Escolar Documentos
Profissional Documentos
Cultura Documentos
82
107.79
107.76
107.73
107.70
107.67
107.64
107.61
107.58
107.55
107.52
107.49
107.46
107.43
107.40
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
107.91
150
Checked by :
107.35
108.40
108.70
108.72
900
108.42
GL
107.37
108.74
850
108.44
108.76
bed
107.39
108.46
800
107.41
108.78
750
108.48
108.80
Formation Level
107.43
108.50
700
107.45
108.82
108.52
108.84
650
107.47
108.54
108.86
600
107.49
108.56
108.88
550
107.51
108.58
108.90
500
107.53
108.60
108.92
450
107.55
108.62
108.94
400
107.57
108.64
108.96
350
107.59
108.66
108.98
300
107.61
108.68
250
107.63
109.00
109.02
109.04
109.06
Datum 107.00
108.70
108.72
108.74
108.76
109.08
200
107.65
107.67
107.69
107.71
108.78
150
107.85
107.94
100
107.73
109.10
100
250
107.97
Chainage
50
Bed Level
108.80
FSL
107.75
Formation Level
50
107.88
108.00
200
Existing G.L.
110.00
FSL
109.00
108.00
107.00
950 1000
Drawn by :
Executive Engineer
Checked by :
107.04
107.01
106.98
106.95
106.92
106.89
1600
1650
1700
1750
1800
1850
106.80
107.07
1550
2000
107.10
1500
106.83
107.13
1450
1950
107.16
1400
106.95
107.95
107.97
107.99
108.01
108.03
108.05
108.07
108.09
108.11
108.13
108.15
108.17
108.24
108.26
108.25
108.27
108.29
108.31
108.33
108.35
108.37
108.39
108.41
108.43
108.45
108.47
108.54
108.56
108.58
108.60
108.62
108.64
108.66
108.68
GL
106.97
106.99
107.01
107.03
107.05
107.07
107.09
107.11
107.13
107.15
107.17
107.19
107.21
108.28
108.30
108.32
108.34
108.36
108.38
B=1.20m,FSD=1.05m,FB=0.30m, S= 1 in 2500
bed
106.86
107.19
1350
107.23
107.25
107.27
107.29
107.31
107.33
108.70
Formation Level
1900
107.22
1300
107.31
1150
107.25
107.34
1100
1250
107.37
Chainage
1050
Bed Level
108.40
FSL
107.35
Formation Level
107.28
107.40
Datum 10600
1200
Existing G.L.
1000
110.00
FSL
109.00
108.00
107.00
106.00
1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000
Drawn by :
Executive Engineer
Tangla Division (Irrigation)
Tangla
LBMC
Fm
7000
6000
5060
4300
3600
2800
2040
1400
700
0
1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
106.68
106.65
106.62
106.59
106.56
106.53
106.50
106.47
106.44
106.41
106.38
106.35
106.32
106.29
106.26
106.23
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
106.74
2100
2200
106.77
Chainage
2050
Bed Level
Checked by :
106.57
107.42
107.44
107.46
107.72
107.74
107.76
GL
106.59
106.61
107.83
107.85
107.53
107.55
107.87
107.89
107.91
107.93
107.95
107.97
107.99
108.01
108.03
bed
106.63
106.65
107.57
107.59
107.61
107.63
107.65
107.67
107.69
107.71
107.73
108.05
108.07
108.09
108.11
108.13
108.25
108.23
Formation Level
106.67
106.69
106.71
106.73
106.75
106.77
106.79
106.81
106.83
107.75
107.77
107.79
107.81
107.83
107.95
107.93
Datum 105.00
106.85
106.87
106.89
106.91
106.93
106.95
106.93
FSL
106.71
106.80
106.78
Formation Level
2150
Existing G.L.
