DQ for Purified Water System


BY PHARMACEUTICAL GUIDANACE ON JULY 2, 2016

OTHER, QUALIFICATION, VALIDATION & QUALIFICATION

NAME OF THE SYSTEM :PRETREATMENT & PURIFIED WATER GENERATION SYSTEM


TABLE OF CONTENTS
SR. NO.

STAGE

OBJECTIVE & SCOPE

ACCEPTANCE CRITERIA

RESPONSIBILITY

SYSTEM DESCRIPTION (SYSTEM AND SUB-SYSTEM)

BASIS OF DESIGN AND ASSUMPTION

TECHNICAL SPECIFICATIONS

DRAWINGS REQUIRED

SUPPORTING UTILITIES

PRE-QUALIFICATION CHECKLIST

10

LIST OF DOCUMENTS REQUIRED

11

DESIGN QUALIFICATION REPORT APPROVAL

12

ABBREVIATIONS

PAGE NO.

FACEBOOK

Like Page

Be the first of your friends to like this

1. OBJECTIVE AND SCOPE


OBJECTIVE
1. To prepare detailed specification for all major components of Equipment / instrument to ensure
that the User Requirement Specification and functional requirement specification are achieved.
2. To design the equipment / instrument in conjunction with the design data in order to provide basis
for vendor, manufacturer & / or the design engineer for designing the system when the project
begins.
SCOPE
Application to any equipment, system, facility, process & software programs.
1. When subjected for new installation
2. When the existing system is replaced with the new system.
3. When the existing system is subjected for up-gradation or modification.
All URS and FRS shall be defined by the user department in consultation with the engineering department,
which should be finalized and mutually discussed with the system supplier, vendor & or manufacturer.
The design qualification is essential part of the qualification mechanism and will serve as a basic
document for the Validation Activity.
2. ACCEPTANCE CRITERIA
2. A) PURIFIED WATER GENERATION SYSTEM

FIND US ON GOOGLE PLUS

Share

A.1 Equipment / Utility system shall confirm to specifications which are as per the user requirements/as
per USP 39.
A.2 The Equipment / Utility / system shall confirm to the predetermined requirements and a certificate is
issued by the projects / Engineering Department.
DESIGN BASIS
RAW WATER ANALYSIS
Sr.

Water Parameters

No.

Actual

Design Consideration

Parameters

Colour

< 5 CTU

< 5 CTU

pH

7.5

6.5 8.5

Conductivity (us/cm)

900

1200

Turbidity

1.8

Less than 5

SDI

Not check

< 3 assumed

Total Dissolved Solids

750 ppm

900 ppm

Total Alkalinity

120 ppm

120 ppm

Total Hardness

300 ppm

350 ppm

Calcium as CaCO3

100 ppm

125 ppm

10

Magnesium as CaCO3

200 ppm

225 ppm

11

Sodium as Na

36.11 ppm

50 ppm

12

Potassium as K

0.975ppm

5 ppm

13

Sulphate as SO4

43.68 ppm

50 ppm

14

Nitrates as NO3

2.3 ppm

10 ppm

15

Chlorides as Cl

92.3 ppm

100 ppm

16

Flouride

0.7 ppm

1 ppm

17

Colloidal Silica

5.6 ppm

10 ppm

18

Reactive Silica

5.6 ppm

10 ppm

19

TOC

1000 ppb

1000 ppb

20

Total Plate Count

79 CFU/ml

1000 CFU/ml

Pharmaceutical Guidance
Seguir

(Note. 1. Feed Water is free from pathogens like E- Coli, Pseudonymous, Salmonella)
2. B) PRETREATMENT & PURIFIED WATER GENERATION SYSTEM
FOR PRESSURE QUARTZ FILTER
END USE : SOFTENER
QUANTITY OF WATER : 7 m3/hr
TYPE OF OPERATION : MANUAL OPERATION
FOR SOFTENER
END USE : PURIFIED WATER GENERATION SYSTEM
QUANTITY : 3.8 m3/hr
OBR : 76 m3
NO OF HRS : 20 hrs
TYPE OF OPERATION : MANUAL OPERATION
FIRST PASS RO SYSTEM (Hot Water Sanitizable)
FEED FLOWRATE : 3800 LPH
REJECT FLOWRATE : 1100 LPH
PERMEATE FLOWRATE : 2700 LPH
OVER ALL RECOVERY : 70 %
TYPE OF OPERATION : FULLY AUTO & MANUAL OPERATION
SECOND PASS RO SYSTEM (Hot Water Sanitizable)
FEED FLOWRATE : 2700 LPH
REJECT RECYCLE FLOWRATE : 500 LPH

92 seguidores

PERMEATE FLOWRATE : 2200 LPH


OVER ALL RECOVERY : 80 %
TYPE OF OPERATION : FULLY AUTO & MANUAL OPERATION
FOR EDI SYSTEM
FEED FLOWRATE : 2200 LPH
PERMEATE FLOWRATE : 2000 LPH
REJECT FLOWRATE : 200 LPH
TYPE OF OPERATION : FULLY AUTO & MANUAL OPERATION
OVERALL RECOVERY : 90 %
TREATED WATER QUALITY
STAGE WISE TREATED WATER QUALITY AFETR RO:
(On basis of maximum feed water limiting condition)
Sr.

Water

Outlet of

Outlet of

Outlet of RO

Outlet of

No.

Parameter

Multi Grade

Softener

Pass I

RO Pass II

Filter
1.

2.

Ph

6 to 8.5

6 to 8.5

56

56

TSS

< 5 ppm

< 5 ppm

Nil

Nil

TDS /

1920 us/cm

1920 us/cm

200 us/cm

25 us/cm

350 ppm

Less than 5

Nil

Nil

Conductivity
3.

Total Hardness
( in ppm)

ppm

4.

SDI

<3

3.0 max

Nil

Nil

5.

TOC

1000 ppb

1000 ppb

500 ppb

200 ppb

6.

TVC

1000 CFU/ml

1000 CFU/ml

100 CFU/ml

50 CFU/ml

TREATED WATER QUALITY AFTER UF : ( as per Design Limits)

(PURIFIED WATER AS PER USP 39 std.)


Sr.

Water Parameters

USP 39

Action

Alert Limit

Limit

No.

Design
Limit

1.

Conductivity

1.25 s/cm

1.0 s/cm

0.8 s/cm

0.7 s/cm

2.

TOC in PPB

500 ppb

300 ppb

200 ppb

100 ppb

3.

TVC / TBC

100 CFU/ml

90 CFU/ml

70 CFU/ml

40 CFU/ml

Microbial Count

Note: With the change in the incoming water parameters, the treated water quantity & quality may get
affected at different stages of the plant.
3. RESPONSIBILTY
User Dept

: For providing user requirement (Technical and cGMP)

Head-Operations

: To review the specification from installation andMaintenance aspects.

Head-Quality

: To review the specification from GMP Aspects

Vendor

: To review and agree upon the requirements.

