Escolar Documentos
Profissional Documentos
Cultura Documentos
ISRAEL
AD 2.5 - 13
17 SEP 15
RVR
RESA
4,000
20
25
5,000
K
21
M S.P
C
FEET
T3
W4
14
S.P
13
S.P
S.P
AP
R
EH ON
S
K
M
WD
SES
E3
W4
T3
E5
F SF
FIRE
ST.
SM
03
J13
J12
ELEV
134
90x218
T4
S.P
J11
S.P
J4
J5
J10
J3
J6
J9
03
S.P
J7
W2W1
CAA
T4
SE1
L
N
LOC 12 ILS CAT I
BG 110.300
L3
T1
RESA
N
B21
90x240
S.P
B1
B22
B23
L5
L6
K1
K5
S.P
B37
B24B2
B36
-B25
B25
K3
J8
B39
B38
APRON BN
43-47
B35
B26
B27
B28
APRON BE
21-39
E2
T2
S.P
L2
L4
H.P.-K2
T1
W
K
L
L1
L2
J3
W3
EL
13 EV
0
S.P
L1
J2
J1
J2
APRON J
E5
W
K
S.P
VB1
SLS
APRON L
APRON V
1-8
J1
SE5
S.P
VB5
VB2
PA R
PI VR
3.1 30
ST4
APRON V
11-29
T S.P
E4
VB6
GP/DME 30
331.100
SEN
S.P
TWR
ILS GP/DME 21
333.20
S.P
VB7
S.P
T
T
10
259
S.P
S
31 TRIP
12 3
X4 23
5 A 2X
SP 300
HA
LT
SR
12 11
S.P
448
PRIMARY
CONTROL
TOWER
RV
S.P
W3
W2W1
T4
M
K
E2
T2
CHANGES: TWY T
3,000
16 15
SRN
30
S.P
18 17
S.P
S.P
ANTENNA
19
T2
T1
RV
S.P
2,000
ARP
ST2
SMR ANTENNA
SN
1,000
E2
SE2
S.P
K
M
S.P
SW
SK
1,500
90x240
Ceilometer 26
WDI
S
27 TRIP
72 2
8
X6
0 A 92X
SP 300
HA
LT
W4
AP
W RON
HS
VAR 4E 2014
ANNUAL RATE
OF CHANGE 5 E
METERS
1,000
VOR/DME
SW
R1
GP/DME 12
335.000
ILS GP/DME 08
330.800 MHz
800
RV
90x240
600
I3
ANEMOMETER
RESA
400
W3
SE
W4
PA
P
2
S1
08
PAPI 3
RVR
SK
08
ELEV
96
200
SW1
SW2 W2 W1
PAPI 3
12
WDI
EL
10 EV
2
90x240
00
4182X3
STRIP ASPHALT
5
4062X4
ELEV
134
PA
PI
3
RV
R
PCN 90/F/C/X/T
26
034 53 39.12 E
E1
31 59 59.88 N
SN
298
30
034 52 00.56 E
RESA
SQ
ELEV
124
SK
32 00 51.14 N
RVR
SK
118
WDI
12
PCN 90F/C/X/U
SK
Y
256
SM
26
RO
N
076
ILS GP/DME 26
330.500
12
08
PCN 90/F/C/W/T
AP
K3
K2
205
TEL-AVIV / BEN-GURION
APRON
21
TWR 132.10
26
034 53 09.89 E
31 59 46.38 N
025
03
ST1
BEARING
STRENGTH
THR
134.60
K5
K4
RWY DIRECTION
TWR
ELEV 134 ft
034 53 08 E
21
32 00 34 N
21
AERODROME CHART
T1
AMENDMENT 2/15