B.04

1,012,090.21

B.05a

1,138,285.06

B.05b

1,172,896.56

B.06a

1,163,454.34

B.06b

1,198,065.84

B.07a

1,183,060.30

3
3
3
3
3
3
3
3
3

B.07b

1,217,671.80

B.08a

1,195,249.47

m3

B.08b

1,229,860.97

m3

B.09a

1,216,695.86

m3

B.09b

1,251,307.36

B13

1,273,745.00

B13.a

48,147.00

B.13b

55,627.00

B.13c

62,271.00

kg
kg
kg
kg
kg
kg
m2

B.14a
B.14b
B.15a
B.15b
B.16a
B.16b
B.17a

130,839.50
13,083.95
162,602.00
16,260.20
127,226.00
158,988.50
218,944.00

m2

B.17b

237,094.00

B.17c

382,602.00

B.17d

395,802.00

B.17e

395,802.00

B.17f

414,502.00

B.17g

345,614.50

B.17h

130,080.50

B.18a

4,221,140.00

B.18b

5,168,080.50

B.18c

8,491,070.50

B.18d

6,675,878.00

m3

B.18e

6,055,208.50

m3

B.18f

5,835,208.50

B.18g

6,126,180.50

B.18h

79,981.00

3
1
1

2
2
2
2
2
2
3
3
3

3
1

3
m1

B.18i

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
200,227.50

Kg
Kg
m3

B.19a
B.19b
B.20a

148,133.39
14,813.34
1,123,347.50

m3

B.20b

1,151,397.50

B.20c

1,190,667.50

B.21a

16,390.00

B.21b

40,975.00

kg

BA.01

34,875.50

SATUAN

3
3

KODE
AHSP

3
kg
kg
m2

BA.02
BA.03
BA.04

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
37,026.00
37,202.00
1,251,525.00

cm
m2

BA.05
BA.06

30,310.50
204,664.90

m2

BA.07

458,667.00

BA.08

576,796.00

BA.09

221,298.00

BA.10

455,675.00

BA.11

128,873.80

BA.12

515,302.15

BA.13

515,330.75

BA.14

178,788.50

BA.15

506,826.10

BA.16

108,433.33

m2

BA.17

270,044.50

m1

BA.18

136,215.75

m1

BA.19

86,003.50

BA.20

182,880.50

BA.21

137,621.00

BA.22

168,888.50

m2

P.09a

256,091.00

P.09b

244,081.20

P.09c

236,178.80

P.10a

124,208.70

P.10b

118,628.62

P.10c

115,362.50

P.11a

385,500.50

P.11b

382,068.50

m2

P.12b

54,295.82

P.12d

49,740.24

m2

P.12n

1,869,598.50

m2

P.12o

1,520,233.00

m2

P.12x

28,946.50

m2

P.13a

90,835.80

P.13b

90,150.50

P.13c

91,958.90

P.14a

95,755.00

P.14b

93,643.00

P.15a

268,599.10

P.15b

249,543.58

SATUAN

2
2
2
1
2
2
2
2

2
2

2
2
2
2
2
2

2
2
2
2
2
2

KODE
AHSP

DAFTAR HARGA BAHAN


PROVINSI
KOTA
PERIODE

NO.

NAMA BAHAN

BAHAN PASANGAN

Batu Kali

Batu Pecah / Split

Batu Gunung

Kerikil

Pasir Urug

Pasir Pasang

Pasir Cor / Beton

Sirtu

Tanah Urug

10

Tanah Urug Pilihan

11

Aggregat Kasar

12

Aggregat Halus

13

Semen Portland

14

Semen Portland

15

Semen Warna

16

Batu Bata Biasa

17

Batu Bata Press

18

Bataco

19

Paving Block 6 cm

20

Paving Block 8 cm

21

Con Block 20 x 20

22

Con Block 30 x 30

23

Kaca Block Uk. 20 x 20

24

Batu Alam Alur

25

Batu Alam Polos

26

Batu Sikat

27

Kanstin

23

NO.

NAMA BAHAN

28

Batu Kerawang

29

Pagar BRC M8 2,5 X 1.4

30

Pagar BRC M8 2,5 X 1.2

31

GRC Ukir

32

Gorong-gorong Dia. 20 Cm

33

Gorong-gorong Dia. 40 Cm

34

Gorong-gorong Dia. 60 Cm

35

Gorong-gorong Dia. 80 Cm

36

Gorong-gorong Dia. 100 Cm

37

Aspal Curah

38

Aspal Drum

39

Kapur Padam

40

Semen Merah

41

Tiang Pancang Beton 25 x 25 cm

42

Tiang Pancang Beton 20 x 20 cm

43

Air

44

Storox - 100

45

Waterstop 150 mm

46

Waterstop 200 mm

47

Waterstop 230-320 mm

48

Plastik Alas

49

Ready Mix K-125

50

Ready Mix K-125

51

Ready Mix K-175

52

Ready Mix K-175

53

Ready Mix K-225

54

Ready Mix K-225

55

Ready Mix K-250

56

Ready Mix K-250

57

Ready Mix K-300

58

Ready Mix K-300

59

Ready Mix K-350

60

Ready Mix K-350

61

Ready Mix K-400

24

NO.

NAMA BAHAN

62

Ready Mix K-400

25

NO.

NAMA BAHAN

II

BAHAN KAYU

63

Kayu Kelas I

64

Kayu Kelas II

65

Kayu Kelas III

66

Kayu Kelas IV

67

Kayu Bakar

68

Kayu Cerocok Dia. 12-15 Cm

69

Dolken Kayu Dia. 8-10 Cm

71

Kayu Profil

72

Tripleks Tebal 3 mm

73

Tripleks Tebal 3.6 mm

74

Tripleks Tebal 4 mm

75

Tripleks Tebal 6 mm

76

Tripleks Tebal 8 mm

77

Tripleks Tebal 12 mm

78

Teakwood Tebal 3 mm

79

Teakwood Tebal 4 mm

80

Teakwood Tebal 6 mm

81

Teakwood Tebal 8 mm

82

Formika

83

Ijuk

84

Thinner Merk Laba - laba

III

BAHAN BESI

85

Besi Beton Polos

86

Besi Beton Ulir

87

Kawat Beton

88

Kawat Bronjong

89

Paku Beton

90

Paku Seng

91

Paku Tripleks

92

Paku Asbes

93

Paku Biasa 1/2" - 1"

94

Paku Biasa 2" - 5"

26

NO.

NAMA BAHAN

95

Plat Besi

96

Besi Strip

97

Baut + Mur

98

Baja Siku

99

Baja Profil

100 Besi Pagar BRC


101 Teralis Besi
102 Kawat Berduri
103 Kawat Nyamuk
104 Kawat Harmonika
105 Kawat Las
106 Formite/penjaga jarak bekisting/spacer
107 Wiremesh M-5
108 Wiremesh M-6A
109 Wiremesh M-6B
110 Wiremesh M-8A
111 Wiremesh M-8B
112 Hollow 40.40.2
113 Metal Fuuring
IV

BAHAN ATAP

114 Seng Gelombang BJLS 18


115 Seng Gelombang BJLS 20
116 Seng Gelombang BJLS 30
117 Seng Plat BJLS 18
118 Seng Plat BJLS 20
119 Seng Plat BJLS 30
120 Plastik Gelombang Tebal
121 Plastik Gelombang Tipis
122 Perabung Seng
123 Seng Aluminium Polos 0.25 mm
124 Seng Aluminium Polos 0.30 mm
125 Seng Aluminium Polos 0.40 mm
126 Perabung Seng Aluminium Polos

27

NO.

NAMA BAHAN

127 Asbes Gelombang Kecil


128 3000x1050x4 mm
129 2400x1050x4 mm
130 2100x1050x4 mm

28

NO.

NAMA BAHAN

131 1800x1050x4 mm
132 Asbes Gelombang Besar
133 3000x920x5 mm
134 2250x920x5 mm
135 1500x920x5 mm
136 3000x920x6 mm
137 2250x920x6 mm
138 1500x920x6 mm
139 Perabung Asbes Gelombang
140 Genteng Beton Polos
141 Perabung Genteng
142 Nok Genteng Beton
143 Genteng Beton Warna
144 Atap Genteng Metal Tebal 0.4 mm
145 Atap Genteng Metal Tebal 0.35 mm
146 Atap Genteng Metal Tebal 0.3 mm
147 Atap Genteng Metal Tebal 0.25 mm
148 Perabung Genteng Metal
149 Nok Genteng Metal
150 Atap Poly Carbonate
151 Aluminium Foil
152 Sunscreen Aluminium
153 Atap Sirap
154 Genteng Plentong "S"
155 Bubungan Genteng Plentong "S"
156 Genteng Kodok / Glazzur
157 Bubungan Genteng Kodok / Glazzur
158 Seng Plat
159 Atap Long Span
160 Rangka Baja Ringan
161 Spandek
162 Atap Sakura
163 Atap Multiroof

29

NO.

NAMA BAHAN

BAHAN PENGGANTUNG DAN PENGUNCI

164 Kunci 2 Slaag Kwalitas Bagus


165 Kunci 2 Slaag Kwalitas Menengah
166 Kunci 2 Slaag Kwalitas Biasa
167 Kunci 1 Slaag Kwalitas Bagus
168 Kunci 1 Slaag Kwalitas Menengah
169 Kunci 1 Slaag Kwalitas Biasa
170 Kunci Tanam Antik
171 Kunci Toilet Kwalitas Bagus
172 Kunci Toilet Kwalitas Menengah
173 Kunci Toilet Kwalitas Biasa
174 Engsel Pintu Kwalitas Bagus 4"
175 Engsel Pintu Kwalitas Bagus
176 Engsel Pintu Kwalitas Menengah 4"
177 Engsel Pintu Kwalitas Menengah 4"
178 Engsel Pintu Kwalitas Biasa 4"
179 Engsel Pintu Kwalitas Biasa 4"
180 Engsel Jendela Kwalitas Bagus 3"
181 Engsel Jendela Kwalitas Bagus 3"
182 Engsel Jendela Kwalitas Menengah 3"
183 Engsel Jendela Kwalitas Menengah 3"
184 Engsel Jendela Kwalitas Biasa 3"
185 Engsel Jendela Kwalitas Biasa 3"
186 Grendel Pintu Kwalitas Bagus 4"
187 Grendel Pintu Kwalitas Menengah 4"
188 Grendel Pintu Kwalitas Biasa 4"
189 Grendel Jendela Kwalitas Bagus 2"
190 Grendel Jendela Kwalitas Menengah 2"
191 Grendel Jendela Kwalitas Biasa 2"
192 Grendel Gembok
193 Hendel Pintu Kwalitas Bagus 8"
194 Hendel Pintu Kwalitas Menengah 8"
195 Hendel Pintu Kwalitas Biasa 8"
196 Hendel Jendela Kwalitas Bagus

30

NO.

NAMA BAHAN

197 Hendel Jendela Kwalitas Menengah


198 Hendel Jendela Kwalitas Biasa
199 Hak Angin Kwalitas Bagus
200 Hak Angin Kwalitas Menengah
201 Hak Angin Kwalitas Biasa
202 Gembok

31

NO.

NAMA BAHAN

VI

BAHAN SANITAIR

203 Kloset Jongkok Kwalitas Bagus


204 Kloset Jongkok Kwalitas Menengah
205 Kloset Jongkok Kwalitas Biasa
206 Kloset Duduk Kwalitas Bagus + Tabung
207 Kloset Duduk Kwalitas Menengah + Tabung
208 Kloset Duduk Kwalitas Biasa + Tabung
209 Bak Air Fiberglass Kwalitas Bagus
210 Bak Air Fiberglass Kwalitas Menengah
211 Bak Air Fiberglass Kwalitas Biasa
212 Bathtub Kwalitas Bagus
213 Bathtub Kwalitas Menengah
214 Bathtub Kwalitas Biasa
215 Shower Kwalitas Bagus
216 Shower Kwalitas Menengah
217 Shower Kwalitas Biasa
218 Wastafel Kwalitas Bagus
219 Wastafel Kwalitas Menengah
220 Wastafel Kwalitas Biasa
221 Pintu Fiber
222 Urinoir Lengkap Kwalitas Bagus
223 Urinoir Lengkap Kwalitas Menengah
224 Urinoir Lengkap Kwalitas Biasa
225 Tangki Air Kapasitas 0.5 M3
226 Tangki Air Kapasitas 0.75 M3
227 Tangki Air Kapasitas 1.0 M3
228 Kran Air Kwalitas Bagus
229 Kran Air Kwalitas Menengah
230 Kran Air Kwalitas Biasa
231 Floor Drain Kwalitas Bagus
232 Floor Drain Kwalitas Menengah
233 Floor Drain Kwalitas Biasa
234 Pompa Air Biasa Setara SANYO
235 Gantungan handuk 5 Kait

32

NO.

NAMA BAHAN

236 Tempat sabun keramik


237 Tempat sabun Stainless
238 Bak cuci piring 2 lubang bagus
239 Bak cuci piring 2 lubang menengah
240 Bak cuci piring 2 lubang biasa
VII

BAHAN LANTAI

241 Keramik Kualitas Bagus Setara Platinum


242 Ukuran 20 x 20 Cm
243 Ukuran 20 x 25 Cm
244 Ukuran 30 x 30 Cm
245 Ukuran 40 x 40 Cm
246 Keramik Kualitas Menengah Ikad,Masterina
247 Ukuran 20 x 20 Cm
248 Ukuran 20 x 25 Cm
249 Ukuran 30 x 30 Cm
250 Ukuran 40 x 40 Cm
251 Keramik Kualitas Biasa Garuda
252 Ukuran 20 x 20 Cm
253 Ukuran 20 x 25 Cm
252 Ukuran 25 x 25 Cm
253 Ukuran 30 x 30 Cm
254 Ukuran 25 x 40 Cm
255 Ukuran 40 x 40 Cm
256 Plint Keramik
257 Bon-bon Keramik
258 Vinyl
259 Karpet
260 Granit Kualitas Bagus
261 Ukuran 20 x 20 Cm
262 Ukuran 30 x 30 Cm
263 Ukuran 40 x 40 Cm
264 Ukuran 60 x 60 Cm
263 Granit Kualitas Menengah

33

NO.

NAMA BAHAN

264 Ukuran 20 x 20 Cm
265 Ukuran 30 x 30 Cm
266 Ukuran 40 x 40 Cm
267 Ukuran 60 x 60 Cm
268 Granit Kualitas Biasa
269 Ukuran 20 x 20 Cm
270 Ukuran 30 x 30 Cm
271 Ukuran 40 x 40 Cm
272 Ukuran 60 x 60 Cm
273 Parquet Jati
274 Parquet Kelapa
275 Lem Vinyl
274

abu-abu uk. 40 x 40 cm

275

abu-abu uk. 30 x 30 cm

276

abu-abu uk. 20 x 20 cm

277

teraso uk. 40 x 40 cm

278

teraso uk. 30 x 30 cm

279

granit uk. 60 x 60 cm

280

granit uk. 80 x 80 cm

281

granit uk. 100 x 100 cm

282

teralux uk. 30 x 30 cm

283

teralux marmer uk. 60 x 60 cm

284

teralux marmer uk. 40 x 40 cm

285

teralux marmer uk. 30 x 30 cm

VIII BAHAN PLAFOND


286 Akustik
287 Akustik 30x30 cm
288 Akustik 30x60 cm
289 Akustik 60x120 cm
290 Gypsumboard 9 mm
291 Calsiboard
292 Eternit
293 Asbes

34

NO.

NAMA BAHAN

294 List Gypsumboard


295 List Calsiboard
296 List Eternit
297 Profil Aluminimum T
298 Paku Skrup
299 Paku Pancing
300 Kawat Dia. 4 mm
301 Tepung Gypsum
302 Ramset
IX

BAHAN KACA

303 Kaca Bening 3 mm


304 Kaca Bening 5 mm
305 Kaca Bening 8 mm
306 Kaca Rayben 3 mm
307 Kaca Rayben 5 mm
308 Kaca Rayben 10 mm
309 Kaca Buram 3 mm
310 Kaca Buram 5 mm
311 Kaca Nako + Bingkai
312 Kaca Block
313 Kaca Cermin 5 mm
X

BAHAN LISTRIK

314 Pemasangan Instalasi


315 Stop Kontak Kualitas Bagus Setara CLIPSAL
316 Stop Kontak Kualitas Menengah Setara PANASONIC
317 Stop Kontak Kualitas Biasa Setara VIBA
318 Saklar Tunggal Kualitas Bagus Setara CLIPSAL
319 Saklar Tunggal Kualitas Menengah Setara PANASONIC
320 Saklar Tunggal Kualitas Biasa VIBA
321 Saklar Ganda Kualitas Bagus Setara CLIPSAL
322 Saklar Ganda Kualitas Menengah Setara PANASONIC
323 Saklar Ganda Kualitas Biasa Setara VIBA

35

NO.

NAMA BAHAN

324 Saklar Triple Kualitas Bagus


325 Saklar Triple Kualitas Menengah
326 Saklar Triple Kualitas Biasa
327 Lampu Pijar
328 Lampu TL
329 Lampu Downlight
XI

BAHAN PIPA

330 Pipa PVC AW (Pipa Tebal)


331 Pipa PVC Dia. 1/2"
332 Pipa PVC Dia. 3/4"
333 Pipa PVC Dia. 1"
334 Pipa PVC Dia. 1 1/2"
335 Pipa PVC Dia. 2"
336 Pipa PVC Dia. 2 1/2"
337 Pipa PVC Dia. 3"
338 Pipa PVC Dia. 4"
339 Pipa PVC Dia. 6"
340 Pipa PVC D (Pipa Tipis)
341 Pipa PVC Dia. 1/2"
342 Pipa PVC Dia. 3/4"
343 Pipa PVC Dia. 1"
344 Pipa PVC Dia. 1 1/2"
345 Pipa PVC Dia. 2"
346 Pipa PVC Dia. 2 1/2"
347 Pipa PVC Dia. 3"
348 Pipa PVC Dia. 4"
349 Pipa PVC Dia. 6"
350 Socket (Tipis)
351 Socket 5"
352 Socket 4"
353 Socket 3"
354 Socket 2,5"
355 Socket 2"

36

NO.

NAMA BAHAN

356 Socket 1,5"


357 Socket 1"
358 Socket 3/4"
359 Socket 1/2"
360 Socket (Tebal)
361 Socket 5"
362 Socket 4"
363 Socket 3"
364 Socket 2,5"
365 Socket 2"
366 Socket 1,5"
367 Socket 1"
368 Socket 3/4"
369 Socket 1/2"
370 Tee (Tipis)
371 Tee 5"
372 Tee 4"
373 Tee 3"
374 Tee 2,5"
375 Tee 2"
376 Tee 1,5"
377 Tee 1"
378 Tee 3/4"
379 Tee 1/2"
380 Tee (Tebal)
381 Tee 5"
382 Tee 4"
383 Tee 3"
384 Tee 2,5"
385 Tee 2"
386 Tee 1,5"
387 Tee 1"
388 Tee 3/4"
389 Tee 1/2"

37

NO.

NAMA BAHAN

390 Elbow (Tipis)


391 Elbow 5"
392 Elbow 4"
393 Elbow 3"
394 Elbow 2,5"
395 Elbow 2"
396 Elbow 1,5"
397 Elbow 1"
398 Elbow 3/4"
399 Elbow 1/2"
400 Elbow (Tebal)
401 Elbow 5"
402 Elbow 4"
403 Elbow 3"
404 Elbow 2,5"
405 Elbow 2"
406 Elbow 1,5"
407 Elbow 1"
408 Elbow 3/4"
409 Elbow 1/2"
410 Pipa GIP Dia. 1/2"
411 Pipa GIP Dia. 3/4"

38

NO.

