Você está na página 1de 4

THE ISRAEL ELECTRIC CORPORATION LTD

ENGINEERING DIVISION
SUBSTATION PLANNING SECTOR

SPEC: STR-1386

Appendix 1

REQUIRED TESTS FOR SWITCHGEAR AND IT'S


COMPONENTS

Test denomination

1.

SWITCHGEAR

1.1.

Type tests

Standard

Sub
clause

IEC 62271-200

Clause 6

1.1.1. Power frequency withstand voltage


IEC 62271-200
test according to ..
Value of test voltage-common value
(kV r.m.s./min)

6.2.6

1.1.2. Lightning impulse withstand voltage IEC 62271-200


test according to ..
Value of test voltage-common value
(kV peak) .

6.2.6

1.1.3. Power frequency withstand voltage


test on auxiliary and control circuits
according to .
Value of test voltage (kV r.m.s./min):

IEC 62271-200

6.2.10

1.1.4. Measurement of the resistance of


the main circuit according to .

IEC 62271-200

6.4

1.1.5. Temperature rise tests (contacts,


terminals, auxiliary and control
equipment etc.) ..

IEC 62271-200

6.5

1.1.6. Short-time withstand current test .


Value of test current (kA r.m.s./sec)

IEC 62271-200

6.6

1.1.7. Verification of the IP coding

IEC 62271-200

6.7.1

1.1.8. Tightness test

IEC 62271-200

6.8

Value

50/1

125

2/1

1.5/5

Page 1 of 4

THE ISRAEL ELECTRIC CORPORATION LTD


ENGINEERING DIVISION
SUBSTATION PLANNING SECTOR

SPEC: STR-1386

Appendix 1

1. REQUIRED TESTS FOR SWITCHGEAR (cont.)

Test denomination

Standard

Sub
clause

1.1.9.

Electromagnetic compatibility
(EMC) test

IEC 62271-200

6.9

1.1.10

Verification of making and breaking


capacities

IEC 62271-200

6.101

1.1.11

Mechanical operation test

IEC 62271-200

6.102

1.2.

Routine tests

IEC 62271-200 Clause 7

1.2.1.

Dielectric test on the main circuit


according to ..
Value of test voltage:
(kV r.m.s./min) .

IEC 62271-200

1.2.2.

Tests
. on auxiliary and control
circuits
2
according to

IEC 62271-200

7.2

1.2.3.

Tightness test

IEC 60694

7.4

1.2.4.

Design and visual checks

IEC 62271-200

7.5

1.2.5

Mechanical operation test ..

IEC 62271-200

7.102

1.3

Special tests

1.3.1

Seismic qualification dynamic


analysis .

Value

7.1
50/1

IEEE Std
693-2005

Page 2 of 4

Moderate
Level

THE ISRAEL ELECTRIC CORPORATION LTD


ENGINEERING DIVISION
SUBSTATION PLANNING SECTOR

SPEC: STR-1386

Appendix 1

2. REQUIRED TESTS FOR CIRCUIT BREAKER

Standard

Sub
clause

IEC 62271-100

Table 7

2.1.1. Dielectric tests as follows:


a. Power frequency voltage test .

IEC 62271-100
IEC 62271-100

6.2
6.2.6.1

b. Lightning impulse voltage test .

IEC 62271-100

6.2.6.2

2.1.2. Measurement
.
of the resistance of the
main2 circuit .
2.1.3. Temperature rise tests .
2.1.4. Short-time withstand current and peak
withstand current test ..
2.1.5. Additional tests on auxiliary and
control circuits
2.1.6. Mechanical operation test at ambient
air temperature .
2.1.7. Short circuit current making and
breaking test

IEC 62271-100

6.4

IEC 62271-100
IEC 62271-100

6.5
6.6

IEC 62271-100

6.10

IEC 62271-100

6.101.2

2
2.1.

2.2.

Test denomination

CIRCUIT BREAKER
Type tests

class M2

IEC 62271-100

IEC 62271-100

Routine tests

6.102
6.106

2.2.1. Dielectric test on main circuit

IEC 62271-100

7.1

2.2.2. Tests on auxiliary and control circuits

IEC 62271-100

7.2

2.2.3. Measurement of the resistance of the


main circuit

IEC 62271-100

7.3

2.2.4. Design and visual checks

IEC 62271-100

7.5

2.2.5. Mechanical operating tests

IEC 62271-100

7.101

Page 3 of 4

Value

THE ISRAEL ELECTRIC CORPORATION LTD


ENGINEERING DIVISION
SUBSTATION PLANNING SECTOR

SPEC: STR-1386

Appendix 1

3. REQUIRED TESTS FOR DISCONNECTORS AND


EARTHING SWITCHES

Test denomination

Standard

Sub
clause

DISCONNECTORS AND EARTHING SWITCHES


Type tests

IEC 62271-102

Clause 6

3.1.1. Dielectric tests

IEC 62271-102

6.2

3.1.2. Measurement of the resistance of the


main circuit

IEC 62271-102

6.4

3.1.3. Temperature rise tests (contacts,


terminals, auxiliary and control
equipment etc.)

IEC 62271-102

6.5

3.1.4. Short-time withstand current and peak


withstand current test

IEC 62271-102

6.6

3.1.5. Test to prove the short-circuit making


performance of earthing switch

IEC 62271-102

6.101

3.1.6. Mechanical operation test at ambient


air temperature

IEC 62271-102

3.1.

class E2

6.102
class M2

IEC 62271-102

Clause 7

3.2.1. Dielectric test on the main circuit

IEC 62271-102

7.1

3.2.2. Measurement of the resistance of the


main circuit

IEC 62271-102

7.3

3.2.3. Mechanical operating test

IEC 62271-102

7.101

3.2.

Routine tests

Page 4 of 4

Value