AMANDEMEN -1
SURAT PERJANJIAN/KONTRAK
untuk melaksanakan
Paket Pekerjaan Pengadaan
Sarana 10 (Sepuluh) Train Set
Kereta Rel Listrik (KRL)
Nomor: RL/PKS/18/XII/2014
Tanggal 12 Desember 2014
‘SYARAT-SYARAT KONTRAK
PENGADAAN SARANA,
BENTUK SURAT PERJANJIAN/KONTRAK
DAN BENTUK SURAT PERINTAH KERJA
Dasar-dasar :
Risalah Rapat / Minutes of Meeting tanggal 16
September 2015 agenda Paket Pekerjaan Pengadaan
Sarana 10 (sepuluh) trainset Kereta Rel Listrik (KRL)
omor kontrak RL/PKS/18/XII/2014 tanggal 12
Desember 2014.
‘SEMULA TERTULIS :
1
Total harga Kontrak atau Nilai Kontrak termasuk
Pajak Pertambahan Nilai (PPN) yang diperoleh
berdasarkan kuantitas. dan harga satuan
pekerjaan sebagaimana tercantum dalam Daftar
Kuantitas dan Harga adalah :
2. Pengadaan Sarana sebesar
USD70.407.827,-(tujuh puluh juta empat
ratus tujuh ribu delapan ratus dua puluh
tujuh Dollar Amerika Serikat);
BERUBAH MENJADI :
1, Total harga Kontrak atau Nilai Kontrak termasuk
Pajak Pertambahan Nilal (PPN) yang diperoleh
berdasarkan kuantitas dan harga satuan
pekerjaan sebagaimana tercantum dalam Daftar
Kuantitas dan Harga adalah :
a. Pengadaan Sarana sebesar
USD70.407.827,-(¢ujuh puluh juta empat
ratus tujuh riby delapan ratus dua puluh
tyjuh Dollar Amerika Serikat),
Tahap pertama 4 (empat) trainset senilai
USD 35,200,000 termasuk PPN 10%.
termasuk uang muka senilai_ USD
10,560,000,
Page 1 of 8
AMENDMENT-1
LETTER OF AGREEMENT/CONTRACT
to execute
Package of Goods Procurement Works of
10 (ten) Rolling Stock Electrical Multiple Unit
(EMU) Trainsets
Number: RL/PKS/18/X11/2014
Dated December 12, 2014
TERMS OF CONTRACT FOR
‘THE PROCUREMENT OF ROLLING STOCK,
FORM OF LETTER OF
AGREEMENT/CONTRACT
AND FORM OF WORK ORDER
Reference :
Minutes of Meeting dated September 16", 2015
about Package of Goods Procurement Works of 10,
(ten) Rolling Stock Electrical Multiple Unit (EMU)
contract number RL/PKS/18/XII/2014 dated
December 12, 2014.
ORIGINALLY WRITTEN AS:
1, The total Contract price or Contract Value
includes Value Added Tax (VAT) acquired
based on quantity and unit price of the works
as set out in the List of Quantity and Price is:
a. Procurement of Rolling Stock in the
amount of USD70.407.827,- (seventy
million four hundred seven thousand eight
hundred twenty seven United States
Dollar);
CHANGED TO BE :
1, The total Contract price or Contract Value
includes Value Added Tax (VAT) acquired based
on quantity and unit price of the works as set
out in the List of Quantity and Price is:
a Procurement of Rolling Stock in the
amount of —USD70.407.827,- (seventy
‘milion four hundred seven thousand eight
hundred twenty seven United States
Dollar);
First phase 4 (four) trainset with amount of
USD 35,200,000 including VAT 10% which
Includes downpayment with amount USD
10,560,000.
PEMBELI
KONSORSIUM
eo K |
yon |Tahap kedua 6 (enam) trainset senilai sise
kontrak sebesar USD 35, 207,827 termasuk
PPN 10%,
Sesual Peraturan Menteri Keuangan (PMK)
193/2015, PEMBELI akan mengajukan
fasiltas surat keterangan tidak dipungut
(SKTD) PPN ke Kantor Pelayanan Pajak
BUMN. Apabila SKTD disetujui, maka
Pembayaran untuk 4 (empat) dan 6 (enam)
train set dan pemeliharaan sarana dikurangi
sebesar PPN yang disetujui dibebaskan,
Page 2 of 8
Second phase 6 (six) trainset with a
remaining contract value of USD 35,
207,827 including VAT 10%.
