Name of Project:

Basic Cost Of Materials


As Per S.O.R for the Year 2016-2017
Sl. No.
Description of item
Ref. Pg. No.
I
Basic cost of Materials
1
Preamble
Municipal area allowance
II
Basic cost of Materials
2
27
20mm HBG SS5 M.C
3
27
12mm HBG SS5 M.C
4
27
10mm HBG SS5 M.C
5
27
6mm HBG SS5 M.C
6
28
40mm HBG SS5 M.C
7
25
Sand for mortar
8
25
Sand forConcrete
9
25
Sand for Filling
10
25
Gravel
11
20
40 mm - 80 mm size metal (Hand broken)/Karkar
12
25
Quarried stone 150 - 200 mm size for Hand Broken
13
1
Bricks traditional size 23 x 11 x 7 cm
14
Cement
15
Reinforcement Fe 415 Grade
16
Structural steel angle / channel / beam / bars
17
Structural steel plate / flats
bolts & nuts
18
28
Binding wire
19
34
Water
20
30
Gelatin 80%
21
25
Electric Detonators
22
26
Crusher stone dust 2.36mm and below
23
20
Cement Primer (Interior)
24
21
Water Proof cement paint
25
14
Water Proofing Compound
26
13
PVC water Stopper 310mm wide
27
14
Welding electrodes 4 mm dia
28
33
Seeds(Grass)
29
34
Un slaked lime
18
Super plasticizer
30
20
Soling stone of 150 mm size of granite, trap and Dolamite varieties.
III
31
32
33
IV
34
35
36
37
38
39
40

Seignorage Charges
Building Stone, Rough Stone & Road Metal
Gravel, Morram & Earth
Ordinary Sand For Mortar & Filling
Labour Charges
Mason /c-I/Brick layer I class/Well Sinker
Blacksmith,Stone Cutter/Welder/Fitter
Mason c-II/ Brick layer C-II,Carpenter
Unskilled Mazdoor (Man/Women)
Painter - Class 1/Electrician
Benbenders
Painter C-1I/Welder/Fitter/Electrician

GO.No 198
GO.No 198
GO.No 198
10
10
11
12
10
10
12

41
42
V
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

64
65
66
67
68
VI
69
70
71

72
73
74
75
76
77
78

79
80
81

10
Blaster/Driller/Plumber
Operator
Machinery Hire Charges
27
Dozer (D50) - Spreading/ Cutting /Cleaning
27
Dozer (D80) - Spreading/ Cutting /Cleaning
27
Mortor Grader - Spreading/ Cutting /Cleaning
27
Front end loader
Pg-27
Tipper 5.5 cum capacity
43
Truck 10 t
29
Crane of 3T
27
Water tanker 6Kl
27
Tractor with ripper attachment
Pg-27
Hydraulic excavator 1 cum bucket capacity @ 50 cum per hour
Pg-27
Smooth wheeled roller 8 tonne
Pg-27
Vibratory roller 8 tonne
27
Tractor with rotavator
44
Welding set
pg-42
IRR
Air compressor 8.5 cmm ( deisel)
Pg-12
IRR
Detonator electric
28
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
28
Wet mix plant 60 TPH
30
Generator-30KVA
30
Generator-100KVA
28
Transit Mixer
28
Concrete pump of 45 and 30 cum
29
Crane with grab bucket 1 cum
29
Crane with grab bucket 0.75 cum
42
Air compressor 7 cmm ( diesel )
29
Integrated stone crusher-200TPH
43
Needle Vibrator 40 mm (petrol)
43
Needle Vibrator 40 mm (eletrical)
43
Needle Vibrator 60 mm (petrol)
43
Needle Vibrator 40 mm (eletrical)
Hire Charges for Centering and Scaffolding
Pg-66 Building SSR
Footing
Pg-66 Building SSR
Pedestals, Pile Caps
Pg-66 Building SSR
Plinth Beams
Unsupported Height Upto 3.66m
Using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc.,
Pg-66 Building SSR
Lintels
Pg-66 Building SSR
Chajjas-Shades
Pg-66 Building SSR
Columns
Pg-66 Building SSR
Beams
Pg-66 Building SSR
Slabs upto 150mm thick
Pg-66 Building SSR
Slabs above 150mm and upto 300mm thick
Pg-66 Building SSR
Slabs above 300mm thick
HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M
Using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., fo
STONE MASONRY/ WALL PUTTY/ TEXTURE PAINTS etc - 1 sqm
Pg-66 Building SSR
1st Floor
nd
Pg-66 Building SSR
2 Floor
rd
Pg-66 Building SSR
3 Floor