NAMA BAHAN

412 Pipa GIP Dia. 1"


413 Pipa GIP Dia. 1 1/2"
414 Pipa GIP Dia. 2"
415 Pipa GIP Dia. 2 1/2"
416 Pipa GIP Dia. 3"
417 Pipa GIP Dia. 4"
XII

BAHAN FINISHING

418 Plamir
419 Menie
420 Residu
421 Dempul
422 Minyak Cat / Tinner
423 Amplas
424 Kuas Gulung Kecil
425 Kuas Gulung besar
426 Kuas Biasa 1"
427 Kuas Biasa 1 1/2"
428 Kuas Biasa 2"
429 Kuas Biasa 2 1/2"
430 Kuas 3"
431 Kuas 4"
432 Kuas 5"
433 Tempat Cat Bagus
434 Tempat Cat Biasa
435 Cat Dasar
436 Cat Minyak Kwalitas Bagus Setara JOTUN/KIMTONE/DULUXE
437 Cat Minyak Kwalitas Menengah Setara PLATONE/AVIAN
438 Cat Minyak Kwalitas Biasa Setara YOYO
439 Cat Air Kwalitas Bagus Setara JOTUN/KIMTONE/DULUXE
440 Cat Air Kwalitas Menengah Setara CATYLAC ICI/SPECTRUM
441 Cat Air Kwalitas Biasa Setara LEKTONE/SIMPATI
442 Cat Maritex
443 Type Cat Setara Jotun Interior

39

NO.

NAMA BAHAN

444 Type Cat Setara Jotun Eksterior


445 Type Cat Biasa Interior
446 Tipe Cat Biasa Eksterior
447 Cat murah /dasar
448 Cat Kayu Dasar /Menie
449 Cat Many Besi
450 Vernish Biasa
451 Vernish Bagus
452 Spritus
453 Lem Kayu
454 Minyak Bekisting
455 Wall Paper Kualitas Biasa
456 Wallpaper Kualitas Bagus
XIII BAHAN LAIN-LAIN
457 Kosen Jendela standart
458 Kosen Pintu
459 Angin - angin standart
460 Daun Pintu
461 Daun Jendela
462 Tiang pilar teras set
463 Tiang bawah teras
464 Angin - angin dari batu
465 Tiang pagar beton
466 Tangki air 500 Liter
467 Tangki air 1000 Liter

40

AFTAR HARGA BAHAN


: RIAU
: DUMAI
: 2015

SATUAN
3

KODE

HARGA

KETERANGAN

M3

490,000.00

M3

400,000.00

M3

510,000.00

M3

400,000.00

M3

120,000.00

M3

120,000.00

M3

380,000.00

M3

230,000.00

M3

78,000.00

M3

80,000.00

M3

460,000.00

M3

480,000.00

Zak

58,000.00 Harga dalam kota

Zak

60,000.00 Harga pinggiran

Zak

70,000.00

Bh

800.00

Bh

750.00

Bh

3,000.00

Bh

2,000.00

Bh

2,500.00

Bh

30,000.00

Bh

40,000.00

Bh

25,000.00

M2

190,000.00

M2

130,000.00

M2

185,000.00

Bh

180,000.00

Uk, 60 x 30 cm

41

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

10,000.00

Lbr

340,000.00

Lbr

290,000.00

M2

500,000.00

Bh

100,000.00

Bh

280,000.00

Bh

350,000.00

Bh

450,000.00

Bh

500,000.00

Kg

13,000.00

Kg

13,000.00

M3

180,000.00

M3

160,000.00

M1

260,000.00

M1

160,000.00

Ltr

20.00

Kg

10,000.00

M1

35,000.00

M1

40,000.00

M1

45,000.00

M2

2,400.00

M3

850,000.00 Harga dalam kota

M3

880,000.00 Harga pinggiran

M3

905,000.00 Harga dalam kota

M3

935,000.00 Harga pinggiran

M3

930,000.00 Harga dalam kota

M3

960,000.00 Harga pinggiran

M3

965,000.00 Harga dalam kota

M3

995,000.00 Harga pinggiran

M3

1,000,000.00 Harga dalam kota

M3

1,030,000.00 Harga pinggiran

M3

1,060,000.00 Harga dalam kota

M3

1,090,000.00 Harga pinggiran

M3

1,100,000.00 Harga dalam kota

42

SATUAN
3
M3

KODE

HARGA

KETERANGAN

1,400,000.00 Harga pinggiran

43

SATUAN
3

KODE

HARGA

KETERANGAN

M3

5,000,000.00

M3

4,000,000.00

M3

3,300,000.00

M3

3,100,000.00

M3

650,000.00

Btg

18,000.00

Btg

12,000.00

Btg

15,000.00

Lbr

55,000.00

Lbr

60,000.00

Lbr

65,000.00

Lbr

92,000.00

Lbr

130,000.00

Lbr

165,000.00

Lbr

90,000.00

Lbr

105,000.00

Lbr

155,000.00

Lbr

210,000.00

Lbr

70,000.00

Kg

18,000.00

Kg

23,000.00

Kg

10,000.00

Kg

12,750.00

Kg

16,000.00

Kg

20,000.00

Kg

40,000.00

Kg

30,000.00

Kg

25,000.00

Kg

25,000.00

Kg

17,500.00

Kg

16,500.00

44

SATUAN
3

KODE

HARGA

KETERANGAN

Kg

20,000.00

Kg

20,000.00

Bh

16,000.00

Kg

19,000.00

Kg

20,700.00

M1

295,000.00

M2

275,000.00

Rol

120,000.00

M2

20,000.00

M2

24,000.00

Kg

27,500.00

Bh

7,500.00

Lbr

230,000.00

Lbr

435,000.00

Lbr

400,000.00

Lbr

680,000.00

Lbr

600,000.00

M1

20,000.00

M1

12,000.00

Lbr

43,000.00

Lbr

46,000.00

Lbr

55,000.00

Lbr

45,000.00

Lbr

50,000.00

Lbr

55,000.00

Lbr

85,000.00

Lbr

70,000.00

Lbr

17,000.00

Lbr

60,000.00

Lbr

75,000.00

Lbr

90,000.00

M1

25,000.00

45

SATUAN
3

KODE

HARGA

KETERANGAN

Lbr

65,000.00

Lbr

55,000.00

Lbr

48,000.00

46

SATUAN
3

KODE

HARGA

KETERANGAN

Lbr

45,000.00

Lbr

105,000.00

Lbr

85,000.00

Lbr

55,000.00

Lbr

125,000.00

Lbr

100,000.00

Lbr

75,000.00

M1

25,000.00

Bh

9,200.00

Bh

13,000.00

Bh

11,000.00

Bh

8,000.00

Lbr

72,000.00

Lbr

45,000.00

Lbr

40,000.00

Lbr

34,000.00

Lbr

30,000.00

Lbr

22,000.00

M2

110,000.00

M2

18,000.00

M2

120,000.00

Lbr

7,500.00

Bh

1,500.00

Bh

2,500.00

Bh

2,500.00

Bh

4,000.00

Lbr

48,000.00

M2

75,000.00

M2

235,000.00

Kodi

1,120,000.00

Lbr

40,000.00

Lbr

80,000.00

47

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

450,000.00

SES/CAVELL

Bh

320,000.00

GIORDINI

Bh

240,000.00

BELAGIO

Bh

300,000.00

Bh

225,000.00

Bh

150,000.00

Bh

270,000.00

Bh

105,000.00

Bh

80,000.00

Bh

60,000.00

Bh

25,000.00

CAVEL

Ktk

50,000.00

CAVEL

Bh

20,000.00

RUSH

Ktk

40,000.00

RUSH

Bh

15,000.00

Ktk

30,000.00

Bh

17,500.00

Ktk

35,000.00

Bh

15,000.00

Ktk

30,000.00

Bh

12,500.00

Ktk

25,000.00

Bh

80,000.00

CAVELL

Bh

60,000.00

BOZANO

Bh

40,000.00

Bh

60,000.00

Bh

40,000.00

Bh

20,000.00

Bh

5,000.00

Bh

200,000.00

CAVELL

Bh

140,000.00

BOZANO

Bh

110,000.00

Bh

30,000.00

48

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

25,000.00

Bh

10,000.00

Bh

55,000.00

CAVELL

Bh

40,000.00

BOZANO

Bh

20,000.00

Bh

35,000.00

49

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

250,000.00

TOTO

Bh

180,000.00

American Standard

Bh

120,000.00

DUTY

Set

2,800,000.00

TOTO

Set

1,800,000.00

American Standard

Set

1,200,000.00

DUTY

Bh

350,000.00

Bh

200,000.00

Bh

150,000.00

Set

4,500,000.00

TOTO

Set

3,500,000.00

American Standard

Set

3,000,000.00

Set

250,000.00

Set

150,000.00

Set

90,000.00

Bh

1,200,000.00

Bh

550,000.00

Bh

250,000.00

Set

300,000.00

Set

1,300,000.00

Set

1,000,000.00

Set

900,000.00

Bh

600,000.00

Bh

800,000.00

Bh

1,200,000.00

Bh

140,000.00

SOLIGEN

Bh

110,000.00

BANDINI

Bh

70,000.00

Bh

150,000.00

Bh

55,000.00

Bh

15,000.00

Bh

425,000.00

Bh

60,000.00

FIO

50

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

45,000.00

Bh

180,000.00

Bh

1,200,000.00

Bh

650,000.00

Bh

370,000.00

M2

65,000.00

M2

65,000.00

M2

70,000.00

M2

70,000.00

M2

60,000.00

M2

60,000.00

M2

65,000.00

M2

65,000.00

M2

55,000.00

M2

55,000.00

M2

55,000.00

M2

55,000.00
58,000.00

M2

58,000.00

M1

7,000.00

M1

7,500.00

M2

200,000.00

M2

30,000.00

M2

180,000.00

M2

180,000.00

M2

185,000.00

M2

200,000.00

51

SATUAN
3

KODE

HARGA

KETERANGAN

M2

150,000.00

M2

166,000.00

M2

170,000.00

M2

180,000.00

M2

140,000.00

M2

141,000.00

M2

143,000.00

M2

145,000.00

M2

295,000.00

M2

285,000.00

Kg

40,000.00

Bh

5,500.00

Bh

3,000.00

Bh

1,300.00

Bh

5,900.00

Bh

3,250.00

Bh

62,500.00

Bh

195,312.50

Bh

425,000.00

Bh

3,100.00

Bh

30,000.00

Bh

12,000.00

Bh

6,500.00

M2

150,000.00

Lbr

15,000.00

Lbr

25,000.00

Lbr

75,000.00

Lbr

70,000.00

Lbr

75,000.00

M2

44,000.00

M2

46,000.00

52

SATUAN
3

KODE

HARGA

KETERANGAN

M1

10,000.00

M1

13,000.00

M1

15,000.00

M1

21,000.00

Kg

25,000.00

Kg

40,000.00

Kg

17,000.00

Kg

9,500.00

Bh

2,000.00

M2

100,000.00

M2

155,000.00

M2

230,000.00

M2

110,000.00

M2

145,000.00

M2

260,000.00

M2

175,000.00

M2

225,000.00

M2

170,000.00

Bh

20,000.00

M2

130,000.00

Titik

270,000.00

Bh

35,000.00

Bh

30,000.00

Bh

12,000.00

Bh

20,000.00

Bh

19,000.00

Bh

12,000.00

Bh

28,000.00

Bh

27,000.00

Bh

15,000.00

53

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

36,000.00

Bh

35,000.00

Bh

15,000.00

Bh

12,000.00

Set

105,000.00

Set

120,000.00

M1

5,700.00

M1

7,000.00

M1

9,300.00

M1

11,700.00

M1

16,500.00

M1

12,500.00

M1

17,500.00

M1

27,500.00

M1

41,250.00

M1

4,560.00

M1

5,600.00

M1

7,440.00

M1

9,360.00

M1

13,200.00

M1

10,000.00

M1

14,000.00

M1

22,000.00

M1

33,000.00

Bh

36,000.00

Bh

22,500.00

Bh

14,800.00

Bh

12,000.00

Bh

8,000.00

54

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

5,500.00

Bh

4,400.00

Bh

3,300.00

Bh

2,800.00

Bh

57,000.00

Bh

50,000.00

Bh

30,000.00

Bh

17,500.00

Bh

12,000.00

Bh

8,000.00

Bh

5,000.00

Bh

3,700.00

Bh

3,200.00

Bh

43,000.00

Bh

28,000.00

Bh

17,000.00

Bh

11,300.00

Bh

8,000.00

Bh

4,900.00

Bh

4,100.00

Bh

3,500.00

Bh

3,000.00

Bh

60,000.00

Bh

40,000.00

Bh

27,000.00

Bh

21,000.00

Bh

14,500.00

Bh

10,700.00

Bh

8,200.00

Bh

4,200.00

Bh

4,000.00

55

SATUAN
3

KODE

HARGA

KETERANGAN

Bh

51,000.00

Bh

37,000.00

Bh

20,000.00

Bh

13,200.00

Bh

9,300.00

Bh

6,700.00

Bh

4,700.00

Bh

3,500.00

Bh

2,700.00

Bh

96,000.00

Bh

69,000.00

Bh

34,000.00

Bh

21,500.00

Bh

15,500.00

Bh

11,500.00

Bh

8,700.00

Bh

5,500.00

Bh

3,300.00

M1

45,000.00

M1

55,500.00

56

SATUAN
3

KODE

HARGA

KETERANGAN

M1

70,000.00

M1

105,000.00

M1

125,000.00

M1

150,000.00

M1

238,000.00

M1

297,000.00

Kg

22,000.00

Ltr

27,000.00

Ltr

18,000.00

Kg

12,000.00

Ltr

20,000.00

Lbr

3,000.00

Bh

12,000.00

Bh

25,000.00

Bh

8,000.00

Bh

10,000.00

Bh

13,000.00

Bh

15,000.00

Bh

18,000.00

Bh

25,000.00

Bh

35,000.00

Bh

25,000.00

Bh

15,000.00

Kg

20,000.00

Kg

120,000.00

Kg

80,000.00

Kg

35,000.00

Kg

95,000.00

Kg

60,000.00

Kg

20,000.00

Kg

11,500.00

Ltr

60,000.00

57

SATUAN
3

KODE

HARGA

KETERANGAN

Ltr

94,000.00

Ltr

35,000.00

Ltr

25,000.00

Ltr

7,500.00

Kg

22,000.00

3 ltr

65,000.00

Ltr

35,000.00

Ltr

60,000.00

Ltr

15,000.00

Kg

18,000.00

Ltr

12,500.00

M2

65,000.00

M2

90,000.00

Lobang

230,000.00
250,000.00

Lobang

75,000.00

Pintu

550,000.00

Lobang

250,000.00

bh

500,000.00

bh

150,000.00

bh

200,000.00

btg

20,000.00

bh

650,000.00

bh

1,100,000.00

58

DAFTAR UPAH KERJA

PROVINSI
KOTA
PERIODE

: RIAU
: DUMAI
: 2015

NO.
1
I

POSISI KERJA

SATUAN

KODE

1 Pekerja

OH

L.01

2 Kepala Tukang Batu

OH

L.03

3 Tukang Batu

OH

L.02

5 Kepala Tukang Kayu

OH

L.03

6 Tukang Kayu

OH

L.02

8 Kepala Tukang Cat

OH

L.03

9 Tukang Cat

OH

L.02

11 Kepala Tukang Besi

OH

L.03

12 Tukang Besi

OH

L.02

13 Tukang Konstruksi

OH

L.02

14 Mandor

OH

L.04

16 Tukang Listrik

OH

L.02

17 Tukang Pipa

OH

L.02

18 Tukang Las

OH

L.02

19 Pembantu Mekanik

OH

L.06

20 Mekanik

OH

L.05

21 Pembantu Operator

OH

L.06

22 Operator

OH

L.05

23 Petugas Satpam

OH

L.07

24 Sopir Truck
25 Juru Ukur
26 Pembantu juru ukur

OH
OH
OH

L.08
L.05
L.06

2
UPAH TENAGA KERJA

DAFTAR UPAH KERJA

HARGA

KETERANGAN

65,000.00
95,000.00
85,000.00
95,000.00
85,000.00
95,000.00
85,000.00
95,000.00
85,000.00
85,000.00
95,000.00
85,000.00
85,000.00
85,000.00
65,000.00
95,000.00
65,000.00
95,000.00
65,000.00
95,000.00
95,000.00
65,000.00

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN

: A.01
: MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK =

No.

U RAIAN

A.

Sewa Tanah

B.

PERALATAN
Periksa lembar 1.2-2

C.
1
2
3
4
5
6

D.

SATUAN

VOL.

M2

FASILITAS KANTOR
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
................................................

M2
M2
M2
M2
M2
M2

50 - 300
10 - 60
10 - 60
20 - 100
20 - 100
10 - 50

FASILITAS LABORATORIUM
1
2
3

Slump Cone
Cylinder/Cube Mould for Compressive Strength
........................

1
2
3
4
5
6

MOBILISASI LAINNYA
.....................................
......................
......................
......................
......................
......................

E.

F.

Set
....
....
....
....
....

DEMOBILISASI

LS

30%

Total Biaya Mobilisasi


Catatan :

Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN

No.

: 1.2
: MOBILISASI

JENIS ALAT

KODE
ALAT

SATUAN

VOL.

B.

PERALATAN
1
2
3
4
5
6
7

COMPRESSOR 4000-6500 L\M


CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
GENERATOR SET
TAMPER
JACK HAMMER
CONCRETE PUMP

Total untuk Item B pada Lembar 1

Unit
Unit
Unit
Unit
Unit
Unit
Unit

Lembar 1.2-1
JUMLAH
HARGA
(Rp.)

HARGA
SATUAN
(Rp.)

mobilisasi di atas sudah termasuk over-head dan laba

HARGA
SATUAN

Lembar 1.2-2
JUMLAH
HARGA

(Rp.)

(Rp.)

