Escolar Documentos
Profissional Documentos
Cultura Documentos
1 of 2
Air Conditioning
Building Controls
http://hpac.com/air-conditioning/evaluation-chiller-plant
Fire / Smoke
Heating
Humidity Control
Motors / Drives
Piping / Pumping
Resources
Advertisement
COMMENTS 0
TWEET
Conclusions
Columns
Because of its age and wear, Chiller 2 was targeted for replacement by the owner.
A recommendation that Chiller 2 be replaced with sustainable equipment that surpasses
code-mandated levels of efficiency and provides control strategies to improve chilledwater-plant energy efficiency was made. This article describes the analysis behind that
recommendation.
Methodology
Tweets by @HPACEng
1 2 3 4 5 Next
SHARE
POSTING AS:
Advertisement
TWEET
kamal_haziq
(Sign Out)
YOUR COMMENT: *
SUBMIT COMMENT
Newsletter Signup
Sign-up to receive our free newsletters
HPAC Engineering Fastrack - (Bi-Weekly) View Sample
E-MAIL*
COUNTRY*
Enter your email above to receive messages about offerings by Penton, its brands, affiliates and/or third-party partners,
consistent with Pentons Privacy Policy.
Related Articles
Rethinking Central Utility Plants
Canada's First Ultraefficient Chiller Plant
27/4/2015 11:24 AM