Escolar Documentos
Profissional Documentos
Cultura Documentos
CONDITION
NO
ITEM
SATISFACTORY
GOOD
FORECASTLE DECK
A.1
Bullwalk contruction
A.2
Railing
A.3
Double bollard
A.4
Panama chock
A.5
Dudukan lifebouy
A.11
Mooring Winch
A.11.1
A.11.2
A.11.3
A.11.4
A.11.5
A.11.6
A.11.7
A.11.8
General greasing
A.12
Windlass
A.12.1
Dudukan windlass
A.12.2
A.12.3
Clutch windlass
A.12.4
A.12.5
A.12.6
A.12.7
A.12.8
A.12.9
Chain locker
A.13
A.14
A.15
A.16
General greasing
MAIN DECK
B.1
B.2
B.3
B.4
B.5
General valve
B.6
Pressure gauge
B.7
B.8
General drain
B.9
B.10
B.11
B.11.1
B.11.2
B.11.3
U-Bolt cargo
B.11.4
General valve
B.11.6
B.11.7
B.11.8
B.12
B.12.1
B.12.2
B.12.3
B.12.4
B.12.5
General valve
B.12.6
B.13
B.13.1
B.13.2
General valve
B.13.3
B.13.4
B.13.5
B.14
General vent
B.14.1
Pipa vent
B.14.2
B.14.3
B.14.4
B.15
B.15.1
Pipa sounding
B.15.2
Cup sounding
B.16
B.17
B.18
B.19
B.21
General manhole
B.22
General tangga
B.23
General catwalk
B.24
Sopep Box
B.25
Dust Box
B.26
B.27
General blower
B.28
B.29
Double bollard
B.30
General drain
B.31
B.32
B.33
General painting
B.34
B.35
Bullwalk contruction
ACCOMODATION
C.1
General kontruksi
C.2
General railling
C.3
General pintu
C.4
C.5
General jendela
C.6
C.7
C.8
C.9
General drain
C.10
General painting
C.11
General punnel
TOP DECK
D.1
General kontruksi
D.2
Main mast
D.3
General railling
D.4
D.5
D.6
D.7
D.8
General drain
D.9
General painting
D.10
Chief Officer
Date:30 June 2015
WANDI
Work shop Hull & Piping
Date:30 June 2015
SYAFWARDI
Marine Superintendent
Date:30 June 2015
LF -E 047/JUN 2015
Written by : SK
Form Code
Revision
Page
LF -E 047
Vessel
MT NASYDA
1 of 1
NDITION
POOR
EVIDENT
REMARKS
Keropos
Keropos
Kurang terawat
Kurang terawat
Keropos
Plate keropos
YAFWARDI
arine Superintendent
ate:30 June 2015
Written by : SK
Approved by : VP/DPA
Retention Period : 1 ye
REMARKS
an)
cabin)
rusak
eropos)
/karat/bocor 10-50%
/karat/bocor 50-100%