4. SYSTEM DESCRIPTION (SYSTEM AND SUB-SYSTEM)


The Fully Automated PLC based Purified Water Generation system generate 2 m3/hr. of Purified water as
Per USP 39 Standards.
SCHEME:
PRETREATMENT & PURIFIED WATER GENERATION SYSTEM:
PRE TREATMENT: (3800 LPH)
Pre Sodium Hypo Chlorite Dosing System
Raw Water Pumps
Multi Grade Filter
Softener Unit
FIRST PASS REVERSE OSMOSIS (HOT WATER SANITIZABLE) SYSTEM:
SMBS Dosing System
Antiscalent Dosing System

pH Correction System
5 Micron Cartridge Filter
ORP Analyzer and pH sensor along with auto Dumping Valve
RO High Pressure Pump
Reverse Osmosis Membranes along with High Pressure Housing
Conductivity Meter with Alarm
SECOND PASS REVERSE OSMOSIS (HOT WATER SANITIZABLE) SYSTEM:
RO High Pressure Pump
Reverse Osmosis Membranes along with High Pressure Housing
Conductivity meter with Alarm
POST TREATMENT:
Hot Water Sanitizable Electro Deionization Unit
Conductivity meter with Alarm
SYSTEM DESCRIPTION:
Raw water before Raw Water Tank is dosed with Sodium Hypochlorite 1 2 ppm. Raw water feed pump
will feed raw water from the raw water storage tank to Multi Grade Filter @ 7000 LPH.
Multi Grade Filter is a vertical down flow vessel containing pure graded silex quartz as a filtering media.
The vessel is fabricated in FRP. The water generated at the outlet of Multi Grade Filter will have
suspended solids less than 5 ppm. Multi Grade Filter is provided with Manual Backwash. We have
provided manual ball valves of for change over from normal operation to Backwash operation.
(Note that the inlet suspended solid load should not be more than 50 ppm).
The water from Multi Grade Filter is passed through Softener. Hardness after softener is less than 5
ppm. Soft Water after Softener unit is fed to Purified Water Generation System.
Sodium Metabisulphite (Na2S2O5) is then dosed in the chlorinated water to neutralize the free chlorine
(excess chlorine) present in the filtered water.
Antiscalent Dosing System is then dosed in the soft water to avoid scale formation on the RO
Membranes.
pH Correction Dosing System is provided to adjust the feed pH of RO feed water as 6.5 8.5. The
treated water is then passed through 5 micron Cartridge Filter to trap the suspended solids. This will
avoid chocking of RO membranes due to suspended solids.

ORP Analyzer is provided so as to check the absence/presence of chlorine in the feed water to the RO
System. If free chlorine is sensed in the feed water it will give an indication on the panel & open the

dumping valve and dump the high ORP water for 300 secs. & Even if the ORP value is not below the set
point it will trip the system.

This soft water is then fed to the Reverse Osmosis First pass System by means of a High Pressure
Vertical multistage Pump with SS 304 wettable parts of M/s. Grundfos, Denmark. The First pass Reverse
Osmosis System will generate 2700 liters/hr water with an overall recovery of 70 %. The generated water
will have total dissolved solids less than 150 ppm. The semi-permeable reverse osmosis membrane has
molecular weight cut off less than 150 MWCO. The Reveres Osmosis membrane acts as positive barrier
to remove dissolved solids, organic compounds & bacteria.
The Reverse Osmosis System consists of thin film composite type Reverse Osmosis membrane of DOW.
The material of construction of the RO membrane is Polyamide. The RO membrane is housed in the High
Pressure SS 316L Wettable Parts Housing having TC end connection.

The outlet water of RO pass one is feed to RO pass two system. The Second pass Reverse Osmosis
System will generate 2200 liters/hr of water with an overall recovery of 80%. The generated water will
have total dissolved solids less than 15-20 ppm.
The Reverse Osmosis System consists of thin film composite type Reverse Osmosis membrane of DOW.
The material of construction of the RO membrane is Polyamide. The RO membrane is housed in the High
Pressure SS 316L Wettable Parts Housing having TC end connection.

The Permeate water from RO system will be fed to the Electro Deionization Unit (EDI) having designed
capacity of 2000 LPH. The EDI system has a recovery of 90%.
The water generated from the outlet of EDI will be as per USP 39Standards for Purified Water.

5. BASIS OF DESIGN AND ASSUMPTION


FEED WATER SAMPLE:
The system design is based on the feed water analysis provided by the customer as per Annexure -A.
PRODUCT WATER QUALITY:
STAGE WISE TREATED WATER PARAMETER:
(On basis of maximum feed water limiting condition)
Sr.

Water

Outlet of

Outlet of

Outlet of RO

Outlet of

No.

Parameter

Multi Grade

Softener

Pass I

RO Pass II

Filter
1.

2.

Ph

6 to 8.5

6 to 8.5

56

56

TSS

< 5 ppm

< 5 ppm

Nil

Nil

TDS /

1920 us/cm

1920 us/cm

200 us/cm

25 us/cm

350 ppm

Less than 5

Nil

Nil

Conductivity
3.

Total Hardness
( in ppm)

ppm

4.

SDI

<3

3.0 max

Nil

Nil

5.

TOC

1000 ppb

1000 ppb

500 ppb

200 ppb

6.

TVC

1000 CFU/ml

1000 CFU/ml

100 CFU/ml

50 CFU/ml

TREATED WATER QUALITY AFTER UF: (as per Design Limits)(PURIFIED WATER AS PER USP 39 std.)
Sr.

Water Parameters

USP 34

Action

Alert Limit

Limit

No.

Design
Limit

1.

Conductivity

1.25 s/cm

1.0 s/cm

0.8 s/cm

0.7 s/cm

2.

TOC in PPB

500 ppb

300 ppb

200 ppb

100 ppb

3.

TVC / TBC

100 CFU/ml

90 CFU/ml

70 CFU/ml

40 CFU/ml

Microbial Count

Note: With the change in the incoming water parameters, the treated water quantity & quality may get
affected at different stages of the plant.
5.3 FACILITY OPERATION:
The plant operation will be for 20 hrs/day,6 days/week,48 weeks/year

ANNEXURE A
Sr.

Water Parameters

No.