82
83
84

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M


using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., fo
WALLS - 1 sqm
Pg-67 Building SOR
1st Floor
nd
Pg-67 Building SOR
2 Floor
Pg-67 Building SOR
3rd Floor

85
86
87

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M


using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., fo
PLASTERING - 1 sqm
Pg-67 Building SOR
1st Floor
nd
Pg-67 Building SOR
2 Floor
rd
Pg-67 Building SOR
3 Floor

88

Extra Charges for Centering & Scaffolding for every 610mm above
3.66m

Pg-68 Building SOR

7
S.S. item no.

Rate

unit

40%
M-053
M-052
M-051
M-050
M-055
M-005
M-005
M-004
M-008
78
M-002
BMT-A.01

M-072
M-189
M-104
166
M-021
BMT-J.01
BMT-J.24
80
60
81
M-162
M-188
BMT-H.112
79

Item 1
Item 8
Item 9
2/(A)/a,b,c
2/(A)/a,b,c
2/(B)/a,b,c
(C)/2,5
2,d/h
3
2/(B)/d,g,h,i

1365.00
1097.00
935.00
735.00
845.00
95.00
95.00
165.00
103.00
75.00
147.00
5200.00
6000.00
34500.00
37500.00
37400.00
123.00
60.00
103.00
73.00
11.00
357.00
165.00
53.00
80.00
470.00
11.00
18.00
2616.00
105.00
95.00

Overheads & Contractors Profit


1 cum
1 cum
1 cum
1 cum
1 cum
1 cum
1 cum
1 cum
1 cum
1 cum
1 cum
1000 Nos.
1 M.T
1 M.T
1 M.T
1 M.T
/kg
Kg
KL
Kg
each
1 Cum
/kg
/kg
/kg
/rm
/each
/kg
/MT
/kg
/cum

As Per July' 16
As Per July' 16
As Per July' 16
As Per July' 16

75.00 1 Cum
30.00 1 Cum
50.00 1 Cum
623.00
623.00
560.00
490.00
714.00
777.00
560.00

each
each
each
each
each
each
each

As per SOR 2016-17


445.00
445.00
400.00
350.00
510.00
555.00
400.00

2,e

2
1
3
5
6
58
35 (c)
10
13
4
8
7
12
65
5
21
38
15
43
43
33
34
35 E
35 D
3
41
40
41
42
43
Item -A
Item -C
Item -D

714.00 each
714.00 each
1649.00
2562.60
3220.00
1650.00
924.10
891.50
422.00
630.00
425.00
2815.90
1122.10
2637.20
425.00
83.20
1379.00
11.00
471.10
1650.00
832.30
1126.00
1915.00
1505.30
3709.00
2268.00
1145.10
20206.00
175.40
164.90
185.50
170.70

/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/No
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr
/Hr

510.00
510.00

incl Hire+fuel+crew

750.00 /cum
1068.00 /cum
2476.00 /cum

el Centering Plates,etc.,

Item -E
Item -F
Item -G
Item -H
Item -I
Item -J
Item -Q

2344.00
410.00
2041.00
3428.00
389.00
399.00
418.00

/cum
/sqm
/cum
/cum
/sqm
/sqm
/sqm

osts, Wall Plates etc., for BRICK MASONRY/


Item -A
Item -B
Item -C

71.76 /sqm
97.71 /sqm
123.67 /sqm

390.5104

2343.06

osts, Wall Plates etc., for PLASTERING to


Item -A
Item -B
Item -C

7.17 /sqm
9.77 /sqm
12.36 /sqm

osts, Wall Plates etc., for CEILING


Item -A
Item -B
Item -C
Note

14.92 /sqm
20.01 /sqm
25.10 /sqm
16.666%

& Contractors Profit

13.615%

Name of the Mandal/Village

Sl.No.

