Escolar Documentos
Profissional Documentos
Cultura Documentos
C
C
=e-kn
Ket =
C=8mg/l e-5(0.33)
8mg/l = 5000 persons
150 gal
personsda y
Q=(750.000 gal/day)
A =(520.8 gpm
ft 2
3 gpm
1440
day
) = 750.000 gal/day
)=173.6 ft2
Ket =
520.8 (flowrate)
3 gpm = loading rate
L=4W
A= W(4W) = 173.6 ft2
W= 6.59 ft or 6 ft. 7,05 in or 6 ft 8 in
L=4(6.59 ft) = 26.35 ft or 26 ft 5 in
CARBONDIOXIDE REMOVAL PROBLEM
C
CO
=e-kn
C=COe-kn
C= 20e-4(0.31)
Ket :
4 = aerasi trays
20= 20 mg/L
150 gal
personday
Q =(7.5X105 gal/day)
Q= (5208.3 gal/min)
day
1440 min
1
8
)= 5208.3 gal/min
)= 651 gal/min
ft 2
4 gpm
)= 162.8 ft2
Ket =
651 gpm = flowrate/aerator
4 gpm = loading rate
L=2W
A=W(2W)=162.8 ft2
W=9.02 ft or 9 ft 0.25 in or 9 ft 1 in
L=2(9 ft.1 in) or 18 ft 2 in.