Você está na página 1de 65

LONGITUD =

ANCHO TOTAL =
FECHA =

40.00m
14.90m

No carrilles
=
(Ancho de via+Veredas)

ABR 2015
H/24>=0.3m =

0.42m

H=7.90m

H=8.30m

H=10.00m

0.4m

0.35m

2.35m

0.95m
5.00m

5.00m

H/2-2H/3

6.67m

1.25m

H/12=

0.83m

0.60m

hv=1.10(0.15+L/18)= 2.61m

0.35m

1.10m

3/8 hv=

0.60m

0.42m

7.70m

4
U

0.41m

0.60m

1.70m

5.00m

1.25m
H/8 - H/10

1.00m

1.67m
B/3

H/12=

0.95m

DATOS:
h.a
h.s
N de vigas

=
=
=

2.40
2.25
4

T/m3
T/m3
U

b) CARGA MUERTA SUPER-ESTRUCTURA (D)

3.225m

0.2

0.8

0.150m

0.375m

2.475m

2.675m

Ancho del tablero

Element Superestructura
Capa de rodadura
Barrera
Tablero (Losa)
Volados

Vigas

Diafragmas
Diafragma de apoyo
Diafragma central

c) CARGA VIVA SUPER-ESTRUCTURA (L)

Cortante:

4.70m

FUERZA DEL FRENADO:

Rd=3.60 T

Rt=14.80 T

Rt=14.80 T

Fr= P (1 + (a+b)/s)

4.30m

11.2

tn

Posicin para det


b=1.80m

3.225m

S=3.000m

0.20m

1.10m

0.20m

2.675m

restructura

1.20m

1.50m

1.900m

15.450m

Area (m2)
0.38
0.208
0.82
0.495

OK

WS
0.084T/m
0.499T/m
1.968T/m
1.188T/m

Ws total
del tablero
3.156m

0.99

mas

Espesor
0.400m
0.400m

2.376T/m
6.116T/m

altura
0.9
0.9

Ws
4.320T/m
0.864T/m
5.184T/m

TOTAL
11.300T/m

Momento:
2.00 P

Fr = S/1.80 P

Rd=3.60 T

31.00m

1.67 P

11.2

tn
Posicin para determinar Factor de Rueda
1.20m

1.80m

a=1.20m

0.900m

0.00m

0.20m

0.050m

3.000m

0.20m

1.10m

0.20m

1.900m

TOTAL
11.300T/m

1.67 P

1.10m

a=1.20m

EMPUJE LATERAL DEL SUELO

1.- Coeficiente de Empuje lateral Activo (Ka):

Pero segn la
teoria de Rankine:

Si = 0 entonces :

Coef. De Empuje
Lateral Activo

=
=

m
g

=
=

10

m
Ka = Tan2 (45-/2)

30
1.80
9.8

T/m3
m/s2

Ka =

0.333

Si = 25 entonces :

25
30

Ka

0.49359

0.0000871

0.0088755937

1.80

T/m3

2.- Coeficiente de Empuje lateral Pasivo (Kp):

Pero segn la
teoria de Rankine:

Si = 0 entonces :

Coef. De Empuje
Lateral Pasivo

m
g

=
=
=
=

10
30
1.80
9.8

m
T/m
m/s2
3

Ka = Tan2 (45 + /2)


Ka =
3.000

Si = 25 entonces :

=
=

25
30
1.80

Ka
T/m

1.66412

0.0002936

0.0299235527

0.0000588

M Pa

0.0059938838

Tn/m2

0.0000871
0.0088755937

M Pa
Tn/m2

0.0005292
0.0539449541

0.0002936
0.0299235527

M Pa
Tn/m2

M Pa
Tn/m2

LONGITUD =
ANCHO TOTAL =

40.00m
14.90m

(Ancho de via+Veredas)

