Você está na página 1de 6

BREVIAR DE CALCUL

INCHIDERE DEPOZIT CALARASI


Calculation basic
The following assumptions and definitions were made:

Calculation the rain runoff r 15 (1) (Q r15) according to STAS 9470-73 [1]
Calculation the volume of retention basin according to ATV A-117 [2]
Return frequency of rain set with 0,2 (suitable for open basins)
Time factor for calculation r 15 (0,2) set with 1,783 [3]
Ratio Outflow / Inflow (Q out / Q in) = 0,2
Flow time to the basin (tf) set with 0 min
(This assumption increases the the reliability.)
Calculation the Design value BR according to pict. 5 and 6 of ATV A117

Calculation the Rain run off


according to STAS 9470-73 [1]:
region:
6
diagram:
6
rain yield factor (r15(1)):
155 l/ s*ha
peak discharge coefficient according to slope and sealing
Drainage area 1:
Area

A [ha]

Ared [ha]

temporary / final sealing


trench / road (gravel)

3,87 ha

0,45

1,74 ha

road (asphalt)

0,03 ha

0,90

0,03 ha

Surrounding countryside

0,00 ha

0,30

0,00 ha

Transfer Station

0,00 ha

0,90

0,00 ha

Total

3,90 ha

0,45

1,77 ha

A [ha]

Ared [ha]

temporary / final sealing


trench / road (gravel)

4,77 ha

0,45

2,15 ha

road (asphalt)

0,01 ha

0,90

0,01 ha

Surrounding countryside

0,00 ha

0,30

0,00 ha

Rain run off: Q r 15 (1,0) = r15(1,0) * A *


Q r 15 (1,0) = 155,00 l/(sxha) * 3,90 ha * 0,45
Q r 15 (1,0) = 274,5 l/s
Drainage area 2:
Area

Transfer Station

0,00 ha

0,90

0,00 ha

Total

4,79 ha

0,45

2,16 ha

Rain run off: Q r 15 (1,0) = r15(1,0) * A *


Q r 15 (1,0) = 155,00 l/(sxha) * 4,79 ha * 0,45
Q r 15 (1,0) = 335,0 l/s

Calculation the volume of retention basin


Throttle outflow

= Q out / Q r 15 (0,2)
= 0,2

Q out

= 0,5* (min Qout + max Qout)

min Q out = 0
max Q out = 2 * * Q r 15(0,2)

Volume of Retention Basin


tf

=0

BR
= 750 s
A117

according to pict. 5 and 6 of ATV

V [m] = (BR * Q r15(0,2))/ 1000

Check the Emptying Time


tE [h] = Vchosen / (3,6 * Q out)
Following the recommendation of the ATV 117 A should be the emptying time
maximum of 3 to 6 hours. This criterion is satisfied with the results from emptying
time.

Compilation of the design values


Retention Basin 1:
Inflow:
Q r15 (1,0)

[l/s]

206,5

Q r15 (0,2)

[l/s]

368,2

Q out max

[l/s]

147,3

Q out

[l/s]

73,6

Q out/Q r 15(0,2)

0,2

tf

[min]

Outflow (Throttle):
Volume of basin:

BR

[s]

750

[m]

276

V chosen

[m]

300

tE

[h]

1,1

Retention Basin 2:
Inflow:
Q r15 (1,0)

[l/s]

335,0

Q r15 (0,2)

[l/s]

597,3

Q out max

[l/s]

238,9

Q out

[l/s]

119,5

Q out/Q r 15(0,2)

0,2

tf

[min]

BR

[s]

750

[m]

448

V chosen

[m]

600

tE

[h]

1,4

Outflow (Throttle):
Volume of basin:

Calculation of pipes and trenches for inflow and/or outflow of the


basin
Retention Basin 1
Pipes
Calculation according to Prandtl/Colebrook [3]
Pipe roughness kb: 1,5 mm
reach: Outflow (Throttle)
gradient I

[%]

nominal diameter (DN)

[mm]

400

Qfull

[l/s]

210

Q
(Throttle outflow Q out max)

[l/s]

368,2

Q / Qfull

0,70

Trenches
reach: Inflow
bottom width bu

[m]

slope inclination
gradient I

0,50
1:2

[%]

1,0

coefficient kst
(Manning/Strickler)

[m 1/3 / s 1/2]

35

Q
(Inflow according to
Q r15 (0,2) / Outflow)

[l/s]

ca. 370

shear stress S

[N/m]

19

pavement

Cp 45/125 in 15 cm concrete

critical shear stress zul

[N/m]

150 - 200

reach: Emergency Outflow


bottom width bu

[m]

0,50

slope inclination
gradient I

1:2
[%]
1/3

bis 10,0
/s

1/2

coefficient kst
(Manning/Strickler)

[m

30

Q
(Inflow according to
Q r15 (0,2) / Outflow)

[l/s]

ca. 370

shear stress S

[N/m]

125

pavement

Cp 90/250 in 20 cm gravel 16/63

critical shear stress zul

[N/m]

200

reach: Emergency Outflow and Throttle Outflow


bottom width bu
[m]

0,50

slope inclination

1:2

gradient I

[%]

2,5

coefficient kst
(Manning/Strickler)

[m 1/3 / s 1/2]

30

Q
(Inflow according to
Q r15 (0,2) / Outflow)

[l/s]

ca. 520

shear stress S

[N/m]

46

pavement

Cp 90/250 in 20 cm gravel 16/63

critical shear stress zul

[N/m]

Retention Basin 2
Pipes
Calculation according to Prandtl/Colebrook [3]

200

Pipe roughness kb: 1,5 mm


reach: Outflow (Throttle)
gradient I

[%]

nominal diameter (DN)

[mm]

500

Qfull

[l/s]

378

Q
(inflow according to
Q r15 (0,2))

[l/s]

238,9

Q / Qfull

0,63

Trenches
reach: Inflow
bottom width bu

[m]

slope inclination

0,50
1:2

gradient I

[%]

2,0

coefficient kst
(Manning/Strickler)

[m 1/3 / s 1/2]

35

Q
(Inflow according to
Q r15 (0,2) / Outflow)

[l/s]

ca. 600

shear stress S

[N/m]

40

pavement

Cp 45/125 in 15 cm concrete

critical shear stress zul

[N/m]

150 - 200

reach: Emergency Outflow


bottom width bu

[m]

reach 1:
reach 2:

slope inclination

3,50
1,50

1:2

gradient I

[%]

reach 1:
reach 2:

1,0
20,0

coefficient kst
(Manning/Strickler)

[m 1/3 / s 1/2]

reach 1:
reach 2:

40
30

Q
(Inflow according to
Q r15 (0,2) / Outflow)

[l/s]

ca. 600

shear stress S

[N/m]

reach 1:
reach 2:

pavement

reach 1:
reach 2:

15
205

grass pavers (concrete)


LMB 10/60 in 15 cm concrete

critical shear stress zul

[N/m]

reach 1:
reach 2:

reach: Emergency Outflow and Throttle Outflow


bottom width bu
[m]

1,50

slope inclination

1:2

gradient I

[%]

24,3

coefficient kst
(Manning/Strickler)

[m 1/3 / s 1/2]

30

Q
(Inflow according to
Q r15 (0,2) / Outflow)

[l/s]

ca. 840

shear stress S

[N/m]

280

pavement

LMB 10/60 in 15 cm concrete

critical shear stress zul

[N/m]

285

100