Actual

Design Consideration

Parameters

Colour

< 5 CTU

< 5 CTU

pH

7.5

6.5 8.5

SDI

900

1200

Total Dissolved Solids

1.8

Less than 5

Total Alkalinity

Not check

< 3 assumed

Total Suspended Solids

750 ppm

900 ppm

Total Hardness

120 ppm

120 ppm

Calcium as CaCO3

300 ppm

350 ppm

Magnesium as CaCO3

100 ppm

125 ppm

10

Sulphate as SO4

200 ppm

225 ppm

11

Nitrates as NO3

36.11 ppm

50 ppm

12

Chlorides as Cl

0.975ppm

5 ppm

13

Silica as SiO2

43.68 ppm

50 ppm

14

Colloidal Silica

2.3 ppm

10 ppm

15

Reactive Silica

92.3 ppm

100 ppm

16

Total Chloride as CaCO3

0.7 ppm

1 ppm

17

Sulphate as CaCO3

5.6 ppm

10 ppm

18

TOC

5.6 ppm

10 ppm

19

TVC

1000 ppb

1000 ppb

(Note. 1. Feed Water is free from pathogens like E- Coli, Pseudonymous, Salmonella)
6. TECHNICAL SPECIFICATIONS
6.A MAJOR EQUIPMENTS OF PRETREATMENT & PURIFIED WATER GENERATION SYSTEM:
6.A.1 PRE SODIUM HYPOCHLORITE DOSING SYSTEM
TAG NO: NaOCl (DT-01 / DP-01)
EQUIPMENT NAME: Pre Sodium Hypo Chlorite Dosing system
EQUIPMENT LOCATION: After Bore Well Pump
FUNCTION: For Bacterial Disinfection in raw water. These will inhibit the bacterial growth.
Sodium Hypo chlorite dosed up to 2 ppm for disinfection.
TECHNICAL SPECIFICATION:
Quantity : One
Type : Positive Displacement Pump
Pump Capacity : 0.4 to 4 LPH
Max. Working Pressure : 5.5 kg/cm2
MOC of Dosing Tank : HDPE
Dosing Tank : 50 Liters Provided
Low Level Switch : Provided
Make : Milton Roy
Model : UC 11
DOSING CALCULATION:
Dosage required : 2 ppm
Feed Flow rate : 7 m3/hr
Conc. of Solution : 1 %
Dosing Pump flow rate : 1.4 LPH
Amount of dosing solution = 1.4 x 24 = 33.6 Ltrs.
6.A.2 RAW WATER PUMPS (1W + 1SB):
TAG NO: RWP-01 / 02
EQUIPMENT NAME: Raw Water Pumps
EQUIPMENT LOCATION: After Raw Water Storage Tank
FUNCTION: For pumping of Raw water to Pretreatment @ 7 m3/hr.
TECHNICAL SPECIFICATION:
Quantity : Two (1W + 1SB)
Type : Horizontal Multistage pump
Flow rate : 7 m3/hr (7000 liter/hr)
Head : 35 mWC
Material of Construction : SS 304
Make : Nanfang
6.A.3 MULTI GRADE FILTER:
TAG NO: MGF-01
EQUIPMENT NAME: Multi Grade Filter
EQUIPMENT LOCATION: After Sodium Hypo-chlorite Dosing System, Piping and Raw
Water Tank.
FUNCTION: It filters the suspended solids in the Raw water up to 5 ppm with the help of
Multi Grade Filter in the vessel, the inlet suspended solids should be less than 50 ppm.
TECHNICAL SPECIFICATION:

Quantity : One
Flow rate : 7 m3/hr
Max. Working Pressure : 3.5 kg/cm2
Max. Pressure Drop : 0.5 kg/cm2
Diameter : 600 mm
Height : 1800 mm
Specific Velocity of Filtration : 25 m/hr.
Back Wash Time Required : 10-15 min.
Filter media : Pure Graded Silex Quartz of 1.5 to
2 mm Particle size.
Valve Type : Ball valve
MOC of Pressure Vessel : Fiber Reinforced Plastic (FRP)
Make of Pressure Vessel : M/s. Wave Cyber, USA / Pentair
Frontal Pipe Size : 38.1 mm
Pressure gauge : 100 mm Dial ( Inlet /Outlet )
MOC Piping : UPVC
Make of Piping : FIP
MOC of Valves : UPVC
Make of Valves : FIP
Inlet, Outlet, Drain Connection : 1.5 BSPF union ends
Operation:
1. Normal Operation
2. Back Wash Operation
3. Rinse Operation
1. Normal Operation:
Since MGF is a Vertical Down Flow Vessel the Suspended Solids are removed by passing
through Filtering Media which is been 60% filled. For normal operation position of Ball
valves which are mounted on MGF should be (In Open Position: BV-05 & BV-06)
(In Close Position: BV-07, BV-08 & BV-09)
2. Back Wash Operation:
WHEN & WHY BACKWASH
Back Wash is used to remove the Suspended Matter which is entrapped in the filter
Media Top Layer during Normal Operation. Back Wash is done after 20 hr OR if the
differential pressure across the filter is more than 0.5 kg/cm2.
For changing from normal operation to backwash operation, the position of the Ball
Valves should be (In Open Position: BV-07 & BV-08)
(In Close Position: BV-05, BV-06 & BV-09)
3. Rinse Operation:
WHEN & WHY BACKWASH
Rinse Operation is done after Back Wash. Rinse is done to remove the Suspended Solid
which is entrapped in the Filter Media during Backwash Operation.
For changing from Back Wash operation to Rinse operation, the position of the Ball
Valves should be (In Open Position: BV-05 & BV-09)
(In Close Position: BV-06, BV-07 & BV-08)

6.A.4 SOFTENER:
TAG NO: SF-01
EQUIPMENT NAME: Softener Unit-01
EQUIPMENT LOCATION: After Multi Grade Filter
FUNCTION: It will replace the hardness causing Ca & Mg ions with Na ions. This will
soften the raw water and will avoid scale formation. Treated Water at the outlet of
softener-II will have hardness less than 5 ppm. Flow totalizer will be provided at the
outlet of softener unit to indicate the amount of soft water generated and give indication
after pre define quantity of soft water is generated.

TECHNICAL SPECIFICATION:
Quantity : One
Type : Vertical Up Flow
Flow rate : 3.8 m3/hr
Max. Working Pressure : 4 kg/cm2
Max. Pressure Drop : 0.5 kg/cm2
Diameter : 600 mm
Height on straight : 1800 mm
Regeneration Time Required : 20-30 min.
Fast Rinse : 5-10 Minutes
Resin Quantity : 450 ltrs.
Make of Resin : M/s. Lenxess
Model of Resin : C 249
Regenerator (NaCl) : 72 Kgs.
Reg. Tank Capacity : 300 lts.
MOC of Reg .tank : HDPE
MOC of Softener : Fiber Reinforced Plastic (FRP)
Make of Vessel : M/s. Wave Cyber, USA / Pentair
Frontal Pipe Size : 38.1 mm
Valve : Ball valve
Pressure gauge : 100 mm Dial ( Inlet /Outlet )
Frontal Piping : UPVC
Make of Piping : FIP
Make of Valves : FIP

Operation:
1. Normal Operation
2. Regeneration Operation
3. Slow Rinse Operation
4. Fast Rinse Operation
1. Normal Operation:
Since Softener is a Vertical UP Flow Vessel the Hardness causing Ions are removed by
passing through Resin Media (Cation and Anion) which is been 92% filled of the Total
Volume. For normal operation the position of the Ball valves should be:
(In Open position: BV-10, BV-11) & (In Close position: BV-12/13/14/15)
After 12 hrs of operation of the softening plant OR after 72 m3 of OBR the softener
should go under regeneration mode or the hardness does not get maintain within its
limit..
2. Regeneration Operation:
WHEN & WHY REGENERATION
Regeneration is used to recharge the Resin to regain its absorbing properties of
hardness. Regeneration is done if the Hardness at the Outlet of Softener Unit is above 5
ppm OR after 72 m3 OBR / 12 hrs of Operation of plant whichever is earlier. Flow
Totalizer will be provided at the outlet of each softener unit to indicate the amount of
soft water generated and give indication of Regeneration after pre define quantity of soft
water generation.
For changing from normal operation to regeneration mode, the valve position should be
(In Open position: BV-12/13/14) & (In Close position: BV-10/11/15)
Allow the softener to backwash completely.
Allow the brine solution to get completely charged in the softener.
3. Slow Rinse Operation:
Slow Rinse is used to get properly mix up with Salts & Resins.
(In Open position: BV-12/14) & (In Close position: BV-10/11/13/15)
4 Fast Rinse Operation:
Fast Rinse is used to remove excess Salts from the resins.
(In Open position: BV-10/15) & (In Close position: BV-11/12/13/14)

6.A.5 SODIUM META BISULPHITE DOSING SYSTEM:


