SCHEDLOG

Scheduling/Leveling Report - 20-Sep-16 - PM.exe


===============================================
Default Project..................................................PONTE
TOCANTINS
Projects:
PONTE
TOCANTINS..................................................MANUTENO PONTE
TOCANTINS
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use
.......................Retained Logic
Calculate start-to-start lag from ...............................Early
Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each
project
Calendar for scheduling Relationship Lag
........................Predecessor Activity Calendar
Advanced
-------Calculate multiple float paths...................................No
Statistics:
----------# Projects.......................................................1
# Activities.....................................................90
# Not Started....................................................90
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................84
# Activities with Constraint.....................................85
Project:
PONTE TOCANTINS Activity:
A1040
Construo completa de canteiro principal incluindo todas as edificaes e
instalaes sanitarias e eltricas necessarias
Project:
PONTE TOCANTINS Activity:
A1050
Manuteno e operao de canteiro de obras (com aluguel de respectiva area at
250 m)
Project:
PONTE TOCANTINS Activity:
A1060
Desmobilizao de pessoal e equipamentos
Project:
PONTE TOCANTINS Activity:
A1070
Retiradas das Juntas Metalicas
Project:
PONTE TOCANTINS Activity:
A1080
Colocao das Juntas Metalicas
Project:
PONTE TOCANTINS Activity:
A1110
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1130
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1140
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1170
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1190
Montagem
Pgina 1

SCHEDLOG
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1220
Montagem
de chapas metalicas de 16mm
Project:
PONTE TOCANTINS Activity:
A1230
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1250
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1270
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1290
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1310
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1320
Montagem
dos Andaimes de acesso
Project:
PONTE TOCANTINS Activity:
A1330
Macaqueamento de estrutura
Project:
PONTE TOCANTINS Activity:
A1340
Demolio e limpeza do grout
Project:
PONTE TOCANTINS Activity:
A1350
Execuo
de grout de nivelamento
Project:
PONTE TOCANTINS Activity:
A1370
Instalao de aparelho de apoio em neopreme fretado
Project:
PONTE TOCANTINS Activity:
A1380
Demolio, remoo e limpeza dos drenos existentes
Project:
PONTE TOCANTINS Activity:
A1400
Montagem
dos drenos de tabuleiro ferroviario
Project:
PONTE TOCANTINS Activity:
A1410
Retirada
de Buzinotes
Project:
PONTE TOCANTINS Activity:
A1420
Montagem
de prolongamento dos buzinotes
Project:
PONTE TOCANTINS Activity:
A1440
Limpeza,
Aplicao e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A1480
Limpeza,
Aplicao e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A1510
Demolio e remoo da junta existente incluindo a remoo do entulho para bota
fora.
Project:
PONTE TOCANTINS Activity:
A1520
Fornecimento de chapas metlicas de 10 mm para liberao provisria do trafego.
Project:
PONTE TOCANTINS Activity:
A1530
Montagem
e remoo das chapa metlicas de 10 mm entre as juntas
Project:
PONTE TOCANTINS Activity:
A1540
Execuo
de lbio Polimrico 2,5x3,0cm (reforo de bordas) para aplicao de junta Jeene
Project:
PONTE TOCANTINS Activity:
A1550
Preparao de sede para aplicao de junta Jeene
Project:
PONTE TOCANTINS Activity:
A1560
Junta
elstica Jeene, forn. e inst. inclusive aplicao de adesivo e
pressurizao/nucleao ou vcuo, tipo JJ 8097 V V
Project:
PONTE TOCANTINS Activity:
A1570
Pintura
de guarda corpo e chapas dos refugios, conforme pado EG-M-402 (SPE-Vale)
Project:
PONTE TOCANTINS Activity:
A1580
Substituio de guarda corpo conforme projeto original (dimenses e bitolas)
Project:
PONTE TOCANTINS Activity:
A1590
Substituo de chapas piso xadrez por grade de piso Tipo Selmec, malha 25 x 50
Project:
PONTE TOCANTINS Activity:
A1600
Pintura
de guarda corpo e chapas dos refugios, conforme pado EG-M-402 (SPE-Vale)
Project:
PONTE TOCANTINS Activity:
A1610
Substituio de guarda corpo conforme projeto original (dimenses e bitolas)
Project:
PONTE TOCANTINS Activity:
A1620
Substituo de chapas piso xadrez por grade de piso Tipo Selmec, malha 25 x 50
Project:
PONTE TOCANTINS Activity:
A1630
Escarificao manual de concreto
Project:
PONTE TOCANTINS Activity:
A1640
Limpeza
de superfcie de concreto com jato de gua
Project:
PONTE TOCANTINS Activity:
A1650
Argamassa para nivelamento, regularizao ou enchimento
Project:
PONTE TOCANTINS Activity:
A1660
Argamassa para nivelamento, regularizao ou enchimento
Pgina 2