ANDHRA PRADESH CAPITAL REGION DEVELOP


MANDADAM
LEAD STATE MEN

Materials

Quarry

20mm HBG SS5 M.C

Perecherla

12mm HBG SS5 M.C

Perecherla

10mm HBG SS5 M.C

Perecherla

6mm HBG SS5 M.C

Perecherla

40mm HBT SS5 M C

Perecherla

Fine aggregate/ Sand (Mortar)

Krishna river

Fine aggregate/ Sand (Concrete)

Krishna river

Sand for Filling

Krishna river

10

Quarried stone 150 - 200 mm size

Perecherla

11

Quarry dust/rubbish

Perecherla

12

Crusher stone dust 2.36mm and below

Perecherla

13

Gravel

Ananthavaram

40 mm - 80 mm size metal (Hand broken)/Karkar


14

Bricks traditional size 23 x 11 x 7 cm

15

Cement

16

Reinforcement Steel

Perecherla
Kollur

Un slaked lime

17

Soling stone
Un-coursed rubble stones (at quarry) (including
seigniorage charges and loading charges)
Ordinary Clay

Ananthavaram
Perecherla

Certified that the leads are taken and correct

H CAPITAL REGION DEVELOPMENT AUTHORITY (AP CRDA)


DAM
LEAD STATE MENT
Conveya
Lead in
Basic
Unit
Initial Cost
nce
KM.
Rate
charges
I cum

54.70

1365.00

1365.00

569.56

Total cost
without
Seignorage
Charges
1934.56

I cum

54.70

1097.00

1097.00

569.56

1666.56

64.79

I cum

54.70

935.00

935.00

569.56

1504.56

64.79

I cum

54.70

735.00

735.00

569.56

1304.56

64.79

I cum

54.70

845.00

845.00

569.56

1414.56

64.79

I cum

9.00

95.00

95.00

116.45

211.45

43.19

I cum

9.00

95.00

95.00

116.45

211.45

43.19

I cum

9.00

165.00

165.00

116.45

281.45

43.19

I cum

54.70

147.00

147.00

569.56

716.56

64.79

I cum

54.70

0.00

569.56

569.56

64.79

I cum

54.70

357.00

357.00

569.56

926.56

64.79

I cum

17.50

103.00

103.00

209.22

312.22

25.92

I cum

54.70

75.00

75.00

569.56

644.56

64.79

1000 Nos.

62.00

5200.00

5200.00 1022.40

6222.40

0.00

1 M.T

0.00

6000.00

6000.00

27.29

6027.29

0.00

1 M.T

0.00

34500.00 34500.00

27.29

34527.29

0.00

1 M.T

0.00

27.29

2643.29

69.11

I cum

Seignorage/l
oading
charges
64.79

2616.00

2616.00

17.50

95.00

95.00

209.22

304.22

64.79

I cum

54.70

293.00

293.00

569.56

862.56

64.79

I cum

1.00

38.00

38.00

26.32

64.32

0.00

e leads are taken and correct to the best of my knowledge

Total cost
1999.35
1731.35
1569.35
1369.35
1479.35
254.64
254.64
324.64
781.35
634.35
991.35
338.13

3.614

709.35
6222.40

7.228

6027.29
34527.3
2712.4

80.00

10.89

369.0
927.35
64.32
227.5
5.6875

27.2

RBR_FNDN
Chapter - 11-FOUNDATION
Index-code

S. No

Description

RBR-FNDN-1

Excavation for Structures


Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom as per
Technical Specification 305 MORD / 304 MORTH

Unit

Quantity

Note : Classifications of Earth Work Specification are as per


302.2.1((A) of MORD and 301.2.1 of MORT&H
Mechanical Means
Upto 3 m depth
Unit = cum
Taking output = 240 cum
(A)Labour
Mate
day
Mazdoor (Unskilled)
day
8.32
(B) Machinery
Hydraulic Excavator 1 cum bucket capacity
hour
6.00
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Note : 1. Cost of dewatering upto 5% of a+b may be added, where required, up to 10 per c
cost. Assessment for dewatering shall be made as per site conditions.
3 m to 6 m depth
Mechanical Means
Unit = cum
Taking output = 210 cum
(A) Labour
Mate
Mazdoor (Unskilled)
(B) Machinery
Hydraulic excavator 1.0 cum bucket capacity

day
day

8.32

hour

6.00

c&d) Overheads & Contractors Profit


Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
Note : Cost of dewatering upto 5 per cent of (a+(B) may be added, where required. As
dewatering shall be made as per site conditions.
Depth above 6 m
Mechanical Means
Unit = cum
Taking output = 180 cum
(A) Labour
Mate
Mazdoor (Unskilled)
(B) Machinery
Hydraulic excavator 1.0 cum bucket capacity

