Escolar Documentos
Profissional Documentos
Cultura Documentos
RFQ
Page 1 of 12
Table of Content
1. Introduction ........................................................................................................................................................
2. Objective ..............................................................................................................................................................
3. Scope ....................................................................................................................................................................
4. RFQ Goals ...............................................................................................................................................................
5. RFQ Timelines ........................................................................................................................................................
6. Instruction to Tendering Parties ...........................................................................................................................
7. Tendering Party Offer Submission .......................................................................................................................
8. Payment Terms ........................................................................................................................................................
RFQ
Page 2 of 12
1. INTRODUCTION
EPTSC is a Multinational technical service provider company and one of ORASCOM Groups of
companies which is considered as one of the largest telecom service provider in Pakistan providing all
types of technical services in telecommunication field.
RFQ
Page 3 of 12
2. OBJECTIVE
The objective of this assignment is to have physical verification and updated database of non-current
assets, comprising of both network and non-network assets, distributed across the geographic area of
operation.
1. The audit & database population would cover the following aspects of the cell site in detail
Space
Power
Tower
All Telco & Non Telco
RFQ
Page 4 of 12
3. SCOPE
RFQ Scope
Audit &
Database
Application
Vedio
Logging
Conduct physical verification of all the assets on all locations (including sites, warehouses, exchanges,
office locations, etc.) and further ensuring the availability of information in the system
Civil
Power
Telco
Design
AC & DC
RF & MW
3.1.1 Civil
RFQ
Page 5 of 12
In case of shared site (Host\Guest) layout should indicate OMO equipment installations
Audit of Tower:
Check type of tower\pole installed. (Self-Support \ Monopole \ Mast \ Wall Mount \ Tripole\ Pole \ Railing \ Indoor \ Other
Check total no of RF antennae installed and examine physical condition
Check total no of MW \VSAT antennae installed and examine physical condition
Check antenna assembly and M-Tilt kit is installed and working fine
Measure diameter\height\azimuth of each MW\VSAT antenna installed
Check total No of RRU installed and examine physical condition
Check free\open space on Tower for further installations
Take picture of each antenna(RF\MW) from antenna height (to check any immediate
blockade in front of antenna)
Snaps of all tower legs clearly showing installed equipment
Physical inspection of structure to identify condition
RFQ
Page 6 of 12
3.1.2. Power
3.1.3. Telco
RFQ
Page 7 of 12
Note: It should cover both, customer equipment and OMO equipment in case of shared site
3.1.4. Design
Audit of RF Design:
Measure Height at which antenna is installed (HBA)
Measure Heights at which RRU are installed
Measure of Direction in which antenna is serving (Azimuth)
Measure of antenna E-Tilt (Electrical tilt)
Measure of antenna M-Tilt(Mechanical tilt)
Check and note E-Tilt value physically appearing on RET
Audit of MW Design:
Measure height at which MW antenna is installed (HBA)
Measure of Direction in which MW antenna is serving (Azimuth)
Measure of diameter of MW antenna\dish
Reconciliation of assets as per record with physical existence, based on their existing asset IDs
Allotment of unique serial numbers to all assets and update site-wise assets listing accordingly
Tagging of all the equipment with the respective serial numbers assigned
Mapping of existing asset IDs with the newly assigned serial numbers
Identification of obsolete/ damaged/ old equipment, if any
Discrepancies between physical assets and FAR (Oracle Financials), if any, are to be reconciled
and rectification entries to be recorded
Consideration of other matters which are considered necessary for conducting the exercise
RFQ
Page 8 of 12
3.1.3. Database
Database need to keep all type of site records with below properties.
Civil
Module
Power
Module
Telco
Module
Design
Module
Web accessible
Four basic modules for civil, power, telco & design respectively.
Each module with multiple forms for data entry (form design should be easy and flexible)
Able to extract data from different tools and update database
Issue activity based WO and automatically update records on completion of activity
Able to generate different types of reports in different pre-defined formats
Able to store different type of documents\scanned copies in an organized manner
Compatible with MS Office (Word, Excel, Visio, PowerPoint ), AutoCAD, PDF etc
Provision of different Levels of Application Access right e.g. read only, read/write etc.
Note:
In case site is shared between different operators OMO installations details will be part of
database.
All the non-operational equipment will also be recorded during the audit and should be part of
the data collection and entered in database application.
3.2. Application
Application will be used to access\update database and it should have following properties
RFQ
Page 9 of 12
4. RFQ GOALS
Customer expects to achieve the following objectives through the Tendering process:
Obtain the most efficient proposal for how to evaluate\audit cell site equipment\structure
precisely with state of the art web based database through a flexible approach (which enables
Customer to pick services\elements it desires, based on BoQs and pricing offered by the selected
Tendering Party).
Professionalize and standardize the network structure and database through close collaboration
with and among the selected Tendering Parties;
Select the solution that over time is financially most attractive.
Obtain aggressive, leading edge pricing, terms and conditions for Customer throughout and after
the duration of the contract.
Introducing the state of the art techniques\procedure\database that will offer substantial benefits
in terms of functionality, future-proof, customer experience and cost.
5. RFQ TIMELINES
The RFQ process is described in the following sub-sections. Customer reserves the right to amend and/or
terminate the RFQ process at any point. This RFQ also does not create any contractual or other obligation
on Customer. Customer is under no obligation to any Tendering Party in regards to any response provided
to this RFQ.
The Tendering Parties must ensure that all deadlines specified for the document are met timeously. The
degree of completeness and the quality of the response will be considered as part of the evaluation process.
RFQ
Page 10 of 12
6.4. CONFIDENTIALITY
This RFQ together with any other information given by Customer must be returned upon request. It is
understood that this RFQ is confidential and proprietary and contains privileged information, part of
which may be copyrighted and is communicated and received by you on the condition that no part thereof,
or any information concerning it may be copied, disclosed or furnished to others without the prior written
consent of Customer (which may be granted or withheld in Customers entire discretion). The RFQ is
made available on the condition and understanding that the receiving party proposes to file a response.
However, Tendering Parties will be bound by the contents of this paragraph whether or not they submit
a proposal or respond in any other way to this RFQ.
All information received by Customer concerning the Tendering Party's information or documents, will
be treated as confidential. Customer will not disclose information provided in response to this RFQ to
anyone other than to its parent and affiliated companies, respective directors, managers and employees,
who need to have access to the information for the purposes and the scope of the present procedure.
Any Confidential Information will be treated on the terms and conditions of this Clause and the Receiving
Party shall:
Keep the Confidential Information confidential;
Not disclose the Confidential Information to any other person other than with the prior written consent
of the Disclosing Party or in accordance with this clause;
Not use the Confidential Information for any purpose other than with respect to this RFQ;
Disclose the Confidential Information to its employees (the "Recipient") to the extent that it is
necessary for the purposes of this RFQ; and
Shall procure that each Recipient has been made aware of, and complies with, all the Tendering
Receiving Party's obligations of confidentiality under this RFQ as if the Recipient was a Party to this
RFQ.
RFQ
Page 11 of 12
6.6. DISCLAIMER
Customer has compiled this RFQ in good faith, however its accuracy cannot be guaranteed. Customer
shall not accept liability for errors or omissions. No guarantee can be given nor should any be implied with
regard to the accuracy of the data, projections, targets or estimates stated in this document.
Amendments to the information contained in this document shall be provided at the sole discretion of
Customer, which reserves the right to withhold information without stating a reason.
8. PAYMENT TERMS
Standard Customer payment terms.
End of Document
RFQ
Page 12 of 12