Você está na página 1de 2

PROCEEDTNGS OF EXECUTTVE ENGtNEER, RWS&S(p) DlVtStON, V|JAYAWADA.

Present: Sri D.Sainath. B.Tech.


Office

Order.No.Al/l/2016.
Sub:

Dt.27.06.2016.

p,s11.

- RWS&S(P) Division, Vijayawada - Distribution of work


the staff of Drawing Branch in division office - orders - Issued.

for among

000
ORDER:

The following work Distribution is ordered among the staff working in Drawing
Branch with immediate effect.
1) Smt. G.Uma

(Tl)

O&M CPWS Schemes, Vallampatla project, Non-CRF , 20%o Project katrenipalli,


Ambedkar Jeevan dhara, Indiramma programme, MHP budget and releases, NRDWP
Gannavaram sub-Division, GPS& GIS survey, Defunct schemes MVS, SAGy and
MPLADS, Janmaboomi Maavooru,NABARD Proposals.
2) Smt. Ch.Anuradha (T2)
NRDWP Works, Vijayawada, Nandigama Sub-Divisions, Yanamalakuduru pH,II
Project, DW& Sanitation facilities to schools and Anganwadis, SS Tanks, Drought,
FDR, Jalamani, ZP/IVIP/GP works of Vijayawada and Tiruvuru SubDivisions.NRDWP Prooosals.

3) Sri S.Subhani. (T3)


NRDWP Project Gollapudi, Reddigudem, Paritala, NRDWP Mylavaram SubDivision, ACDP Mylavaram, Penamaluru and Gannavaram constituencies,
Meekosam, Pending Electrical connections, NH-5 (old) and NH-g (old), polavaram
effected works, status of PWS, CPWS, HPs-Weekly reports, defunct schemes SVS
and to look after T4 seat untill further orders

4)

rrat

Sustainability works, water leves monthly, HP Stock position. Zillaparishat/Mandal


parishaVGP works of Nuzvid/Jaggaiahpeta sub-Divisions.

5)

rrst

NRDWP Works Jaggaiahpeta Sub Division,Maintenance of Laboratory, CPWS


Scheme Mulapadu, TTDC Gollapudi, Construction of Lab at Gollapudi, Crash
Programme.

6)

r.rrort

7) Sri K.Ravi (JTO2)


NRDWP Works, Nuzvid and Tiruvuru Sub Divisions,Krishna Pushkarams-2016,
ZPllvIflCP works of Mylavaram, Gannavaram, Sub'Divisions, CPWS Scheme to
Vissannapeta and other habs, Drought weekly reports,Z.P.Proposals.and to look after
T5 seat untill further orders

8) Sri

G.V.D.Naeeswara Rao (JTO3)

MIS, Solar pumps and community drinking water plants and to look after HD seat
joining of HD.

9)

Sri V.Rama Mohana Rao. (HD)

Tenders, Agreements, QC Reports, Indent orders, Work orders'

10) Sri B.Mahesh GPO)


Paper clippings, Status of IHHLS, TSC Sanitation,Swatcha Bharath, ACDP,
ZPII'IPIGP works of Nandigama Sub-Division.

The above Case workers are here by directed to hand over and take over charge
per above distribution immediately and report compliance.

as

Sd/D.sainath
Executive Engineer,

RWS&S(P) Division, Vijayawada.


To
All the case workers.
Copy to Executive Engineer's table, D.A.O's Table and Superintendent's Table.
Copy to all Case workers in A.B.
Copy to all Deputy Executive Engineers, RWS&S(P) Division, Vijayawada.

ltl ,

RWS&S(P) Division, Vijayawada.

vhrlb

Você também pode gostar