2000
2040
109.00
FSL
108.00
107.00
106.00
105.00
2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550 2600 2650 2700 2750 2800 2850 2900 2950
FB=0.30m, S= 1 in 2500
B=1.00m,FSD=0.85m ,
Drawn by :
Executive Engineer
LBMC
Fm
7000
6000
5060
4300
3600
2800
2040
1400
To
8000
7000
6000
5060
4300
3600
2800
2040
B
0.450
0.550
0.650
0.900
0.900
0.950
1.050
1.100
d
0.400
0.500
0.550
0.750
0.800
0.850
0.850
1.000
FB
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
D
0.700
0.800
0.850
1.050
1.100
1.150
1.150
1.300
700
0
1400
700
1.20
1.25
1.00
1
0.30
0.3
1
1.3
Type of canal
2000
2000
2000
2000
2000
2000
2000
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
2000 CC lining
2000 CC lining
2000
2020
2050
2100
2150
2200
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
Checked by :
105.87
105.84
105.81
105.78
105.75
105.72
3550
3600
3650
3700
3750
3800
105.63
105.90
3500
3950
105.93
3450
105.66
105.96
3400
3900
105.99
3350
105.69
106.02
3300
106.17
106.19
106.21
106.23
106.25
106.27
106.29
106.31
106.33
106.35
106.37
106.39
106.41
106.43
106.45
106.47
106.49
106.51
106.53
106.55
107.02
107.04
107.06
107.08
107.10
107.12
107.14
107.16
107.18
107.20
107.22
107.24
107.26
107.28
107.30
107.32
107.34
107.36
107.38
107.40
107.32
107.34
107.36
107.38
107.40
107.42
107.44
107.46
107.48
107.50
107.52
107.54
107.56
107.58
107.60
107.62
107.64
107.66
107.68
107.70
107.72
3850
106.05
3250
106.14
3100
106.08
106.17
3050
3200
106.20
Chainage
3000
Bed Level
107.42
FSL
106.57
Formation Level
106.11
106.23
Datum 105.00
3150
Existing G.L.
2950
109.00
108.00
107.00
106.00
105.00
2950 3000 3050 3100 3150 3200 3250 3300 3350 3400 3450 3500 3550 3600 3650 3700 3750 3800 3850 3900 3950
Drawn by :
Executive Engineer
Tangla Division (Irrigation)
Tangla
LBMC
Fm
7000
6000
5060
4300
3600
2800
2040
1400
700
0
2950
3000
3050
3100
3150
3200
3250
3300
3350
3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
Checked by :
105.27
105.24
105.21
105.18
105.15
105.12
4550
4600
4650
4700
4750
4800
105.03
105.30
4500
4950
105.33
4450
105.06
105.36
4400
4900
105.39
4350
105.27
106.07
106.09
106.11
106.13
106.15
106.17
106.19
106.21
106.23
106.25
106.27
106.29
106.31
106.38
106.37
106.39
106.41
106.43
106.45
106.47
106.49
106.51
106.53
106.55
106.57
106.59
106.61
106.68
106.70
106.72
106.74
106.76
106.78
106.80
GL
105.29
105.31
105.33
105.35
105.37
105.39
105.41
105.43
105.45
105.47
105.49
105.51
105.53
106.40
106.42
106.44
106.46
106.48
106.50
bed
105.09
105.42
4300
105.55
105.57
105.59
105.61
105.63
105.65
107.32
Formation Level
4850
105.45
4250
105.54
4100
105.48
105.57
4050
4200
105.60
Chainage
4000
Bed Level
107.02
FSL
106.17
Formation Level
105.51
105.63
Datum 104.00
4150
Existing G.L.
3950
108.00
FSL
107.00
106.00
105.00
104.00
3950 4000 4050 4100 4150 4200 4250 4300 4350 4400 4450 4500 4550 4600 4650 4700 4750 4800 4850 4900 4950
Drawn by :
Executive Engineer
Tangla Division (Irrigation)
Tangla
LBMC
Fm
7000
6000
5060
4300
3600
2800
2040
1400
700
0
3950
4000
4050
4100
4150
4200
4250
4300
4350
4400
4450
4500
4550
4600
4650
4700
4750
4800
4850
4900
4950
Checked by :
104.88
104.85
104.82
104.79
104.76
104.73
104.70
104.67
104.64
104.61
104.58
104.55
5200
5250
5300
5350
5400
5450
5500
5550
5600
5650
5700
5750
104.46
104.91
5150
5900
104.96
104.94
5060
5100
104.49
104.97
5050
5850
105.00
Chainage
5000
Bed Level
104.89
104.91
104.93
104.95
104.97
104.99
105.01
105.03
105.05
105.07
105.09
105.11
105.13
105.15
105.17
105.19
105.23
105.21
105.23
105.25
105.49
105.51
105.53
105.55
105.57
105.59
105.61
105.63
105.65
105.67
105.69
105.71
105.73
105.75
105.77
105.79
106.03
105.81
106.03
106.05
106.07
FSL
105.27
105.79
105.81
105.83
105.85
105.87
105.89
105.91
105.93
105.95
105.97
105.99
106.01
106.03
106.05
106.07
106.09
106.33
106.11
106.33
106.35
106.37
Formation Level
B=0.90m, FSD=0.80m
104.52
105.03
Datum 104.00
5800
Existing G.L.