AHSP.BIDANG CIPTA KARYA

A. PEKERJAAN PERSIAPAN
A.02 1 M2 Papan Nama Proyek
No

Uraian

Kode

Satuan

Koefisien

Tenaga

Pekerja

L.01

OH

1.000

Tukang Kayu

L.02

OH

1.000

Kepala Tukang Kayu

L.03

OH

0.100

Tukang Cat dan Tulis

L.02

OH

1.500

Mandor

L.04

OH

0.100

Jumlah Ha
B

Bahan

Multiplek tebal 12 mm

Lbr

1.000

Kayu 8/12 Kelas II

m3

0.077

Paku Campuran 5 cm dan 7 cm

Kg

1.250

Cat Kayu

Kg

2.5

Jum
C

Peralatan

Jumlah
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

A.03 1 M1 Pengukuran dan Pasang Bouwplank


No

Uraian

Kode

Satuan

Koefisien

Tenaga

Pekerja

L.01

OH

0.100

Tukang Kayu

L.02

OH

0.100

Kepala Tukang

L.03

OH

0.010

Mandor

L.04

OH

0.005

Jumlah Ha
B

Bahan

Kayu Balok 5/7

m3

0.012

Paku 2" - 3"

Kg

0.020

Kayu Papan 2/30

m3

0.007

AHSP.BIDANG CIPTA KARYA

Jum
C

Peralatan

Jumlah
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

A.04 1 m2 Membersihkan lapangan dan perataan


No

Uraian

Kode

Satuan

Koefisien

Tenaga

Pekerja

L.01

OH

0.100

Mandor

L.04

OH

0.05

Jumlah Ha
B

Bahan

Jum
C

Peralatan

Jumlah
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

A.05 1 m2 membuat jalan sementara


No

Uraian

Kode

Satuan

Koefisien

Tenaga

Pekerja

L.01

OH

1.000

Mandor

L.04

OH

0.05

Jumlah Ha
B

Bahan

AHSP.BIDANG CIPTA KARYA


1

Batu belah

m2

0.15

Batu pecah

m3

0.090

Pasir pasang

m3

0.010

Jum
C

Peralatan

Jumlah
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

A.08 Pembongkaran 1 m3 dinding tembok bata


No

Uraian

Kode

Satuan

Koefisien

Tenaga

Pekerja

L.01

OH

0.200

Mandor

L.04

OH

0.020

Jumlah Ha
B

Bahan

Jum
C

Peralatan

Jumlah
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)

Jumlah
(Rp)

65,000.00

65,000.00

85,000.00

85,000.00

95,000.00

9,500.00

85,000.00

127,500.00

95,000.00

9,500.00

Jumlah Harga Tenaga Kerja

296,500.00

165,000.00

165,000.00

4,000,000.00

308,000.00

16,500.00

20,625.00

35,000.00

87,500.00

Jumlah Harga Bahan

581,125.00

Jumlah Harga Peralatan

877,625.00

xD

87,762.50
965,387.50

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00

6,500.00

85,000.00

8,500.00

95,000.00

950.00

95,000.00

475.00

Jumlah Harga Tenaga Kerja

16,425.00

3,300,000.00

39,600.00

16,500.00

330.00

3,300,000.00

23,100.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

63,030.00

Jumlah Harga Peralatan

79,455.00

xD

7,945.50
87,400.50

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00

6,500.00

95,000.00

4,750.00

Jumlah Harga Tenaga Kerja

11,250.00

Jumlah Harga Bahan

Jumlah Harga Peralatan

11,250.00

xD

1,125.00
12,375.00

Harga Satuan
(Rp)

Jumlah
(Rp)

65,000.00

65,000.00

95,000.00

4,750.00

Jumlah Harga Tenaga Kerja

69,750.00

AHSP.BIDANG CIPTA KARYA


510,000.00

76,500.00

400,000.00

36,000.00

120,000.00

1,200.00

Jumlah Harga Bahan

113,700.00

Jumlah Harga Peralatan

183,450.00

xD

18,345.00
201,795.00

Harga Satuan
(Rp)

Jumlah
(Rp)

65,000.00

13,000.00

95,000.00

1,900.00

Jumlah Harga Tenaga Kerja

14,900.00

Jumlah Harga Bahan

Jumlah Harga Peralatan

14,900.00

xD

1,490.00
16,390.00

AHSP.BIDANG CIPTA KARYA

B. PEKERJAAN TANAH
T.01a Penggalian 1 m3 tanah biasa sedalam 1 m
No

Uraian

Kode

Satuan

Tenaga

Pekerja

L.01

OH

Mandor

L.04

OH

Jum
B

Bahan

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.01b Penggalian 1 m3 tanah biasa sedalam 2 m


No

Uraian

Kode

Satuan

Tenaga

Pekerja

L.01

OH

Mandor

L.04

OH

Jum
B

Bahan

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

AHSP.BIDANG CIPTA KARYA


E

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.09a Pengurugan Kembali 1 m3 galian tanah biasa sedalam 1 m


No

Uraian

Kode

Satuan

Tenaga

Pekerja

L.01

OH

Mandor

L.04

OH

Jum
B

Bahan

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.09b Pengurugan Kembali 1 m3 galian tanah biasa sedalam 2 m


No

Uraian

Kode

Satuan

1
A
1
2

L.01
L.04

OH
OH

Tenaga
Pekerja
Mandor

Jum
B

Bahan

Peralatan

AHSP.BIDANG CIPTA KARYA


D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.10 Pemadatan tanah 1 m3 tanah (per 20 cm)


No

Uraian

Kode

Satuan

Tenaga

Pekerja

L.01

OH

Mandor

L.04

OH

Jum
B

Bahan

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.11 Pengurugan 1 m3 dengan pasir urug


No

Uraian

Kode

Satuan

Tenaga

Pekerja

L.01

OH

Mandor

L.04

OH

Jum
B

Bahan

Pasir Urug

AHSP.BIDANG CIPTA KARYA


C

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.13 1 m3 Urugan Tanah


No

Uraian

Kode

Satuan

Tenaga

Pekerja

L.01

OH

Mandor

L.04

OH

Jum
B
1

Bahan
Tanah Urug

m3

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

T.15 1 m1 Pasang kayu cerucuk dia. 12 - 15 cm


No

Uraian

Kode

Satuan

1
A
1
4

L.01
L.04

OH
OH

Tenaga
Pekerja
Mandor

Jum
B

Bahan

Kayu cerucuk dia 12 - 15 cm

m1

AHSP.BIDANG CIPTA KARYA

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

T.16 1 m1 pasang kayu cerucuk dia. 8 - 10 cm


No

Uraian

Kode

Satuan

1
A
1
4

L.01
L.04

OH
OH

Tenaga
Pekerja
Mandor

Jum
B

Bahan

Kayu cerucuk dia 8 - 10 cm

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

m1

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.750

65,000.00

48,750.00

0.025

95,000.00

2,375.00

Jumlah Harga Tenaga Kerja

51,125.00

Jumlah Harga Bahan

Jumlah Harga Peralatan

51,125.00

10% x D

5,112.50
56,237.50

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.900

65,000.00

58,500.00

0.045

95,000.00

4,275.00

Jumlah Harga Tenaga Kerja

62,775.00

Jumlah Harga Bahan

Jumlah Harga Peralatan

62,775.00

AHSP.BIDANG CIPTA KARYA


10% x D

6,277.50
69,052.50

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.250

65,000.00

16,250.00

0.008

95,000.00

791.67

Jumlah Harga Tenaga Kerja

17,041.67

Jumlah Harga Bahan

Jumlah Harga Peralatan

17,041.67

10% x D

1,704.17
18,745.83

Harga Satuan
(Rp)

Koefisien
5

6
0.300
0.015

65,000.00
95,000.00

Jumlah Harga Tenaga Kerja

Jumlah Harga Bahan

Jumlah
(Rp)
7
19,500.00
1,425.00

20,925.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Peralatan
10% x D

20,925.00
2,092.50
23,017.50

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.500

65,000.00

32,500.00

0.050

95,000.00

4,750.00

Jumlah Harga Tenaga Kerja

37,250.00

Jumlah Harga Bahan

Jumlah Harga Peralatan

37,250.00

10% x D

3,725.00
40,975.00

Koefisien
5

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.300

65,000.00

19,500.00

0.010

95,000.00

950.00

Jumlah Harga Tenaga Kerja


1.200

120,000.00

20,450.00
144,000.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

144,000.00

Jumlah Harga Peralatan

164,450.00

10% x D

16,445.00
180,895.00

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.250

65,000.00

16,250.00

0.015

95,000.00

1,425.00

Jumlah Harga Tenaga Kerja


1.200

78,000.00

Jumlah Harga Bahan

17,675.00
93,600.00

93,600.00

Jumlah Harga Peralatan

111,275.00

10% x D

11,127.50
122,402.50

Koefisien
5

Harga Satuan
(Rp)
6

0.030
65,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja
1.000

4,500.00

Jumlah
(Rp)
7
1,950.00
285.00
2,235.00
4,500.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

4,500.00

Jumlah Harga Peralatan

6,735.00
673.50
7,408.50

10% x D

Harga Satuan
(Rp)

Koefisien
5

0.030
65,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja
1.000

3,000.00

Jumlah
(Rp)
7
1,950.00
285.00
2,235.00
3,000.00

Jumlah Harga Bahan

3,000.00

Jumlah Harga Peralatan

5,235.00
523.50
5,758.50

10% x D

AHSP.BIDANG CIPTA KARYA

C. PEKERJAAN PONDASI
P.03 Pemasangan 1 m3 pondasi sumuran, diameter 100 cm
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jum
B

Bahan

1
2

Batu Belah
Semen portland

m3
Kg

Pasir Beton

m3

Kerikil

m3

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.04 Pengadaan tiang pancang (ukuran 25 x 25 x 6 m')


No

Uraian

Kode

Satuan

1
A
1
2
3
4
5

L.01
L.05
L.05
L.03
L.04

OH
OH
OH
OH
OH

Tenaga
Pekerja
Mekanik
Operator (Heavy)
Kepala Tukang
Mandor

Jum
B
1

Bahan
Tiang Pancang (uk. 25/25 Panjang 6 m)

C
1
2

Peralatan
Crewler Crane
Alat Bantu

jam
Ls

AHSP.BIDANG CIPTA KARYA


D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.05 Handling tiang pancang (dilapangan)


No

Uraian

Kode

Satuan

1
A
1
2
3
4
5

L.01
L.05
L.05
L.03
L.04

OH
OH
OH
OH
OH

Tenaga
Pekerja
Mekanik
Operator (Heavy)
Kepala Tukang
Mandor

Jum
B

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.06 1 m Pemancangan Tiang Pancang


No

Uraian

Kode

Satuan

1
A
1
2
3
4
5

L.01
L.05
L.05
L.03
L.04

OH
OH
OH
OH
OH

Tenaga
Pekerja
Mekanik
Operator (Heavy)
Kepala Tukang
Mandor

Jum
B

Bahan

AHSP.BIDANG CIPTA KARYA


C
1
2
3

Peralatan
Diesel Hammer (Pile driver + hammer)
Crewler crane
Alat Bantu

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

jam
jam
Ls

P.07 1 Titik Penyambungan Tiang Pancang


No

Uraian

Kode

Satuan

1
A
1
2
3
4
5

L.01
L.05
L.05
L.03
L.04

OH
OH
OH
OH
OH

Tenaga
Pekerja
Mekanik
Operator (Heavy)
Kepala Tukang
Mandor

Jum
B
1

Bahan
Kawat Las

jam

C
1
2

Peralatan
Mesin Las (Welding Set)
Alat Bantu

jam
Ls

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.08 1 Titik Pemotongan tiang pancang


No

Uraian

Kode

Satuan

1
A
1
2

L.01
L.05

OH
OH

Tenaga
Pekerja
Mekanik

AHSP.BIDANG CIPTA KARYA


3
4
5

Operator (Heavy)
Kepala Tukang
Mandor

L.05
L.03
L.04

OH
OH
OH

Jum
B

Bahan

C
1
2

Peralatan
Blender (Bleding equipment)
Alat Bantu

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

jam
Ls

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

2.400
65,000.00
0.800
85,000.00
0.080
95,000.00
0.119
95,000.00
Jumlah Harga Tenaga Kerja

156,000.00
68,000.00
7,600.00
11,305.00
242,905.00

0.450
194.000

10,000.00
1,160.00

4,500.00
225,040.00

0.312

500,000.00

156,000.00

0.468
280,000.00
Jumlah Harga Bahan

131,040.00
516,580.00

Jumlah Harga Peralatan

759,485.00
75,948.50
835,433.50

10% x D

Harga Satuan
(Rp)

Koefisien
5

6
0.150
0.150
0.030
0.015
0.010

65,000.00
95,000.00
95,000.00
95,000.00
95,000.00

Jumlah Harga Tenaga Kerja


1.000

260,000.00

Jumlah Harga Bahan


0.138
1.000

250000.00
500.00

Jumlah
(Rp)
7
9,750.00
14,250.00
2,850.00
1,425.00
950.00
29,225.00
260,000.00
260,000.00
34,500.00
500.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Peralatan
10% x D

Harga Satuan
(Rp)

Koefisien
5

6
0.064
0.020
0.020
0.020
0.020

65,000.00
95,000.00
95,000.00
95,000.00
95,000.00

Jumlah Harga Tenaga Kerja

35,000.00
324,225.00
32,422.50
356,647.50

Jumlah
(Rp)
7
4,160.00
1,900.00
1,900.00
1,900.00
1,900.00
11,760.00

Jumlah Harga Bahan

Jumlah Harga Peralatan


10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.813
0.181
0.182
0.018
0.090

65,000.00
95,000.00
95,000.00
95,000.00
95,000.00

Jumlah Harga Tenaga Kerja

11,760.00
1,176.00
12,936.00

Jumlah
(Rp)
7
52,845.00
17,195.00
17,290.00
1,710.00
8,550.00
97,590.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan
0.056
0.090
1.000

200,000.00
250,000.00
500.00

Jumlah Harga Peralatan


10% x D

Harga Satuan
(Rp)

Koefisien
5

6
0.500
0.200
0.020
0.025
0.020

65,000.00
95,000.00
95,000.00
95,000.00
95,000.00

Jumlah Harga Tenaga Kerja


0.432

27,500.00

Jumlah Harga Bahan


0.056
1.000

200,000.00
500.00

Jumlah Harga Peralatan


10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.500
0.200

65,000.00
95,000.00

11,200.00
22,500.00
500.00
34,200.00
131,790.00
13,179.00
144,969.00

Jumlah
(Rp)
7
32,500.00
19,000.00
1,900.00
2,375.00
1,900.00
57,675.00
11,880.00
11,880.00
11,200.00
500.00
11,700.00
81,255.00
8,125.50
89,380.50

Jumlah
(Rp)
7
32,500.00
19,000.00

AHSP.BIDANG CIPTA KARYA


0.020
0.025
0.020

95,000.00
95,000.00
95,000.00

Jumlah Harga Tenaga Kerja

Jumlah Harga Bahan


1.500
1.000

200,000.00
500.00

Jumlah Harga Peralatan


10% x D

1,900.00
2,375.00
1,900.00
57,675.00

300,000.00
500.00
300,500.00
358,175.00
35,817.50
393,992.50

AHSP.BIDANG CIPTA KARYA

D. PEKERJAAN BETON

B.02a Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78 (Ma
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

276.000
0.591
0.750
215.000
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.02b Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78 (Mo
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
0.189
0.019
0.066
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

276.000
0.591
0.750
215.000
Juml

C
1

Peralatan
Molen 0,35

Sewa-hari

0.250
Jumlah

AHSP.BIDANG CIPTA KARYA


D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.05a Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

326.000
0.543
0.762
215.000
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.05b Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
0.189
0.019
0.066
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

326.000
0.543
0.762
215.000
Juml

Peralatan

AHSP.BIDANG CIPTA KARYA


1

Molen 0,35

Sewa-hari

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

0.250
Jumlah
10%

B.07a Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

371.000
0.499
0.776
215.000
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.07b Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

1.323
0.189
0.019
0.066
Jumlah Har
371.000
0.499
0.776
215.000

AHSP.BIDANG CIPTA KARYA

Juml
C
1

Peralatan
Molen 0,35

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Sewa-hari

0.250
Jumlah
10%

B.08a Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

384.000
0.494
0.770
215.000
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.08b Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
0.189
0.019
0.066
Jumlah Har

B
1
2

Bahan
Semen Portland
Pasir Beton

Kg
m3

384.000
0.494

AHSP.BIDANG CIPTA KARYA


3
4

Kerikil (Maks 30 mm)


Air

m3
Liter

C
1

Peralatan
Molen 0,35

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

0.770
215.000
Juml

Sewa-hari

0.250
Jumlah
10%

B.12a Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0,48 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

2.100
0.350
0.035
0.105
Jumlah Har

B
1
2
3
4

Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

448.000
0.476
0.741
215.000
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.12b Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0,48 (M
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Bahan

1.680
0.240
0.004
0.084
Jumlah Har

AHSP.BIDANG CIPTA KARYA


1
2
3
4

Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air

Kg
m3
m3
Liter

C
1

Peralatan
Molen 0,35

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

448.000
0.476
0.741
215.000
Juml

Sewa-hari

0.250
Jumlah
10%

B.14b Pembesian 1 Kg dengan besi polos


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.0070
0.0070
0.0007
0.0004
Jumlah Har

B
1
2

Bahan
Besi beton polos
Kawat beton

kg
kg

1.050
0.015
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.15b Pembesian 1 Kg dengan besi ulir


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Bahan

0.0070
0.0070
0.0007
0.0004
Jumlah Har

AHSP.BIDANG CIPTA KARYA


1
2

Besi beton ulir


Kawat beton

Peralatan

kg
kg

1.050
0.015
Juml
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.16a Pembesian 10 Kg kabel presstressed polos


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.0500
0.0500
0.0050
0.0030
Jumlah Har

B
1
2

Bahan
Besi beton polos
Kawat beton

kg
kg

10.500
0.150
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.17a Pemasangan 1 m2 bekisting untuk pondasi


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.5200
0.2600
0.0260
0.0260
Jumlah Har

Bahan

1
2
3

Kayu kelas III


Paku 5 - 10 cm
Minyak bekisting

m3
kg
Liter

0.040
0.300
0.100

AHSP.BIDANG CIPTA KARYA

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.17b Pemasangan 1 m2 bekisting untuk sloof


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Bahan

1
2
3

Kayu kelas III


Paku 5 - 10 cm
Minyak bekisting

Peralatan

0.5200
0.2600
0.0260
0.0260
Jumlah Har

m3
kg
Liter

0.045
0.300
0.100
Juml
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.17c Pemasangan 1 m2 bekisting untuk kolom


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.6600
0.3300
0.0330
0.0330
Jumlah Har

Bahan

1
2
3

Kayu kelas III


Paku 5 - 10 cm
Minyak Bekisting

m3
kg
Liter

0.040
0.400
0.200

Balok kayu kelas II

m3

0.015

AHSP.BIDANG CIPTA KARYA


5
6

Plywood tebal 9 mm
Dolken kayu 8 - 10 cm Panjang 4 m

Lbr
Batang

0.350
2.000

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.17d Pemasangan 1 m2 bekisting untuk balok


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.6600
0.3300
0.0330
0.0330
Jumlah Har

Bahan

1
2
3

Kayu kelas III


Paku 5 - 12 cm
Minyak Bekisting

m3
kg
Liter

0.040
0.400
0.200

4
5
6

Balok kayu kelas II


Plywood tebal 9 mm
Dolken kayu 8 - 10 cm Panjang 4 m

m3
Lbr
Batang

0.018
0.350
2.000

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.17e Pemasangan 1 m2 bekisting untuk lantai


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang

0.6600
0.3300
0.0330

AHSP.BIDANG CIPTA KARYA


4

Mandor

L.04

Bahan

1
2
3

Kayu kelas III


Paku 5 - 12 cm
Minyak Bekisting

4
5
6

Balok kayu kelas II


Plywood tebal 9 mm
Dolken kayu 8 - 10 cm Panjang 4 m

OH

0.0330
Jumlah Har

m3
kg
Liter

0.040
0.400
0.200

m3
Lbr
Batang

0.015
0.350
3.000

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.17g Pemasangan 1 m2 bekisting untuk tangga


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.6600
0.3300
0.0330
0.0330
Jumlah Har

Bahan

1
2
3

Kayu kelas III


Paku 5 - 12 cm
Minyak Bekisting

m3
kg
Liter

0.030
0.400
0.150

4
5
6

Balok kayu kelas II


Plywood tebal 9 mm
Dolken kayu 8 - 10 cm Panjang 4 m

m3
Lbr
Batang

0.015
0.350
2.000

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.18a Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


No

Uraian

Kode

Satuan

Koefisien

AHSP.BIDANG CIPTA KARYA


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

Bahan

1
2
3
4
5
6

Kayu kelas III


Paku 5 - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen Portland

Pasir beton

m3

0.540

Kerikil

m3

0.810

m3
kg
Liter
Kg
Kg
Kg

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
Jumlah Har
0.200
1.500
0.400
157.500
2.250
336.000

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.18b Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
Jumlah Har

Bahan

1
2
3

Kayu kelas III


Paku 5 - 12 cm
Minyak bekisting

m3
kg
Liter

0.270
2.000
0.600

AHSP.BIDANG CIPTA KARYA


4
5
6

Besi beton polos


Kawat beton
Semen Portland

Kg
Kg
Kg

210.000
3.000
336.000

Pasir beton

m3

0.540

Kerikil

0.810

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.18c Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

Bahan

1
2
3
4
5
6

Kayu kelas III


Paku 5 - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen Portland

Pasir beton

m3

0.540

Kerikil

m3

0.810

9
10
11

Kayu Kelas II balok


Plywood 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m

Peralatan

m3
kg
Liter
Kg
Kg
Kg

m3
Lembar
Batang

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
Jumlah Har
0.400
4.000
2.000
315.000
4.500
336.000

0.150
3.500
20.000
Juml
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA


B.18d Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

Bahan

1
2
3
4
5
6

Kayu kelas III


Paku 5 - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen Portland

Pasir beton

m3

0.540

Kerikil

0.810

m3
kg
Liter
Kg
Kg
Kg

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
Jumlah Har
0.320
3.200
1.600
210.000
3.000
336.000

9
10
11

Kayu Kelas II balok


Plywood 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m

Peralatan

m3
Lembar
Batang

0.140
2.800
16.000
Juml
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.18e Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
Jumlah Har