DATOS:
hormign =
m
=

2.40 T/m3
1.80 T/m3

30

a) MUERTA INFRAESTRUCTURA
0.60m

1.10m

0.35m

7.70m0.60m

P5

H=10.00m

0.4m

P6
P4
P7

P3

7.70m

P8

EV3
EV1

0.60m

EV
2

P2

P1
A
2.35m

0.95m

1.70m

5.00m

Peso del
concreto
(tn/m3)

Area (m2)

1
2
3
4
5
6
7
8

2.40
2.40
2.40
2.40
2.40
1.80
1.80
1.80

3.00
1.28
4.98
0.07
0.60
22.09
0.07
1.28

Carga
(Tn/m)
7.200
3.066
11.952
0.168
1.428
39.762
0.126
2.300
66.002

CARAGA DEL PESO PROP

23.814

Tn/m

1.5 m

AGA DEL PESO PROPIO

METRADO DE CARGAS
1.- CARGAS VERICALES:
a) Carga de peso propio
losa de acercamiento

DC 9 =

altura
2.35

2.4

superestructura
ESTRIBOS
altura
b) Superficie de rodamiento

DW =

2.25

0.05

c) Cargas de presion vertical :


EV1
EV2
EV3
EV4
EV5
d)

1.8
1.8
1.8
1.8
1.8

largo
2.35
1.7

alto
9.1
2.2

Carga (tn/m)
38.493
6.732
2.5245
0.126
2.178

1.4025
0.07
1.21

Cargas de presion lateral del terreno


ka (activa)
carga de terreno
EH1 =
Por 9.70 m
del terreno

carga de losa
EH2
carga de la losa
de acercamiento :

Carga (tn/m)

0.33333

1.8

9.7

5.8199418

5.8199418

9.7

0.6

33.872061276

EH1 (y) =

EH1 * sen (S)

EH1 (y) =

16.936030638

ka (activa)
0.33333

1.8

0.1799982

9.7

EH2 (y) =
EH2 (y) =

EH1 * sen (S)


0.87299127

e) Carga viva de la super estructura de puente (LL)


f) Sobrecarga por carga viva del terreno (LS)

tn/m

0.3

Carga (tn/m)
0.1799982
1.74598254

tn/m

LS1 =

carga de losa
LS2=

1.8

largo
2.35

ka (activa)
0.33333

1.8

0.6599934

9.7

LS2 (y) =
LS2 (y) =

alto
1.1

Carga (tn/m)
4.653

1.1

Carga (tn/m)
0.6599934

LS2 * sen (S)


3.20096799

6.40193598

tn/m

expresor
0.3

Carga (tn/m)
1.692

expresor

Carga (tn/m)
0.3375

50.0535 tn/m

CARGA
DC1
DC2
DC3
DC4
DC5
DC9
Pdc
Pdw
EV1
EV2
EV3
EV4
EV5
EH1 (y)
EH2 (y)
Pl
LS1
LS2 (y)
total

angulo

coeficiente

S = 30

0.6

tn/m

angulo
S = 30
tn/m

coeficiente
0.6

TIPO

DC

DW

EV

EH
LL
LS

angulo
S = 30
tn/m

coeficiente
0.6

V (tn/m)
7.200
3.066
11.952
0.168
1.428
1.692
11.300
0.338
38.493
6.732
2.525
0.126
2.178
16.936
0.873
14.010
4.653
3.201
126.870

d (A)
2.500
2.417
2.000
2.417
2.475
3.825
2.000
2.000
3.825
0.850
1.133
2.467
2.467
5.000
5.000
2.000
3.825
5.000

Mv (tn-m/m)
18.000
7.409
23.904
0.406
3.534
6.472
22.599
0.675
147.236
5.722
2.860
0.311
5.372
84.680
4.365
28.020
17.798
16.005
395.369

2.- CARGAS HORIZONTALES


a) Cargas de presion lateral del terreno: (EH)

EH1 =
Por 9.70 m del terreno

EH2 =

carga de la losa
de acercamiento

angulo
S = 30

33.872061276
EH1 (x) =
EH1 (x) =

EH1 * cos (S)


