GENERAL
10.1
Engineering Services
Engineering services are performed in three steps:
a.
b.
c.
Chapter 10, Engineering Reports and Facility Plans, covers only item (a)
above.
10.2
b.
c.
No approval for construction can be issued until final, detailed plans and
specifications have been submitted and approved by the appropriate
reviewing authority. Refer to Chapter 20.
11.
10-1
CHAPTER 10
The concept (including process description and sizing), factual data, and
controlling assumptions and considerations for the functional planning of
wastewater facilities are presented for each process unit and for the whole system.
These data form the continuing technical basis for the detailed design and
preparation of construction plans and specifications.
Architectural, structural, mechanical, and electrical designs are usually excluded.
Sketches may be desirable to aid in presentation of a project. Outline
specifications of process units, special equipment, etc., are occasionally included.
Engineering Reports shall be completed for minor collection system, pump
station, and interceptor projects. Facility Plans shall be completed or have been
completed for projects involving new, expanded, upgraded, or rehabilitated
wastewater treatment facilities and major collection, interceptor sewer, and pump
station projects. The determination of classification as major or minor collection
interceptor sewer and pump station projects will be made by the reviewing
authority based on review of recommended classification by the owner.
For federal, provincial, or state financed grant or loan projects, additional
requirements may apply.
11.1
Engineering Reports
Engineering reports shall contain the following and any other pertinent
information as required by the reviewing authority.
11.11 Problem Definition
Description of the existing system should include an evaluation of
the conditions and problems needing correction.
11.12 Flows and Organic Loads
The anticipated design average and design peak flows and waste
loads for the existing and ultimate conditions shall be established.
The basis of the projection of initial and future flows and waste
loads shall be included and shall reflect the existing or initial
service area, and the anticipated future service area. More detail
on flow and organic load information and the data needed for new
collection systems are included in Paragraphs 11.24 and 11.25.
11.13 Impact on Existing Wastewater Facilities
The impact of the proposed project on all existing wastewater
facilities (including gravity sewers, lift stations, and treatment
facilities) shall be evaluated.
11.14 Project Description
A written description of the project is required.
11.15 Location Drawings
Drawings identifying the site of the project and the anticipated
10-2
CHAPTER 10
Facility Plans
Facility Plans shall contain the following and any other pertinent
information as required by the reviewing authority.
11.21 Problem Evaluation and Existing Facility Review
a.
b.
10-3
CHAPTER 10
b.
c.
d.
11.242
b.
CHAPTER 10
11.243
11.244
b.
c.
10-6
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.1
0.3
0.4 0.5
0.7
1.0
2.0
3.0
4.0 5.0
Source:
18+ P
4+ P
20
30
40
10
7.0
POPULATION IN THOUSANDS
0.2
(where inflitration and inflow are excluded in accordance with Section 31)
FIGURE 1
RATIO OF PEAK HOURLY FLOW TO DESIGN AVERAGE FLOW
50
70
100
a.
CHAPTER 10
b.
c.
d.
10-7
11.253
CHAPTER 10
b.
c.
d.
b.
c.
d.
e.
CHAPTER 10
b.
c.
d.
Site Evaluation
Site evaluation shall consider the following criteria. When a
site must be used which is critical with respect to the
following items, appropriate measures shall be taken to
minimize adverse impacts.
1.
CHAPTER 10
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
10-10
13.
e.
CHAPTER 10
Unit Sizing
Unit operation and unit process sizing and basis shall be
provided.
f.
Flow Diagram
Flow diagram of treatment facilities including all recycle
flows shall be included.
g.
Flexibility
Compliance with requirements of Paragraph 53.6
Arrangement of Units shall be assured.
h.
Removal Efficiencies
Loadings to and removal efficiencies through each unit
operation shall be provided in addition to total removal
efficiency and effluent quality (both concentrations and
mass).
i.
Emergency Operation
Emergency operation requirements as outlined in Section 47
and Paragraph 56.1 shall be provided. State or local
regulatory agencies may have more stringent requirements.
j.
10-11
k.
CHAPTER 10
Sludge
The solids disposal options considered and method selected
shall be included. This is critical to completion of a
successful project. Compliance with requirements of Chapter
80, Sludge Processing, Storage, and Disposal shall be
assured.
l.
m.
n.
Cost Estimates
Cost estimates for capital and operation and maintenance
(including basis), shall be included.
o.
Environmental Review
Consideration shall be given to minimizing any potential
adverse environmental effects of the proposed project.
Compliance with planning requirements of federal,
provincial, state, and local regulatory agencies shall be
documented.
PRE-DESIGN MEETING
A pre-design meeting is recommended for plant projects with the applicant,
design engineer and reviewing authority in attendance to discuss subsequent
changes to the engineering report or facilities plan approval, deviations from
design standards, schedule of submittal and review, and applicable reliability
10-12
CHAPTER 10
10-13