AHSP.BIDANG CIPTA KARYA


B

Bahan

1
2
3
4
5
6

Kayu kelas III


Paku 5 - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
Semen Portland

Pasir beton

m3

0.540

Kerikil

0.810

m3
kg
Liter
Kg
Kg
Kg

0.320
3.200
1.600
157.500
2.250
336.000

9
10
11

Kayu Kelas II balok


Plywood 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m

Peralatan

m3
Lembar
Batang

0.120
2.800
32.000
Juml
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.18h Membuat 1 m kolom praktis beton bertulang (11 x 11) cm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
Jumlah Har

Bahan

1
2
3
4
5

Kayu kelas III


Paku 5 - 12 cm
Besi beton polos
Kawat beton
Semen Portland

m3
kg
Kg
Kg
Kg

0.002
0.010
3.000
0.450
4.000

Pasir beton

m3

0.006

Kerikil

0.009
Juml

Peralatan

Jumlah
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

AHSP.BIDANG CIPTA KARYA


E
F

Overhead + Profit / (10%)


Harga Satuan Pekerjaan (D+E)

10%

B.18i Membuat 1 m ring balok beton bertulang (10 x 15) cm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
3
4

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
Jumlah Har

Bahan

1
2
3
4
5

Kayu kelas III


Paku 5 - 12 cm
Besi beton polos
Kawat beton
Semen Portland

m3
kg
Kg
Kg
Kg

0.030
0.020
3.600
0.050
5.500

Pasir beton

m3

0.009

Kerikil

m3

0.015
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.19a Pemasangan 10 Kg Jaring Kawat Baja dilas (Wiremesh M-6A)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Jaring kawat baja dilas M-6A
Kawat beton

Kg
Kg

0.0250
0.0250
0.0250
0.0010
Jumlah Har
10.200
0.050

AHSP.BIDANG CIPTA KARYA

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.19b Pemasangan 1 Kg Jaring Kawat Baja dilas (Wiremesh M-6A)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.0025
0.0025
0.0025
0.0001
Jumlah Har

B
1
2

Bahan
Jaring kawat baja dilas M-6A
Kawat beton

Kg
Kg

1.020
0.005
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.20a 1 M3 Beton K-175 (Ready Mix)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.0000
0.2500
0.0250
0.1000
Jumlah Har

B
1

Bahan
Campuran beton Ready Mix K-175

m3

1.020

Juml
C

Peralatan
Jumlah

AHSP.BIDANG CIPTA KARYA


D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.20b 1 M3 Beton K-225 (Ready Mix)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.0000
0.2500
0.0250
0.1000
Jumlah Har

B
1

Bahan
Campuran beton Ready Mix K-225

m3

1.020

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

B.20c 1 M3 Beton K-250 (Ready Mix)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.0000
0.2500
0.0250
0.1000
Jumlah Har

B
1

Bahan
Campuran beton Ready Mix K-250

m3

1.020

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA


B.20e 1 M3 Beton K-350 (Ready Mix)
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.0000
0.2500
0.0250
0.1000
Jumlah Har

B
1

Bahan
Campuran beton Ready Mix K-350

m3

1.020

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA


0,78 (Manual)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

107,250.00
23,375.00
2,660.00
7,885.00
141,170.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

320,160.00
224,742.86
299,851.85
4,300.00
849,054.71

Jumlah Harga Peralatan

990,224.71
99,022.47
1,089,247.18

xD

0,78 (Molen)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

85,995.00
16,065.00
1,805.00
6,270.00
110,135.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

320,160.00
224,742.86
299,851.85
4,300.00
849,054.71

250,000.00
Jumlah Harga Peralatan

62,500.00
62,500.00

AHSP.BIDANG CIPTA KARYA


1,021,689.71
102,168.97
1,123,858.68

xD

= 0,66 (Manual)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

107,250.00
23,375.00
2,660.00
7,885.00
141,170.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

378,160.00
206,285.71
304,888.89
4,300.00
893,634.60

Jumlah Harga Peralatan

1,034,804.60
103,480.46
1,138,285.06

xD

= 0,66 (Molen)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

85,995.00
16,065.00
1,805.00
6,270.00
110,135.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

378,160.00
206,285.71
304,888.89
4,300.00
893,634.60

AHSP.BIDANG CIPTA KARYA


250,000.00
Jumlah Harga Peralatan
xD

62,500.00
62,500.00
1,066,269.60
106,626.96
1,172,896.56

= 0,58 (Manual)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

107,250.00
23,375.00
2,660.00
7,885.00
141,170.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

430,360.00
189,457.14
310,222.22
4,300.00
934,339.37

Jumlah Harga Peralatan

1,075,509.37
107,550.94
1,183,060.30

xD

= 0,58 (Molen)
Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
1,160.00
380,000.00
400,000.00
20.00

Jumlah
(Rp)
7
85,995.00
16,065.00
1,805.00
6,270.00
110,135.00
430,360.00
189,457.14
310,222.22
4,300.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

934,339.37

250,000.00
Jumlah Harga Peralatan

62,500.00
62,500.00
1,106,974.37
110,697.44
1,217,671.80

xD

= 0,56 (Manual)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

107,250.00
23,375.00
2,660.00
7,885.00
141,170.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

445,440.00
187,828.57
307,851.85
4,300.00
945,420.42

Jumlah Harga Peralatan

1,086,590.42
108,659.04
1,195,249.47

xD

= 0,56 (Molen)
Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
1,160.00
380,000.00

Jumlah
(Rp)
7
85,995.00
16,065.00
1,805.00
6,270.00
110,135.00
445,440.00
187,828.57

AHSP.BIDANG CIPTA KARYA


400,000.00
20.00
Jumlah Harga Bahan

307,851.85
4,300.00
945,420.42

250,000.00
Jumlah Harga Peralatan

62,500.00
62,500.00
1,118,055.42
111,805.54
1,229,860.97

xD

= 0,48 (Manual)
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

136,500.00
29,750.00
3,325.00
9,975.00
179,550.00

1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

519,680.00
181,042.86
296,296.30
4,300.00
1,001,319.15

Jumlah Harga Peralatan

1,180,869.15
118,086.92
1,298,956.07

xD

= 0,48 (Molen)
Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
109,200.00
20,400.00
380.00
7,980.00
137,960.00

AHSP.BIDANG CIPTA KARYA


1,160.00
380,000.00
400,000.00
20.00
Jumlah Harga Bahan

519,680.00
181,042.86
296,296.30
4,300.00
1,001,319.15

250,000.00
Jumlah Harga Peralatan

62,500.00
62,500.00
1,201,779.15
120,177.92
1,321,957.07

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

455.00
595.00
66.50
38.00
1,154.50

10,000.00
16,000.00
Jumlah Harga Bahan

10,500.00
240.00
10,740.00

Jumlah Harga Peralatan

11,894.50
1,189.45
13,083.95

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
455.00
595.00
66.50
38.00
1,154.50

AHSP.BIDANG CIPTA KARYA


12,750.00
16,000.00
Jumlah Harga Bahan

13,387.50
240.00
13,627.50

Jumlah Harga Peralatan

14,782.00
1,478.20
16,260.20

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

3,250.00
4,250.00
475.00
285.00
8,260.00

10,000.00
16,000.00
Jumlah Harga Bahan

105,000.00
2,400.00
107,400.00

Jumlah Harga Peralatan

115,660.00
11,566.00
127,226.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
3,300,000.00
16,500.00
12,500.00

Jumlah
(Rp)
7
33,800.00
22,100.00
2,470.00
2,470.00
60,840.00
132,000.00
4,950.00
1,250.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

138,200.00

Jumlah Harga Peralatan

199,040.00
19,904.00
218,944.00

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

33,800.00
22,100.00
2,470.00
2,470.00
60,840.00

3,300,000.00
16,500.00
12,500.00
Jumlah Harga Bahan

148,500.00
4,950.00
1,250.00
154,700.00

Jumlah Harga Peralatan

215,540.00
21,554.00
237,094.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
42,900.00
28,050.00
3,135.00
3,135.00
77,220.00

3,300,000.00
16,500.00
12,500.00

132,000.00
6,600.00
2,500.00

4,000,000.00

60,000.00

AHSP.BIDANG CIPTA KARYA


130,000.00
12,000.00

45,500.00
24,000.00

Jumlah Harga Bahan

270,600.00

Jumlah Harga Peralatan

347,820.00
34,782.00
382,602.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
42,900.00
28,050.00
3,135.00
3,135.00
77,220.00

3,300,000.00
16,500.00
12,500.00

132,000.00
6,600.00
2,500.00

4,000,000.00
130,000.00
12,000.00

72,000.00
45,500.00
24,000.00

Jumlah Harga Bahan

282,600.00

Jumlah Harga Peralatan

359,820.00
35,982.00
395,802.00

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00

Jumlah
(Rp)
7
42,900.00
28,050.00
3,135.00

AHSP.BIDANG CIPTA KARYA

95,000.00
umlah Harga Tenaga Kerja

3,135.00
77,220.00

3,300,000.00
16,500.00
12,500.00

132,000.00
6,600.00
2,500.00

4,000,000.00
130,000.00
12,000.00

60,000.00
45,500.00
36,000.00

Jumlah Harga Bahan

282,600.00

Jumlah Harga Peralatan

359,820.00
35,982.00
395,802.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
42,900.00
28,050.00
3,135.00
3,135.00
77,220.00

3,300,000.00
16,500.00
12,500.00

99,000.00
6,600.00
1,875.00

4,000,000.00
130,000.00
12,000.00

60,000.00
45,500.00
24,000.00

Jumlah Harga Bahan

236,975.00

Jumlah Harga Peralatan

314,195.00
31,419.50
345,614.50

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
344,500.00
23,375.00
110,500.00
89,250.00
24,890.00
25,175.00
617,690.00

3,300,000.00
16,500.00
12,500.00
10,000.00
16,000.00
1,160.00

660,000.00
24,750.00
5,000.00
1,575,000.00
36,000.00
389,760.00

380,000.00

205,200.00

400,000.00

324,000.00

Jumlah Harga Bahan

3,219,710.00

Jumlah Harga Peralatan

3,837,400.00
383,740.00
4,221,140.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
3,300,000.00
16,500.00
12,500.00

Jumlah
(Rp)
7
367,250.00
23,375.00
132,600.00
119,000.00
30,685.00
26,885.00
699,795.00
891,000.00
33,000.00
7,500.00

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA


10,000.00
16,000.00
1,160.00

2,100,000.00
48,000.00
389,760.00

380,000.00

205,200.00

400,000.00

324,000.00

Jumlah Harga Bahan

3,998,460.00

Jumlah Harga Peralatan

4,698,255.00
469,825.50
5,168,080.50

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
458,250.00
23,375.00
140,250.00
178,500.00
38,285.00
33,535.00
872,195.00

3,300,000.00
16,500.00
12,500.00
10,000.00
16,000.00
1,160.00

1,320,000.00
66,000.00
25,000.00
3,150,000.00
72,000.00
389,760.00

380,000.00

205,200.00

400,000.00

324,000.00

4,000,000.00
130,000.00
12,000.00
Jumlah Harga Bahan

600,000.00
455,000.00
240,000.00
6,846,960.00

Jumlah Harga Peralatan

7,719,155.00
771,915.50
8,491,070.50

xD

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
412,750.00
23,375.00
140,250.00
119,000.00
31,635.00
30,210.00
757,220.00

3,300,000.00
16,500.00
12,500.00
10,000.00
16,000.00
1,160.00

1,056,000.00
52,800.00
20,000.00
2,100,000.00
48,000.00
389,760.00

380,000.00

205,200.00

400,000.00

324,000.00

4,000,000.00
130,000.00
12,000.00
Jumlah Harga Bahan

560,000.00
364,000.00
192,000.00
5,311,760.00

Jumlah Harga Peralatan

6,068,980.00
606,898.00
6,675,878.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
344,500.00
23,375.00
110,500.00
89,250.00
25,175.00
25,175.00
617,975.00

AHSP.BIDANG CIPTA KARYA


3,300,000.00
16,500.00
12,500.00
10,000.00
16,000.00
1,160.00

1,056,000.00
52,800.00
20,000.00
1,575,000.00
36,000.00
389,760.00

380,000.00

205,200.00

400,000.00

324,000.00

4,000,000.00
130,000.00
12,000.00
Jumlah Harga Bahan

480,000.00
364,000.00
384,000.00
4,886,760.00

Jumlah Harga Peralatan

5,504,735.00
550,473.50
6,055,208.50

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
11,700.00
1,700.00
1,700.00
1,700.00
570.00
855.00
18,225.00

3,300,000.00
16,500.00
10,000.00
16,000.00
1,160.00

6,600.00
165.00
30,000.00
7,200.00
4,640.00

380,000.00

2,280.00

400,000.00
Jumlah Harga Bahan

3,600.00
54,485.00

Jumlah Harga Peralatan

72,710.00

AHSP.BIDANG CIPTA KARYA


xD

7,271.00
79,981.00

Harga Satuan
(Rp)
6

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

Jumlah
(Rp)
7
19,305.00
2,805.00
2,805.00
2,805.00
950.00
1,425.00
30,095.00

3,300,000.00
16,500.00
10,000.00
16,000.00
1,160.00

99,000.00
330.00
36,000.00
800.00
6,380.00

380,000.00

3,420.00

400,000.00
Jumlah Harga Bahan

6,000.00
151,930.00

Jumlah Harga Peralatan

182,025.00
18,202.50
200,227.50

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
12,514.38
16,000.00

Jumlah
(Rp)
7
1,625.00
2,125.00
2,375.00
95.00
6,220.00
127,646.72
800.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

128,446.72

Jumlah Harga Peralatan

134,666.72
13,466.67
148,133.39

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja

162.50
212.50
237.50
9.50
622.00

12,514.38
16,000.00
Jumlah Harga Bahan

12,764.67
80.00
12,844.67

Jumlah Harga Peralatan

13,466.67
1,346.67
14,813.34

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
905,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan

Jumlah
(Rp)
7
65,000.00
21,250.00
2,375.00
9,500.00
98,125.00
923,100.00
923,100.00
-

AHSP.BIDANG CIPTA KARYA


1,021,225.00
102,122.50
1,123,347.50

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
930,000.00

Jumlah
(Rp)
7
65,000.00
21,250.00
2,375.00
9,500.00
98,125.00
948,600.00

Jumlah Harga Bahan

948,600.00

Jumlah Harga Peralatan

1,046,725.00
104,672.50
1,151,397.50

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
965,000.00

Jumlah
(Rp)
7
65,000.00
21,250.00
2,375.00
9,500.00
98,125.00
984,300.00

Jumlah Harga Bahan

984,300.00

Jumlah Harga Peralatan

1,082,425.00
108,242.50
1,190,667.50

xD

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
umlah Harga Tenaga Kerja
1,060,000.00

Jumlah
(Rp)
7
65,000.00
21,250.00
2,375.00
9,500.00
98,125.00
1,081,200.00

Jumlah Harga Bahan

1,081,200.00

Jumlah Harga Peralatan

1,179,325.00
117,932.50
1,297,257.50

xD

AHSP.BIDANG CIPTA KARYA


E. PEKERJAAN BESI & ALUMINIUM
BA.01 Pemasangan 1 kg besi profil
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang las konstruksi
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.060
0.060
0.006
0.003
Jumlah Harg

B
1

Bahan
Besi Profil

Kg

1.150

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.02 Pemasangan 1 kg rangka kuda-kuda IWF


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang las konstruksi
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.060
0.060
0.006
0.003
Jumlah Harg

B
1

Bahan
Besi Baja IWF

Kg

1.150

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

BA.03 Pengerjaan 100 kg pekerjaan perakitan

10%

AHSP.BIDANG CIPTA KARYA


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi Konstruksi
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Solar
Minyak Pelumas

0.100
0.100
0.001
0.005
Jumlah Harg

Liter
Liter

1.000
0.100

Jumla
C
1

Peralatan
Sewa Alat

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Jam

0.800
Jumlah H
10%

BA.04 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
Besi siku L 30.30.3
Besi plat baja
Kawat las

kg
kg
kg

1.050
1.050
0.105
0.052
Jumlah Harg
15.000
32.800
0.050

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.05 Pengerjaan 10 cm pengelasan dengan las listrik


No

Uraian

Kode

Satuan

Koefisien

No

Uraian

Kode

Satuan
Koefisien
AHSP.BIDANG
CIPTA KARYA

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
Kawat las listrik
Solar
Minyak Pelumas

0.040
0.020
0.002
0.002
Jumlah Harg

kg
Liter
Liter

0.400
0.300
0.040

Jumla
C
1

Peralatan
Sewa alat

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Jam

0.170
Jumlah H
10%

BA.06 Pengerjaan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
Besi scuare tube
Besi lis kaca (1 x 1) cm
Pengelasan

m
m
cm

0.650
0.650
0.065
0.032
Jumlah Harg
4.760
4.522
20.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.07 Pemasangan 1 m2 pintu rolling door besi


No

Uraian

Kode

Satuan

Koefisien

AHSP.BIDANG CIPTA KARYA


Satuan
Koefisien

No

Uraian

Kode

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.200
1.200
0.120
0.006
Jumlah Harg

B
1

Bahan
Pintu gulung besi

m2

1.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.08 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.440
0.440
0.044
0.044
Jumlah Harg

B
1

Bahan
Pintu gulung besi

m2

1.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.09 Pemasangan 1 m2 sunscreen aluminium


No

Uraian

Kode

Satuan

Koefisien

No

Uraian

Kode

Satuan
Koefisien
AHSP.BIDANG
CIPTA KARYA

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.080
0.800
0.080
0.004
Jumlah Harg

B
1

Bahan
Sunscreen alluminium

m2

1.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.10 Pemasangan 1 m2 rolling door aluminium


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
1.000
0.100
0.05
Jumlah Harg

B
1

Bahan
Rolling dor alluminium

m2

1.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.11 Pemasangan 1 m kusen pintu alluminium


No

Uraian

Kode

Satuan

Koefisien

AHSP.BIDANG CIPTA KARYA


1
A
1
2
3
4

2
Tenaga
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

B
1
2
3

Bahan
Profilr alluminium
Skrup fixer
Sealant

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.043
0.043
0.004
0.0021
Jumlah Harg

m
buah
Tube

1.100
2.000
0.060

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.085
0.085
0.009
0.0042
Jumlah Harg

B
1
2

Bahan
Profilr alluminium
Alluminium strip

m
m

4.400
14.600

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.13 Pemasangan 1 m2 pintu kaca rangka alluminium


No

Uraian

Kode

Satuan

Koefisien

No

Uraian

Kode

Satuan
Koefisien
AHSP.BIDANG
CIPTA KARYA

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Khusus Aluminium/Kaca
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
Pintu Alluminium
Profil Kaca
Sealant

0.085
0.085
0.009
0.005
Jumlah Harg

m
m
Tube

4.400
4.500
0.270

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.14 Pemasangan 1 m2 venetions blinds dan Vertical blinds


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.350
0.350
0.035
0.018
Jumlah Harg

B
1

Bahan
Venetions blinds dan vertical blinds (tirai)

m2

1.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.15 Pemasangan 1 m2 terali besi strip (2 x 3) mm


No

Uraian

Kode

Satuan

Koefisien

No

Uraian

Kode

Satuan
Koefisien
AHSP.BIDANG
CIPTA KARYA

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Las
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Besi strip
Pengelasan

1.670
1.670
0.167
0.083
Jumlah Harg

m2
cm

6.177
27.080

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.16 Pemasangan 1 m2 kawat nyamuk


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
Kawat nyamuk
Pengelasan
Baja strip (0,2 x 2) cm

m2
cm
kg

0.100
0.100
0.010
0.005
Jumlah Harg
1.100
11.110
1.716

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.17 Pemasangan 1 m2 jendela nako & tralis


No

Uraian

Kode

Satuan

Koefisien

No

Uraian

Kode

Satuan
Koefisien
AHSP.BIDANG
CIPTA KARYA

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
Jendela nako (rangka + kaca 5 mm)
Paku skrup 1 cm - 2,5 cm
Besi strip

