CHECK LIST FOR QUALITY CONTROL OF RCC WORKS

September 13, 2016

admin

CHECK LIST FOR QUALITY CONTROL OF RCC WORKS


CHECK LIST FOR QUALITY CONTROL OF RCC WORKS
1. Carry out slump test at regular intervals to ensure proper workability.
2. While concreting cubes must be taken to as per IS: 456 2000 to ensure the
quality and strength of concrete by testing at 7, 21, and 28 days.
3. Make adequate number of cover blocks & chairs as per the required clear cover of
various members. Cover Blocks must be placed at minimum of 1m c/c
4. Get reinforcement physical test certificate from supplier/manufacturer.
5. Ensure that binding wires are adequately used for tying up of reinforcements.
6. Check spacing/length of hooks and overlaps. Laps shall be staggered.
7. Check vertical & horizontal alignment & strength of centering and shuttering.
8. Ensure that thickness/width of section is adequate for inserting vibrator; else inform the design office for possible revision.
9. Ensure proper curing for required number of days. Use curing compound, if member is not easily accessible.
10. Check that expansion/construction joints are properly made & at correct location as per the drawings.
11. Make proper access/ walking arrangement over slab for proper inspection & to avoid any damage to reinforcements.
12. De-bonding compound to shuttering materials.
13. Depth and width of all beams must be checked.
14. Dimensions, diagonal, plumb and supporting of lift pit should be checked properly.
15. All beam sides should be absolutely in line and plumb.
16. Over all cleaning should be done before concreting.
17. Walk-way Planks to be used while casting the slab.
18. Slab concreting should be done in strips (Bays) to avoid cold joints. Concrete should be placed within 30 minutes for next strip
otherwise keep the joint alive by putting one/two pans of concrete at joint and vibrate it.
19. Spare Vibrator and needless must be kept ready at the place of concreting.
20. Concrete should be poured from more than 1 m height to avoid segregation
21. Reinforcement should be placed as per specified spacing and diameter

Related Post

Various stages in the


construction of a building

converted by Web2PDFConvert.com

Like 2.4K

2,455

PREVIOUS

Stages of new home construction

NEXT
Formula (d^2/162) for calculation of per metre weight of rebar derived

1 COMMENT

Sudheer srambikkal
SEPTEMBER 13, 2016 AT 3:53 AM

Thh

REPLY

Leave a Reply
Your email address will not be published.
Comment

Name *

Email *

Website

POST COMMENT

Search

converted by Web2PDFConvert.com

CATEGORIES
Autocad Projects
Bridge Engineering
Checklist
Civil Engineer
Civil Engineering App
Civil Engineering Ebooks
Civil Engineering Jobs
Civil Engineering Software
Concrete Technology
Construction Company
Construction Material
Construction Tips
Entrance Exams
Estimation and Costing
Famous Project
Field Testing
Finishing Work
Gendral Civil Engineering
IS Codes
converted by Web2PDFConvert.com

Quotation
Reinforcement
Safety Protection
Seminar Reports
Site Engineer
Social
Uncategorized
Vastu

RECENT POSTS
Options for a graduated Civil Engineer
Core cutting method
Prepare for civil engineering placements
Civil Engineer WhatsApp status
After completing B.E. in Civil

RECENT COMMENTS
faizal on Civil Engineer WhatsApp status
John on Important Points for Civil Site Engineers to Remember
kifle Tefera on Why Cement is grey in colour
Ranganathan on After completing B.E. in Civil

DISCLAIMER
Information shared in this Site is based on our own experience.Please think from your context and your circumstances. This site will give you only basic
information. We do our best to correct any errors and welcome your feedback!
September 2016
M

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Aug

Copyright 2016 | WordPress Theme by MH Themes

converted by Web2PDFConvert.com

Você também pode gostar