Calculation the rain runoff r 15 (1) (Q r15) according to STAS 9470-73 [1]
Calculation the volume of retention basin according to ATV A-117 [2]
Return frequency of rain set with 0,2 (suitable for open basins)
Time factor for calculation r 15 (0,2) set with 1,783 [3]
Ratio Outflow / Inflow (Q out / Q in) = 0,2
Flow time to the basin (tf) set with 0 min
(This assumption increases the the reliability.)
Calculation the Design value BR according to pict. 5 and 6 of ATV A117
A [ha]
Ared [ha]
3,87 ha
0,45
1,74 ha
road (asphalt)
0,03 ha
0,90
0,03 ha
Surrounding countryside
0,00 ha
0,30
0,00 ha
Transfer Station
0,00 ha
0,90
0,00 ha
Total
3,90 ha
0,45
1,77 ha
A [ha]
Ared [ha]
4,77 ha
0,45
2,15 ha
road (asphalt)
0,01 ha
0,90
0,01 ha
Surrounding countryside
0,00 ha
0,30
0,00 ha
Transfer Station
0,00 ha
0,90
0,00 ha
Total
4,79 ha
0,45
2,16 ha
= Q out / Q r 15 (0,2)
= 0,2
Q out
min Q out = 0
max Q out = 2 * * Q r 15(0,2)
=0
BR
= 750 s
A117
[l/s]
206,5
Q r15 (0,2)
[l/s]
368,2
Q out max
[l/s]
147,3
Q out
[l/s]
73,6
Q out/Q r 15(0,2)
0,2
tf
[min]
Outflow (Throttle):
Volume of basin:
BR
[s]
750
[m]
276
V chosen
[m]
300
tE
[h]
1,1
Retention Basin 2:
Inflow:
Q r15 (1,0)
[l/s]
335,0
Q r15 (0,2)
[l/s]
597,3
Q out max
[l/s]
238,9
Q out
[l/s]
119,5
Q out/Q r 15(0,2)
0,2
tf
[min]
BR
[s]
750
[m]
448
V chosen
[m]
600
tE
[h]
1,4
Outflow (Throttle):
Volume of basin:
[%]
[mm]
400
Qfull
[l/s]
210
Q
(Throttle outflow Q out max)
[l/s]
368,2
Q / Qfull
0,70
Trenches
reach: Inflow
bottom width bu
[m]
slope inclination
gradient I
0,50
1:2
[%]
1,0
coefficient kst
(Manning/Strickler)
[m 1/3 / s 1/2]
35
Q
(Inflow according to
Q r15 (0,2) / Outflow)
[l/s]
ca. 370
shear stress S
[N/m]
19
pavement
Cp 45/125 in 15 cm concrete
[N/m]
150 - 200
[m]
0,50
slope inclination
gradient I
1:2
[%]
1/3
bis 10,0
/s
1/2
coefficient kst
(Manning/Strickler)
[m
30
Q
(Inflow according to
Q r15 (0,2) / Outflow)
[l/s]
ca. 370
shear stress S
[N/m]
125
pavement
[N/m]
200
0,50
slope inclination
1:2
gradient I
[%]
2,5
coefficient kst
(Manning/Strickler)
[m 1/3 / s 1/2]
30
Q
(Inflow according to
Q r15 (0,2) / Outflow)
[l/s]
ca. 520
shear stress S
[N/m]
46
pavement
[N/m]
Retention Basin 2
Pipes
Calculation according to Prandtl/Colebrook [3]
200
[%]
[mm]
500
Qfull
[l/s]
378
Q
(inflow according to
Q r15 (0,2))
[l/s]
238,9
Q / Qfull
0,63
Trenches
reach: Inflow
bottom width bu
[m]
slope inclination
0,50
1:2
gradient I
[%]
2,0
coefficient kst
(Manning/Strickler)
[m 1/3 / s 1/2]
35
Q
(Inflow according to
Q r15 (0,2) / Outflow)
[l/s]
ca. 600
shear stress S
[N/m]
40
pavement
Cp 45/125 in 15 cm concrete
[N/m]
150 - 200
[m]
reach 1:
reach 2:
slope inclination
3,50
1,50
1:2
gradient I
[%]
reach 1:
reach 2:
1,0
20,0
coefficient kst
(Manning/Strickler)
[m 1/3 / s 1/2]
reach 1:
reach 2:
40
30
Q
(Inflow according to
Q r15 (0,2) / Outflow)
[l/s]
ca. 600
shear stress S
[N/m]
reach 1:
reach 2:
pavement
reach 1:
reach 2:
15
205
[N/m]
reach 1:
reach 2:
1,50
slope inclination
1:2
gradient I
[%]
24,3
coefficient kst
(Manning/Strickler)
[m 1/3 / s 1/2]
30
Q
(Inflow according to
Q r15 (0,2) / Outflow)
[l/s]
ca. 840
shear stress S
[N/m]
280
pavement
[N/m]
285
100
285