0.200
0.200
0.020
0.001
Jumlah Harg

m2
buah
m

1.100
10.000
7.000

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.18 Pemasangan 1 m talang datar / jurai seng bjls 28 lebar 90 cm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.200
0.200
0.020
0.001
Jumlah Harg

B
1
2
3

Bahan
Seng plat
Paku 1 cm - 2,5 cm
Papan kayu kelas III

m
Kg
m3

1.050
0.015
0.019

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.19 Pemasangan 1 m talang 1/2 lingkaran D-15 cm, seng plat Bjls 30 lebar 45 cm

AHSP.BIDANG CIPTA KARYA


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.150
0.300
0.030
0.008
Jumlah Harg

B
1
2
3

Bahan
Seng plat
Paku 1 cm - 2,5 cm
Besi strip

m
Kg
kg

1.050
0.010
0.500

Jumla
C

Peralatan

Jumlah H
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

BA.20 Pemasangan 1 m2 rangka kuda - kuda baja ringan


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4
5

Bahan
Main truss C-75-75
Roof Bottom / reng R 33-0,45
Self drilling screw dia. 6 x 20 mm (truss screw)
Self drilling screw dia. 6 x 20 mm (roof batten scre
Dynabol dia. 12 x 20 mm

m
m
Bh
Bh
Bh

0.247
0.176
0.117
0.005
Jumlah Harg
2.800
5.100
25.000
35.000
1.000

Jumla
C
1

Peralatan
Alat bantu (mesin bor listrik) / gensit

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Ls

1.000
Jumlah H

AHSP.BIDANG CIPTA KARYA


E
F

Overhead + Profit / (10%)


Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
19,000.00

Jumlah
(Rp)
7
3,900.00
5,100.00
570.00
285.00
9,855.00
21,850.00

Jumlah Harga Bahan

21,850.00

Jumlah Harga Peralatan

31,705.00
3,170.50
34,875.50

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
20,700.00

Jumlah
(Rp)
7
3,900.00
5,100.00
570.00
285.00
9,855.00
23,805.00

Jumlah Harga Bahan

23,805.00

Jumlah Harga Peralatan

33,660.00
3,366.00
37,026.00

xD

AHSP.BIDANG CIPTA KARYA


Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
8,500.00
95.00
475.00
15,570.00

7,250.00
30,000.00
Jumlah Harga Bahan

7,250.00
3,000.00
10,250.00

10,000.00
Jumlah Harga Peralatan

8,000.00
8,000.00
33,820.00
3,382.00
37,202.00

xD

ja siku
Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

68,250.00
89,250.00
9,975.00
4,940.00
172,415.00

19,000.00
20,700.00
27,500.00
Jumlah Harga Bahan

285,000.00
678,960.00
1,375.00
965,335.00

Jumlah Harga Peralatan

1,137,750.00
113,775.00
1,251,525.00

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

2,600.00
1,700.00
190.00
190.00
4,680.00

27,500.00
7,250.00
30,000.00
Jumlah Harga Bahan

11,000.00
2,175.00
1,200.00
14,375.00

50,000.00
Jumlah Harga Peralatan

8,500.00
8,500.00
27,555.00
2,755.50
30,310.50

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

42,250.00
55,250.00
6,175.00
3,040.00
106,715.00

5,000.00
2,000.00
2,325.00
Jumlah Harga Bahan

23,800.00
9,044.00
46,500.00
79,344.00

Jumlah Harga Peralatan

186,059.00
18,605.90
204,664.90

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
225,000.00

Jumlah
(Rp)
7
78,000.00
102,000.00
11,400.00
570.00
191,970.00
225,000.00

Jumlah Harga Bahan

225,000.00

Jumlah Harga Peralatan

416,970.00
41,697.00
458,667.00

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
450,000.00

Jumlah
(Rp)
7
28,600.00
37,400.00
4,180.00
4,180.00
74,360.00
450,000.00

Jumlah Harga Bahan

450,000.00

Jumlah Harga Peralatan

524,360.00
52,436.00
576,796.00

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
120,000.00

Jumlah
(Rp)
7
5,200.00
68,000.00
7,600.00
380.00
81,180.00
120,000.00

Jumlah Harga Bahan

120,000.00

Jumlah Harga Peralatan

201,180.00
20,118.00
221,298.00

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
250,000.00

Jumlah
(Rp)
7
65,000.00
85,000.00
9,500.00
4,750.00
164,250.00
250,000.00

Jumlah Harga Bahan

250,000.00

Jumlah Harga Peralatan

414,250.00
41,425.00
455,675.00

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA


6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
95,000.00
2,500.00
10,000.00

7
2,795.00
3,655.00
408.50
199.50
7,058.00
104,500.00
5,000.00
600.00

Jumlah Harga Bahan

110,100.00

Jumlah Harga Peralatan

117,158.00
11,715.80
128,873.80

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

5,525.00
7,225.00
807.50
399.00
13,956.50

95,000.00
2,500.00
Jumlah Harga Bahan

418,000.00
36,500.00
454,500.00

Jumlah Harga Peralatan

468,456.50
46,845.65
515,302.15

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
95,000.00
7,500.00
10,000.00

Jumlah
(Rp)
7
5,525.00
7,225.00
807.50
475.00
14,032.50
418,000.00
33,750.00
2,700.00

Jumlah Harga Bahan

454,450.00

Jumlah Harga Peralatan

468,482.50
46,848.25
515,330.75

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

22,750.00
29,750.00
3,325.00
1,710.00
57,535.00

105,000.00
Jumlah Harga Bahan

105,000.00
105,000.00

Jumlah Harga Peralatan

162,535.00
16,253.50
178,788.50

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

108,550.00
141,950.00
15,865.00
7,885.00
274,250.00

20,000.00
2,325.00
Jumlah Harga Bahan

123,540.00
62,961.00
186,501.00

Jumlah Harga Peralatan

460,751.00
46,075.10
506,826.10

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
8,500.00
950.00
475.00
16,425.00

20,000.00
2,325.00
20,000.00
Jumlah Harga Bahan

22,000.00
25,830.75
34,320.00
82,150.75

Jumlah Harga Peralatan

98,575.75
9,857.58
108,433.33

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

13,000.00
17,000.00
1,900.00
95.00
31,995.00

170,000.00
1,250.00
2,000.00
Jumlah Harga Bahan

187,000.00
12,500.00
14,000.00
213,500.00

Jumlah Harga Peralatan

245,495.00
24,549.50
270,044.50

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
27,500.00
17,500.00
3,300,000.00

Jumlah
(Rp)
7
13,000.00
17,000.00
1,900.00
95.00
31,995.00
28,875.00
262.50
62,700.00

Jumlah Harga Bahan

91,837.50

Jumlah Harga Peralatan

123,832.50
12,383.25
136,215.75

xD

45 cm

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA


Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
27,500.00
45,000.00
20,000.00

Jumlah
(Rp)
7
9,750.00
25,500.00
2,850.00
760.00
38,860.00
28,875.00
450.00
10,000.00

Jumlah Harga Bahan

39,325.00

Jumlah Harga Peralatan

78,185.00
7,818.50
86,003.50

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

16,055.00
14,960.00
11,115.00
475.00
42,605.00

15,000.00
9,000.00
350.00
300.00
15,000.00
Jumlah Harga Bahan

42,000.00
45,900.00
8,750.00
10,500.00
15,000.00
122,150.00

1,500.00
Jumlah Harga Peralatan

1,500.00
1,500.00
166,255.00

AHSP.BIDANG CIPTA KARYA


xD

16,625.50
182,880.50

F. PEKERJAAN DINDING PASANGAN

AHSP.BIDANG CIPTA KARYA

P.09a Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 2 P


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumla
B
1
2
3

Bahan
Bata Merah
Semen Portland
Pasir Pasang

Peralatan

Buah
Kg
m3

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.09c Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 4 P


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumla
B
1
2
3

Bahan
Bata Merah
Semen Portland
Pasir Pasang

Peralatan

Buah
Kg
m3

Jum
D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA

P.10a Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 2
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumla
B
1
2
3

Bahan
Bata Merah
Semen Portland
Pasir Pasang

Peralatan

Buah
Kg
m3

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.10c Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 4
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumla
B
1
2
3

Bahan
Bata Merah
Semen Portland
Pasir Pasang

Peralatan

Buah
Kg
m3

Jum
D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA

u camp 1 SP : 2 PP
Harga Satuan
(Rp)

Koefisien
5

0.600
65,000.00
0.200
85,000.00
0.020
95,000.00
0.030
95,000.00
Jumlah Harga Tenaga Kerja
140.000
43.500
0.080

800.00
1,160.00
120,000.00

Jumlah
(Rp)
7
39,000.00
17,000.00
1,900.00
2,850.00
60,750.00
112,000.00
50,460.00
9,600.00

Jumlah Harga Bahan

172,060.00

Jumlah Harga Peralatan

232,810.00
23,281.00
256,091.00

10% x D

u camp 1 SP : 4 PP
Koefisien

Harga Satuan
(Rp)

0.600
65,000.00
0.200
85,000.00
0.020
95,000.00
0.030
95,000.00
Jumlah Harga Tenaga Kerja
140.000
26.550
0.093

800.00
1,160.00
120,000.00

Jumlah
(Rp)
7
39,000.00
17,000.00
1,900.00
2,850.00
60,750.00
112,000.00
30,798.00
11,160.00

Jumlah Harga Bahan

153,958.00

Jumlah Harga Peralatan

214,708.00
21,470.80

10% x D

236,178.80

atu camp 1 SP : 2 PP
Koefisien

Harga Satuan
(Rp)

0.300
65,000.00
0.100
85,000.00
0.010
95,000.00
0.015
95,000.00
Jumlah Harga Tenaga Kerja
70.0000
18.9500
0.0380

800.00
1,160.00
120,000.00

Jumlah
(Rp)
7
19,500.00
8,500.00
950.00
1,425.00
30,375.00
56,000.00
21,982.00
4,560.00

Jumlah Harga Bahan

82,542.00

Jumlah Harga Peralatan

112,917.00
11,291.70
124,208.70

10% x D

atu camp 1 SP : 4 PP
Koefisien

Harga Satuan
(Rp)

0.300
65,000.00
0.100
85,000.00
0.010
95,000.00
0.015
95,000.00
Jumlah Harga Tenaga Kerja
70.0000
11.5000
0.0430

800.00
1,160.00
120,000.00

Jumlah
(Rp)
7
19,500.00
8,500.00
950.00
1,425.00
30,375.00
56,000.00
13,340.00
5,160.00

Jumlah Harga Bahan

74,500.00

Jumlah Harga Peralatan

104,875.00
10,487.50

10% x D

AHSP.BIDANG CIPTA KARYA

115,362.50

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA

G. HARGA SATUAN PEKERJAAN PLESTERAN


P.12b Pemasangan 1 m2 plesteran 1 SP : 2 PP tebal 15 mm
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Semen Portland
Pasir Pasang

Kg
m3

0.300
0.150
0.015
0.015
Jumlah Ha
10.224
0.020

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.12d Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 15 mm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
0.150
0.015
0.015
Jumlah Ha

B
1
2

Bahan
Semen Portland
Pasir Pasang

Kg
m3

6.240
0.024

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA


P.12n Pemasangan 1 m2 plesteran 1 SP : 3PP tebal 20 mm
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Semen Portland
Pasir Pasang

Kg
m3

0.260
0.200
0.020
0.013
Jumlah Ha
10.368
0.031

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.12o Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.400
0.200
0.020
0.022
Jumlah Ha

B
1
2

Bahan
Semen Portland
Pasir Pasang

Kg
m3

8.320
0.032

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA


P.12x Pemasangan 1 m2 acian
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.200
0.100
0.010
0.001
Jumlah Ha

B
1

Bahan
Semen Portland

Kg

3.250

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
1,160.00
120,000.00

Jumlah
(Rp)
7
19,500.00
12,750.00
1,425.00
1,425.00
35,100.00
11,859.84
2,400.00

Jumlah Harga Bahan

14,259.84

Jumlah Harga Peralatan

49,359.84
4,935.98
54,295.82

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
1,160.00
120,000.00

Jumlah
(Rp)
7
19,500.00
12,750.00
1,425.00
1,425.00
35,100.00
7,238.40
2,880.00

Jumlah Harga Bahan

10,118.40

Jumlah Harga Peralatan

45,218.40
4,521.84
49,740.24

xD

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
160,000.00
120,000.00

Jumlah
(Rp)
7
16,900.00
17,000.00
1,900.00
1,235.00
37,035.00
1,658,880.00
3,720.00

Jumlah Harga Bahan

1,662,600.00

Jumlah Harga Peralatan

1,699,635.00
169,963.50
1,869,598.50

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
160,000.00
120,000.00

Jumlah
(Rp)
7
26,000.00
17,000.00
1,900.00
2,090.00
46,990.00
1,331,200.00
3,840.00

Jumlah Harga Bahan

1,335,040.00

Jumlah Harga Peralatan

1,382,030.00
138,203.00
1,520,233.00

xD

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
1,160.00

Jumlah
(Rp)
7
13,000.00
8,500.00
950.00
95.00
22,545.00
3,770.00

Jumlah Harga Bahan

3,770.00

Jumlah Harga Peralatan

26,315.00
2,631.50
28,946.50

xD

AHSP.BIDANG CIPTA KARYA

H. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


P.19a Pemasangan 1 m2 lantai keramik ukuran 40 cm x 40 cm
No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Ubin keramik (Kualitas menegah)
Semen portland
Pasir Pasang
Semen Warna

Buah
Kg
M3
Kg

0.70
0.35
0.035
0.035
Jumlah Harga
6.25
8.19
0.045
1.62

Jumlah
C

Peralatan

Jumlah Ha
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.19b Pemasangan 1 m2 lantai keramik ukuran 30 cm x 30 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Ubin keramik (Kualitas Menengah)
Semen portland
Pasir Pasang
Semen warna

Buah
Kg
M3
Kg

0.70
0.35
0.035
0.035
Jumlah Harga
11.87
10.00
0.045
1.50

Jumlah
C

Peralatan

Jumlah Ha
D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

10%

AHSP.BIDANG CIPTA KARYA


F

Harga Satuan Pekerjaan (D+E)

P.33b Pemasangan 1 m2 lantai keramik ukuran 25 cm x 25 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Ubin keramik (Kualitas Biasa)
Semen portland
Pasir Pasang
Semen warna

Buah
Kg
M3
Kg

0.700
0.350
0.035
0.035
Jumlah Harga
16.00
10.20
0.045
1.50

Jumlah
C

Peralatan

Jumlah Ha
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.19c Pemasangan 1 m2 lantai keramik ukuran 20 cm x 20 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Ubin keramik (Kualitas Menengah)
Semen portland
Pasir pasang
Semen warna

Buah
Kg
M3
Kg

0.70
0.35
0.035
0.035
Jumlah Harga
26.50
10.40
0.045
1.62

Jumlah
C

Peralatan

Jumlah Ha
D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

10%

AHSP.BIDANG CIPTA KARYA


F

Harga Satuan Pekerjaan (D+E)

P.22a Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Plint keramik
Semen portland
Pasir pasang
Semen warna

Buah
Kg
M3
Kg

0.090
0.090
0.035
0.005
Jumlah Harga
2.500
1.140
0.003
0.025

Jumlah
C

Peralatan

Jumlah Ha
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.29d Pemasangan 1 m2 dinding keramik 20 cm x 20 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Keramik (Kualitas Menengah)
Semen Porlant
Pasir Pasang
Semen warna

Buah
Kg
M3
Kg

0.90
0.45
0.045
0.045
Jumlah Harga
26.500
9.300
0.018
1.940

Jumlah
C

Peralatan

Jumlah Ha
D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

10%

AHSP.BIDANG CIPTA KARYA


F

Harga Satuan Pekerjaan (D+E)

P.29f Pemasangan 1 m2 dinding keramik 25 cm x 40 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Keramik (Kualitas Biasa)
Semen Porlant
Pasir Pasang
Semen warna

Buah
Kg
M3
Kg

0.90
0.45
0.045
0.045
Jumlah Harga
10.000
9.300
0.018
1.940

Jumlah
C

Peralatan

Jumlah Ha
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.29e Pemasangan 1 m2 dinding keramik 20 cm x 25 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Keramik (Kualitas Menengah)
Semen Porlant
Pasir Pasang
Semen warna

Buah
Kg
M3
Kg

0.90
0.45
0.045
0.045
Jumlah Harga
21.100
9.300
0.018
1.570

Jumlah
C

Peralatan

Jumlah Ha
D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

10%

AHSP.BIDANG CIPTA KARYA


F

Harga Satuan Pekerjaan (D+E)

P.32 Pemasangan 1 m2 wallpaper lebar 50 cm


No

Uraian

Kode

Satuan Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.350
0.175
0.017
0.002
Jumlah Harga

B
1
2

Bahan
Wallpaper (Kualitas Biasa)
Lem

M
Kg

2.200
0.250

Jumlah
C

Peralatan

Jumlah Ha
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

45,500.00
29,750.00
3,325.00
3,325.00
81,900.00

9,280.00
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

58,000.00
9,500.40
5,400.00
2,268.00
75,168.40

Jumlah Harga Peralatan

157,068.40
15,706.84
172,775.24

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

45,500.00
29,750.00
3,325.00
3,325.00
81,900.00

5,475.99
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

65,000.00
11,600.00
5,400.00
2,100.00
84,100.00

Jumlah Harga Peralatan

166,000.00
16,600.00

xD

AHSP.BIDANG CIPTA KARYA


182,600.00

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

45,500.00
29,750.00
3,325.00
3,325.00
81,900.00

3,437.50
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

55,000.00
11,832.00
5,400.00
2,100.00
74,332.00

Jumlah Harga Peralatan

156,232.00
15,623.20
171,855.20

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

45,500.00
29,750.00
3,325.00
3,325.00
81,900.00

2,264.15
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

60,000.00
12,064.00
5,400.00
2,268.00
79,732.00

Jumlah Harga Peralatan

161,632.00
16,163.20

xD

AHSP.BIDANG CIPTA KARYA


177,795.20

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

5,850.00
7,650.00
3,325.00
475.00
17,300.00

2,320.00
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

5,800.00
1,322.40
360.00
35.00
7,517.40

Jumlah Harga Peralatan

24,817.40
2,481.74
27,299.14

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

58,500.00
38,250.00
4,275.00
4,275.00
105,300.00

2,264.15
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

60,000.00
10,788.00
2,160.00
2,716.00
75,664.00

Jumlah Harga Peralatan

180,964.00
18,096.40

xD

AHSP.BIDANG CIPTA KARYA


199,060.40

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

58,500.00
38,250.00
4,275.00
4,275.00
105,300.00

5,800.00
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

58,000.00
10,788.00
2,160.00
2,716.00
73,664.00

Jumlah Harga Peralatan

178,964.00
17,896.40
196,860.40

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

58,500.00
38,250.00
4,275.00
4,275.00
105,300.00

2,843.60
1,160.00
120,000.00
1,400.00
Jumlah Harga Bahan

60,000.00
10,788.00
2,160.00
2,198.00
75,146.00

Jumlah Harga Peralatan

180,446.00
18,044.60

xD

AHSP.BIDANG CIPTA KARYA


198,490.60

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
65,000.00
40,000.00

Jumlah
(Rp)
7
22,750.00
14,875.00
1,615.00
190.00
39,430.00
143,000.00
10,000.00

Jumlah Harga Bahan

153,000.00

Jumlah Harga Peralatan

192,430.00
19,243.00
211,673.00

xD

AHSP.BIDANG CIPTA KARYA

I. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


P.34a Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Triplek
Paku tripleks

Lembar
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.34b Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Triplek
Paku tripleks

Lembar
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA

P.36 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)mm, tebal 9


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Gypsum board
Paku skrup

Lembar
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.38a Pemasangan 1 m1 list langit-langit kayu profil


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
List Kayu Profil
Paku

M1
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.38b Pemasangan 1 m1 list langit-langit gypsum


No

Uraian

Kode

Satuan

AHSP.BIDANG CIPTA KARYA


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
List gypsum Profil
Tepung Gypsum