29.3332051
tn/m

1.74598254

angulo
S = 30

EH2 (x) =
EH2 (x) =

coeficiente
0.6

coeficiente
0.6

EH1 * cos (S)


1.51202088

tn/m

b) Sobre carga por carga viva en el terreno: (LS)


LS2 =

angulo
S = 30

6.40193598
LS2 (x) =
LS2 (x) =

LS2 * cos (S)


5.54407656
tn/m

c) Carga de viento sobre la estructura: (WS) MUERTA

Coef. Viento

0.059

Longitud
Altura

=
=

39.4
1.9

WD

0.30565675

Viento
Viga+tablero+acera

W
0.30565675

d)Fuerza de frenado: (BR)


BR =
BR =

0.25 * 11.2
2.8/14.45

e) cargas de accion sismica: (EQ)


Accion sismica del terreno

=
=

2.8
0.19377163

tn
tn/m

kae =

EQ =

0.433

tn/m

Carga sismica por superestructura

Peq =

10.197 tn/m

CARGA
EH1 (x)
EH2 (x)
LS2 (x)
WS
BR
EQ
Peq
Total

coeficiente
0.6

TIPO
EH
LS
WS
BR
EQ

H (tn/m)
29.3332051
1.51202088
5.54407656
0.30565675
0.19377163
9
10.197
56.0857309

dA
3.233
4.85
4.85
9.45
11.8
5
9.45

Mh (tn-m/m)
94.834251975
7.3333012663
26.88877131
2.888456263
2.2865051903
45
96.36165
275.592936

CARGAS VERTICALES
TIPO

DC

CARGAS

DC1

DC2

DC3

DC4

DC5

DC9

Pdc

V (tn/m)

7.200

3.066

11.952

0.168

1.428

1.692

11.300

Resistencia
II

0.900

0.900

0.900

0.900

0.900

0.900

0.900

6.480

2.759

10.757

0.151

1.285

1.523

10.170

Resistencia
II

1.250

1.250

1.250

1.250

1.250

1.250

1.250

9.000

3.833

14.940

0.210

1.785

2.115

14.124

Evento
Extremo

0.900

0.900

0.900

0.900

0.900

0.900

0.900

6.480

2.759

10.757

0.151

1.285

1.523

10.170

Evento
Extremo

1.250

1.250

1.250

1.250

1.250

1.250

1.250

9.000

3.833

14.940

0.210

1.785

2.115

14.124

MOMENTO ESTABILIZADOR (por ca

TIPO

DC

CARGAS

DC1

DC2

DC3

DC4

DC5

DC9

Pdc

M (tn/m)

18.000

7.409

23.904

0.406

3.534

6.472

22.599

Resistencia
II

0.900

0.900

0.900

0.900

0.900

0.900

0.900

16.200

6.668

21.514

0.365

3.181

5.825

20.339

1.250

1.250

1.250

1.250

1.250

1.250

1.250

22.500

9.262

29.880

0.507

4.418

8.090

28.249

0.900

0.900

0.900

0.900

0.900

0.900

0.900

16.200

6.668

21.514

0.365

3.181

5.825

20.339

1.250

1.250

1.250

1.250

1.250

1.250

1.250

22.500

9.262

29.880

0.507

4.418

8.090

28.249

LS

WS

BR

Resistencia
II
Evento
Extremo
Evento
Extremo

CARGAS HORIZONTALES

TIPO

EH

EQ

CARGAS

EH1 (x)

EH2 (x)

LS2 (x)

WS

BR

EQ

Peq

H (tn/m)

29.333

1.512

5.544

0.306

0.194

10.197

Resistencia
II
Resistencia
II
Evento
Extremo I
Evento
Extremo I

1.500

1.500

1.350

0.000

1.350

44.000

2.268

7.485

0.000

0.262

1.500

1.500

1.350

0.000

1.350

44.000

2.268

7.485

0.000

0.262

0.900

0.900

0.500

0.000

0.500

26.400

1.361

2.772

0.000

0.097

1.250

1.250

0.500

0.000

0.500

36.667

1.890

2.772

0.000

0.097

0
0.000

0
0.000

0
0.000

0
0.000

1
9.000

1
10.197

1
9.000

1
10.197

MOMENTO DE VUELCO (cargas horizontales)

