Você está na página 1de 3
‘Bk 123 Hougang Ave | 401-1404 Singopor 530123, Tel 6282 2204 Fox: 6262 2077, swansea ek eccinomn — HIBATE. METHOD STATEMENT FOR WATER LEAKING INVESTIGATION & SILICONE APPLICATION WORKS The objective of this method statement is forthe procedure of work for water leaking silicone pplication works 1. Scope of work 1.1 To remove aluminium pane o find out the leakage points & apply silicone Location: 1-6 1.2 Supervisor and safety personnel to conduc oo! box briefing onsite to highlight the potential hazards and safety control measure follows by PPE, equipment inspection 129 Howpang Ave 1 901-1404 Singapore 530123, eaten 2204 tox 6280 9077 21 Only IRATA cenifed rope technicians to perform the installation works wit certified equipment 2.2 Ascend and descend rope access system ae secured to the trong permanent main stel Colouran Rubber sheet shouldbe provided sn order to protect there frm sharp edges ofthe building 2.3 Safety signage shouldbe displayed at the rope access working area to prevent any unauthorized removal ofthe rope 2.4 Secureall working tools with proper lanyard rope & tightening metbod 255 Accessing work atea at ro0flevel-s Bk 129 Hougang Ave 1 #01-1404 Singopora 530123 erie me foe azaty7 hi ANE, aps// wor st omg Ero. 3. Rope rigging method & work procedure 3.1 Rigging point onthe permanent steel structure o rigging point bear by work aca 3.2. Main rigging rope secured at igging point to aange working rope 3.3 Checking the leakage points and apply silicone whereever needed 34 Secure all working tools with proper lanyard rope & tightening method, 535 Proper work coordination and communication for the werkto be earied out 3.6 Baricade working ara for installation 3.8 Mainuining good housekeeping a

Você também pode gostar