Escolar Documentos
Profissional Documentos
Cultura Documentos
TABLE OF CONTENTS :
About us : KED
Major features of Power Plant Simulator & Designer
Typical applications (extract of multiple references)
Additional modules
18/11/2012
ABOUT K E D
History :
Managment
18/11/2012
18/11/2012
18/11/2012
Nearly all kind of boilers, incl. HRSG, biomass steam & hot water boiler, Fluidized Bed Boiler
Selection between approx. 60 different elements (heat exchanger surface, spray cooler, control elements
etc.)
Almost any combinations of the heaters, coolers, combustion chambers are possible
Complete water-steam circuit, incl. turbine, condenser, feed water preheater (high pressure and low
pressure), feed pump, dearator etc.
Complete thermal calculation, pressure drop, natural-, sub- and supercritical forced circulation calculation
with all kinds of recirculation's
Efficiency calculation (direct & indirect method, acc. EN-12952-15/DIN 1942 and ASME PTC)
Heat exchanger can be divided into zones to take different temperatures and mass flows into consideration
Hot water and Thermal Oil boiler (shell tube, water tube and waste heat boiler)
18/11/2012
Start simulation
calculation
Selection Element
group
18/11/2012
zooming
Save File
Selection of
scheme
Selection Element
group
18/11/2012
(2)
Nominal load calculation i.e. with pre-set steam flow : calculation of temperatures, pressures and fuel
consumption.
User-definable detailed input and output calculation data with Excel Files
18/11/2012
General
output
data
Specific
output data
Superheater 2
18/11/2012
10
Diagrams
18/11/2012
11
18/11/2012
12
Typical Options : Language, Schema, Dimension set-up, Document properties, Calculation options
Options
18/11/2012
13
18/11/2012
14
Output Data
MCR
18/11/2012
15
18/11/2012
16
18/11/2012
17
18/11/2012
18
18/11/2012
19
18/11/2012
20
Typical Boiler Applications : Bio-Waste fired Boiler with separate fired Superheater (a)
18/11/2012
21
Typical Boiler Applications : Bio-Waste fired Boiler with separate fired Superheater (b)
18/11/2012
22
18/11/2012
23
18/11/2012
24
18/11/2012
25
18/11/2012
26
18/11/2012
27
Natural circulation
Load changes
18/11/2012
28
Print File
Selection of
scheme
Selection Element
group
18/11/2012
29
18/11/2012
30
QT-Diagram
18/11/2012
31