TIPO

EH

LS

WS

BR

EQ

CARGAS

EH1 (x)

EH2 (x)

LS2 (x)

WS

BR

EQ

Peq

Mv (tn/m)

94.834

7.333

26.889

2.888

2.287

45

96.361

Resistencia
II

1.500

1.500

1.350

1.350

142.251

11.000

36.300

3.087

1.500

1.500

1.350

1.350

142.251

11.000

36.300

3.087

0.900

0.900

0.500

0.500

85.351

6.600

13.444

1.143

1.250

1.250

0.500

0.500

118.543

9.167

13.444

1.143

Resistencia
II
Evento
Extremo I
Evento
Extremo I

0
0.000

0.000
0

0.000

0
0.000

1
45.000

1
96.361

1
45.000

1
96.361

CARGAS VERTICALES
DW

EV

EH

LL+IM

Pdw

EV1

EV2

EV3

EV4

EV5

EH1 (y)

EH2 (y) P (LL+IM)

0.338

38.493

6.732

2.525

0.126

2.178

16.936

0.873

14.010

0.650

1.000

1.000

1.000

1.000

1.000

1.500

1.500

1.350

0.219

38.493

6.732

2.525

0.126

2.178

25.404

1.309

18.914

1.500

1.350

1.350

1.350

1.350

1.350

1.500

1.500

1.350

0.506

51.966

9.088

3.408

0.170

2.940

25.404

1.309

18.914

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.500

0.304

34.644

6.059

2.272

0.113

1.960

15.242

0.786

7.005

1.250

1.250

1.250

1.250

1.250

1.250

1.250

1.250

0.500

0.422

48.116

8.415

3.156

0.158

2.723

21.170

1.091

7.005

ESTABILIZADOR (por cargas verticales)

DW

EV

EH

LL+IM

Pdw

EV1

EV2

EV3

EV4

EV5

EH1 (y)

0.675

147.236

5.722

2.860

0.311

5.372

84.680

4.365

28.020

0.650

1.000

1.000

1.000

1.000

1.000

1.500

1.500

1.350

0.439

147.236

5.722

2.860

0.311

5.372

127.020

6.547

37.827

1.500

1.350

1.350

1.350

1.350

1.350

1.500

1.500

1.350

1.013

198.768

7.725

3.861

0.420

7.253

127.020

6.547

37.827

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.500

0.608

132.512

5.150

2.574

0.280

4.835

76.212

3.928

14.010

1.250

1.250

1.250

1.250

1.250

1.250

1.250

1.250

0.500

0.844

184.045

7.153

3.575

0.388

6.715

105.850

5.456

14.010

total

EH2 (y) P (LL+IM)

54.014

54.014

49.827

60.622

total
192.638

192.638

247.899

283.658

LS
LS1

LS2 (y)

4.653

3.201

1.350

1.350

6.282

4.321

1.350

1.350

6.282

4.321

0.500

0.500

2.327

1.600

0.500

0.500

2.327

1.600

total
139.6278

170.3153

105.437

142.189

LS
LS1

LS2 (y)

17.798

16.005

1.350

1.350

24.027

21.607

1.350

1.350

24.027

21.607

0.500

0.500

8.899

8.002

0.500

0.500

8.899

8.002

total
453.0604

538.9733

331.1028

447.8439

CHEQUEO POR ESTABILIDAD Y ESFUERZOS


e max <= (11/30)B

a) Vuelco alrededor del punto A

e max <= B/4

ESTADO
V (tn/m)
Mvu (tn/m)
Resistencia
139.627782 453.0604160925
II a

Mhu
192.6379531371

Resistencia
170.315333 538.9732669815
II b

192.6379531371

Evento
105.437021
Extremo I a

331.102783347

247.8994361673

Evento
142.18898
Extremo I b

447.843922575

283.6580798018

b) Deslizamiento en base al estribo


u = tg (s)

s=
u = 0.5773
Resistente "Ft"
(tn/m)