In according to Ministry of Finance (PMK)
regul 1193/2015, PURCHASER will
apply VAT tax exemption facilities (SKTD)
to tax service office BUMN (stated owned
company). If SKTD will be approved, then
the payment for 4 (four) and 6 (six)
trainset and maintenance of rolling stock
will be deducted by VAT that has been
approved to be exernpt.
SEMULA TERTULIS : ORIGINALLY WRITTEN AS:
1.1 Barang dan Jasa adalah 1.1 Goods and Services are:
a. Sarana sebanyak 10 (sepuluh) train set
Kereta Rel Listrik(Electrical Multiple Unit)
atau setara dengan 60 (enam puluh) unit
a. Rolling stock as many as 10 (ten)
trainsets or equivalent to 60 (sixty)
Electrical Multiple Units as described in the
Kereta Rel Listrik (Electrical Multiple Unit) scope of work for the rolling stock.
sebagaimana dijelaskan dalam lingkup
pekerjaan sarana,
b. Pemeliharaan sarana untuk 10 (sepuluh) b. Maintenance of rolling stock for 10 (ten)
train set Kereta Rel Listrk (Electrical trainsets or equivalent to 60 (sixty)
‘Multiple Unit) atau setara dengan 60 Electrical Multiple Units as described in the
(enam puluh) Kereta Rel Listrik (Electrical ‘scope of maintenance work for the rolling
‘Multiple Unit) sebagaimana _dijelaskan stock.
dalam tingkup pekerjean pemeliharaan
sarana
BERUBAH MENJADI : CHANGED TO BE:
1.1 Barang dan Jasa adalah 1.1 Goods and Services are:
a. Sarana sebanyak 10 (sepuluh) train set
Kereta Rel Listrik(Electrica’ Multiple Unit)
atau setara dengan 60 (enam puluh) unit
Kereta Rel Listrik (Electrical Muttiple Unit)
sebagaimana dijelaskan dalam _lingkup
pekerjaan sarana. Tahap pertama 4
(empat) train set dan tahap kedua 6
(enam) train set.
b, Pemeliharaan sarana untuk 10 (sepuluh)
train set Kereta Rel Listrik (Electrical
Multiple Unity atau setara dengan 60
(enam puluh) Kereta. Rel Listrik (Electrical
Multiple Unit) sebagaimana —dijelaskan
dalam lingkup pekerjaanpemeliharaan
sarana
PEMBELI
KONSORSIUM |
a. Rolling stock as many as 10 (ten)
trainsets or equivalent to 60 (sixty)
Electrical Multiple Units as described in the
scope of work for the rolling stock. First
Phase 4 (four) trainset and second phase
6 (six) trainset.
b. Maintenance of rolling stock for 10 (ten)
trainsets or equivalent to 60 (sixty)
Electrical Multiple Units as described in the
scope of maintenance work for the rolling
stock.
PENYEDIA
ayy
fds
7SEMULA TERTULIS :
4.16 Masa Kontrak adalah jangka _waktu
berlakunya Kontrak ini terhitung efektif ika 4
(empat) kondisi ini terpenuhi yaitu apabila :
1) Pembebasan Lahan untuk KA Bandara
Soekarno-Hatta dinyatakan selesai_ oleh
Otoritas terkalt’ dan kondisi tersebut
diterima oleh PEMBELI;
2) Penandatanganan Akad
PEMBELI dan Kreditur;
3) Letter of Credit (L/C) sudah dibuka oleh
PEMBELL
4)Surat Perintah Mulai Kerja (SPMK) telah
diterbitkan oleh PEMBELI.
Kredit antara
BERUBAH MENJADI :
4.46 Masa Kontrak adalah jangka _waktu
berlakunya Kontrak ini terhitung efektifjika 4
(empat) kondisi ini terpenuhi yaitu apabil
1) Pembebasan lahan untuk KA Bandara
Soekarno — Hatta dinyatakan dapat diterima
‘oleh Kreditur untuk pencairan Kredit dan
pembukaan L/C;
2) Penandatanganan Akad Kredit
PEMBELI dan Kreditur;
3) Letter of credit (/C) untuk empat (4)
trainset sudah dibuka oleh PEMBELT.
