Você está na página 1de 8

VPA-Engineering, 2016

Project: BKK-15

10/6/2016 6:22:00 PM

BKK-15
Calculation Note
Allowable Bearing Capacity of Pile

Prepared by: PHAN Sophea, Civil Engineer


Checked by: PANN Vily, Director VPA Engineering

Report No.:

BKK-PC-NdC-20161006.doc

Page 1

VPA-Engineering, 2016
Project: BKK-15

10/6/2016 6:22:00 PM

Table of Contents
1.

HYPOTHESES ................................................................................................................................ 3

2.

CALCULATION METHOD ............................................................................................................... 3


2.1.

3.

ANNEXE 1 ............................................................................................................................... 3

RESULT ........................................................................................................................................... 3

ANNEX 1:METHOD FOR CALCULATION .............................................................................................. 4


ANNEX 2: EXCEL CALCULATION OF ALLOWABLE BEARING CAPACITY ....................................... 6
ANNEX 3: SOIL DATA ............................................................................................................................. 7

Report No.:

BKK-PC-NdC-20161006.doc

Page 2

VPA-Engineering, 2016
Project: BKK-15

10/6/2016 6:22:00 PM

Calculation Note
1. Hypotheses
In this report, the Allowable bearing capacity of pile is calculated according to Standard Penetration
Test (SPT). All soil data are extracted from Soil Test Report from LST ( Laboratory of Soil Test for
foundation) which was conducted on 17 January 2014.

Borehole No 1
Pile size D=100mm
Pile depth L=32m
Safty Factor for Soil Fs=3
Concrete Compression Strength fck=35 MPa

2. Calculation Method
It is written in ( Annexe 1).

3. Result
The table below represents the summary of Allowable bearing capacity of Pile load
(QAll) (Annexe 2 ).
Pile
Size
(m)

Pile depth from


ground surface
L (m)

Allowable End
bearing Load
Qb,all(T)

Allowable Friction
Load
Qf,all(T)

Allowable bearing
Pile Load
QAll= Qb,all + Qf,all (T)

1.00

32
34.5
35

181.06
189.02
226.82

184.57
244.84
258.57

365.63
433.86
485.40

Report No.:

BKK-PC-NdC-20161006.doc

Page 3

VPA-Engineering, 2016
Project: BKK-15

10/6/2016 6:22:00 PM

Annexe 1: Calculation Method

Allowable bearing capacity of Pile load (QAll ) = Allowable End bearing Load (Qb,all )
+Allowable Friction Load (Qf,all)
QAll (T)= Qb,all (T) + Qf,all (T)
Safty Factor for Soil Fs=3

Report No.:

BKK-PC-NdC-20161006.doc

Page 4

VPA-Engineering, 2016
Project: BKK-15

Report No.:

BKK-PC-NdC-20161006.doc

10/6/2016 6:22:00 PM

Page 5

VPA-Engineering, 2016
Project: BKK-15

10/6/2016 6:22:00 PM

Annexe 2: Excel for calculation of allowable bearing capacity of pile


BOREHOLE : BH01
Layer

Top Level Bottom Level

Spacing

Soil Sampling

Pile Length

SPT

1-Made Ground
2-Soft Lean organic Silty CLAY
3-Briwnish grey Lean CLAY
4-Dark Grey Lean CLAY

5-Dark Grey Soft Lean Organic Silty CLAY


6-Dark Grey Soft Lean Peat and Other Organic Silty CLAY
7-Loose Organic Silty Fine SAND
8-Very Stiff Clayed Fine SAND

9-Very Stiff Lean Clayed Fine to Coarse SAND

10-Hard or very dense Clayed Coarse SAND

Toe Bearing
N

N60

0.00
0.00
1.52
1.52
3.04
3.80
3.04
4.56
4.56
1.52
2.28
2.28
4.56
12.16
19.00
23.56
19.00
20.52
30.40
40.28
58.52
69.16
69.16
69.16
72.2
86.64

0.00
1.50
2.00
3.50
5.00
6.50
8.00
9.50
11.00
12.50
14.00
15.50
17.00
18.50
20.00
21.50
23.00
24.50
26.00
27.50
29.00
30.50
32.00
33.50
34.50
35.00

[m]

0
1.5
0.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1
0.5

0.00
1.50
2.00
3.50
5.00
6.50
8.00
9.50
11.00
12.50
14.00
15.50
17.00
18.50
20.00
21.50
23.00
24.50
26.00
27.50
29.00
30.50
32.00
33.50
34.50
35.00

Skin Friction

qb

N60

[kN/m2]
0
0
2
2
4
5
4
6
6
2
3
3
6
16
25
31
25
27
40
53
77
91
91
91
95
114

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

[m]

100
100
150
150
150
150
150
150
150
150
150
150
100
100
100
100
100
100
100
100
100
100
100
100
100
100

Report No.:

0
0
228
228
456
570
456
684
684
228
342
342
456
1216
1900
2356
1900
2052
3040
4028
5852
6916
6916
6916
7220
8664

fsi
[kN/m2]

0
0
1
2
3
5
5
5
6
4
3
3
5
11
21
28
28
26
34
47
65
84
91
91
93
105

0.00
0.00
0.76
1.52
2.28
3.42
3.42
3.80
4.56
3.04
1.90
2.28
3.42
8.36
15.58
21.28
21.28
19.76
25.46
35.34
49.40
63.84
69.16
69.16
70.68
79.42

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2.00
2.00
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
2.00
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30

0.00
0.00
2.51
5.02
7.52
11.29
11.29
12.54
15.05
10.03
6.27
7.52
11.29
16.72
51.41
70.22
70.22
65.21
84.02
116.62
163.02
210.67
228.23
228.23
233.24
262.09

60

0.8

0.95

Pile Bearing Capacity (t)


qsi
[kNm/m2]
0.00
0.00
1.25
7.52
11.29
16.93
16.93
18.81
22.57
15.05
9.41
11.29
16.93
25.08
77.12
105.34
105.34
97.81
126.03
174.93
244.53
316.01
342.34
342.34
233.24
131.04

qsi
[kNm/m2]
0.00
0.00
1.25
8.78
20.06
36.99
53.92
72.73
95.30
110.35
119.76
131.04
147.97
173.05
250.17
355.51
460.85
558.66
684.68
859.62
1104.15
1420.16
1762.50
2104.84
2338.08
2469.13

BKK-PC-NdC-20161006.doc

Dia. 1.00

Dia. 1.00

Qb
[kN]

Qs
[kN]

Qu
[T]

Qall
[T]

0
0
179
179
358
448
358
537
537
179
269
269
358
955
1492
1850
1492
1612
2388
3164
4596
5432
5432
5432
5671
6805

0
0
4
28
63
116
169
228
299
347
376
412
465
544
786
1117
1448
1755
2151
2701
3469
4462
5537
6613
7345
7757

0
0
18
21
42
56
53
77
84
53
64
68
82
150
228
297
294
337
454
586
806
989
1097
1204
1302
1456

0
0
6
7
14
19
18
26
28
18
21
23
27
50
76
99
98
112
151
195
269
330
365.63
401.48
433.86
485.39

Page 6

VPA-Engineering, 2016
Project: BKK-15

10/6/2016 6:22:00 PM

Annexe 3: Soil Data

Report No.:

BKK-PC-NdC-20161006.doc

Page 7

VPA-Engineering, 2016
Project: BKK-15

Report No.:

BKK-PC-NdC-20161006.doc

10/6/2016 6:22:00 PM

Page 8

Você também pode gostar