10.40

hour

6.00

c&d) Overheads & Contractors Profit


Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180
Note : 1. Cost of dewatering upto 5 per cent of (a+(B) may be added, where required. As
dewatering shall be made as per site conditions..
2. Labour provided for excavation by mechanical means includes that required for trimming o
side slopes.
Carting
away the surplus excavated materials i.e., earth
from the site to a suitable distance of about 5 kms including
loading, unloading, conveyance charges and dumping the
carted materials at the contractors cost, labour charges, all
leads and lifts, all other incidental and operational charges etc
complete including VAT and Labour cess.

AP SOR
Lead Charges

RBR-FNDN-2

day
day

Lead upto 5 Kms


Filling in foundation trenches as per drawing and
technical specification Clause 305.3.9 MORD & 304
MORTH
Sand filling
Unit = cum
(A)Labour
Mate
Mazdoor (Unskilled)
(B) Material
Sand
Water

cum

day
day

0.31

cum
Kl

1.00484
0.01

RBR_FNDN

OUNDATION
Rate Rs.

490.00

Amount Rs.

Remarks

4076.80

2815.90

16895.40
2855.37
23827.57
99.28 /Cum
where required, up to 10 per cent of labour
tions.

490.00

4076.80

2815.90

16895.40
20972.20
2855.37
23827.57
113.46 /Cum
be added, where required. Assessment for

490.00

5096.00

2815.90

16895.40
21991.40
2994.13
24985.53
138.81 /Cum
be added, where required. Assessment for

es that required for trimming of bottom and

82.70 /Cum

490.00

151.90

324.64
103.00

324.64
1.03

485

Wall
PCC

Structural Details of Cable Trench Cros


For 33KV Cable Trench
Item No:

Sl.
No

Description

Unit

Nos'

For Manhole
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom as per
Technical
Specification 305 MORD / 304 MORTH
Upto 3m depth
Cum
Providing concrete for plain concrete in open foundations using
40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH.
PCC M-10
Cum
Supply
and
placing
of
the
Design
Mix
Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum
cement content as per IS code from standard
suppliers
approved by the department including pumping, centering,
shuttering, laying concrete, vibrating, curing etc. complete
but excluding cost of steel and its fabrication charges for
finished
item of work.
RCC M-25
Cum

For Trench (per metres)


Per 1 metre
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom as per
Technical
Specification 305 MORD / 304 MORTH
Upto 3m depth
Cum

Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH
Sand filling - 250mm thk
Cum
Carting away the surplus excavated materials i.e., earth from the
site to a suitable distance of about 5 kms including loading,
unloading, conveyance charges and dumping the carted
materials at the contractors cost, labour charges, all leads and
lifts, all other incidental and operational charges etc complete
including VAT and Labour cess.
Cum
Upto 5Km Lead
Supply, Laying and Fixing of precast concrete blocks for paving of
M-20 grade and thickness not less than 50 mm for Non-traffic
areas conforming to IS 15658:2006 in all shapes and designs as
per the manufacturer's specification
1000mmx500mmx40mm

Nos

Rmt

Laying and jointing of HDPE pipes by butt fusion welding as per


IS:7634 part-II/1975 as amended from time to time to the
alignment and gradient and testing the pipeline to the required
pressure.
200mm DIa
Rmt

Laying of a Redtape between Layers of Soil in Trenches as as per


drawing and technical specifications
Manufacture, supply, & delivery of HDPE pipes grade PE 100
conforming to IS 4984 - 1995 including transportation to any
where in A.P, including, sales tax but excluding specials etc,
including VAT and Labour cess. (Supply upto 90 mm dia in coil &
above 90 mm dia straight length in 6 M.)
200mm DIa

Total Cost of Trench


Total Coat of Trench and Manhole per KM (per every 50m of
length one manhole0

Breadth
Width
Depth
hinkness
hinkness

(m)
(m)
(m)
(m)
(m)

Manhole
1.55
2.00
1.65
0.25
0.10

Trench
1.55
1.50
0.25
0.50
0.25
0.50

Sandfilling
Soil
Soil
Soil

Cable Trench Cross Sections at Nelapadu Village


Length (m) Breadth (m) Depth (m)

Quantity

Rate Rs.

