SAUDI ARAMCO TEST REPORT

SATR NUMBER

Coating Equipment Check Sheet

SATR-H-2004

PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED TEST DATE & TIME

ACTUAL TEST DATE & TIME

31-Mar-13
DATE APPROVED
QR NUMBER

30-Apr-13

MECH

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

PURCHASE ORDER NUMBER

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY

SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

WORK PERMIT REQUIRED?

NOTE: THIS FORM TO BE USED IN CONJUNCTION WITH SAIC-H-2013 OR SAIC-H-2026


EQUIPMENT

UNIT NUMBER
2
3

A. Compressors
Capacity
No. of Manifold Outlet
Size of Air Hose
Gauges
Grounding
Oil Leaks
Air Hose condition
Air hose connections
Outlet connections and valves
(1-1/2" or 2")

B. Air Storage Drum


Size/Capacity (Manufacturer
stamped in accordance with ASME
Sec. VIII D1, Unfired Pressure
Vessels, Ref. SAES-H-001, Para.
5.4.1.4)
Pressure Test Certificate
Revalidation Test
Relief Valve Calibration
Pressure Gauges
C. Blasting Pots : Type
Capacity
Condition of Pot
Mixing Valves
Oil & Moisture traps
Air Hose Size
Air hose condition
D. Blasting Hose:
Size (3 to 4 times nozzle orifice)
Anti-static Hose
Couplings & Safety Pins
Deadman Switch fitted
E. Blast Nozzles
Size
Condition
Page 1 of 3

REMARKS

F. FBE Powder Application Equipment For FBE Coating of Field Girth Welds (SAIC-H-2013)
Condition of Induction Coil Heater
Powder Application Equipment

Page 2 of 3

SAUDI ARAMCO ID/PID - 31-March-13 - REV 7 (Standards Cutoff - Mar 2013)

Rev 7

SAUDI ARAMCO TEST REPORT

31-Mar-2013

SATR NUMBER

Coating Equipment Check Sheet

DATE APPROVED

SATR-H-2004

PROJECT TITLE

WBS / BI / JO NUMBER

QR NUMBER

30-Apr-13

MECH

CONTRACTOR / SUBCONTRACTOR

F. Airless Spray System


Spray pump Type/Model
Pressure Ratio
No. of Spare filters
Hand Set
Liquid Line Size
Hand Set Condition
Gauges
Spray Gun Tip Size
Condition of Reversible
No. of Machines on Site
Spare Hand Set
Spare Tip
Tools
G. Conventional Spray System
Air supply hose connection
Oil & Moisture Separator
Spray Hand Set
Condition of Paint Mixers
H. Paint Mixers
Type
Size
REMARKS:
REFERENCE DOCUMENTS:
1.SAES-H-001, Coating selection and application Requirements for Industrial plant Equipments, (10 Apr 2011)
2.SAES-H-002, Internal and External Coatings for steel pipeline and piping, (02 June 2012)
3.SAES-H-003, Protective Coatings for Industrial Concrete Structures , (25 Sep 2012)
4.SAES-H-004,Protective Coating selection and application Requirements for offshore structures and facilities, (07 July 2010)
5. SSPC, Steel Structures Painting Council, (Latest Edition)

Contractor / Third-Party

Saudi Aramco

Technician Performing Test*


Name, Title, Department,
Company, Initials and
Date:

PMT Representative

Test Performed Successfully and Results are Acceptable:


Name, Initials and Date:

QC Inspector
Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

PID Representative
Witnessed Test

Work / Rework May Proceed

QC Supervisor

Name, Initials and Date:

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results

Y = YES

Page 3 of 3

N = NO F = FAILED