M1
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.39b Pemasangan 1 m2 Rangka langit-langit metal furring ukuran (60 x 60) cm


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B

Bahan

1
2

Metal Furing
Assesoris (Perkuatan,Dll)

M1
Ls

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA

240) cm, tebal 3 mm


Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.100
65,000.00
0.100
85,000.00
0.010
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
8,500.00
950.00
475.00
16,425.00

0.375
0.030

20,625.00
750.00

55,000.00
25,000.00
Jumlah Harga Bahan

21,375.00

Jumlah Harga Peralatan

37,800.00
3,780.00
41,580.00

10% x D

240) cm, tebal 4 mm


Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.100
65,000.00
0.100
85,000.00
0.010
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
8,500.00
950.00
475.00
16,425.00

0.375
0.030

24,375.00
750.00

65,000.00
25,000.00
Jumlah Harga Bahan

25,125.00

Jumlah Harga Peralatan

41,550.00
4,155.00
45,705.00

10% x D

AHSP.BIDANG CIPTA KARYA

(120x240x9)mm, tebal 9 mm
Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.100
65,000.00
0.050
85,000.00
0.005
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
4,250.00
475.00
475.00
11,700.00

0.364
0.110

25,480.00
2,750.00

70,000.00
25,000.00
Jumlah Harga Bahan

28,230.00

Jumlah Harga Peralatan

39,930.00
3,993.00
43,923.00

10% x D

Harga Satuan
(Rp)

Koefisien
5

6
0.050
65,000.00
0.050
85,000.00
0.005
95,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja
3,750.00

1.050
0.010

30,000.00

7
3,250.00
4,250.00
475.00
285.00
8,260.00
3,937.50
300.00

Jumlah Harga Bahan

4,237.50

Jumlah Harga Peralatan

12,497.50
1,249.75
13,747.25

10% x D

Koefisien

Jumlah
(Rp)

Harga Satuan
(Rp)

Jumlah
(Rp)

Harga Satuan
(Rp)

Koefisien
5

6
0.060
65,000.00
0.060
85,000.00
0.006
95,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja
10,000.00

1.050
0.150

9,500.00

Jumlah
(Rp)
7
3,900.00
5,100.00
570.00
285.00
9,855.00
10,500.00
1,425.00

Jumlah Harga Bahan

11,925.00

Jumlah Harga Peralatan

21,780.00
2,178.00
23,958.00

10% x D

ukuran (60 x 60) cm


Harga Satuan
(Rp)

Koefisien
5

6
0.350
65,000.00
0.350
85,000.00
0.035
95,000.00
0.018
95,000.00
Jumlah Harga Tenaga Kerja

4.000
20 % x rangka

3,000.00
3,600.00

Jumlah
(Rp)
7
22,750.00
29,750.00
3,325.00
1,710.00
57,535.00
12,000.00
3,600.00

Jumlah Harga Bahan

15,600.00

Jumlah Harga Peralatan

73,135.00
7,313.50
80,448.50

10% x D

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA

J. HARGA SATUAN PEKERJAAN PENUTUP ATAP


P.43b Pemasangan 1 m1 bubung stel gelombang 1.05 m
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Bubung stel gel.
Paku skrup 3,5

0.084
0.125
0.013
0.004
Jumlah Har

Lembar
Bh

2.10
6.00

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.45a Pemasangan 1 m2 genteng metal, tebal 0,4 mm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Genteng metal
Paku biasa -1

Buah
Kg

0.200
0.100
0.010
0.001
Jumlah Har
1.02
0.20

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA


P.45b Pemasangan 1 m2 genteng metal, tebal 0,35 mm
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Genteng metal
Paku biasa -1

0.200
0.100
0.010
0.001
Jumlah Har

Buah
Kg

1.02
0.20

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.45c Pemasangan 1 m2 genteng metal, tebal 0,3 mm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Genteng metal
Paku biasa -1

Buah
Kg

0.200
0.100
0.010
0.001
Jumlah Har
1.02
0.20

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.45d Pemasangan 1 m2 genteng metal, tebal 0,25 mm


No

Uraian

Kode

Satuan

Koefisien

AHSP.BIDANG CIPTA KARYA


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Genteng metal
Paku biasa -1

0.200
0.100
0.010
0.001
Jumlah Har

Buah
Kg

1.02
0.20

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.47b Pemasangan 1 m1 nok genteng metal


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Nok genteng metal
Paku biasa -1

Buah
Kg

0.250
0.150
0.015
0.013
Jumlah Har
1.10
0.05

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.48a Pemasangan 1 m2 Atap Long Span


No

Uraian

Kode

Satuan

Koefisien

AHSP.BIDANG CIPTA KARYA


1
A
1
2
3
4

2
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

B
1
2

Bahan
Atap Long Span
Paku biasa -1

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.120
0.060
0.006
0.006
Jumlah Har

m2
Kg

1.00
0.02

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.48b Pemasangan 1 m1 nok atap seng


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
Seng plat 3" x 6" bjls 30
Paku biasa -1

0.150
0.070
0.007
0.006
Jumlah Har

Lembar
Kg

0.30
0.40

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

P.50 Pemasangan 1 m1 aluminium foil/sisalation


No

Uraian

Kode

Satuan

Koefisien

1
A

Tenaga

AHSP.BIDANG CIPTA KARYA


1
2
3
4

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

B
1

Bahan
aluminium foil

L.01
L.02
L.03
L.04

OH
OH
OH
OH

M2

0.150
0.050
0.005
0.008
Jumlah Har
1.05

Juml
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

5,460.00
10,625.00
1,235.00
380.00
17,700.00

30,000.00
1,250.00

63,000.00
7,500.00

Jumlah Harga Bahan

88,200.00
8,820.00
97,020.00

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
72,000.00
17,500.00
Jumlah Harga Bahan

xD

70,500.00

Jumlah
(Rp)
7
13,000.00
8,500.00
950.00
95.00
22,545.00
73,440.00
3,500.00
76,940.00
99,485.00
9,948.50
109,433.50

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

13,000.00
8,500.00
950.00
95.00
22,545.00

45,000.00
17,500.00

45,900.00
3,500.00

Jumlah Harga Bahan

49,400.00
71,945.00
7,194.50
79,139.50

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
40,000.00
17,500.00
Jumlah Harga Bahan

xD

Harga Satuan
(Rp)

Jumlah
(Rp)
7
13,000.00
8,500.00
950.00
95.00
22,545.00
40,800.00
3,500.00
44,300.00
66,845.00
6,684.50
73,529.50

Jumlah
(Rp)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

13,000.00
8,500.00
950.00
95.00
22,545.00

34,000.00
17,500.00

34,680.00
3,500.00

Jumlah Harga Bahan

38,180.00
60,725.00
6,072.50
66,797.50

xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
22,000.00
17,500.00
Jumlah Harga Bahan

xD

Harga Satuan
(Rp)

Jumlah
(Rp)
7
16,250.00
14,250.00
1,425.00
1,235.00
33,160.00
24,200.00
875.00
25,075.00
58,235.00
5,823.50
64,058.50

Jumlah
(Rp)

AHSP.BIDANG CIPTA KARYA

AHSP.BIDANG CIPTA KARYA


6

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

7,800.00
5,700.00
570.00
570.00
14,640.00

75,000.00
17,500.00

75,000.00
350.00

Jumlah Harga Bahan

75,350.00
89,990.00
8,999.00
98,989.00

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

9,750.00
6,650.00
665.00
570.00
17,635.00

55,000.00
17,500.00

16,500.00
7,000.00

Jumlah Harga Bahan

23,500.00
41,135.00
4,113.50
45,248.50

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

AHSP.BIDANG CIPTA KARYA


65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
18,000.00
Jumlah Harga Bahan

xD

9,750.00
4,750.00
475.00
760.00
15,735.00
18,900.00
18,900.00
34,635.00
3,463.50
38,098.50

AHSP.BIDANG CIPTA KARYA

K. HARGA SATUAN PEKERJAAN KAYU


P.51b Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Balok kayu Kelas II
Paku 10 cm
Lem Kayu

m3
Kg
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.51c Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas III
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Balok kayu kelas III
Paku 10 cm
Lem Kayu

m3
Kg
Kg

J
C

Peralatan

AHSP.BIDANG CIPTA KARYA

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.52a Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Papan Kayu
Paku 5 - 7 cm

m3
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.52b Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas III
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Papan Kayu
Paku 5 - 7 cm

m3
Kg

J
C

Peralatan

Jum

AHSP.BIDANG CIPTA KARYA


D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.53b Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Papan Kayu
Paku 5 - 7 cm

m3
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.54b Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Papan Kayu
Paku 5 - 7 cm

m3
Kg

J
C

Peralatan

Jum
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

AHSP.BIDANG CIPTA KARYA


E
F

Overhead + Profit / (10%)


Harga Satuan Pekerjaan (D+E)

P.56a Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (leba
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3
4

Bahan
Papan Kayu
Lem Kayu
Paku 1 cm - 2.5 cm
Plywood tebal 4 mm
Ukuran (90 x 220 cm)

m3
Kg
Kg
Lebar

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.57b Pembuatan 1 m2 Jalusi Kusen, Kayu Kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Papan Kayu
Paku 1 cm - 2.5 cm

m3
Kg

J
C

Peralatan

Jum

AHSP.BIDANG CIPTA KARYA


D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.59b Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 me


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Balok Kayu
Besi Strip Tebal 5 mm
Paku 12 cm

m3
Kg
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.59c Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 m


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Balok Kayu
Besi Strip Tebal 5 mm
Paku 12 cm

m3
Kg
Kg

J
C

Peralatan

AHSP.BIDANG CIPTA KARYA

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.60 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Balok Kayu
Besi Strip Tebal 5 mm
Paku 12 cm

m3
Kg
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.62a Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Kaso-kaso 5 x 7 cm
Paku 7 cm - 10 cm

m3
Kg

AHSP.BIDANG CIPTA KARYA


C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.63a Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Kaso-kaso 5 x 7 cm
Paku 7 cm - 10 cm

m3
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.63b Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III
No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2

Bahan
Kaso-kaso 5 x 7 cm
Paku 7 cm - 10 cm

m3
Kg

AHSP.BIDANG CIPTA KARYA


C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.64a Pemasangan 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Papan Kayu
Paku 5 cm - 7 cm

m3
Kg

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

P.64b Pemasangan 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II


No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Jumlah
B
1
2
3

Bahan
Papan Kayu
Paku 5 cm - 7 cm

m3
Kg

AHSP.BIDANG CIPTA KARYA

J
C

Peralatan

Jum
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA

ela, kayu kelas II


Harga Satuan
(Rp)

Koefisien
5

6.000
65,000.00
18.000
85,000.00
1.8000
95,000.00
0.300
95,000.00
Jumlah Harga Tenaga Kerja
1.200
1.250
1.000

4,000,000.00
16,500.00
18,000.00

Jumlah
(Rp)
7
390,000.00
1,530,000.00
171,000.00
28,500.00
2,119,500.00
4,800,000.00
20,625.00
18,000.00

Jumlah Harga Bahan

4,838,625.00

Jumlah Harga Peralatan

6,958,125.00
695,812.50
7,653,937.50

10% x D

ela, kayu kelas III


Harga Satuan
(Rp)

Koefisien
5

6.000
65,000.00
18.000
85,000.00
1.8000
95,000.00
0.300
95,000.00
Jumlah Harga Tenaga Kerja
1.200
1.250
1.000

3,300,000.00
16,500.00
18,000.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
390,000.00
1,530,000.00
171,000.00
28,500.00
2,119,500.00
3,960,000.00
20,625.00
18,000.00
3,998,625.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Peralatan
10% x D

6,118,125.00
611,812.50
6,729,937.50

elas II
Harga Satuan
(Rp)

Koefisien
5

0.350
65,000.00
1.050
85,000.00
0.1050
95,000.00
0.018
95,000.00
Jumlah Harga Tenaga Kerja
0.04
0.05

4,000,000.00
16,500.00

Jumlah
(Rp)
7
22,750.00
89,250.00
9,975.00
1,710.00
123,685.00
160,000.00
825.00

Jumlah Harga Bahan

160,825.00

Jumlah Harga Peralatan

284,510.00
28,451.00
312,961.00

10% x D

elas III
Harga Satuan
(Rp)

Koefisien
5

0.350
65,000.00
1.050
85,000.00
0.105
95,000.00
0.018
95,000.00
Jumlah Harga Tenaga Kerja
0.04
0.05

3,300,000.00
16,500.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

Jumlah
(Rp)
7
22,750.00
89,250.00
9,975.00
1,710.00
123,685.00
132,000.00
825.00
132,825.00
-

AHSP.BIDANG CIPTA KARYA


256,510.00
25,651.00
282,161.00

10% x D

s II
Harga Satuan
(Rp)

Koefisien
5

1.000
65,000.00
3.000
85,000.00
0.300
95,000.00
0.050
95,000.00
Jumlah Harga Tenaga Kerja
0.04
0.50

4,000,000.00
16,500.00

Jumlah
(Rp)
7
65,000.00
255,000.00
28,500.00
4,750.00
353,250.00
160,000.00
8,250.00

Jumlah Harga Bahan

168,250.00

Jumlah Harga Peralatan

521,500.00
52,150.00
573,650.00

10% x D

u kelas II
Harga Satuan
(Rp)

Koefisien
5

0.800
65,000.00
2.400
85,000.00
0.240
95,000.00
0.040
95,000.00
Jumlah Harga Tenaga Kerja
0.024
0.300

4,000,000.00
16,500.00

Jumlah
(Rp)
7
52,000.00
204,000.00
22,800.00
3,800.00
282,600.00
96,000.00
4,950.00

Jumlah Harga Bahan

100,950.00

Jumlah Harga Peralatan

383,550.00

AHSP.BIDANG CIPTA KARYA


10% x D

38,355.00
421,905.00

as II tertutup (lebar sampai 90 cm)


Harga Satuan
(Rp)

Koefisien
5

0.700
65,000.00
2.100
85,000.00
0.210
95,000.00
0.035
95,000.00
Jumlah Harga Tenaga Kerja
0.025
0.500
0.500
1.000

4,000,000.00
18,000.00
17,500.00
65,000.00

Jumlah
(Rp)
7
45,500.00
178,500.00
19,950.00
3,325.00
247,275.00
100,000.00
9,000.00
8,750.00
65,000.00

Jumlah Harga Bahan

182,750.00

Jumlah Harga Peralatan

430,025.00
43,002.50
473,027.50

10% x D

Harga Satuan
(Rp)

Koefisien
5

0.670
65,000.00
2.000
85,000.00
0.200
95,000.00
0.335
95,000.00
Jumlah Harga Tenaga Kerja
0.060
0.150

4,000,000.00
17,500.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

Jumlah
(Rp)
7
43,550.00
170,000.00
19,000.00
31,825.00
264,375.00
240,000.00
2,625.00
242,625.00
-

AHSP.BIDANG CIPTA KARYA


507,000.00
50,700.00
557,700.00

10% x D

las II bentang 6 meter


Harga Satuan
(Rp)

Koefisien
5

4.000
65,000.00
12.000
85,000.00
1.200
95,000.00
0.200
95,000.00
Jumlah Harga Tenaga Kerja
1.100
15.000
5.600

4,000,000.00
20,000.00
16,500.00

Jumlah
(Rp)
7
260,000.00
1,020,000.00
114,000.00
19,000.00
1,413,000.00
4,400,000.00
300,000.00
92,400.00

Jumlah Harga Bahan

4,792,400.00

Jumlah Harga Peralatan

6,205,400.00
620,540.00
6,825,940.00

10% x D

las III bentang 6 meter


Harga Satuan
(Rp)

Koefisien
5

4.000
65,000.00
12.000
85,000.00
1.200
95,000.00
0.200
95,000.00
Jumlah Harga Tenaga Kerja
1.100
15.000
5.600

3,300,000.00
20,000.00
16,500.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
260,000.00
1,020,000.00
114,000.00
19,000.00
1,413,000.00
3,630,000.00
300,000.00
92,400.00
4,022,400.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Peralatan
10% x D

Harga Satuan
(Rp)

Koefisien
5

6.700
65,000.00
20.100
85,000.00
2.010
95,000.00
0.335
95,000.00
Jumlah Harga Tenaga Kerja
1.100
15.000
3.000

4,000,000.00
20,000.00
16,500.00

5,435,400.00
543,540.00
5,978,940.00

Jumlah
(Rp)
7
435,500.00
1,708,500.00
190,950.00
31,825.00
2,366,775.00
4,400,000.00
300,000.00
49,500.00

Jumlah Harga Bahan

4,749,500.00

Jumlah Harga Peralatan

7,116,275.00
711,627.50
7,827,902.50

10% x D

as II
Harga Satuan
(Rp)

Koefisien
5

0.150
65,000.00
0.300
85,000.00
0.030
95,000.00
0.075
95,000.00
Jumlah Harga Tenaga Kerja
0.015
0.200

4,000,000.00
16,500.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
9,750.00
25,500.00
2,850.00
7,125.00
45,225.00
61,600.00
3,300.00

64,900.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Peralatan
10% x D

110,125.00
11,012.50
121,137.50

II
Harga Satuan
(Rp)

Koefisien
5

0.200
65,000.00
0.300
85,000.00
0.030
95,000.00
0.010
95,000.00
Jumlah Harga Tenaga Kerja
0.016
0.250

4,000,000.00
16,500.00

Jumlah
(Rp)
7
13,000.00
25,500.00
2,850.00
950.00
42,300.00
65,200.00
4,125.00

Jumlah Harga Bahan

69,325.00

Jumlah Harga Peralatan

111,625.00
11,162.50
122,787.50

10% x D

III
Harga Satuan
(Rp)

Koefisien
5

0.200
65,000.00
0.300
85,000.00
0.030
95,000.00
0.010
95,000.00
Jumlah Harga Tenaga Kerja
0.016
0.250

3,300,000.00
16,500.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
13,000.00
25,500.00
2,850.00
950.00
42,300.00
53,790.00
4,125.00
57,915.00

AHSP.BIDANG CIPTA KARYA

Jumlah Harga Peralatan


10% x D

Harga Satuan
(Rp)

Koefisien
5

0.100
65,000.00
0.200
85,000.00
0.020
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja
0.011
0.050

5,000,000.00
16,500.00

100,215.00
10,021.50
110,236.50

Jumlah
(Rp)
7
6,500.00
17,000.00
1,900.00
475.00
25,875.00
55,000.00
825.00

Jumlah Harga Bahan

55,825.00

Jumlah Harga Peralatan

81,700.00
8,170.00
89,870.00

10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.100
65,000.00
0.200
85,000.00
0.020
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja
0.011
0.050

4,000,000.00
16,500.00

Jumlah
(Rp)
7
6,500.00
17,000.00
1,900.00
475.00
25,875.00
44,000.00
825.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

44,825.00

Jumlah Harga Peralatan

70,700.00
7,070.00
77,770.00

10% x D

L. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


P.69a Pemasangan 1 buah kunci tanam antik
No

Uraian

Kode

Satuan

TENAGA KERJA

Pekerja

L.01

OH

Tukang Kayu

L.02

OH

Kepala Tukang

L.03

OH

Mandor

L.04

OH

Jum
B
1
C

Bahan
Kunci Tanam Antik

Bh

Peralatan

J
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit ( 10%)

Harga Satuan Pekerjaan (D+E)

P.69b Pemasangan 1 buah kunci tanam biasa


No

Uraian

Kode

Satuan

Tenaga Kerja

Pekerja

L.01

OH

Tukang Kayu

L.02

OH

Kepala Tukang

L.03

OH

Mandor

L.04

OH

Jum
B

Bahan
Kunci Tanam Biasa

Bh

Peralatan

J
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit ( 10%)

Harga Satuan Pekerjaan (D+E)

P.70 Pemasangan 1 buah kunci kamar mandi


No

Uraian

Kode

Satuan

Tenaga Kerja

Pekerja

L.01

OH

Tukang Kayu

L.02

OH

Kepala Tukang

L.03

OH

Mandor

L.04

OH

Jum
B
1
C

Bahan
Kunci Tanam KM

Bh

Peralatan

J
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit ( 10%)