Actuante "Hu"
(tn/m)

Resistencia
139.627782
II a

64.4856949075

54.0139339667

Resistencia
170.315333
II b

78.6584335768

54.0139339667

Evento
105.437021
Extremo I a

60.8687923458

30.6296274427

Evento
142.18898
Extremo I b

82.085698229

41.4254565233

ESTADO

V (tn/m)

c) Presiones Actuantes en la base del estribo

ESTADO
V (tn/m)
Mvu (tn/m)
Resistencia
139.627782 453.0604160925
II a
Resistencia
170.315333 538.9732669815
II b

Mhu
192.6379531371
192.6379531371

Resistencia
170.315333 538.9732669815
II b

192.6379531371

Evento
105.437021
Extremo I a

331.102783347

247.8994361673

Evento
142.18898
Extremo I b

447.843922575

283.6580798018

fundacion en suelo estable: qr >= q

=
=

1.833
1.25

Xo

e (m)

e max (m)

1.86511924 0.6348807598

1.25

2.03349462 0.4665053819

1.25

0.78912839 1.7108716064

1.833

1.1547016

1.3452984006

30
t (resist)
0.8

t (even ext)
1

1.833

OK
OK
OK
OK

Xo

e (m)

q (tn/m2)

1.86511924 0.6348807598 37.4313286


2.03349462 0.4665053819 41.8774979

OK
OK
OK
OK

2.03349462 0.4665053819 41.8774979


0.78912839 1.7108716064 66.8059989
1.1547016

1.3452984006 61.5695779

AREAS DE ACERO
BARRA
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12

3/8"
1/2"
5/8"
3/4"
7/8"
1"
1 1/8"
1 1/4"
1 3/8"
1 1/2"

A (cm2)
0.71 cm2
1.27 cm2
1.98 cm2
2.85 cm2
3.88 cm2
5.07 cm2
6.41 cm2
7.92 cm2
9.58 cm2
11.40 cm2

EMPUJE LATERAL DEL SUELO

1.- Coeficiente de Empuje lateral Activo (Ka):

Pero segn la teoria de Rankine:

Coef. De Empuje
Lateral Activo

h'

=
=
=

30
1.80

T/m

Ka = Tan2 (45-/2)
Ka =
0.333

Coef. De Empuje
Lateral Pasivo

Kp = 1/Ka
Kp =

Coef. De Empuje
Lateral Pasivo

Kp = 1/Ka
Kp =
3

LONGITUD =
40.00m
ANCHO TOTAL =
14.45m
FECHA =
MARZO 2015

(Ancho de via+Veredas)

DISEO DE LA PANTALLA
DATOS:
f'c =
280 Kg/cm2
Ka = Tan2 (45-/2)
Ka == 0.333
=

H
3

( H + 3 h' )
( H + 2 h' )

31.02Ton

3.361m

0.60m

h' =

0.35m

s Ka H (H+2 h')

(4)

H=1.10 m

1/2

1.00 m

fy =
4200 Kg/cm2
Kp = 1/Ka
Kp == 3

Hv = H viga

0.800m
30
1.80 T/m3
0.07m

1.10m

=
=
=
=

0.60m

h'

m
Rec

0.60m

2.35m
0.95m

5.00m

7.70m

0.648m

1.70m
(1)

1.0

H=1.00m

(2)

H=6.30 m

H=7.30m

0.00

0.60m

H=1.00 m

0.4m

H=10.00m

(3)

0.600m

ARMADURA EN LA PANTALLA
FRANJA

Mu

As

(m)

(m)

( t-m /m )

1.60 M

( m)

(Kg/cm )

