Você está na página 1de 1

0

100

This drawing may have been reduced

DRAWING PROVIDED FOR REFERENCE ONLY.

Reference Drawings

BASE BUILD SERVICE DRAWINGS SHOULD BE REVIEWED TO ASCERTAIN


EXTENT OF SERVICES

original scale : 100mm

Legend

Notes

Hatch indicates base build work by


main contractor

LOCATION PLAN

Indicates bulkhead @ +4075mm above +0mm


concrete slab within base build package.
See IDA-0126 for details.
To be decorated according to specification
Section EX09900
Paint ref.: Dulux 00NN 13/000

DO NOT SCALE FROM THIS DRAWING


THIS DRAWING IS SET UP AT A1 SIZE
THIS DRAWINGS IS TO BE READ IN
CONJUNCTION WITH THE FOLLOWING
SPECIFICATION NUMBERS:

CC

CC

Date

Drawn

Description

Revision

Suspended open cell ceiling @ +4075mm above


+0mm concrete slab within base build package.
See IDA-0126 for details.

Approved

B2 issue for tender


RP

Indicates 2 No. projectors and extent of projection


to curved wall.
Projectors to be suspended from ceiling with steel
supports.

15.05.09

Full height partition.


500m width painted cold formed metal framed
wall 3375mm to underside of open cell ceiling.
See spec for details.
To be decorated according to specification
Section EX09900
Paint ref.: Dulux 50BG 38/011

SETWORKS
SHOWCASES
SPECIAL EFFECTS
SHOW EFFECTS CONTROL PANEL
MECHANICAL INTERACTIVES
MODEL MAKING
GRAPHIC PRODUCTION
AV/IT HARDWARE
INTERACTIVE SOFTWARE
EXHIBITION LIGHTING
SPARE COMPONENTS

Checked

EX100
EX110
EX120
EX125
EX140
EX150
EX200
EX300
EX400
EX500
EX900

Oil Drop installation.


See YF-01-07, YF-01-08 & YF-01-09 for details.
Note: All clouded zones indicate underfloor and
ceiling void areas enabled for services.
Please see drawings YF-01-19 to YF-01-23 for all
mechanics and specifications for the Oil Drop.

Revisions

Indicates overhead steelwork within base build


package.
See IDV-0245 for details.

KUWAIT OIL CO.


K. S. C.
Indicates current layout for ventilation within base
build package.
See IDM-3303 for details.
Project

NEW DISPLAY CENTRE


AHMADI, KUWAIT
YOUR FUTURE
YF-01: HVAC OVERLAY

Title

Scale

1:50

(when plotted @ A1)

Drawn RP
Date

05.06.08

Checked

CC

Approved CC

Date

30.09.08

Date

15.05.09

PLAN

DRAWING PROVIDED FOR REFERENCE ONLY.


YF-01: HVAC & STEELWORK OVERLAY

BASE BUILD SERVICE DRAWINGS SHOULD BE REVIEWED TO ASCERTAIN


EXTENT OF SERVICES

Project number

EA / 1703

Drawing number

SDA-YF-01-04

Revision

B2

Você também pode gostar