Harga Satuan Pekerjaan (D+E)

P.72a Pemasangan 1 Buah Engsel Pintu


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B
1

Bahan
Engsel Pintu

Peralatan

Bh

J
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

E
F

Overhead + Profit ( 10%)


Harga Satuan Pekerjaan (D+E)

P.73b Pemasangan 1 Buah Engsel jendela kupu-kupu


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B
1

Bahan
Engsel kupu-kupu

Peralatan

Bh

J
D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

E
F

Overhead + Profit ( 10%)


Harga Satuan Pekerjaan (D+E)

P.73c Pemasangan 1 Buah Engsel Angin


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B

Bahan
1
Engsel Angin

Bh

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

E
F

Overhead + Profit ( 10%)


Harga Satuan Pekerjaan (D+E)

P.75 Pemasangan 1 Buah kait angin


No

Uraian

Kode

Satuan

No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B

Bahan
1
Kait angin

Bh

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit ( 10%)
Harga Satuan Pekerjaan (D+E)

P.76 Pemasangan 1 Buah door closer


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B

Bahan
1
Door closer

Set

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit ( 10%)
Harga Satuan Pekerjaan (D+E)

P.78 Pemasangan 1 Buah door holder


No

Uraian

Kode

Satuan

1
A

L.01
L.02

OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu

3
4

Kepala Tukang
Mandor

L.03
L.04

OH
OH

Jum
B

Bahan
1
Door holder

Bh

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit ( 10%)
Harga Satuan Pekerjaan (D+E)

P.82a Pemasangan 1 m2 kaca tebal 3 mm


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B

Bahan
1
2

Kaca tebal 3 mm
Sealant

m2
Kg

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit ( 10%)
Harga Satuan Pekerjaan (D+E)

P.82b Pemasangan 1 m2 kaca tebal 5 mm


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B

Bahan

1
2

Kaca tebal 5 mm
Sealant

m2
Kg

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit ( 10%)
Harga Satuan Pekerjaan (D+E)

P.83b Pemasangan 1 m2 kaca cermin tebal 5 mm


No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga
1
Pekerja
2
Tukang Kayu
3
Kepala Tukang
4
Mandor

Jum
B

Bahan
1

Kaca cermin 5 mm

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit ( 10%)
Harga Satuan Pekerjaan (D+E)

m2

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.060

65,000.00

3,900.00

0.600

85,000.00

51,000.00

0.060

95,000.00

5,700.00

0.003

95,000.00

285.00

Jumlah Harga Tenaga Kerja


1

270,000.00

Jumlah Harga Bahan

60,885.00
270,000.00
270,000.00

Jumlah Harga Peralatan

330,885.00

10% x D

33,088.50
363,973.50

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.010

65,000.00

650.00

0.500

85,000.00

42,500.00

0.050

95,000.00

4,750.00

0.005

95,000.00

475.00

Jumlah Harga Tenaga Kerja


1.00

240,000.00

Jumlah Harga Bahan

Jumlah Harga Peralatan

48,375.00
240,000.00
240,000.00

288,375.00

10% x D

28,837.50

317,212.50

Harga Satuan
(Rp)

Koefisien
5

Jumlah
(Rp)
7

0.005

65,000.00

325.00

0.500

85,000.00

42,500.00

0.050

95,000.00

4,750.00

0.003

95,000.00

285.00

Jumlah Harga Tenaga Kerja


1.00

80,000.00

Jumlah Harga Bahan

47,860.00
80,000.00
80,000.00

Jumlah Harga Peralatan


127,860.00
10% x D

12,786.00
140,646.00

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.015
65,000.00
0.150
85,000.00
0.015
95,000.00
0.0008
95,000.00
Jumlah Harga Tenaga Kerja

975.00
12,750.00
1,425.00
76.00
15,226.00

1.00
25,000.00
Jumlah Harga Bahan

25,000.00
25,000.00

Jumlah Harga Peralatan

40,226.00

10% x D

4,022.60
44,248.60

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.01
65,000.00
0.10
85,000.00
0.010
95,000.00
0.0005
95,000.00
Jumlah Harga Tenaga Kerja

650.00
8,500.00
950.00
47.50
10,147.50

1.00
17,500.00
Jumlah Harga Bahan

17,500.00
17,500.00

Jumlah Harga Peralatan

27,647.50

10% x D

Koefisien

2,764.75
30,412.25

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.10
65,000.00
0.20
85,000.00
0.02
95,000.00
0.0005
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
17,000.00
1,900.00
47.50
25,447.50

1.00
40,000.00
Jumlah Harga Bahan

40,000.00
40,000.00

Jumlah Harga alat

65,447.50

10% x D

Koefisien

Harga Satuan
(Rp)

6,544.75
71,992.25

Jumlah
(Rp)

Koefisien
5

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.015
65,000.00
0.150
85,000.00
0.015
95,000.00
0.008
95,000.00
Jumlah Harga Tenaga Kerja

975.00
12,750.00
1,425.00
760.00
15,910.00

1.00
40,000.00
Jumlah Harga Bahan

40,000.00
40,000.00

Jumlah Harga Alat

55,910.00
5,591.00
61,501.00

10%

Koefisien
5

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.05
65,000.00
0.5
85,000.00
0.05
95,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja

3,250.00
42,500.00
4,750.00
285.00
50,785.00

1.00
300,000.00
Jumlah Harga Bahan

300,000.00
300,000.00

Jumlah Harga alat

350,785.00
35,078.50
385,863.50

10%

Koefisien
5

xD

Harga Satuan
(Rp)
6

0.05
0.5

65,000.00
85,000.00

Jumlah
(Rp)
7
3,250.00
42,500.00

0.05
95,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja

4,750.00
285.00
50,785.00

1.00
140,000.00
Jumlah Harga Bahan

140,000.00
140,000.00

Jumlah Harga alat

190,785.00
19,078.50
209,863.50

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.015
65,000.00
0.15
85,000.00
0.015
95,000.00
0.0008
95,000.00
Jumlah Harga Tenaga Kerja

975.00
12,750.00
1,425.00
76.00
15,226.00

1.10
100,000.00
0.05
25,000.00
Jumlah Harga Bahan

110,000.00
1,250.00
111,250.00

Jumlah Harga alat

126,476.00
12,647.60
139,123.60

10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.015
65,000.00
0.15
85,000.00
0.015
95,000.00
0.0008
95,000.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
975.00
12,750.00
1,425.00
76.00
15,226.00

1.10
155,000.00
0.05
25,000.00
Jumlah Harga Bahan

170,500.00
1,250.00
171,750.00

Jumlah Harga alat

186,976.00
18,697.60
205,673.60

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.015
65,000.00
0.15
85,000.00
0.015
95,000.00
0.008
95,000.00
Jumlah Harga Tenaga Kerja

975.00
12,750.00
1,425.00
760.00
15,910.00

1.10
130,000.00
Jumlah Harga Bahan

143,000.00
143,000.00

Jumlah Harga alat

158,910.00
15,891.00
174,801.00

10% x D

M. HARGA SATUAN PEKERJAAN PENGECATAN


c.01 1 m2 pengikisan/pengerokan permukaan cat lama
No

Uraian

Kode

Satuan

Koefisien

TENAGA KERJA

Pekerja

L.01

OH

0.15

Mandor

L.04

OH

0.003

Jumlah Har
B

Bahan

Soda api

Kg

0.050

Juml
C

Peralatan
Jumlah

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

c.02 1 m2 pencucian bidang permukaan tembok yang pernah di cat


No

Uraian

Kode

Satuan

Koefisien

Tenaga Kerja

Pekerja

L.01

OH

0.15

Mandor

L.04

OH

0.003

Jumlah Har
B

Bahan

Sabun

Kg

0.050

Juml
C

Peralatan
Jumlah

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

c.03 1 m2 pengerokan karat pada permukaan baja cara normal


No

Uraian

Kode

Satuan

Koefisien

No

Uraian

Kode

Satuan

Koefisien

1
A
1

Tenaga Kerja
Pekerja

L.01

OH

0.15

Mandor

L.04

OH

0.008

Jumlah Har
B

Bahan

Sabun

Kg

0.050

Juml
C

Peralatan
Jumlah

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit / (10%)

Harga Satuan Pekerjaan (D+E)

10%

c.04 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.07
0.009
0.006
0.003
Jumlah Har

B
1
2
3
4
5
6
7

BAHAN
Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas

Kg
Kg
Kg
Kg
Bh
Kg
Lbr

0.20
0.15
0.17
0.26
0.01
0.03
0.2
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.05 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 3 lapis cat
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.07
0.105
0.004
0.003
Jumlah Har

B
1
2
3
4
5
6
7

BAHAN
Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas

Kg
Kg
Kg
Kg
Bh
Kg
Lbr

0.20
0.15
0.17
0.35
0.01
0.03
0.2
Juml

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.06 1 m2 pelaburan bidang kayu dengan teak oil


No

Uraian

Kode

Satuan

Koefisien

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1

Tenaga Kerja
1
Pekerja
2
Tukang cat
3
Kepala Tukang
4
Mandor
BAHAN
Teak oil

Ltr

0.04
0.063
0.063
0.003
Jumlah Har
0.36

Juml
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.07 1 m2 pelaburan bidang kayu dengan cat residu dan ter


No

Uraian

Kode

Satuan

Koefisien

1
A

L.01
L.04

OH
OH

B
1

Tenaga Kerja
1
Pekerja
2
Mandor
BAHAN
Residu atau ter

0.10
0.006
Jumlah Har

Ltr

0.35

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.08 1 m2 pelaburan bidang kayu dengan vernis


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.16
0.16
0.016
0.003
Jumlah Har

B
1
2
3

BAHAN
Vernis
Dempul
Amplas

Ltr
Kg
Lbr

0.15
0.05
0.10
Juml

Peralatan
Jumlah

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

10%

Harga Satuan Pekerjaan (D+E)

c.09 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat pen
No

Uraian

Kode

Satuan

Koefisien

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.02
0.063
0.0063
0.003
Jumlah Har

Kg
Kg
Kg

0.10
0.10
0.26
Juml

Tenaga Kerja
1
Pekerja
2
Tukang cat
3
Kepala tukang
4
Mandor

B
1
2
3

BAHAN
Plamuur
Cat dasar
Cat penutup

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.10 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup )
No

Uraian

Kode

Satuan

Koefisien

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.028
0.042
0.0042
0.003
Jumlah Har

Kg
Kg

0.12
0.18
Juml

Tenaga Kerja
1
Pekerja
2
Tukang cat
3
Kepala tukang
4
Mandor

B
1
2

BAHAN
Cat dasar
Cat penutup

Peralatan
Jumlah

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)

10%

Harga Satuan Pekerjaan (D+E)

c.11 Pengecatan 1 m2 permukaan baja dengan menie besi


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

BAHAN
Menie besi
Kuas

0.0200
0.2000
0.0200
0.0025
Jumlah Har

Kg
Bh

1.10
0.01

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.12 Pengecatan 1 m2 plafond eternit / gypsum


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

BAHAN
Cat dasar
Cat Penutup

Kg
L

0.0280
0.0420
0.0042
0.0025
Jumlah Har
0.12
0.18

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.13 Pengecatan 1 m2 Genteng


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.0200
0.0630
0.0063
0.0025
Jumlah Har

B
1

BAHAN
Cat Genteng

Kg

0.2600

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

c.14 Mengecat bidang dengan cat minyak ( 2 lapis cat penutup )


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang cat
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

BAHAN
Plamir / dempul
Cat dasar
Cat penutup

0.0700
0.0090
0.0063
0.0025
Jumlah Har
0.15
0.17
0.26

Juml
C

Peralatan
Jumlah

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00

9,750.00

95,000.00

285.00

Jumlah Harga Tenaga Kerja


25,000.00
Jumlah Harga Bahan

10,035.00
1,250.00
1,250.00

Jumlah Harga Peralatan

11,285.00

xD

1,128.50
12,413.50

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00

9,750.00

95,000.00

285.00

Jumlah Harga Tenaga Kerja


10,000.00
Jumlah Harga Bahan

10,035.00
500.00
500.00

Jumlah Harga Peralatan

10,535.00

xD

1,053.50
11,588.50

Harga Satuan
(Rp)

Jumlah
(Rp)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00

9,750.00

95,000.00

760.00

Jumlah Harga Tenaga Kerja

10,510.00

10,000.00

500.00

Jumlah Harga Bahan

500.00

Jumlah Harga Peralatan

11,010.00

xD

1,101.00
12,111.00

lapis cat penutup )


Harga Satuan
(Rp)

Jumlah
(Rp)

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

4,550.00
765.00
570.00
285.00
6,170.00

22,000.00
22,000.00
22,000.00
35,000.00
13,000.00
20,000.00
3,000.00
Jumlah Harga Bahan

4,400.00
3,300.00
3,740.00
9,100.00
130.00
600.00
600.00
21,870.00

Jumlah Harga Peralatan

28,040.00
2,804.00
30,844.00

xD

lapis cat penutup )


Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

4,550.00
8,925.00
380.00
285.00
14,140.00

22,000.00
22,000.00
22,000.00
35,000.00
13,000.00
20,000.00
3,000.00
Jumlah Harga Bahan

4,400.00
3,300.00
3,740.00
12,250.00
130.00
600.00
600.00
25,020.00

Jumlah Harga Peralatan

39,160.00
3,916.00
43,076.00

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
70,000.00
Jumlah Harga Bahan

Jumlah
(Rp)
7
2,600.00
5,355.00
5,985.00
285.00
14,225.00
25,200.00
25,200.00

Jumlah Harga Peralatan


xD

Harga Satuan
(Rp)
6

65,000.00
95,000.00
Jumlah Harga Tenaga Kerja
18,000.00

39,425.00
3,942.50
43,367.50

Jumlah
(Rp)
7
6,500.00
570.00
7,070.00
6,300.00

Jumlah Harga Bahan

6,300.00

Jumlah Harga Peralatan

13,370.00
1,337.00
14,707.00

xD

Harga Satuan
(Rp)

Jumlah
(Rp)

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

10,400.00
13,600.00
1,520.00
285.00
25,805.00

35,000.00
12,000.00
3,000.00
Jumlah Harga Bahan

5,250.00
600.00
300.00
6,150.00

Jumlah Harga Peralatan

31,955.00
3,195.50

xD

35,150.50

pis cat penutup )


Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

1,300.00
5,355.00
598.50
285.00
7,538.50

22,000.00
20,000.00
20,000.00
Jumlah Harga Bahan

2,200.00
2,000.00
5,200.00
9,400.00

Jumlah Harga Peralatan

16,938.50
1,693.85
18,632.35

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja

1,820.00
3,570.00
399.00
285.00
6,074.00

20,000.00
20,000.00
Jumlah Harga Bahan

2,400.00
3,600.00
6,000.00

Jumlah Harga Peralatan

12,074.00
1,207.40

xD

13,281.40

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
27,000.00
13,000.00

Jumlah
(Rp)
7
1,300.00
17,000.00
1,900.00
237.50
20,437.50
29,700.00
130.00

Jumlah Harga Bahan

29,830.00

Jumlah Harga Peralatan

50,267.50
5,026.75
55,294.25

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
20,000.00
20,000.00

Jumlah
(Rp)
7
1,820.00
3,570.00
399.00
237.50
6,026.50
2,400.00
3,600.00

Jumlah Harga Bahan

6,000.00

Jumlah Harga Peralatan

12,026.50
1,202.65
13,229.15

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
35,000.00

Jumlah
(Rp)
7
1,300.00
5,355.00
598.50
237.50
7,491.00
9,100.00

Jumlah Harga Bahan

9,100.00

Jumlah Harga Peralatan

16,591.00
1,659.10
18,250.10

xD

Harga Satuan
(Rp)
6

65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
12,000.00
22,000.00
35,000.00

Jumlah
(Rp)
7
4,550.00
765.00
598.50
237.50
6,151.00
1,800.00
3,740.00
9,100.00

Jumlah Harga Bahan

14,640.00

Jumlah Harga Peralatan

20,791.00
2,079.10
22,870.10

xD

N. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


sa.01 Pemasangan 1 buah closet duduk / monobolck

No
1
A
1
2
3
4

Uraian

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

TENAGA KERJA
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

Bahan
Closet duduk
Perlengkapan

Unit
Ls

Ju
C

Peralatan

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.02 Pemasangan 1 buah closet jongkok porslen

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2
3

Bahan
Closet jongkok
Semen portland
Pasir pasang

Peralatan

Unit
Kg
M3

Ju

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.03 Pemasangan 1 buah closet jongkok teraso

No
1
A
1
2
3
4

Uraian

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2
3
4

Bahan
Closet jongkok
Semen portland
Pasir pasang
Bata merah

Peralatan

Unit
Kg
M3
Bh

Ju

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.05 Pemasangan 1 buah wastafel

No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
1 Pekerja
2 Tukang batu
3 Kepala Tukang
4 Mandor

Jumlah H
B
1
2
3
4

BAHAN
Wastafel
Semen Portland
Pasir pasang
Perlengkapan

unit
Kg
M3
%

Ju
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.09 Pemasangan 1 buah bak mandi Fibreglass vol 0,30 M3

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Bak fibreglass
Perlengkapan

Unit
Ls

Ju
C

Peralatan

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.10 Pemasangan 1 buah bak air fibreglass vol 1 M3

No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor

Jumlah H
B
1
2

BAHAN
Bak air fibreglass
Perlengkapan

Unit
%

Jumlah Harga Bahan


C
Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.11 Pemasangan 1 buah bak cuci piring stainlessteel

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Bak cuci piring
Waterdrain

Unit
Bh
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.12 Pemasangan 1 buah floor drain

No

Uraian

Kode

Satuan

1
A

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor

Jumlah H
B
1

BAHAN
Floor drain

Unit
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.14 Pemasangan 1 buah bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2
3
4
5
6

BAHAN
Bata merah
Semen portland
Pasir pasang
Pasir beton
Kerikil
Baja tulangan

Bh
Kg
M3
M3
M3
Kg

Ju
C

Peralatan

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.17 Pemasangan 1 buah kran diameter atau 3/4

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Kran air
Sealtape

M
Bh

Ju
C

Peralatan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.23 Pemasangan 1 m pipa PVC tipe AW diameter 1/2

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 1/2
Perlengkapan

M
%

Ju
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.24 Pemasangan 1 m pipa PVC tipe AW diameter 3/4

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 3/4
Perlengkapan

M
%
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.25 Pemasangan 1 m pipa PVC tipe AW diameter 1

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 1
Perlengkapan

M
%
Jumlah Harga Bahan

Peralatan

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.26 Pemasangan 1 m pipa PVC tipe AW diameter 1 1/2

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 1 1/2
Perlengkapan

M
%
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.27 Pemasangan 1 m pipa PVC tipe AW diameter 2

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 2
Perlengkapan

M
%

Ju
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.28 Pemasangan 1 m pipa PVC tipe AW diameter 2 1/2

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 2 1/2
Perlengkapan

M
%

Ju
C

Peralatan

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.29 Pemasangan 1 m pipa PVC tipe AW diameter 3

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 3
Perlengkapan

M
%

Ju
C

Peralatan

D
E
F

Jumlah Harga Peralatan


Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sa.30 Pemasangan 1 m pipa PVC tipe AW diameter 4

No

Uraian

Kode

Satuan

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah H
B
1
2

BAHAN
Pipa PVC 4
Perlengkapan

M
%

Ju
C

Peralatan

Jumla
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

3.30
65,000.00
1.10
85,000.00
0.01
95,000.00
0.16
95,000.00
Jumlah Harga Tenaga Kerja

214,500.00
93,500.00
950.00
15,200.00
324,150.00

1.00
1,800,000.00
6% x closet
108,000.00
Jumlah Harga Bahan

1,800,000.00
108,000.00
1,908,000.00

Jumlah Harga Peralatan

2,232,150.00
223,215.00
2,455,365.00

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

1.00
65,000.00
1.50
85,000.00
0.15
95,000.00
0.16
95,000.00
Jumlah Harga Tenaga Kerja