4) Surat Perintah Mulai Kerja (SPMK) telah
diterbitkan oleh PEMBELI.
antara
‘SEMULA TERTULIS +
12. Jadwal Pelaksanaan Pekerjaan
12.1. Jangka waktu Pengadaan Sarana dengan :
‘a. Masa penyerahan pertama _sekurang-
kurangnya sebanyak 4 (empat) train set
dalam jangka waktu 16 (enam belas) bulan
sejak efektif berlakunya Kontrak sesuai
ketentuan pasal 1.16.;
j
b. Masa penyerahan kedua merupakan sisa
yang belum diserahkan dalam jangka
waktu 18 (delapan belas) bulan sejak
Page 3 of 8
ORIGINALLY WRITTEN AS:
1.16 Term of Contract is the Contract validity
period effective as of the 4 (four) conditions
bellows are completed :
1) The Land acquisition for Soekarno-Hatta
Airport Railways has been stated final by
the Related Authority and the conditions
will be accepted by the PURCHASER;
2) The Credit Contract has been signed by
the PURCHASER and the Creditor;
3) Letter of Credit (L/C) has been opened
by the PURCHASER;
4) Notice to Proceed (SPMK) has been issued
by the PURCHASER.
CHANGED TO BE:
1.16 Term of Contract is the Contract validity
period effective as of the 4 (four) conditions
bellows are completed :
1) The Land acquisition for Soekarno-Hatta
Airport Railways has been approved by
Creditor for purpose loan disbursement and
open L/C;
2) The Credit Contract has been signed by the
PURCHASER and the Creditor;
3) Letter of Credit (L/C) for four (4) trainsets
has been opened by the PURCHASER;
4) Notice to Proceed (SPMK) has been issued
by the PURCHASER.
ORIGINALLY WRITTEN AS
12, Schedule of Work Execution
12.1 The Term of the Procurement Contract
with:
a. The first submission of at least 4
(four) trainsets within a period of time
of 16 (sixteen) months as of the
effectiveness of the Contract
according 1.16;
b. The second delivery being the
remaining that has yet to be delivered
within the period of time of 18
efektif berlakunya - Kontrak —sesual (eigthteen) months as of the
ketentuan pasal 1.16.) effectiveness of the Contract
according 1.16;
PEMBELI KONSORSIUM
j PENYEDIA.
me dy WAS
aePage 4 of 8
a, Masa penyerahan pertama _sekurang-
kurangnya sebanyak 4 (empat) Train Set
dalam jangka waktu 16 (enam belas) bulan
sejak ‘efektif beriakunya Kontrak sesuai
ketentuan pasal 1.1
Jika 4 Train Set telah selesai dalam jangka
waktu 16 (enam belas) bulan sebagaimana
dipersyaratkan dalam —kontrak —namun
prasarana kereta api belum selesal dan/atau
tidak slap untuk —_pengujian dan
engoperasian 4 (empat) Train Set secara
keseluruhan atau sebagian, maka
konsorsium penyedia tidak dapat dikenakan
segala denda atau klaim.
Konsorsium Penyedia akan mengusahakan
ssemaksimal mungkin memenuhi permintaan
Pembeli untuk menyerahkan —trainset
ertama dalam Jangka waktu 12 (dua belas)
bulan agar sarana tersedia pada saat
prasarana selesai_dibangun. —Apabila
Konsorsium —Penyedia tidak dapat
menyerahkan trainset pertama dalam jangka
waktu 12 (dua belas) bulan maka
konsorsium penyedia tidak dapat dikenakan
segala denda atau klaim.
b. Masa penyerahan untuk sisa 6 (enam)
trainset berikutnya adalah 16 (enam belas)
I bulan_sejak penerbitan L/C kedua.
| Jika 6 Train Set telah selesai dalam jangka
|
i
waktu 16 (enam belas) bulan sebagaimana
dipersyaratkan dalam kontrak — namun
prasarana kereta api belum _selesai
dan/atau tidak slap untuk pengujlan dan
engoperasian 6 (enam) Train Set secara
keseluruhan atau sebagian, maka
konsorsium —penyedia tidak dapat
dikenakan segala denda atau Klaim.
. Jangka waktu Kontrak ini _termasuk
engiriman dan pengujian Barang.
c. Jangka waktu Kontrak ini termasuk c. The Term of this Contract includes the
pengiriman dan pengufian Barang. delivery and testing of the Goods.