TAG NO: SMBS (DT-02 / DP-02)
EQUIPMENT NAME: Sodium Meta Bisulphate Dosing system
EQUIPMENT LOCATION: After Softener Unit
FUNCTION: 1 ppm of chlorine needs 2 ppm SMBS dosing. We have considered 2 ppm of
chlorine so we have assumed 4 ppm of SMBS dosing. 6 ppm SMBS is dosed in soft water
to neutralize the free chlorine in soft water. (Note: ORP analyzer is provide with dumping
valve to check & dump the high chlorinated water)
TECHNICAL SPECIFICATION:
Quantity : One
Type : Positive Displacement Pump
Pump Capacity : 0.4 to 4 LPH
Max. Working Pressure : 5.5 kg/cm2
MOC of Dosing Tank : SS 304
Dosing Tank : 25 Liters Provided
Low Level Switch : Provided
Make : Milton Roy
Model : UC 11
DOSING CALCULATION:
Dosage required : 4 ppm
Feed Flow rate : 3.8 m3/hr
Conc. of Solution : 1 %
Dosing Pump flow rate: 1.52 LPH
If we consider 3 shifts of 8 hrs. = 8 x 3 = 24 hrs.
Amount of dosing solution = 1.52 x 24 = 36.48 Ltrs.
6.A.6 ANTISCALENT DOSING SYSTEM:
TAG NO: ADS (DT-03 / DP-03)
EQUIPMENT NAME: Anti Scalent Dosing System
EQUIPMENT LOCATION: After SMBS Dosing System
FUNCTION: ADS (5 ppm) is dosed in soft water to avoid scaling in RO membrane.
TECHNICAL SPECIFICATION:
Quantity : One
Type : Positive Displacement Pump
Pump Capacity : 0.4 to 4 LPH
Max. Working Pressure : 5.5 kg/cm2
MOC of Dosing Tank : SS 304
Dosing Tank : 25 Liters Provided
Low Level Switch : Provided
Make : Milton Roy
Model : UC 11
DOSING CALCULATION:
Dosage required : 5 ppm
Feed Flow rate : 3.8 m3/hr
Conc. of Solution : 2 %
Dosing Pump flow rate: 0.95 LPH
If we consider 3 shifts of 8 hrs. = 8 x 3 = 24 hrs.
Amount of dosing solution = 0.95 x 24 = 22.8 Ltrs.
6.A.7 pH CORRECTION DOSING SYSTEM:
TAG NO: pHC (DT-04 / DP-04)
EQUIPMENT NAME: pH Correction Dosing System

EQUIPMENT LOCATION: After Anti-scalent dosing system


FUNCTION: To boost up the pH of RO feed water so as to convert the dissolved CO2 into
alkalinity and which can be rejected in RO Pass I.
TECHNICAL SPECIFICATION:
Quantity : One
Type : Positive Displacement Pump
Pump Capacity : 0.4 to 4 LPH
Max. Working Pressure : 5.5 kg/cm2
MOC of Dosing Tank : SS 304
Dosing Tank : 25 Liters Provided
Low Level Switch : Provided
Make : Milton Roy
Model : UC 11
pH Correction Chemical : NaOH or Na2CO3
6.A.8 5-MICRON CARTRIDGE FILTER:
TAG NO: CF 01
EQUIPMENT NAME: 5 Micron Cartridge Filter
EQUIPMENT LOCATION: After SMBS / ADS / pHC Dosing Systems
FUNCTION: It filter all the suspended solids in water greater than 5 micron thus avoid
chocking in RO membrane.
TECHNICAL SPECIFICATION:
No. of Unit : One
Type of Cartridge : Spun Bounded Type
Rating : 5 micron
Flow rate : 3800 LPH
No. of Cartridge : 2 nos. 20 long
MOC of Cartridge Housing : SS 304
MOC of Cartridge : PP ( Polypropylene)
Make of Cartridge : Kumar/Pratham
Make of Housing : HydroPure Systems
Surface Finish of Housing : Internally < 0.4 Ra
Externally mirror up to 180 grit
Type of Filter : Double open end filter

6.A.9 REVERSE OSMOSIS HIGH PRESSURE PUMP-I:


TAG NO: ROHP I
EQUIPMENT NAME: Reverse Osmosis High Pressure Pump- I
EQUIPMENT LOCATION: After 5-micron Cartridge Filter
FUNCTION: For pumping of water to RO pass-I system. @ 3.8 m3/hr
TECHNICAL SPECIFICATION:
Quantity : One
Type : Vertical Multistage Pump
Flow rate : 3.8 m3/hr (3800 liter/hr)
Pressure : 12 kg / cm2
Material of Construction : SS 304 Wettable parts
Voltage Requirement : 415 Volts
Make : Grundfos
6.A.10 REVERSE OSMOSIS MEMBRANES:
EQUIPMENT NAME: Reverse Osmosis Membranes
EQUIPMENT LOCATION: Within the RO System

FUNCTION: RO membranes reduce the TDS & microbial load in the water. The semipermeable reverse osmosis membrane has molecular weight cut off less than 150
MWCO. The Reveres Osmosis membrane acts as positive barrier to remove dissolved
solids, organic compounds & bacteria. Membranes consist of thin film composite type. It
will bring down the conductivity less than 200 s/cm.
TECHNICAL SPECIFICATION:
No. of Membrane : 4 Nos.
Size of Membrane : 8 Dia. & 40 Long
Type of Membrane : Thin Film Composite
Type of Sanitization : Hot Water Sanitizable
Material of Construction : Polyamide
Make of Membrane : DOW.
Model : HSRO-390FF
Operating Temperature : 450 C
Recovery : 70 %
Feed Water Flow Rate : 3800 m3/hr
Permeate Flow Rate : 2700 m3/hr
Reject Water Flow Rate : 1100 m3/hr
Sanitization Temp. : 850 C
6.A.11 REVERSE OSMOSIS HOUSING:
TAG NO: RO PASS I
EQUIPMENT NAME: Reverse Osmosis Housing
EQUIPMENT LOCATION: After RO High Pressure I
FUNCTION: RO membranes are housed in the housing.
TECHNICAL SPECIFICATION:
No. of Housing : One
No. of Membranes in RO Housing : 4 Nos.
Make of Housing : HydroPure Systems
Material of Construction : SS 304
Diameter : 204 mm
Length : 4060 mm
Thickness : 2.5 mm
Surface Finish of RO Housing : Internally < 0.4 Ra
Externally mirror up to 180 grit
Maximum Flow rate for housing : 4000 LPH
Permeate flow rate from RO Pass I is 2.7 m3/hr.
6.A.12 REVERSE OSMOSIS HIGH PRESSURE PUMP-II:
TAG NO: ROHP II
EQUIPMENT NAME: RO High Pressure Pump II
EQUIPMENT LOCATION: After RO pass I
FUNCTION: For pumping of water to RO pass II system.
TECHNICAL SPECIFICATION:
Quantity : One
Type : Vertical Multistage Pump
Flow rate : 2.7 m3/hr (2700 LPH)
Pressure : 9 kg/cm2
Material of Construction : SS 316 wettable parts
Voltage Requirement : 415 volts
Make : Grundfos
6.A.13 REVERSE OSMOSIS MEMBRANES:
EQUIPMENT NAME: Reverse Osmosis Membranes

EQUIPMENT LOCATION: Within the RO Housing


FUNCTION: RO membranes reduce the TDS & microbial load in the water. The semipermeable reverse osmosis membrane has molecular weight cut off less than 150
MWCO. The Reveres Osmosis membrane acts as positive barrier to remove dissolved
solids, organic compounds & bacteria. Membranes consist of thin film composite type.
This will bring down the conductivity less than 25 s/cm.
TECHNICAL SPECIFICATION:
No. of Membrane : 2 Nos.
Size of Membrane : 8 Dia. & 40 Long
Type of Membrane : Thin Film Composite
Type of sanitization : Hot water
Temperature of sanitization : 850 C
Material of Construction : Polyamide
Make of Membrane : DOW.
Model : HSRO-390FF
Operating Temperature : 450 C
Recovery : 80-85 %
Feed Water Flow Rate : 2.7 m3/hr
Permeate Flow Rate : 2.2 m3/hr
6.A.14 REVERSE OSMOSIS HOUSING:
TAG NO: PWG-RO PASS II
EQUIPMENT NAME: Reverse Osmosis Housing
EQUIPMENT LOCATION: After RO High Pressure II
FUNCTION: RO membranes are housed in the housing.
TECHNICAL SPECIFICATION:
No. of Housing : One
Make of Housing : HydroPure Systems
Material of Construction : SS 316L
Diameter : 204 mm
Length : 2040 mm
Thickness : 2.5 mm
Surface Finish of RO Housing : Internally < 0.4 Ra
Externally mirror up to 180 grit
Max Feed Flow rate : 3000 LPH
6.A.15 ELECTRO DEIONIZATION UNIT:
TAG NO: EDI 01
EQUIPMENT NAME: Electro De-Ionization System
EQUIPMENT LOCATION: After RO pass II
FUNCTION: EDI bring down the conductivity of RO treated water. The water generated
from the outlet of EDI will be as per USP 34.
TECHNICAL SPECIFICATION:
No. of Unit : One
Type : Hot Water Sanitizable
Model No. : IP LXM 24 HI-3
Minimum Flow rate : 1400 ltrs/hr
Maximum Flow rate : 4200 Ltrs/hr
Normal Flow rate : 2800 ltrs/hr
End Connection : 1 TC
Operating Voltage DC : 150 250 V DC
Maximum Voltage : 300 V
Operating Current : 1 3 Amps

Maximum Current : 5 6 Amps.