65,000.00
127,500.00
14,250.00
15,200.00
221,950.00

1.00
180,000.00
6.00
1,160.00
0.01
120,000.00
Jumlah Harga Bahan

180,000.00
6,960.00
1,200.00
188,160.00

Jumlah Harga Peralatan

410,110.00
41,011.00
451,121.00

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

1.00
65,000.00
1.50
85,000.00
0.15
95,000.00
0.05
95,000.00
Jumlah Harga Tenaga Kerja

65,000.00
127,500.00
14,250.00
4,750.00
211,500.00

1.00
120,000.00
6.00
1,160.00
0.01
120,000.00
7.00
800.00
Jumlah Harga Bahan

120,000.00
6,960.00
1,200.00
5,600.00
133,760.00

Jumlah Harga Peralatan

345,260.00
34,526.00
379,786.00

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

1.20
65,000.00
1.45
85,000.00
0.15
95,000.00
0.06
95,000.00
Jumlah Harga Tenaga Kerja

78,000.00
123,250.00
14,250.00
5,700.00
221,200.00

1.20
550,000.00
6.00
1,160.00
0.01
120,000.00
12.00
66,000.00
Jumlah Harga Bahan

660,000.00
6,960.00
1,200.00
792,000.00
1,460,160.00

a Peralatan
10% x D

1,681,360.00
168,136.00
1,849,496.00

Harga Satuan
(Rp)

Koefisien
5

3.00
65,000.00
4.50
85,000.00
0.05
95,000.00
0.90
95,000.00
Jumlah Harga Tenaga Kerja
1.00
12% x bak

350,000.00
42,000.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
195,000.00
382,500.00
4,750.00
85,500.00
667,750.00
350,000.00
42,000.00
392,000.00

Jumlah Harga Peralatan


1,059,750.00
105,975.00
1,165,725.00

10% x D

Koefisien

Harga Satuan
(Rp)

0.3
65,000.00
0.45
85,000.00
0.045
95,000.00
0.015
95,000.00
Jumlah Harga Tenaga Kerja
1.00
12.00

350,000.00
42,000.00

Jumlah
(Rp)
7
19,500.00
38,250.00
4,275.00
1,425.00
63,450.00
350,000.00
42,000.00
392,000.00

a Peralatan
10% x D

455,450.00
45,545.00
500,995.00

Koefisien

Harga Satuan
(Rp)

0.03
65,000.00
0.30
85,000.00
0.03
95,000.00
0.015
95,000.00
Jumlah Harga Tenaga Kerja
1.00
1.00

Jumlah
(Rp)

650,000.00
55,000.00

1,950.00
25,500.00
2,850.00
1,425.00
31,725.00
650,000.00
55,000.00
705,000.00

a Peralatan
736,725.00
73,672.50
810,397.50

10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.01
65,000.00
0.10
85,000.00
0.01
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja
1.00

Jumlah
(Rp)

55,000.00

650.00
8,500.00
950.00
475.00
10,575.00
55,000.00
55,000.00

a Peralatan
10%

45 cm tinggi 50 cm

xD

65,575.00
6,557.50
72,132.50

a Peralatan

Harga Satuan
(Rp)

Koefisien

3.2
65,000.00
1.15
85,000.00
0.011
95,000.00
0.016
95,000.00
Jumlah Harga Tenaga Kerja
70.00
77.00
0.13
0.09
0.02
2.60

800.00
1,160.00
1,400.00
380,000.00
400,000.00
20,700.00

Jumlah
(Rp)
7
208,000.00
97,750.00
1,045.00
1,520.00
308,315.00
56,000.00
89,320.00
182.00
34,200.00
8,000.00
53,820.00

Jumlah Harga Bahan

241,522.00

Jumlah Harga Peralatan

549,837.00
54,983.70
604,820.70

10% x D

Harga Satuan
(Rp)

Koefisien

0.01
65,000.00
0.4
85,000.00
0.04
95,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja
1.00
0.025

110,000.00
3,000.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
650.00
34,000.00
3,800.00
475.00
38,925.00
110,000.00
75.00
110,075.00

149,000.00
14,900.00
163,900.00

10% x D

Harga Satuan
(Rp)

Koefisien
5

0.036
65,000.00
0.06
85,000.00
0.006
95,000.00
0.002
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

Jumlah
(Rp)

5,700.00
2,394.00

Jumlah Harga Bahan

2,340.00
5,100.00
570.00
190.00
8,200.00
6,840.00
2,394.00
9,234.00

10%

Koefisien

xD

Harga Satuan
(Rp)
6

0.036
65,000.00
0.06
85,000.00
0.006
95,000.00
0.002
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

7,000.00
2,940.00

17,434.00
1,743.40
19,177.40

Jumlah
(Rp)
7
2,340.00
5,100.00
570.00
190.00
8,200.00
8,400.00
2,940.00
11,340.00

a Peralatan

19,540.00
1,954.00
21,494.00

10% x D

Koefisien

Harga Satuan
(Rp)

0.036
65,000.00
0.06
85,000.00
0.006
95,000.00
0.002
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

9,300.00
3,906.00

Jumlah Harga Peralatan


10% x D

Koefisien

Harga Satuan
(Rp)
6

0.054
65,000.00
0.09
85,000.00
0.009
95,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

11,700.00
4,914.00

Jumlah
(Rp)
7
2,340.00
5,100.00
570.00
190.00
8,200.00
11,160.00
3,906.00
15,066.00

23,266.00
2,326.60
25,592.60

Jumlah
(Rp)
7
3,510.00
7,650.00
855.00
285.00
12,300.00
14,040.00
4,914.00
18,954.00

31,254.00
3,125.40
34,379.40

10% x D

Harga Satuan
(Rp)

Koefisien

0.054
65,000.00
0.09
85,000.00
0.009
95,000.00
0.003
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

16,500.00
6,930.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
3,510.00
7,650.00
855.00
285.00
12,300.00
19,800.00
6,930.00
26,730.00

a Peralatan
39,030.00
3,903.00
42,933.00

10% x D

Harga Satuan
(Rp)

Koefisien

0.081
65,000.00
0.135
85,000.00
0.0135
95,000.00
0.004
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

12,500.00
5,250.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
5,265.00
11,475.00
1,282.50
380.00
18,402.50
15,000.00
5,250.00
20,250.00

Jumlah Harga Peralatan


38,652.50
3,865.25
42,517.75

10% x D

Harga Satuan
(Rp)

Koefisien
5

0.081
65,000.00
0.135
85,000.00
0.0135
95,000.00
0.004
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

17,500.00
7,350.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
5,265.00
11,475.00
1,282.50
380.00
18,402.50
21,000.00
7,350.00
28,350.00

n
46,752.50
4,675.25
51,427.75

10% x D

Harga Satuan
(Rp)

Koefisien

0.081
65,000.00
0.135
85,000.00
0.0135
95,000.00
0.004
95,000.00
Jumlah Harga Tenaga Kerja
1.20
35.00

27,500.00
11,550.00

Jumlah Harga Bahan

Jumlah
(Rp)
7
5,265.00
11,475.00
1,282.50
380.00
18,402.50
33,000.00
11,550.00
44,550.00

Jumlah Harga Peralatan


10% x D

62,952.50
6,295.25
69,247.75

AHSP.BIDANG CIPTA KARYA

O. HARGA SATUAN PEKERJAAN LINGKUNGAN


Li.01 1 m' Memasang got U - 20 cm
No

Uraian

Kode

Satuan

Koefisien

1
A
1

L.01

OH

Tenaga
Pekerja

0.700

Jumlah Ha
B
1
2

Bahan
Pas. Bata merah 1 PC : 4 PS
Got U - 20 cm

m3
m3

0.006
1.000

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Li.02 1 m2 Memasang paving blok, tebal 6 cm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

Tenaga
Pekerja
Tukang Batu
Mandor

L.01
L.02
L.04

OH
OH
OH

0.225
0.050
0.003
Jumlah Ha

B
1
2

Bahan
Paving Blok t = 6 cm
Pasir Pasang

m2
m3

1.025
0.050

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Li.03 1 m2 Memasang paving blok, tebal 8 cm


No

Uraian

Kode

Satuan

Koefisien

AHSP.BIDANG CIPTA KARYA


A
1
2
3

Tenaga
Pekerja
Tukang Batu
Mandor

B
1
2

Bahan
Paving Blok t = 8 cm
Pasir Pasang

L.01
L.02
L.04

OH
OH
OH

0.225
0.050
0.003
Jumlah Ha

m2
m3

1.025
0.050

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Li.04 1 m' Memasang kanstin abu-abu 10.20.40 K-175


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

Tenaga
Pekerja
Tukang Batu
Mandor

L.01
L.02
L.04

OH
OH
OH

B
1
2

Bahan
Kanstin abu-abu
Adukan

0.0500
0.0175
0.0087
Jumlah Ha

m'
m3

1.000
0.010

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Li.05 1 m2 Melabur dengan aspal untuk jalan beton


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

0.0034
0.0003
Jumlah Ha

AHSP.BIDANG CIPTA KARYA


1
2
3
4

Aspal
Pasir Beton
Minyak Tanah
Kayu Bakar

Kg
m3
Ltr
m3

1.0764
0.0162
0.0550
0.0013

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Li.06 1 m1 Membuat delatasi dengan concrete cutter untuk jalan beton


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga
Pekerja
Mandor

L.01
L.04

OH
OH

0.0200
0.0100
Jumlah Ha

B
1

Bahan
Joint Sealant

Kg

0.1375

Jum
C
1
2

Peralatan
Concrete cutter
Air Compressor

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

sewa-jam
sewa-jam

0.0456
0.0020
Jumlah
10%

Li.07 1 m2 Membuat bekisting untuk jalan beton


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga
Pekerja
Mandor

L.01
L.04

OH
OH

0.520
0.026
Jumlah Ha

B
1
2

Bahan
Kayu Kelas III
Paku 5 cm - 10 cm

m3
Kg

0.031
0.300

AHSP.BIDANG CIPTA KARYA

Jum
C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

Li.08 1 m2 Menggaris / Finishing permukaan jalan beton (Manual)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

0.023
0.012
Jumlah Ha

Jum
C
1

Peralatan
Alat Bantu

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Ls

5%
Jumlah
10%

Li.09 1 m2 Membuat Bekisting untuk parit beton dengan Multiflex


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3
4

Bahan
Multiflex 8 mm
Kaso 5/5 cm
Paku 5 cm dan & 7 cm
Minyak Bekisting

lbr
m3
kg
L

0.500
0.250
0.025
0.050
Jumlah Ha
0.3500
0.0143
0.2500
0.2000

Jum

AHSP.BIDANG CIPTA KARYA


C

Peralatan

Jumlah
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

10%

AHSP.BIDANG CIPTA KARYA

Harga Satuan
(Rp)

Jumlah
(Rp)

65,000.00

45,500.00

Jumlah Harga Tenaga Kerja

45,500.00

115,362.50
35,000.00
Jumlah Harga Bahan

692.18
35,000.00
35,692.18

Jumlah Harga Peralatan

81,192.18
8,119.22
89,311.39

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
Jumlah Harga Tenaga Kerja

14,625.00
4,250.00
285.00
19,160.00

74,000.00
120,000.00
Jumlah Harga Bahan

75,850.00
6,000.00
81,850.00

Jumlah Harga Peralatan

101,010.00
10,101.00
111,111.00

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

AHSP.BIDANG CIPTA KARYA


65,000.00
85,000.00
95,000.00
Jumlah Harga Tenaga Kerja

14,625.00
4,250.00
285.00
19,160.00

92,500.00
290,000.00
Jumlah Harga Bahan

94,812.50
14,500.00
109,312.50

Jumlah Harga Peralatan

128,472.50
12,847.25
141,319.75

xD

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

65,000.00
85,000.00
95,000.00
Jumlah Harga Tenaga Kerja

3,250.00
1,487.50
826.50
5,564.00

180,000.00
51,568.18
Jumlah Harga Bahan

180,000.00
515.68
180,515.68

Jumlah Harga Peralatan

186,079.68
18,607.97
204,687.65

xD

Harga Satuan
(Rp)
6
65,000.00
95,000.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
221.00
28.50
249.50

AHSP.BIDANG CIPTA KARYA


13,000.00
380,000.00
2,500.00
650,000.00

13,993.20
6,156.00
137.50
845.00

Jumlah Harga Bahan

21,131.70

Jumlah Harga Peralatan

21,381.20
2,138.12
23,519.32

xD

Harga Satuan
(Rp)
6
65,000.00
95,000.00
Jumlah Harga Tenaga Kerja
13,000.00

Jumlah
(Rp)
7
1,300.00
950.00
2,250.00
1,787.50

Jumlah Harga Bahan

1,787.50

150,000.00
50,000.00
Jumlah Harga Peralatan

6,840.00
100.00
6,940.00
10,977.50
1,097.75
12,075.25

xD

Harga Satuan
(Rp)
6
65,000.00
95,000.00
Jumlah Harga Tenaga Kerja
3,300,000.00
16,500.00

Jumlah
(Rp)
7
33,800.00
2,470.00
36,270.00
103,290.00
4,950.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Bahan

108,240.00

Jumlah Harga Peralatan

144,510.00
14,451.00
158,961.00

xD

Harga Satuan
(Rp)
6
65,000.00
95,000.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
1,495.00
1,140.00
2,635.00

Jumlah Harga Bahan


131.75
Jumlah Harga Peralatan
xD

Harga Satuan
(Rp)
6
65,000.00
85,000.00
95,000.00
95,000.00
Jumlah Harga Tenaga Kerja
130,000.00
3,300,000.00
16,500.00
12,500.00
Jumlah Harga Bahan

6.59
6.59
2,641.59
264.16
2,905.75

Jumlah
(Rp)
7
32,500.00
21,250.00
2,375.00
4,750.00
60,875.00
45,500.00
47,190.00
4,125.00
2,500.00
99,315.00

AHSP.BIDANG CIPTA KARYA

Jumlah Harga Peralatan


xD

160,190.00
16,019.00
176,209.00

AHSP.BIDANG CIPTA KARYA

P. HARGA SATUAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


Me.01 1 titik Pasang Stop kontak
No

Uraian

Kode

Satuan

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga
Pekerja
Tukang listrik
Kepala tukang

Jum
B
1
2
3

Bahan
Kabel NYA 1 x 2,5 mm
Pipa pralon 5/8''
Stop kontak + indoos

Peralatan

m'
btg
bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Me.02 1 titik Pasang Saklar tunggal


No

Uraian

Kode

Satuan

1
A
1

L.02

OH

Tenaga
Tukang listrik

Jum
B
1
2
3

Bahan
Kabel NYA 1 x 2,5 mm
Pipa pralon 5/8"
Saklar tunggal + indoos

Peralatan

m'
btg
bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Me.03 1 titik Pasang Saklar ganda


No

Uraian

Kode

Satuan

1
A
1

L.02

OH

Tenaga
Tukang listrik

AHSP.BIDANG CIPTA KARYA

Jum
B
1
2
3

Bahan
Kabel NYA 1 x 2,5 mm
Pipa pralon 5/8"
Saklar tunggal + indoos

Peralatan

m'
btg
bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA


Me.04 1 buah pasang lampu TL 20 watt
No

Uraian

Kode

Satuan

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga
Pekerja
Tukang Listrik
Kepala Tukang

Jum
B
1

Bahan
Lampu TL 20 Watt

Peralatan

bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Me.05 1 buah pasang lampu SL 18 watt


No

Uraian

Kode

Satuan

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga
Pekerja
Tukang Listrik
Kepala Tukang

Jum
B
1
2

Bahan
Lampu SL 18 Watt
Fitting Keramik

Peralatan

bh
bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

Me.06 1 buah pasang lampu Pijar 25 watt


No

Uraian

Kode

Satuan

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga
Pekerja
Tukang Listrik
Kepala Tukang

AHSP.BIDANG CIPTA KARYA

Jum
B
1
2

Bahan
Lampu Pijar 25 Watt
Fitting Keramik

Peralatan

bh
bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA


Me.07 1 buah pasang Panel Box + MCB
No

Uraian

Kode

Satuan

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga
Pekerja
Tukang Listrik
Kepala Tukang

Jum
B
1
2
3

Bahan
Panel Box + MCB
Kabel NYA 1 x 2,5 mm
Isolasi

Peralatan

bh
m'
bh

J
D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit / (10%)
Harga Satuan Pekerjaan (D+E)

AHSP.BIDANG CIPTA KARYA

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.050
65,000.00
0.500
85,000.00
0.05
95,000.00
Jumlah Harga Tenaga Kerja

3,250.00
42,500.00
4,750.00
50,500.00

15.000
2,500.00
1.200
15,000.00
1.000
30,000.00
Jumlah Harga Bahan

37,500.00
18,000.00
30,000.00
85,500.00

Jumlah Harga Peralatan

136,000.00
13,600.00
149,600.00

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.050
85,000.00
Jumlah Harga Tenaga Kerja

4,250.00
4,250.00

12.000
2,500.00
2.000
15,000.00
1.000
19,000.00
Jumlah Harga Bahan

30,000.00
30,000.00
19,000.00
79,000.00

Jumlah Harga Peralatan

83,250.00
8,325.00
91,575.00

10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.050

85,000.00

Jumlah
(Rp)
7
4,250.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Tenaga Kerja

4,250.00

18.000
2,500.00
2.000
15,000.00
1.000
12,500.00
Jumlah Harga Bahan

45,000.00
30,000.00
12,500.00
87,500.00

Jumlah Harga Peralatan

91,750.00
9,175.00
100,925.00

10% x D

AHSP.BIDANG CIPTA KARYA

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.100
65,000.00
0.020
85,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja

6,500.00
1,700.00
475.00
8,675.00

1.000
45,000.00
Jumlah Harga Bahan

45,000.00
45,000.00

Jumlah Harga Peralatan

53,675.00
5,367.50
59,042.50

10% x D

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.010
65,000.00
0.020
85,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja

650.00
1,700.00
475.00
2,825.00

1.000
30,000.00
1.000
12,000.00
Jumlah Harga Bahan

30,000.00
12,000.00
42,000.00

Jumlah Harga Peralatan

44,825.00
4,482.50
49,307.50

10% x D

Koefisien
5

Harga Satuan
(Rp)
6

0.010
0.020
0.005

65,000.00
85,000.00
95,000.00

Jumlah
(Rp)
7
650.00
1,700.00
475.00

AHSP.BIDANG CIPTA KARYA


Jumlah Harga Tenaga Kerja

2,825.00

1.000
10,000.00
1.000
12,000.00
Jumlah Harga Bahan

10,000.00
12,000.00
22,000.00

Jumlah Harga Peralatan

24,825.00
2,482.50
27,307.50

10% x D

AHSP.BIDANG CIPTA KARYA

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)
7

0.010
65,000.00
0.020
85,000.00
0.005
95,000.00
Jumlah Harga Tenaga Kerja

650.00
1,700.00
475.00
2,825.00

1.000
200,000.00
12.000
2,500.00
1.000
12,000.00
Jumlah Harga Bahan

200,000.00
30,000.00
12,000.00
242,000.00

Jumlah Harga Peralatan

244,825.00
24,482.50
269,307.50

10% x D

No.

Uraian

Volume

PEKERJAAN PERSIAPAN

Membersihkan lahan

Papan Plank Nama

56 M2
Ls

Jumlah Harga Peker


II

PEKERJAAN PONDASI

Pek. Galian Tanah sedelam 1m

M3

pek.Urugan Tanah Di Bawah Lantai 15cm

8.4

3
4

M2

M2

M2

M'

Jumlah Harga Peker

Harga Satuan
(Rupiah)
e

Satuan
c
Ls

Jumlah
Harga-Harga
f = (d x e)

300,000.00

Ls

umlah Harga Pekerjaan

#REF!

M3
M

Rp

122,402.50 Rp

M3

M2

M2

101,250.00

141,666.67

'

umlah Harga Pekerjaan

#REF!

#REF!
1,028,181.00
#REF!

#REF!

Você também pode gostar