Amount Rs.

1.75

2.20

1.65

6.35

99.28

630.69

2.00

1.65

0.10

0.33

4619.27

1524.36

8.10

2.00

0.25

4.05

4861.99

19691.05
21846.09

1.00

1.75

1.50

2.63

99.28

260.61

1.00

1.55

0.25

0.39

542.59

210.25

0.69

82.70

2.00

245.66

491.33

1.00

4.00

33.57

134.26

1.00

4.00

1190.20

4760.80

1.00

4.00

63.09

252.36
6727.36

56.86

7819666.167422
0.7820

4.05
8.1

Remarks

/M
/km

Wall
PCC

Structural Details of Cable Trench Cros


For 415V Cable Trench
Item No:

Sl.
No

Description

Unit

Nos'

For Manhole
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom as per
Technical
Specification 305 MORD / 304 MORTH
Upto 3m depth
Cum
Providing concrete for plain concrete in open foundations using
40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH.
PCC M-10
Cum
Supply
and
placing
of
the
Design
Mix
Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum
cement content as per IS code from standard
suppliers
approved by the department including pumping, centering,
shuttering, laying concrete, vibrating, curing etc. complete
but excluding cost of steel and its fabrication charges for
finished
item of work.
RCC M-25
Cum

For Trench (per metres)


Per 1 metre
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom as per
Technical Specification 305 MORD / 304 MORTH

Upto 3m depth

Cum

Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH
Sand filling - 250mm thk
Cum

Carting away the surplus excavated materials i.e., earth from the
site to a suitable distance of about 5 kms including loading,
unloading, conveyance charges and dumping the carted
materials at the contractors cost, labour charges, all leads and
lifts, all other incidental and operational charges etc complete
including VAT and Labour cess.
Cum
Upto 5Km Lead
Supply, Laying and Fixing of precast concrete blocks for paving of
M-20 grade and thickness not less than 50 mm for Non-traffic
areas conforming to IS 15658:2006 in all shapes and designs as
per the manufacturer's specification
1000mmx500mmx40mm

Nos

Rmt

Laying and jointing of HDPE pipes by butt fusion welding as per


IS:7634 part-II/1975 as amended from time to time to the
alignment and gradient and testing the pipeline to the required
pressure.
160mm Dia
Rmt

Laying of a Redtape between Layers of Soil in Trenches as as per


drawing and technical specifications
Manufacture, supply, & delivery of HDPE pipes grade PE 100
conforming to IS 4984 - 1995 including transportation to any
where in A.P, including, sales tax but excluding specials etc,
including VAT and Labour cess. (Supply upto 90 mm dia in coil &
above 90 mm dia straight length in 6 M.)
160mm Dia

Total Cost of Trench


Total Coat of Trench and Manhole per KM (per every 50m of
length one manhole)

Breadth
Width
Depth
hinkness
hinkness

(m)
(m)
(m)
(m)
(m)

Manhole
1.00
2.00
2.00
0.25
0.10

Trench
1.00
2.00
0.25
0.50
0.50
0.50
0.25

Sandfilling
Soil
Soil
Soil
Soil

Cable Trench Cross Sections at Nelapadu Village


Length (m) Breadth (m) Depth (m)

Quantity

Rate Rs.

Amount Rs.

1.20

2.20

2.00

5.28

99.28

524.21

2.00

2.00

0.10

0.40

4619.27

1847.71

7.00

2.00

0.25

3.50

4861.99

17016.95
19388.87

1.00

1.20

2.00

2.40

99.28

238.28

1.00

1.00

0.25

0.25

542.59

135.65

0.65

82.70

2.00

245.66

491.33

1.00

5.00

33.57

167.83

1.00

5.00

764.40

3822.00

1.00

5.00

40.67

203.35
5618.80

53.76

6588239.961646
0.6588

4.05
8.1

Remarks

/M
/km

Você também pode gostar