BERUBAH MENJADI : CHANGED TO BE:
12, Jadwal Pelaksanaan Pekerjaan 12. Schedule of Work Execution
12.1 Jangka waktu Pengadaan Sarana dengan : 12.1. The Term of the Procurement Contract
with:
a. The first submission of at least 4
(four) Train Sets within a period of
time of 16 (sixteen) months as of the
effectiveness of the Contract.
according 1.16;
If 4 Train Set are finalized within 16
(sixteen) months as required by the
contract but the raliway infrastructure
| not completed and/or not ready for
testing and traffic (operational) for
any of the four (4) Train Set, the
consortium will not be liable for any
fines or claims.
Consortium will do their best effort to
fulfill Purchaser request to deliver the
first trainset within 12 (twelve)
months, so the first trainset is ready
when the infrastructure {s completed.
In case the consortium cannot deliver
the first trainset within 12. (twelve)
months the consortium will not be
liable for any fines or claims.
. The remaining six (6) trainset shall be
delivered within 16 (sixteen) months
of L/C opening.
If the 6 Train Set are finalized within
16 (sheen) months as required in the
contract but the rail infrastucture has
not been completed and/or not ready
to test and operate whole of/ some of
sh (6) Train Set, then suplier
consortium can not ‘to be fined or
claimed.
c. The Term of this Contract includes the
delivery and testing of the Goods.
PEMBELI
4.
KONSORSIUM
PERWEDIA
Ab
m 4 4}
i
SEMULA TERTULIS :
54. Pembayaran
54.1 Pembayaran Pengadaan Sarana terdiri da
a. Uang muka
1) Uang Muka dapat diberikan kepada
KONSORSIUM PENYEDIA untuk:
(2) pembayaran ang tanda jadi
kepada pemasok —_Barang/
material; dan/atau.
(2) persiapan teknis lain yang
diperlukan bagi pelaksanaan
Pengadaan Barang;
2)
besaran Uang Muka sebesar-besarnya
15% (lima belas perseratus) dari Nilai
Pengadaan Sarana dalam —bentuk
transferable irrevocable sight L/C, LIC
tersebut mencakup jumlah Pembayaran
Termin Pertama, Termin Kedua dan
Pembayaran Terakhir yang dibuka
paling lambat 7 (tujuh) hari kerja
setelah KONSORSIUM —PENYEDIA
menyerahkan Jaminan Uang Muka
senilai uang muka yang diterima;
b. Pembayaran Termin Kedua;
Penyelesaian pembayaran sebesar 80%
(delapan_puluh perseratus) dibayarkan
selambat-lambatnya 30 (tiga puluh) hari
Kalender setelah Barang dinyatakan
diterima sesuai dengan:
(1) Berita Acara Serah Terma Barang
(BAST) atau Certificate of Acceptance
(COA) dan dilengkapi dengan berita
acara has ujicoba, dalam waktu
paling lama 14 (empat _belas)
harisetelah dikeluarkannya berita acara
pemeriksaan dan pengujian oleh
PEMBELI. Setelah lampaunya waktu 14
(empat belas) hari tersebut tanpa
diterbitkannya BAST, maka Berita
‘Acara Hasil Pemeriksaan dan Pengujian
(BAHPP) berlaku sebagai BAST;
Page 5 of 8
ORIGINALLY WRITTEN AS:
54, Payment
54.1 Payment for the Procurement of Rolling Stock
consists of :
a. Advance Payment
1) The Advance Payment can be given
to the SUPPLIER CONSORTIUM for:
(1) Payment of commitment fee to
the supplier of the Goods/
material; and/or.
(2) Other technical _ preparation
needed for the execution of the
Procurement of the Goods;
2) The amount of the Advance Payment
at the maximum of 15% (fifteen
percent) of the Rolling Stock
Procurement Value in the form of
transferable irrevocable sight L/C.
