NOTES

37.0
36.0
35.0
K = 30

34.0

V.C. = 293.701 m
0+331.674

33.0
32.0
31.0

EI = 30.084
PI = 0+478.525

30.0

LIMIT OF CONTRACT - MATCH WITH EXISTING ROAD

29.0

22.0
21.0
20.0
19.0
18.0
17.0
16.0
15.0
14.0

REINFORCED SOIL WALL

VERTICAL CURVES
The vertical alignment is made up of a series pf grades expressed as
percentages and parabolic curves. The parabolic curves used are of the
following form:

-G2

+G

(%)

where
A is the algebraic difference in (G2-G1)
A -ve K value indicates a Crest Curve
A +ve K value indicates a Sag Curve
The gradiente is showm as +ve or -ve in the direction of increasing stationing

CANAL

5.0

%
1(

TEMPORARY ROAD

7.0
6.0

Pier 3

Pier 2

8.0

Pier 1

CENTRELINE
DRKF

9.0

Pier 4

10.0

Pier 5

11.0

Pier 6

12.0

Pier 7

13.0

23.0

PROPOSED STRUCTURE (DEPTH 2.60m)

AL KHAIL ROAD

24.0

EXISTING GROUND PROFILE ALONG


HORIZONTAL/VERTICAL CENTROLINE

Pier 10

25.0

LEGEND
PROPOSED ROAD PROFILE ALONG
HORIZONTAL/VERTICAL CENTROLINE

Pier 10

26.0

80
%

Pier 9

27.0

-5.

%
3.99

Pier 8

28.0

4.0

DRAWING STATUS:-

3.0
2.0

G= 3.99%
L = 331.674

VERTICAL ALIGNMENTS
L= 73.834
R= 707.300

HORIZONTAL ALIGNMENTS

L= 193.666
R= 182.300

25.710 6.76

26.219 2.84

R = 3000.000
L = 293.701

REV.

B.K
DATE

A.P

B.A

FIRST ISSUE - TENDER DRAWINGS

DR'N CH'D AP'D

DESCRIPTION

25.000

0+525.00

25.000

0+500.00

25.000

0+475.00

25.000

0+450.00

0+425.00

25.000

26.520 3.03

26.613 2.92

26.497 2.93

26.173 2.95
25.000

0+400.00

25.000

0+375.00

25.000

0+350.00

18.496

25.641 4.14

24.900 5.23

24.218 5.98
0+331.50

6.504

0+325.00

25.000

0+300.00

25.000

23.959 6.25

22.961 7.04

21.964 7.71

21.664 7.61

7.500

0+275.00

0+250.00

17.500

0+267.50

20.966 7.27

19.969 6.19
25.000

0+225.00

25.000

0+200.00

25.000

0+175.00

25.000

18.971 3.72

17.974 3.12

16.976 0.00
25.000

0+125.00

25.000

0+150.00

26.166

15.979 3.03

14.981 2.97

13.937 3.17

12.986 12.11
23.834

25.000

0+100.00

0+000.00

PROJECT CHAINAGES

25.000

0+073.83

PARTIAL DISTANCES

0+050.00

PROJECT LEVELS

0+025.00

EXISTING GROUND LEVELS

11.989 11.99

1.0
10.991 11.02

E.L. 0.000

P.O. Box: 118899, DUBAI - U.A.E

TEL.: 971-4-2844444

FAX: 971-4-2065555

Consultant:

P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198

Project Name:

Project Number:

Directional Ramp From Al Khail


Road To Financial Center Road

L= 64.004

2.00%

4.00%

R1023

Drawing Title:

SUPERELEVATION
-4.00%

-4.00%

-2.00%

Drawing Number:

VL SCALE

HZ SCALE

R1023-3-03001

Date:

Sheet:

Scale:

AUG. 2015

01 OF 02

N.T.S