Concentrate Flow rate (Reject) : 250 LPH
Pressure Drop across concentrate : 0.5 kg/cm2
Max. Working Pressure : 2.5 kg/cm2
Make of EDI : M/s. Ion Pure EDI, USA
Material of Construction of different parts:
Dilute Spacer : Polysulfone
Concentrate Spacer : Polysulfone
End Block : Polypropylene
Resin compartment O-rings : FDA-grade silicon
Anion exchange resin 1 : Styrene / DVB, strong base, type I
Anion exchange resin 2 : Styrene / DVB, strong base, type II
Cation exchange resin : Styrene / DVB, strong acid
Anion exchange membrane : Heterogeneous PE/AER
Cation exchange membrane : Heterogeneous PE/CER
Anode : Platinized Titanium
Cathode : SS 316
6.A.16 CIP TANK
TAG NO: CIP-ST
EQUIPMENT NAME: CIP Tank
EQUIPMENT LOCATION: Before CIP feed pump
FUNCTION: For Sanitization.
TECHNICAL SPECIFICATION:
Quantity : One
Make : Hydro pure
Type : Plain Tank
Working Capacity : 200 Liters
Gross Capacity : 220 Liters
Tank Dia ID : 600 mm
Shell Height : 750 mm
Design Pressure & Tempe. : 3.5 Kg/cm2 & 120oC
Design Code : cGMP
Top & Bottom : Torispherical Dished end
M.O.C. of Shell : SS 316 L
Nozzles : Triclover end
Surface Finish : Internally electro polished to <0.4 micron Ra.
Externally buffed to mirror finish

6.A.17 CIP FEED PUMP:


TAG NO: CIP CIPFP
EQUIPMENT NAME: CIP Feed Pump
EQUIPMENT LOCATION: Trolley Mounted
FUNCTION: Pumps Purified water to RO system @ 2.5 m3/hr
TECHNICAL SPECIFICATION:
Quantity : One
Type : Horizontal Multistage Pump
Flow rate : 2.5 m3/hr (2500 liter/hr)
Pressure : 2.9 kg / cm2
Material of Construction : SS 316 wettable parts
Voltage Requirement : 3 Phase, 415 volts
Make : Grundfos

6.B INSTRUMENTATION & OTHER ITEMS


6.B.1.1 PRESSURE GUAGES:
TAG NO: PG-01 / 02 / 03
INSTRUMENT NAME: Pressure Gauges
LOCATION: 1) Inlet of Multi Grade Filter
2) Outlet of Multi Grade Filter
3) Outlet of Softener
FUNCTION: To check the line pressure
TECHNICAL SPECIFICATION:
Make :

Waaree

Size of Gauge :

100 mm Dial

Range : 0-7 kg/cm2


End Connection : 3/8 BSP (M)
MOC : SS Body with SS internals
6.B.1.2 PRESSURE GUAGES:
TAG NO: PG 04 / 05 / 10
INSTRUMENT NAME: Pressure Gauges
LOCATION: 1) Inlet of 5 micron Cartridge Filter
2) Outlet of 5 micron Cartridge Filter
3) Inlet line of EDI System
FUNCTION: To check the line pressure.
TECHNICAL SPECIFICATION:
Make :
Size of Gauge :

Waaree
63 mm Dial

Range : 0 7 kg/cm2
End Connection : BSP (M)
MOC : SS Body with SS internals
Damping Liquid : Glycerin
Accuracy : 1.6 % of FS
6.B.1.3 PRESSURE GUAGES:
TAG NO: PG 06 / 07 / 08 / 09
INSTRUMENT NAME: Pressure Gauges
LOCATION: FOR TWO PASS RO-EDI SYSTEM
1) Feed line of RO pass I
2) Reject line of RO pass I
3) Feed line of RO pass II
4) Reject line of RO pass II
FUNCTION: To check the line pressure
TECHNICAL SPECIFICATION:
Make :
Size of Gauge :

Waaree
63 mm Dial

Range : 0 21 kg/cm2
End Connection : 1/4 BSP (M)
MOC : SS Body with SS internals
Damping Liquid : Glycerin
Accuracy : 1.6 % of FS
6.B.1.3 PRESSURE GUAGES:
TAG NO: CIP-PG
INSTRUMENT NAME: Pressure Gauges

LOCATION: Discharge line of CIP Feed Pump-1


FUNCTION: To check the line pressure.
TECHNICAL SPECIFICATION:
Make :

Waaree

Size of Gauge :

63 mm Dial

Range : 0 7 kg/cm2
End Connection : BSP (M)
MOC : SS Body with SS internals
Damping Liquid : Glycerin
Accuracy : 1.6 % of FS
6.B.2 ROTAMETER:
TAG NO: RM-01 / 02 / 03 / 04 / 05 / 06
INSTRUMENT NAME: Rotameter
LOCATION: 1) Inlet line of Multi Grade Filter (1000 10000 LPH)
2) Potable Water Line (500 5000 LPH)
3) RO First Pass reject line (200 2000 LPH)
4) RO Second Pass reject line (100 1000 LPH)
5) EDI Feed line (400 4000 LPH)
6) Concentrate line of EDI I (30 300 LPH)
FUNCTION: To check the line flow rate.
TECHNICAL SPECIFICATION:
Make :

George Fischer

End Connection : Tri Clover end


Type : Variable Area
Model : SK
MOC of float : SS 316
MOC of Measuring Tube : SS
MOC of end connection : Nylon 6
Accuracy class : 2.5
6.B.3 FLOW INDICATOR TOTALIZER:
TAG NO: FIT-01
INSTRUMENT NAME: Flow Indicator Totalizer
LOCATION: Outlet of Softeners
FUNCTION: To check the total line flow rate.
TECHNICAL SPECIFICATION:
Make :

Aster Technology

Model : FT-650
Line Size : 38 mm
Type : Turbine Type
End Connection : Threaded
6.B.4 FLOATY LEVEL SWITCH:
TAG NO: FLS-01
INSTRUMENT NAME: Floaty Level Switches
LOCATION: Raw Water Tank
FUNCTION: To check the Level in the tank. If the level in the tank is below the desired
level the system will give indication on the panel & will trip the system.
TECHNICAL SPECIFICATION:
Make :
Quantity :

Innovative Technologies
One

Type : Floaty type

MOC

PVC

6.B.5 LOW LEVEL SWITCH:


TAG NO: LLS-01 / 02 / 03 / 04 / 05
INSTRUMENT NAME: Low Level Switches
LOCATION:
1) NaOCl-01 Dosing Tank
2) Raw Water Tank
3) SMBS dosing system
4) ADS dosing system
5) pH correction system
FUNCTION: To check the Level in the dosing tank. If the level in the tank is below the
desired level the system will give hooter & after settable time will trip the system.
TECHNICAL SPECIFICATION:
Make :