SCHEDLOG
Project:
PONTE TOCANTINS Activity:
A1670
Escarificao manual de concreto
Project:
PONTE TOCANTINS Activity:
A1680
Limpeza
de superfcie de concreto com jato de gua
Project:
PONTE TOCANTINS Activity:
A1690
Demolio de pavimentao asfaltica - com fresadora, e=0,25cm
Project:
PONTE TOCANTINS Activity:
A1700
Carga e
transporte de material proveniente de demolio ou desmontes para a area de bota
fora - DMT ate 1000m
Project:
PONTE TOCANTINS Activity:
A1730
Pintura
de ligao com material betuminoso
Project:
PONTE TOCANTINS Activity:
A1750
Fornecimento e preparo de concreto betuminoso usinado a qyente (C.B.U.Q),
preparo, lanamento, aplicao e compactao
Project:
PONTE TOCANTINS Activity:
A1770
Demolio de pavimentao asfaltica - com fresadora, e=0,25cm
Project:
PONTE TOCANTINS Activity:
A1780
Carga e
transporte de material proveniente de demolio ou desmontes para a area de bota
fora - DMT ate 1000m
Project:
PONTE TOCANTINS Activity:
A1810
Pintura
de ligao com material betuminoso
Project:
PONTE TOCANTINS Activity:
A1830
Fornecimento e preparo de concreto betuminoso usinado a qyente (C.B.U.Q),
preparo, lanamento, aplicao e compactao
Project:
PONTE TOCANTINS Activity:
A1850
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1860
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A1930
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1940
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A3700
Execuo
de Sinalizao Horizontal
Project:
PONTE TOCANTINS Activity:
A3760
Execuo
de Placas de Sinalizao
Project:
PONTE TOCANTINS Activity:
A3790
Formas
Project:
PONTE TOCANTINS Activity:
A3800
Armadura
em ao CA-50
Project:
PONTE TOCANTINS Activity:
A3810
Concretos
Project:
PONTE TOCANTINS Activity:
A3850
Servios
de Sinalizao
Project:
PONTE TOCANTINS Activity:
A3860
Servios
de Sinalizao
Project:
PONTE TOCANTINS Activity:
A3870
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A3880
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A3890
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A3900
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A3910
Montagem
dos Andaimes de acesso
Project:
PONTE TOCANTINS Activity:
A3920
Macaqueamento de estrutura
Project:
PONTE TOCANTINS Activity:
A3930
Demolio e limpeza do grout
Project:
PONTE TOCANTINS Activity:
A3940
Execuo
de grout de nivelamento
Project:
PONTE TOCANTINS Activity:
A3950
Instalao de aparelho de apoio em neopreme fretado
Project:
PONTE TOCANTINS Activity:
A3960
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A3970
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A3980
Montagem
das estruturas de acesso
Pgina 3

