SURAU
Name of Building :
SURAU BLOCK
Bldg. Type
Bldg. Code
A - 3 - 2639
BQ Reg. Nos.
Areas :
Functional Unit :
934.00 m2
Ground Floor :
826.00 m2
Upper Floor :
707.00 m2
Enclosing Wall
To Floor Ratio
1,308.00
=
38%
33%
29%
2,467.00 m2
962.00 m2
Roof Area :
438.00 m2
Storey Heights :
Av.Below Grd. Floor :
Drawing No.
-
3.80
3.80
RM
Provisional Sum :
RM
Rm
file:///var/www/apps/conversion/tmp/scratch_7/330946916.xls330946916.xlssurau(form2-1)
Base Index :
Building Functional
Unit Cost :
surau(form2-1)/ 1
A - 3 - 2639
REF.
ELEMENT
ELEMENT
COST
ELEMENT
COST/M2
OF GFA
ELEMENT
UNIT
QUANTITY
ELEMENT
UNIT
RATE
ELEMENT
TO
FLOOR
% OF
BLDG.
COST
(RM)
A
(RM)
B=A/(GFA)
(RM)
D=A/C
RATIO
E=C/GFA
F=A/BLDG.
COST
1 Substructure
1A Piling
1B Work Below Lowest Floor Finish
Group Element Total:
2
2A
2B
2C
2D
2E
2F
2G
2H
3
3A
3B
3C
3D
4
5
5A
5B
5C
5D
5E
5F
5G
5H
5I
5J
5K
5L
5M
5N
5O
5P
5Q
TOTAL
Superstructure
Frame
Upper Floors
Roof
Stairs
External Walls
Windows & External Doors
Internal Walls & Partitions
Internal Doors
Group Element Total:
Finishes
Internal Wall Finishes
Internal Floor Finishes
Internal Ceiling Finishes
External Finishes
Group Element Total:
Fittings and Furnishings
Services
Sanitary Appliances
Natural Gas Installation Services
Lift Services
Fire Protection Services
Cold Water Plumbing Services
Sanitary Plumbing Services
Air- Conditioning and Mechanical
Ventilation Services
Electrical LV Systems
Telephone System
Public Address (PA) System
Master Antenna TV System
CCTV System
Trunking System
Stage Lighting System
Stage Curtain System
Miscellaneous
Builder's Work In Connection With
Services
Group Element Total:
122,816.00
49.78
222,146.37
90.05
344,962.37
139.83
111,604.62
204,653.54
188,078.52
10,888.79
86,189.60
37,249.50
5,408.50
2,786.50
646,859.57
45.24
82.96
76.24
4.41
34.94
15.10
2.19
1.13
262.20
13,694.10
26,693.00
26,069.00
56,610.60
123,066.70
5.55
10.82
10.57
22.95
49.89
8,517.00
62,740.00
41,000.00
25,780.00
3.45
25.43
16.62
10.45
1,452.00 m
826.00 m2
268.94
0.59
9.35%
0.33
16.91%
26.26%
2,467.00
707.00
937.00
461.00
167.05
223.00
3.78
m2
m2
m2
m2
45.24
289.47
200.72
186.96
222.98
24.25
737.17
1.00
0.29
0.38
0.19
0.07
0.09
0.00
8.50%
15.58%
14.32%
0.83%
6.56%
2.84%
0.41%
0.21%
49.25%
537.00 m2
342.00 m2
818.00 m2
-
25.50
78.05
31.87
-
0.22
0.14
0.33
-
1.04%
2.03%
1.98%
4.31%
9.37%
119.96
25.43
16.62
10.45
0.03
1.00
1.00
1.00
1.00
0.65%
0.00%
0.00%
4.78%
3.12%
1.96%
0.00%
3.09%
0.00%
0.91%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
71.00
2,467.00
2,467.00
2,467.00
2,467.00
m2
m2
m2
Nos.
m2
Nos.
m2
m2
m2
40,577.04
12,000.70
-
16.45
4.86
-
2,467.00 m2
2,467.00 m2
-
16.45
4.86
-
1.00
1.00
-
8,036.80
198,651.54
3.26
80.52
2,467.00 m2
3.26
1.00
1,313,540.18
532.44
0.61%
15.12%
100.00%
REF.
ELEMENT
Bldg. Code:
REINFORCED
CONCRETE
m3
A-3-2467
REINFORCEMENT
Kg.