9.40m

3.361m

104.26T-m

166.82T-m

0.880m

21.542m

0.0064

56.21cm2

3.10m

1.21m

5.286T-m

8.457T-m

0.578m

2.532m

0.0007

4.13cm2

2.10m

0.85m

1.985T-m

3.175T-m

0.530m

1.130m

0.0003

1.69cm2

1.10m

0.48m

0.424T-m

0.678T-m

0.280m

0.864m

0.0002

0.68cm2

cm2/m

ARMADURA DE DISTRIBUCION (LADO SIN RELLENO)


EJE

Mu

(m)

(m)

( t-m /m )

1.60 M

( m)

(Kg/cm2)

0.950m

0.000m

Lado relleno

As

norma
0.0016

cm2/m
15.20cm2

ARMADURA DE DISTRIBUCION
EJE

Mu

(m)

(m)

( t-m /m )

1.60 M

( m)

(Kg/cm )

0.725m

0.000m

2 lados

DISEO DEL DEDO

norma
0.0012

As
cm2/m
11.40cm2

nM
nM
nF

Si e<B/6
Si e>B/6

Mr = Me - Mv
X = Mr/nF
e = B/2 - X
q1=n?F/B(1+6e/B)<qa
q2=2n?F/(3L(b/2e))<qa

=
=
=

331.100T-m
247.890T-m
105.437T-m

=
=
=

83.210T-m
0.789m
1.711m
=
64.38T/m2
=
-22.20T/m2

0.60m

132mm@10cm

2.35m

0.95m

1.70m

64.38T/m2

34.94T/m2

18.49T/m2

-22.20

5.00m

64.38T/m2

34.94T/m
=

M = L2 (q1+2 q2)/6

78.85T-m/m
ARMADURA DEL DEDO (CONTACTO CON AGUA)

Mu

( t-m / m )

1.60 M

( m)

(Kg/cm )

78.848T-m

126.157T-m

0.530m

44.912m

0.0143

As min

As

As colocar

cm2/m
75.87cm2

17.67

75.87

S calculo

(mm)

( cm )

32mm

11cm

DISEO DEL TALON

0.60m

16.92T/m2

2.35m

0.95m

1.70m
132mm@10cm

5.00m

64.38T/m2

34.94T/m2

18.49T/m2

-22.20
M = q L2 / 2 - L2 (q1+2 q2) / 6

ARMADURA DEL TALON (CONTACTO CON RELLENO)


M

Mu

( t-m / m )

1.60 M

( m)

(Kg/cm2)

70.577T-m

112.922T-m

0.530m

40.200m

0.0126

As

As min

As

As min

As colocar

cm2/m
66.83cm2

17.67

66.83

S calculo

(mm)

( cm )

32mm

12cm

ARMADURA DE DISTRIBUCION

( m)

(Kg/cm2)

0.600m

0.000m

norma
0.0012

As colocar

cm2/m
7.20cm2

7.20

S calculo

S asumido

As colocado

(mm)

( cm )

( cm )

( cm2 )

20mm

44cm

15cm

20.944

132mm@10cm

120mm@15cm

132mm@10cm

.40m

0.80m

H=9.40m

As min

As colocar

S calculo

S asumido

As colocado

(mm)

( cm )

( cm )

( cm2 )

29.33

56.21

20mm

6cm

12.5cm

69.900

OK

19.26

19.26

20mm

16cm

12.5cm

25.133

OK

17.67

17.67

25mm

28cm

25cm

19.635

OK

9.33

9.33

20mm

34cm

25cm

12.566

OK

S calculo

S asumido

As colocado

(mm)

( cm )

( cm )

( cm2 )

20mm

21cm

10cm

31.416

S calculo

S asumido

As colocado

(mm)

( cm )

( cm )

( cm2 )

20mm

28cm

20cm

15.708

N RELLENO)
As min

0.00

As colocar
15.20

OK

N
As min

0.00

As colocar
11.40

OK

S calculo

S asumido

As colocado

( cm )

( cm )

( cm2 )

11cm

10cm

80.425

OK

5.66%

S calculo

S asumido

As colocado

( cm )

( cm )

( cm2 )

12cm

10cm

80.425

OK

16.90%

As colocado
( cm2 )
20.944

OK

65.62%

Você também pode gostar