Project:
tratamento e reparo estrutural
Project:
das estruturas de acesso
Project:
tratamento e reparo estrutural
Project:
das estruturas de acesso
Project:
tratamento e reparo estrutural
Project:
das estruturas de acesso
Project:
tratamento e reparo estrutural
Project:
das estruturas de acesso
Project:
tratamento e reparo estrutural

SCHEDLOG
PONTE TOCANTINS Activity:

A3990

Limpeza,

PONTE TOCANTINS Activity:

A4000

Montagem

PONTE TOCANTINS Activity:

A4010

Limpeza,

PONTE TOCANTINS Activity:

A4020

Montagem

PONTE TOCANTINS Activity:

A4030

Limpeza,

PONTE TOCANTINS Activity:

A4040

Montagem

PONTE TOCANTINS Activity:

A4050

Limpeza,

PONTE TOCANTINS Activity:

A4060

Montagem

PONTE TOCANTINS Activity:

A4070

Limpeza,

Errors:
------Warnings:
--------Activities without predecessors..................................67
Project:
PONTE TOCANTINS Activity:
A1020
Adm
local
Project:
PONTE TOCANTINS Activity:
A1030
Servios
preliminares de limpeza do terreno, terraplanagem, construo area para canteiro
e estacionamento.
Project:
PONTE TOCANTINS Activity:
A1040
Construo completa de canteiro principal incluindo todas as edificaes e
instalaes sanitarias e eltricas necessarias
Project:
PONTE TOCANTINS Activity:
A1050
Manuteno e operao de canteiro de obras (com aluguel de respectiva area at
250 m)
Project:
PONTE TOCANTINS Activity:
A1070
Retiradas das Juntas Metalicas
Project:
PONTE TOCANTINS Activity:
A1080
Colocao das Juntas Metalicas
Project:
PONTE TOCANTINS Activity:
A1130
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1140
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1170
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1190
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1220
Montagem
de chapas metalicas de 16mm
Project:
PONTE TOCANTINS Activity:
A1230
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1250
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1270
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1290
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1310
Montagem
de chapa metlica 12,5mm/ 16mm com solda
Project:
PONTE TOCANTINS Activity:
A1330
Macaqueamento de estrutura
Project:
PONTE TOCANTINS Activity:
A1340
Demolio e limpeza do grout
Project:
PONTE TOCANTINS Activity:
A1350
Execuo
de grout de nivelamento
Project:
PONTE TOCANTINS Activity:
A1370
Instalao de aparelho de apoio em neopreme fretado
Project:
PONTE TOCANTINS Activity:
A1400
Montagem
dos drenos de tabuleiro ferroviario
Pgina 4

Project:

SCHEDLOG
PONTE TOCANTINS Activity:

A1410

Retirada

de Buzinotes
Project:
PONTE TOCANTINS Activity:
A1420
Montagem
de prolongamento dos buzinotes
Project:
PONTE TOCANTINS Activity:
A1480
Limpeza,
Aplicao e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A1520
Fornecimento de chapas metlicas de 10 mm para liberao provisria do trafego.
Project:
PONTE TOCANTINS Activity:
A1530
Montagem
e remoo das chapa metlicas de 10 mm entre as juntas
Project:
PONTE TOCANTINS Activity:
A1540
Execuo
de lbio Polimrico 2,5x3,0cm (reforo de bordas) para aplicao de junta Jeene
Project:
PONTE TOCANTINS Activity:
A1550
Preparao de sede para aplicao de junta Jeene
Project:
PONTE TOCANTINS Activity:
A1560
Junta
elstica Jeene, forn. e inst. inclusive aplicao de adesivo e
pressurizao/nucleao ou vcuo, tipo JJ 8097 V V
Project:
PONTE TOCANTINS Activity:
A1580
Substituio de guarda corpo conforme projeto original (dimenses e bitolas)
Project:
PONTE TOCANTINS Activity:
A1590
Substituo de chapas piso xadrez por grade de piso Tipo Selmec, malha 25 x 50
Project:
PONTE TOCANTINS Activity:
A1610
Substituio de guarda corpo conforme projeto original (dimenses e bitolas)
Project:
PONTE TOCANTINS Activity:
A1620
Substituo de chapas piso xadrez por grade de piso Tipo Selmec, malha 25 x 50
Project:
PONTE TOCANTINS Activity:
A1630
Escarificao manual de concreto
Project:
PONTE TOCANTINS Activity:
A1640
Limpeza
de superfcie de concreto com jato de gua
Project:
PONTE TOCANTINS Activity:
A1650
Argamassa para nivelamento, regularizao ou enchimento
Project:
PONTE TOCANTINS Activity:
A1660
Argamassa para nivelamento, regularizao ou enchimento
Project:
PONTE TOCANTINS Activity:
A1670
Escarificao manual de concreto
Project:
PONTE TOCANTINS Activity:
A1700
Carga e
transporte de material proveniente de demolio ou desmontes para a area de bota
fora - DMT ate 1000m
Project:
PONTE TOCANTINS Activity:
A1730
Pintura
de ligao com material betuminoso
Project:
PONTE TOCANTINS Activity:
A1750
Fornecimento e preparo de concreto betuminoso usinado a qyente (C.B.U.Q),
preparo, lanamento, aplicao e compactao
Project:
PONTE TOCANTINS Activity:
A1770
Demolio de pavimentao asfaltica - com fresadora, e=0,25cm
Project:
PONTE TOCANTINS Activity:
A1780
Carga e
transporte de material proveniente de demolio ou desmontes para a area de bota
fora - DMT ate 1000m
Project:
PONTE TOCANTINS Activity:
A1810
Pintura
de ligao com material betuminoso
Project:
PONTE TOCANTINS Activity:
A1830
Fornecimento e preparo de concreto betuminoso usinado a qyente (C.B.U.Q),
preparo, lanamento, aplicao e compactao
Project:
PONTE TOCANTINS Activity:
A1860
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A1940
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A3760
Execuo
de Placas de Sinalizao
Project:
PONTE TOCANTINS Activity:
A3800
Armadura
em ao CA-50
Project:
PONTE TOCANTINS Activity:
A3810
Concretos
Project:
PONTE TOCANTINS Activity:
A3840
CONCLUSO DA OBRA
Project:
PONTE TOCANTINS Activity:
A3860
Servios
de Sinalizao
Project:
PONTE TOCANTINS Activity:
A3870
Desmontagem das estruturas de acesso
Pgina 5

SCHEDLOG
Project:
PONTE TOCANTINS Activity:
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
Desmontagem das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
Macaqueamento de estrutura
Project:
PONTE TOCANTINS Activity:
Demolio e limpeza do grout
Project:
PONTE TOCANTINS Activity:
de grout de nivelamento
Project:
PONTE TOCANTINS Activity:
Instalao de aparelho de apoio em neopreme fretado
Project:
PONTE TOCANTINS Activity:
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
tratamento e reparo estrutural