Kg./m3
FORMWORK
m2
m2/m3
SUBSTRUCTURE
1.1
1.2
7-Educational, Cultural,
Scientific Building
35.00
6,125.00
175.00
222.00
6.34
351.25
43,666.62
124.32
463.00
1.32
386.25
49,791.62
158.00
28,013.00
177.30
2,062.00
13.05
685.00
SUPERSTRUCTURE
2.1
Frame
2.2
Upper Floor
88.38
105,161.00
1,189.94
707.00
8.00
2.3
Roof
66.38
7,390.00
111.34
551.00
8.30
2.4
Stairs
8.50
627.00
73.76
42.00
4.94
2.5
2.6
Sub-total
321.25
141,191.00
3,362.00
TOTAL
707.50
190,982.62
4,047.00
ELEMENT
SPECIFICATION
1 Substructure
1A Piling
RC pile caps, ground beam, ground floor slab, anti-termite treatment, Class 'Y' pipe culvert
2 Superstructure
2A Frame
2B Upper Floors
Reinforced concrete
2C Roof
Steel roof trusses, 'Saint Gobain' tiles,16 Gauge galvanised iron flashing, uPVC rain water down pipe
2D Stairs
Reinforced concrete staircase, 'KIMGRESS' ceramic tiles with colour and pattern
2E External Walls
Natural anodised aluminium frame windows with glass,composite window, timber flush doors, sliding door
2H Internal Doors
3 Finishes
3A Internal Wall Finishes
Homogeneous tiles, cement and sand rendering, non-metallic hardener, haevy duty capet
3D External Finishes
Cement & sand plastering with weathersheild paint,cement & sand rendering,non-slip homogeneous tiles,UAC
asbestos ceiling,emulsion paint
Nil
5 Services
5A Sanitary Appliances
Water closet, wash hand basin, bib tap, soap & toilet roll holder, mirror ,robe hook,soap holder,floor trap
5B Plumbing Installation
ABS pipe, FRP water storage tank, HDPE pipe,VCP pipeworks(sanitary system),uPVC vents pipe
5C Refuse Disposal
Not applicable
Not applicable
5E Electrical Installation
Hose reel, G.I pipe, manual breakglass, alarm bell, fire extinguisher.smoke detector
Not applicable
5H Communication Installation
Not applicable
5J Special Installation
Not applicable
Description
Surau Ground Floor
Prayer hall
Ramp
Ablution M
Toilet M
Ablution F
Toilet F
Circulation
AcademicSpecial Edu.
Administration
Other Facilities Corridoor
Staircase
120.00
18.00
19.50
19.50
15.00
17.50
18.00
14.00
1st Floor
Prayer Hall F
120.00
Subtotal
Total
311.50
361.50
50.00
A - 3 - 2639
JOB TITLE :
LOCATION :
CLIENT :
PERBADANAN PUTRAJAYA
1-Sep-03
TENDER DATE :
INFORMATION ON TOTAL PROJECT
Project and Contract Information
Contract PWD23A
YES
Type of C
NO
Basis of Tender
Bills Of Q
Open/Selected
Competition
Negotiated
RM
52,868,474.25
Government
53,948,067.60
55,999,000.00
Private
56,870,417.62
57,173,585.60
Sched. Of Rates /
Spec. & Drsings
57,986,370.60
Serial
27.25
months
27.25
months
Provision RM
Prime Co RM
PreliminaRM
Continge RM
Contract RM
61,149,630.49
65,659,792.65
12
8
ANALYSIS OF SINGLE BUILDING
Design/Shape Information
934.00
Ground Floor
826.00
Upper Floor
GROSS FLOOR AREA
Functional
Unit :
m
1308
Design/Shape :
Percentage of Gross Floor
M2
Area :
m2
707.00
m2
2,467.00
m2
709.00
2,467.00
b) Single Storey
Usable Area
m2
Circulation Area
m2
Ancillary Area
m2
Internal Division
m2
m2
Storey Heights :
Av. Below Grd. Floor
m2
962.00
438.00
0.287
c) Two storey
Construction
m
3.8 m
3.8 m
m2
d) 3-storey
Construction
e) 4-storey
Construction
Construction
53,948,067.60
8,500,000.00
-Educational, Culture,
cientific Building
ERBADANAN PUTRAJAYA
1-Sep-03
Int/JV/L
L
L
L
L
L
L
L
L
Design/Shape :
ercentage of Gross Floor
38%
33%
29%