said LIC comprises the amounts of
Payment of the First Term, Payment
of the Second Term and — Final
Payment to be called the latest 7
(Seven) business days after the
SUPPLIER CONSORTIUM has
delivered the Advance Payment Bond
in the amount of the received down
payment;
b. Payment of the Second Term;
The settlement of the payment in the
amount of 80% (eighty percent) shall be
paid the latest 30 (thirty) calendar days
after the Goods are declared received in
accordance with:
(1) Minutes of Handover of the Goods
(BAST) or Certificate of Acceptance
(COA) and furnished with the Minutes
of the Result of the tryout, within a
period the longest 14 (fourteen) days
as of the issuance of the minutes of
inspection and testing by the
PURCHASER. After the lapse of the
said period of 14 (fourteen) days
without the issuance of the BAST,
then the Minutes of Inspection and
Testing (BAHPP) shall prevail as 2
BAST;
PEMBELI
KONSORSIUM
PBDYEDIA
{4%
ae 4Page 6 of 8
‘
Uang Muka dengan jumlah sebesar USD
10,560,000 termasuk PPN 10% harus
dibayarkan oleh PEMBELI—_ kepada
KONSORSIUM PENYEDIA paling lambat
tujuh (7) hari kerja setelah KONSORSIUM
PENYEDIA — menyerahkan —_obligasi
Pembayaran uang muka sejumlah obligasi
pembayaran uang muka yang diterima,
b, Pembayaran Termin Kedua;
Penyelesaian pembayaran sebesar USD
23,231,843 dibayarkan—_selambat-
lambatnya 30 (tiga puluh) hari kalender
setelah Barang dinyatakan diterima sesuai
dengan:
(1) Berita Acara Serah Terima Barang
(BAST) atau Certificate of Acceptance
(COA) dan dilengkapi dengan berita
acara hasil uji coba, dalam waktu
paling lama 14 (empat belas) hari
setelah dikeluarkannya berita acara
pemeriksaan dan pengufian oleh
PEMBELI. Setelah lampaunya waktu 14
(empat belas) hari tersebut tanpa
diterbitkannya BAST, maka Berita
‘Acara Hasil Pemeriksaan dan Pengujian
(BAHPP) bertaku sebagai BAST;
(2) Nota tagihan.
(3) Faktur Pajak dengan menggunakan
kurs yang berlaku pada saat
pembayaran.
(2) Nota tagihan (2) Invoice
(B) Faktur Pajak dengan menggunakan (3) Tax Invoice subject to the exchange
kurs yang berlaku pada saat rate prevailing at the date of
pembayaran payment.
BERUBAH MENJADI: CHANGED TO BE:
54, PEMBAYARAN 54, PAYMENT
Pembayaran harus disiapkan oleh PEMBELL Payments shall made by the PURCHASER to the
kepada KONSORSIUM PENYEDIA sebagai SUPPLIER CONSORTIUM as follows :
berikut :
54.1 PEMBELI akan membuka L/C yang pertama 54.1 PURCHASER will open the first L/C no later
paling lambat pada tanggal 31 Maret 2016 2016 than March 31° 2016 for four (4) Train Set
untuk empat (4) Train Set senilai USD with amount 35,200,000 USD including VAT
35,200,000 termasuk PPN 10% dalam bentuk 10% _ in transferable irrevocable sight L/C
transferable irrevocable sight L/C meliputi : covering :
a. Uang Muka; a. Advance Payment;
‘Advance Payment with amount USD
10,560,000 including VAT 10% shall be
made by the PURCHASER to. the
SUPPLIER CONSORTIUM no later than
seven (7) working days after the
SUPPLIER CONSORTIUM has delivered
the Advance Payment Bond in the
amount of the received advance payment
bond.
bb, Payment of the second term;
The settlement of the payment in the
amount of USD 23,231,843 shall be paid
the latest 30 (thirty) calendar days after
the Goods are declared received in
accordance with:
(1) Minutes of Handover of the Goods
(BAST) or Certificate of Acceptance
(COA) and furnished with the Minutes
of the Result of the tryout, within a
period the longest 14 (fourteen) days
as of the issuance of the minutes of
inspection and testing by the
PURCHASER. After the lapse of the
said period of 14 (fourteen) days
without the issuance of the BAST,
then the Minutes of Inspection and
Testing (BAHPP) shall prevail as a
BAST;
(2) Invoice.
(3) Tax Invoice subject to the exchange
rate prevailing at the date of payment.
PEMBELI
KONSORSIUM
PENYEDIA
fae
Ty¢. Pembayaran Terakhir.
Pembayaran terakhir sebeser_ USD
1,408,157 akan dibayarkan dalam jangka
‘waktu 6 (enam) bulan setelah Berita Acara
Serta Terima (BAST) atau Certificate of
Acceptance.