Innovative Technology

Quantity :

05 Nos.

Type : Magnetic
MOC

PP

6.B.6 FLOW SWITCHES:


TAG NO: FS-01
INSTRUMENT NAME: Flow Switches
LOCATION: Raw Water inlet line
FUNCTION: To check the line flow.
TECHNICAL SPECIFICATION:
Make :
Quantity :

Dag Process
One

MOC

SS 316

Size

1.5

6.B.7 ORP SENSOR TRANSMITTER & CONTROLLER:


TAG NO: ORP 01
INSTRUMENT NAME: Oxidation Reduction Potential Analyzer
LOCATION: Inlet of RO pass I
FUNCTION: ORP Analyzer is provided so as to check the absence/presence of chlorine
in the feed water to the RO System. If free chlorine is sensed in the feed water it will

give an indication on the panel & open the dumping valve and dump the high
chlorinated water for 300 secs. & even if the ORP value is not below the set point it will
trip the system.
TECHNICAL SPECIFICATION:
Quantity :

One

Make :

Forbes Marshall

Range : +1000 to 1000 mV


End Connection : 1 TC end connection
MOC of Electrode : Glass
6.B.8.1 CONDUCTIVITY SENSOR TRANSMITTER & CONTROLLER:
TAG NO: CIC 01/02
INSTRUMENT NAME: Conductivity Indicator cum Controller
LOCATION: 1) Outlet of RO pass I 2) Outlet of RO pass II
FUNCTION: To check the conductivity in the water, if the conductivity in the feed water is
sensed high above a settable value then it will give an indication on the panel & open the
dumping valve and dump the high conductivity water.

TECHNICAL SPECIFICATION:
Quantity : Two
Make :

Emerson

Range : 0 200 s/cm for First Pass Permeate


0 100 s/cm for Second Pass Permeate
End Connection : 1 TC end connection.
MOC

SS 316 wettable parts

6B.8.2 CONDUCTIVITY SENSOR TRANSMITTER & CONTROLLER:


TAG NO: CIC 03
INSTRUMENT NAME: Conductivity Indicator cum Controller
LOCATION: 1) Outlet of EDI system
FUNCTION: To check the conductivity in the water, if the conductivity in the feed water is
sensed high above a settable value then it will give an indication on the panel & open the
dumping valve and dump the high conductivity water.
TECHNICAL SPECIFICATION:
Make :

Emerson

Range : 0 10 s/cm (EDI outlet)


End Connection : 1 TC end connection.
MOC

SS 316 wettable parts

6. B.9 HIGH PRESSURE SWITCH:


TAG NO: HPS 01 / 02
INSTRUMENT NAME: High Pressure Switch
LOCATION: 1) Outlet of RO High Pressure I
2) Outlet of RO High Pressure II
FUNCTION: To check the feed pressure to the RO system, if the line pressure in the feed
water is sensed high above a settable value then it will trip the entire RO-EDI system.
TECHNICAL SPECIFICATION:
Make :

Danfoss

Range : 1 to 16 bar
End Connection : 3/8 BSP (M)
MOC

SS wettable parts

Type : Seamless Bellow type pressure switch


B.10 LOW PRESSURE SWITCH:
TAG NO: LPS 01 / 02 / 03
INSTRUMENT NAME: High Pressure Switch
LOCATION:
1) Inlet of RO High Pressure I
2) Inlet of RO High Pressure II
3) Inlet of EDI unit
FUNCTION: To check the pressure in the water, if the line pressure in the feed water is
sensed low below the settable value then it will trip the entire RO-EDI system.
TECHNICAL SPECIFICATION:
Make :

Danfoss

Range : 0 to 3 bar
End Connection : 3/8 BSP (M)
MOC

SS wettable parts

Type : Seamless Bellow type pressure switch


6. B.11 LEVEL SWITCH for CIP Tank:
TAG NO: CIP LLS
INSTRUMENT NAME: Low Level Switch

LOCATION: CIP Tank


FUNCTION: To check the Level in the CIP tank. If the level in the tank is below the desired
level the system will give indication on the panel & will trip the system.
TECHNICAL SPECIFICATION:
Quantity : One
Make : Mahalaxmi
Model : SMT-16M 3 TC-AH
MOC :

SS 316

6. B.12 TEMPERATURE INDICATOR & TRANSMITTER


TAG NO: CIP TT
EQUIPMENT NAME: Temperature Transmitter
EQUIPMENT LOCATION: 1) CIP Feed Pump Discharge
FUNCTION: To check Temperature of system during Sanitization Process
TECHNICAL SPECIFICATION:
Make : Wika
Wetted material : SS 316
Range : 0 to 2000 C
Input : PT 100 (RTD)
Accuracy : + / 0.5% of F.S.
Ambient Temp : 250 C
B.13 CONTROL VALVES
TAG NO: AV 01 / 02 / 03 / 04 / 05 / 06
EQUIPMENT NAME: Control Valves
LOCATION :
1) Raw Water Inlet line
2) Before RO High Pressure I (ORP Dump)
3) Reject line of RO pass I (Auto Rinse Valve)
4) Permeate line of RO pass I (CIC Dump)
5) Reject line of RO pass II (Auto Rinse Valve)
6) Permeate line of RO pass II (CIC Dump)
FUNCTION: To monitor the plant operation in Auto/Semi-Auto mode as per the pre-set
logic & time.
TECHNICAL SPECIFICATION:
Make : Avcon
Type : Y- type Pneumatic operated ON-OFF
MOC : SS Wettable Parts
End Connection : TC end
Size : As per valve schedule
B.14 FLOW DIVERTER VALVE
TAG NO: FDV 01
EQUIPMENT NAME: Flow Diverter Valve
LOCATION: Outlet of EDI unit.
FUNCTION: To dump the high conductivity water at outlet of EDI unit.
TECHNICAL SPECIFICATION:
Make : Kumar Process
MOC : SS 316L
End Connection : TC end
Size : 1
6.B.15 SAMPLING VALVE:
EQUIPMENT NAME: SP-05 to 11

EQUIPMENT LOCATION: RO-EDI Distribution Piping


FUNCTION: To take a Sample for RO Water Analysis.
TECHNICAL SPECIFICATION:
Quantity : 07 Nos.
Make : Kumar Process
Type : Milipore Design
Size : 8 NB
M.O.C. : SS 316L
6.B.16 VALVE SCHEDULE
Sr.

Location of Valve

Tag No.

Size

Type

MOC

Before Raw Water

AV-01

32 mm

Actuated Valve

SS 304

No.
1

Tank
2

ORP dump valve

(NC)
AV-02

25 mm

Actuated Valve

SS 304

(NC)
3

RO-I Reject line (Auto

AV-03

20 mm

Flushing)
4

RO-I Conductivity

RO-II Reject line

AV-04

20 mm

RO-II Conductivity

AV-05

20 mm

Suction line of RWP-

AV-06

20 mm

Discharge line of

BV-01

1.5 NB

Suction line of RWP-

BV-02

1.25 NB

Discharge line of

BV-03

1.5 NB

MGF Inlet

SS 304

Manual Ball

SS 304

Manual Ball

SS 304

Manual Ball

SS 304

Valve
BV-04

1.25 NB

RWP-02
11

Actuated Valve

Valve

02
10

SS 304

Valve

RWP-01
9

Actuated Valve

(NC)

01
8

SS 304

(NC)

dump valve
7

Actuated Valve
(NC)