A3880
A3890
A3900
A3920
A3930
A3940

Execuo

A3950
A3960

Montagem

A3970

Limpeza,

A3990

Limpeza,

A4010

Limpeza,

A4030

Limpeza,

A4050

Limpeza,

A4070

Limpeza,

Activities without successors....................................30


Project:
PONTE TOCANTINS Activity:
A1000
ORDEM DE
SERVIO
Project:
PONTE TOCANTINS Activity:
A1050
Manuteno e operao de canteiro de obras (com aluguel de respectiva area at
250 m)
Project:
PONTE TOCANTINS Activity:
A1060
Desmobilizao de pessoal e equipamentos
Project:
PONTE TOCANTINS Activity:
A1070
Retiradas das Juntas Metalicas
Project:
PONTE TOCANTINS Activity:
A1080
Colocao das Juntas Metalicas
Project:
PONTE TOCANTINS Activity:
A1110
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1380
Demolio, remoo e limpeza dos drenos existentes
Project:
PONTE TOCANTINS Activity:
A1410
Retirada
de Buzinotes
Project:
PONTE TOCANTINS Activity:
A1420
Montagem
de prolongamento dos buzinotes
Project:
PONTE TOCANTINS Activity:
A1440
Limpeza,
Aplicao e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A1510
Demolio e remoo da junta existente incluindo a remoo do entulho para bota
fora.
Project:
PONTE TOCANTINS Activity:
A1570
Pintura
de guarda corpo e chapas dos refugios, conforme pado EG-M-402 (SPE-Vale)
Project:
PONTE TOCANTINS Activity:
A1600
Pintura
de guarda corpo e chapas dos refugios, conforme pado EG-M-402 (SPE-Vale)
Project:
PONTE TOCANTINS Activity:
A1630
Escarificao manual de concreto
Project:
PONTE TOCANTINS Activity:
A1640
Limpeza
de superfcie de concreto com jato de gua
Project:
PONTE TOCANTINS Activity:
A1650
Argamassa para nivelamento, regularizao ou enchimento
Project:
PONTE TOCANTINS Activity:
A1690
Demolio de pavimentao asfaltica - com fresadora, e=0,25cm
Project:
PONTE TOCANTINS Activity:
A1850
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1930
Montagem
Pgina 6

SCHEDLOG
das estruturas de acesso
Project:
de Sinalizao Horizontal
Project:
Project:
de Sinalizao
Project:
de Sinalizao
Project:
das estruturas de acesso
Project:
tratamento e reparo estrutural
Project:
das estruturas de acesso
Project:
das estruturas de acesso
Project:
das estruturas de acesso
Project:
das estruturas de acesso
Project:
das estruturas de acesso

PONTE TOCANTINS Activity:

A3700

Execuo

PONTE TOCANTINS Activity:


PONTE TOCANTINS Activity:

A3790
A3850

Formas
Servios

PONTE TOCANTINS Activity:

A3860

Servios

PONTE TOCANTINS Activity:

A3960

Montagem

PONTE TOCANTINS Activity:

A3970

Limpeza,

PONTE TOCANTINS Activity:

A3980

Montagem

PONTE TOCANTINS Activity:

A4000

Montagem

PONTE TOCANTINS Activity:

A4020

Montagem

PONTE TOCANTINS Activity:

A4040

Montagem

PONTE TOCANTINS Activity:

A4060

Montagem

Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0
Milestone Activities with invalid relationships..................0
Finish milestone and predecessors have different calendars.......0
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................90
# Relationships with other projects..............................0
Data
Date........................................................13-Sep-16
Earliest Early Start
Date........................................13-Sep-16
Latest Early Finish
Date.........................................28-Sep-18
Exceptions:
----------Critical Activities..............................................11
Project:
PONTE TOCANTINS Activity:
A1380
Demolio, remoo e limpeza dos drenos existentes
Project:
PONTE TOCANTINS Activity:
A1400
Montagem
dos drenos de tabuleiro ferroviario
Project:
PONTE TOCANTINS Activity:
A1850
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A1860
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A3790
Formas
Project:
PONTE TOCANTINS Activity:
A3800
Armadura
em ao CA-50
Project:
PONTE TOCANTINS Activity:
A3810
Concretos
Project:
PONTE TOCANTINS Activity:
A4000
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A4010
Limpeza,
tratamento e reparo estrutural
Project:
PONTE TOCANTINS Activity:
A4020
Montagem
das estruturas de acesso
Project:
PONTE TOCANTINS Activity:
A4030
Limpeza,
tratamento e reparo estrutural
Activities with unsatisfied constraints..........................0
Pgina 7

SCHEDLOG
Activities with unsatisfied relationships........................0
Activities with external dates...................................0

Pgina 8