54.2 PEMBELI akan membuka L/C kedua paling
lambat tanggal 30 Juni 2016 untuk enam (6)
Trainset sebesar USD 35,207,827 termasuk PPN
10% dalam bentuk irrevocable sight L/C
meliputi :
a. Pembayaran Termin Pertama;
Penyelesaian pembayaran sebesar USD
33,095,592 dibayarkan_—_selambat-
lambatnya 30 (tiga puluh) hari kalender
setelah Barang dinyatakan diterima sesval
dengan:
(2) Berita Acara Serah Terima Barang
(BAST) atau Certificate of Acceptance
(COA) dan dilengkapi dengan berita
acara basil ujicoba, dalam waktu
paling lama 14 (empat belas) hari
setelah dikeluarkannya berita acara
pemeriksaan dan pengujian oleh
PEMBELI. Setelah lampaunya waktu 14
(empat betas) hari tersebut tanpa
diterbitkannya BAST, maka Berita
Acara Hasil Pemeriksaan dan Pengujian
(BAHPP) berlaku sebagai BAST;
(2) Nota tagihan,
(3) Faktur Pajak dengan menggunakan
kurs yang berlaku pada saat
pembayaran,
b, Pembayaran Terakhir.
Pembayaran terakhir sebesar USD
2,112,235 akan dibayarkan dalam jangka
waktu 6 (enam) bulan setelah Berita Acara
Serta Terma (BAST) atau Certificate of
Acceptance.
54.2
Page 7 of 8
c. Final Payment.
The Final Payment in the amount of USD
1,408,157 willbe paid within a period of
6 (six) months as of the Minutes of
Handover (BAST) or Certificate of
Acceptance.
‘The PURCHASER will open the second L/C
no later than June 30", 2016 for six (6)
Trainsets in the amount of 35,207,827
USD including VAT 10% in transferable
irrevocable sight L/C covering :
Payment of the first term;
The settlement of the payment in the
amount of USD 33,095,592 shall be paid
the latest 30 (thirty) calendar days after
the Goods are declared received in
accordance with:
(1) Minutes of Handover of the Goods
(BAST) or Certificate of Acceptance
(COA) and furnished with the Minutes
of the Result of the tryout, within a
period the longest 14 (fourteen) days
as of the issuance of the minutes of
Inspection and testing by the
PURCHASER. After the lapse of the
said period of 14 (fourteen) days
without the issuance of the BAST,
then the Minutes of Inspection and
Testing (BAHPP) shall prevail as a
BAST;
(2) Invoice.
(3) Tax Invoice subject to the exchange
rate prevailing at the date of payment.
Final Payment.
The Final Payment in the amount of USD
2,112,235 willbe paid within a period of 6
(six) months as of the Minutes of
Handover (BAST) or Certificate of
Acceptance.
All other terms and condistions if the Letter of
Agreement / Contract shall remain unchanged
and in full force and effect.
‘Semua syarat dan Ketentuan lainnya dalam Surat
Perjanjian / Kontrak bersifat tetap tidak berubah
dan berlaku sepenuhnya.
~~ PEMBELT KONSORSIUM
PENYEDIA.
“m4 | FA
7DENGAN DEMIKIAN, PEMBELI dan KONSORSIUM
PENYEDIA telah bersepakat untuk menandatangani
Amandemen Kontrak ini pada tanggal 1 Februari
2016 dan melaksanakan Kontrak sesuai dengan
ketentuan peraturan perundang-undangan di
Republik Indonesia,
Untuk dan atas nama/
For and on Behalf
Untuk dan atas nama/
For and on Behalf
PT Rallink Bombardier
Transportation
/
. Heru Kus Mr, Tom Townson
President Director Director, Sales &
Business Development
‘ 1} DWAKUKAMBEMETERAIA
1 otanda Poet
Dm KERATIN
PETER KEUARIGAN.
Page 8 of 8
IN WITNESS WHEREOF, the PURCHASER and
the SUPPLIER CONSORTIUM have agreed to
sign this Contract Amendment on the date
February 1%, 2016 and to execute the Contract
in accordance with the provisions of the
applicable laws and regulations in the Republic
of Indonesia.
Untuk dan atas nama/
For and on Behalf
PT. Industri Kereta Api
Untuk dan atas/
For and on Behalf of
PT. Multi Graha
Teknika
President Director
President Director
Bombardier Transportation Sweden AB
a
PEMBELI
KONSORSIUM
PENYEDIA
AAr
er
Martin R. MgRHetfpehe Teknika