(Auto Flushing)
6

SS 304

(NC)

dump valve
5

Actuated Valve

Manual Ball

SS 304

Valve
BV-05

d40DN32

Manual Ball

UPVC

Valve
12

MGF outlet

BV-06

d40DN32

Manual Ball

UPVC

Valve
13

MGF back wash inlet

BV-07

d40DN32

Manual Ball

UPVC

Valve
14

MGF back wash

BV-08

d40DN32

outlet
15

MGF drain

Manual Ball

UPVC

Valve
BV-09

d40DN32

Manual Ball

UPVC

Valve
16

Softener-01 Inlet

BV-10

d40DN32

Manual Ball

UPVC

Valve
17

Softener-01 Outlet

BV-11

d40DN32

Manual Ball

UPVC

Valve
18

Softener-01 power

BV-12

d25DN20

water
19

Softener-01 brine

UPVC

Valve
BV-13

d40DN32

injection
20

Manual Ball

Manual Ball

UPVC

Valve
BV-14

d40DN32

UPVC

21

Softener-01 slow

Manual Ball

Rinse outlet

Valve

Softener-01 Fast

BV-15

d40DN32

Rinse outlet
22

Diversion line

Manual Ball

UPVC

Valve
BV-16

d40DN32

Manual Ball

UPVC

Valve
23

Discharge ROHP-01

BV-17

25 mm

Manual Ball

SS 304

Valve
24

Discharge ROHP-02

BV-18

25 mm

Manual Ball

SS 304

Valve
25

Discharge line of Raw

NRV-01

1.25

Water Pump 01
26

Discharge line of Raw

Conc. Inlet EDI

SS 304

Valve
NRV-02

1.25

Water Pump 02
27

Non Return

Non Return

SS 304

Valve
DV-01

DN 20

Diaphragm

SS 316

Valve
28

CIP Tank drain valve

CIP-DV-01

DN 20

Daiphragm

SS 316

Valve
29

CIP Suction Valve

CIP-DV-02

DN 20

Daiphragm

SS 316

Valve
30

CIP Discharge Valve

CIP-DV-03

DN 20

Diaphragm

SS 316

Valve
31

ORP needle valve

NV-01

Needle valve

SS 304

32

Reject line RO-01

NV-02

20 mm

Needle Valve

SS 304

33

Reject line RO-02

NV-03

20 mm

Needle Valve

SS 304

34

After NaOCl-01

SP-01

8 NB

Sampling Valve

SS 304

SP-02

8 NB

Sampling Valve

SS 304

SP-03

8 NB

Sampling Valve

SS 304

Dosing System
35

Inlet of Multi Grade


Filter

36

Outlet of Multi Grade


Filter

37

Outlet of Softener-01

SP-04

8 NB

Sampling Valve

SS 304

38

After SMBS dosing

SP-05

8 NB

Sampling Valve

SS 316

SP-06

8 NB

Sampling Valve

SS 316

SP-07

8 NB

Sampling Valve

SS 316

SP-08

8 NB

Sampling Valve

SS 316

system
39

After ADS dosing


system

40

After pHC dosing


system

41

After 5-micron
Cartridge Filter

42

After RO pass-I

SP-09

8 NB

Sampling Valve

SS 316

43

After RO pass-II

SP-10

8 NB

Sampling Valve

SS 316

44

After EDI system

SP-11

8 NB

Sampling Valve

SS 316

6. C.1 PLC PANEL:


TAG NO.: PLC Panel
INSTRUMENT NAME: MCC cum PLC panel.
LOCATION: Mounted on the SKID

FUNCTION: To operate all Pumps, drives, control valves and instrumentation. To operate
predefined operational logic of the plant. To operate the plant with predefine interlock
logic for safety and trouble free operation. To collect predefine process parameter for
equipment validation.
TECHNICAL SPECIFICATION:
MOC of Panel : SS 304 with matt finish
Digital Input and Output Card
Make : Mitsubishi
Model : FX3G 60MR+FX2N 8ER
Digital Input : 40, 24VDC input
Digital Output : 28, 230VAC output
Analog Input/Output Card
Make : Mitsubishi
Model : FX2N 8AD + 5A
Analog Input : 12 Nos.
Analog Output : 01 No.
MMI ( Monochrome)
Make : Mitsubishi
Catalogue No. : E 1043
Communication Port : RS-232 (DF1)
Printer Port : RS-232
Display : Touch Screen
Size : 3.5
6.C.2 PLC INPUT/OUTPUT DETAILS:
Sr.No

D/Input

Input Description

D/Output

Output description

X0

RWP-01 start/stop

Y0

NaOCl-01

X1

RWP-01 trip

Y1

SMBS-01

X2

RWP-02 start/stop

Y2

ADS-01

X3

RWP-02 trip

Y3

PHC-01

X4

LLS NaOCl-01

Y4

RWP-01

X5

FS-01

Y5

RWP-02

X6

HL Raw Water Tank

Y6

ROHP-01

X7

ML Raw Water Tank

Y7

ROHP-02

X10

LL Raw Water Tank

Y10

EDI

10

X11

ROHP 1 start/stop

Y11

PLP-01

11

X12

ROHP 1 trip

Y12

PLP-02

12

X13

ROHP 2 start/stop

Y13

HIUV

13

X14

ROHP 2 trip

Y14

PWST Heater

14

X15

EDI start/stop

Y15

CIPFP

15

X16

EDI trip

Y16

CIP Heater

16

X17

CIPFP start/stop

Y17

AV-01

17

X20

CIPFP trip

Y20

AV-02

18

X21

CIP HTR Start / Stop

Y21

AV-03

19

X22

LLS SMBS-01

Y22

AV-04

20

X23

LLS ADS-01

Y23

AV-05

21

X24

LLS-pHC-01

Y24

AV-06

22

X25

LPS-01 ROHP-01

Y25

FDV-01

23

X26

LPS-02 ROHP-02

Y26

PWD-FDV-01

24

X27

LPS-03 EDI

Y27

PWD-AV-01

25

X30

HPS-01 ROHP-01

Y30

VF HTR

26

X31

HPS-02 ROHP-02

Y31

Hooter

27

X32

LLS CIPT

Y32

Spare

28

X33

PLP 1 start / stop

Y33

Spare

29

X34

PLP 2 start / stop

30

X35

PLP 1/2 trip

31

X36

PWST Ceramic Heater

32

X37

Auto Manu. Switch for RO-

Analog

A/O description

EDI
33

X40

Auto Manu. Switch for


Purified Water Distribution
System

34

X41

EMERGENCY

35

X42

ACCEPT

36

X43

Air Pressure Switch

37

X44

Spare

38

X45

Spare

39

X46

Spare

40

X47

Spare

Sr.No

Analog

A/I description

Input

Output

AI-1

PWG ORP 01

AI-2

PWG CIC 01

AI-3

PWG CIC 02

AI-4

PWG CIC 03

AI-5

PWD CIC 01

AI-6

PWD FT 01

AI-7

PWD TT 01

AI-8

PWD LIC

AI-9

CIP TIC

10

AI-10

EDI Current

AO-1

PLP VFD

6.C.3 System Description & Process Logics for Purified water Generation System
Sr.

Interlock Description

Action Taken

No.

Indication

Audio

on MMI

Visual
Alarm

High Level in Raw

Will close Actuated Valve AV-

Water Tank

01

YES

YES

Medium Level in Raw

Will open Actuated Valve AV-

Water Tank

01

YES

NA

Low Level in Raw

Will stop RWP-01 / 02

YES

YES

Will start RWP-01 / 02

YES

NA

Low Level in NaOCl-

Will trip NaOCl-01 Dosing

YES

YES

01 Dosing Tank.

Pump & will close AV-01


YES

YES

Water Tank
4

Medium Level in Raw


Water Tank

Low flow in Raw

Will trip NaOCl-01 Dosing

Water inlet line

Pump & will close AV-01

High Totalized flow

It Should give Alarm for

at outlet of softener

Regeneration.

Emergency Stop

10

11

YES

YES

Should Trip the System.

YES

YES

Low level in SMBS 1

RWP-01 will stop & RO-EDI

YES

YES

Dosing tank

System will stop.

Low level in ADS

RWP-01 will stop & RO-EDI

YES

YES

Dosing tank

System will stop.

Low Level in pH

RWP-01 will stop & RO-EDI

YES

YES

Correction Dosing

System will stop.

YES

YES

YES

NA

YES

YES

This will trip the ROHP 01

YES

YES

Repeated Low

After ROHP 01 trips for 4

YES

YES

Pressure at ROHP

times in a minute. This will

01 suction

trip the entire plant.

High Pressure at

RO EDI system will trip.

YES

YES

High Conductivity at

1) If the conductivity is

YES

YES

RO pass I outlet

above the set point, it will

YES

NA

YES

YES

tank
12

High ORP-01 Value.

1) Free chlorine will pass


through and ORP sensor will
sense free chlorine. Inturn the
ORP value will increase above
the set point. This will open
the ORP dumping valve AV02.

2) ORP comes down


within the desired limit. After
30 secs. of consistent
reading, below the set value it
will close the AV-02. Allow the
water to feed to the RO
system. The entire system
will start automatically.

3) If the ORP value is high


for more than 300 secs. it will
trip the plant.
13

Low Pressure at
ROHP 01 suction

14

15

ROHP 01 discharge
16

open the dumping valve AV04.

2) After 30 secs. of
consistent reading, below the
set value, it will close the AV04. Allow the water to feed to
the 2nd Pass of RO system.
The entire system will start
automatically.

3) If the RO pass-I outlet


conductivity is high for more

than 300 secs. It will trip the


plant.
17

Low Pressure at

This will trip the ROHP II

YES

YES

RO EDI system will trip.

YES

YES

High Conductivity at

1) If the conductivity is

YES

YES

RO pass II outlet

above the set point, it will

YES

NA

YES

YES

YES

YES

YES

YES

YES

NA

YES

YES

Ceramic Heater will be ON.

YES

NA

Ceramic Heater will be OFF.

YES

NA

Low Level in CIP

Should trip the Heater & CIP

YES

YES

Tank

Feed Pump.

Emergency Stop

RO-EDI System will trip.

YES

YES

ROHP II
18

High Pressure in
ROHP II discharge

19

open the dumping valve AV06.

2) After 30 secs. of
consistent reading, below the
set value, it will close the AV06. Allow the water to feed to
the EDI system. The entire
system will start
automatically.

3) If the RO pass-II outlet


conductivity is high for more
than 300 secs. it will trip the
plant.
20

21

Low pressure at EDI

Low pressure at EDI inlet, will

inlet

trip EDI unit.

High Conductivity at

1) If the conductivity is

EDI outlet

above the set point, it will


open the dumping valve FDV01.

2) After 30 secs. of
consistent reading below the
set value, it will close the FDV01. Allow the water to feed to
the purified water tank. The
entire system will start
automatically.

3) If the EDI outlet


conductivity is high for more
than 300 secs. it will trip the
plant.

22

Low temperature at
CIP supply line

23

High temperature at
CIP supply line

24

25

7. DRAWINGS REQUIRED

SR. NO.

DESCRIPTION

DRAWING NO.

REV

P&ID for Pretreatment & Purified

HPS/PR150/PWG/DR01

Water Generation & Distribution


System
2

Skid Drawings

HPS/PR150/PWG/DR02

Isometric for Pretreatment System

HPS/PR150/PWG/DR03

Isometric for RO-EDI System

HPS/PR150/PWG/DR04

Control Panel Drawing

HPS/PR150/PWG/DR05

CIP Tank Drawing

HPS/PR150/PWG/DR06

8. SUPPORTING UTILITIES
SR.

Equipments /

NO.

Instruments

Location

Utilities

Specification

Scope

Pretreatment

PW

Raw Water

7000 LPH

ZCHL

Plant

Generation

Power

3 phase, 430V, 50

ZCHL

Plant
Control Panel

RO Plant
Room

RO Plant

Hz

RO Plant

Compressed

MOC of tube is

Room

Filtered

PU, Press 6

regulated Air

kg/cm2

9. PRE-QUALIFICATION CHECK LIST


9.1 HYDRAULIC PRESSURE TEST
9.2 DOCUMENTATION CHECK
9.3 INTERLOCK CHECKS
9.4 OPERATIONAL CHECKS
10. LIST OF DOCUMENTS REQUIRED FORGENERATION SYSTEM
CODE

DOCUMENTS REQUIRED

Manufacturers Manuals Preventive Maintenance (O.M.)

MOC Certificate

Leak Test Reports / Hydro Test Report

Sanitization Reports

Cleaning / Flushing Reports

Manufacturers Catalogue

Test Certificate

Guarantee / Warranty Certificate

Basis of Design

11. DESIGN QUALIFICATION REPORT


APPROVAL
Approved / Not Approved
Signature
Approved By

Vendor

Executive name

Client

Engineering

ZCHL

Head-Operations
Head-Quality

Abbreviation

Description

URS

User Required Specification

FRS

Functional Required Specification

cGMP

Current Good Manufacturing Practice

QA

Quality Assurance

USP

United States Pharmacopoeia

WHO

World Health Organization

ROHP

RO High Pressure Pump

CIPFP

CIP Feed Pump

SMBS

Sodium Meta bisulfate

ADS

Antiscalent dosing System

pHC

pH Correction

CF

Cartridge Filter

RO

Reverse Osmosis

EDI

Electro-Deionization

CIP

Cleaning In Place

Ppm

Mg/Ltrs OR Parts Per Million

NTU

Neblometric Turbidity Unit

MWCO

Molecular Weight Cut-Off

CFU/ml

Colony Forming Unit per ml

TSS

Total Suspended Solids

TDS

Total Dissolved Solids

TOC

Total Organic Carbon

TVC

Total Viable Count

TBC

Total Bacterial Count

TC

Tri Clover

P&ID

Process Flow & Instrumentation Diagram

LPH

Liters Per Hour

12. ABBREVIATIONS
PG

Pressure Gauge

RM

Rotameter

LLS

Low Level Switch

PLC

Programmable Logical Controls

MMI

Manual Machine Interface

ORP

Oxidation Reduction Potential

CIC

Conductivity Indicator cum Controller

HPS

High Pressure Switch

LPS

Low Pressure Switch

MOC

Material Of Construction

CPVC

Chlorinated Poly-Vinyl Chloride

SS

Stainless Steel

PP

Poly-Propylene

FRP

Fiber Reinforced Plastic

HDPE

High Density Poly Ethylene

HOS

Height Of Shell

Sharing

ABOUT AUTHOR

PHARMACEUTICAL GUIDANACE

RELATED POSTS

SEPTEMBER 3, 2016

Performance Qualification
Protocol of Tunnel Sterilizer

AUGUST 22, 2016

DESIGN QUALIFICATION OF BIN


WASHING & DRYING SYSTEM

AUGUST 21, 2016

DESIGN QUALIFICATION
CARTONING MACHINE HI CART
(BLISTER PACKING)

LEAVE A REPLY

Your Comment

Your Name

Your Email

Your Website

POST COMMENT

GO BACK

ABOUT

RECENT POST

Pharmaceutical Guidance

Performance Qualification Protocol of Tunnel Sterilizer

Pharma Guidance is Indias online complete Pharma


solution platform, where people can connect with each
other to share knowledge, buy the required Pharma

SOP on Quality Risk Management

SHARING

related Document .The vision is to support the all


manufacturers of pharmaceutical company to prepared
the current and update document to complies the cGMP
norms and also give the updated knowledge to new
Pharma beginner.