4950
107.00
106.00
105.00
104.00
4950 5000 5050 5100 5150 5200 5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900
Drawn by :
Executive Engineer
Tangla Division (Irrigation)
Tangla
LBMC
4950
5000
5050
5080
5100
5150
5200
5250
5300
5350
5400
5450
5500
5550
5600
5650
5700
5750
5800
Checked by :
104.16
104.13
104.10
104.07
104.04
104.01
103.98
6400
6450
6500
6550
6600
6650
6700
103.89
103.86
6850
6900
103.92
104.19
6350
6800
104.22
6300
103.95
104.25
6250
103.99
104.01
104.03
104.05
104.07
104.09
104.11
104.13
104.15
104.67
104.69
104.71
104.73
104.75
104.77
104.79
104.81
104.83
104.85
104.87
104.49
104.51
104.53
104.55
104.57
104.59
104.61
104.63
104.65
105.17
105.19
105.21
105.23
105.25
105.27
105.29
105.31
105.33
105.45
105.47
104.79
104.81
104.83
104.85
104.87
104.89
104.91
104.93
104.95
105.47
105.49
105.51
105.53
105.55
105.57
105.59
105.61
105.63
105.75
105.77
105.79
B=0.65 m,
6750
104.28
6200
104.37
6050
104.31
104.40
6000
6150
104.43
Chainage
5950
Bed Level
105.49
FSL
104.89
Formation Level
104.34
104.46
Datum 103.00
6100
Existing G.L.
5900
106.00
105.50
105.00
104.50
104.00
103.50
103.00
5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6650 6700 6750 6800 6850 6900
Drawn by :
Executive Engineer
LBMC
Fm
7000
6000
5060
4300
3600
2800
2040
1400
To
8000
7000
6000
5060
4300
3600
2800
2040
B
0.450
0.550
0.650
0.900
0.900
0.950
1.050
1.100
d
0.400
0.500
0.550
0.750
0.800
0.850
0.850
1.000
FB
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
D
0.700
0.800
0.850
1.050
1.100
1.150
1.150
1.300
Type of canal
2000
2000
2000
2000
2000
2000
2000
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
700
0
1400
700
1.20
1.25
1.00
1
0.30
0.3
1
1.3
2000
2000
CC lining
CC lining
5900
5950
6000
6050
6100
6150
6200
6250
6300
6350
6400
6450
6500
6550
6600
6650
6700
6750
6800
6850
6900
6950
103.62
103.59
103.56
103.53
103.50
103.47
103.44
103.41
103.38
103.35
7300
7350
7400
7450
7500
7550
7600
7650
7700
7750
Checked by :
103.29
103.26
103.23
103.20
7850
7900
7950
8000
103.32
103.65
7250
103.55
103.57
103.59
103.61
103.63
103.65
103.67
103.69
103.71
103.73
103.75
103.77
103.79
103.81
103.83
103.85
103.87
103.89
103.91
103.93
103.95
103.97
103.95
103.97
103.99
104.01
104.03
104.05
104.07
104.09
104.11
104.13
104.15
104.17
104.19
104.21
104.23
104.25
104.27
104.29
104.31
104.33
104.45
104.47
104.25
104.27
104.29
104.31
104.33
104.35
104.37
104.39
104.41
104.43
104.45
104.47
104.49
104.51
104.53
104.55
104.57
104.59
104.61
104.63
104.75
104.77
104.79
B=0.60m,
7800
103.68
7200
103.77
7050
103.71
103.80
7000
7150
103.83
Chainage
6950
Bed Level
104.49
FSL
103.99
Formation Level
103.74
103.86
Datum 102.00
7100
Existing G.L.
6900
105.00
104.00
103.00
102.00
6900 6950 7000 7050 7100 7150 7200 7250 7300 7350 7400 7450 7500 7550 7600 7650 7700 7750 7800 7850 7900 7950 8000
Drawn by :
Executive Engineer
UDMARI FIS
MAIN CANAL LBMC
FSL=(BL+FSD)
Chainage
GL
BL
0
108.00
107.75
108.80
50
107.97
107.73
108.78
100
107.94
107.71
108.76
150
107.91
107.69
108.74
200
107.88
107.67
108.72
250
107.85
107.65
108.70
300
107.82
107.63
108.68
350
107.79
107.61
108.66
400
107.76
107.59
108.64
450
107.73
107.57
108.62
500
107.70
107.55
108.60
550
107.67
107.53
108.58
600
107.64
107.51
108.56
650
107.61
107.49
108.54
700
107.58
107.47
108.52
750
107.55
107.45
108.50
800
107.52
107.43
108.48
850
107.49
107.41
108.46
900
107.46
107.39
108.44
950
107.43
107.37
108.42
1000
107.40
107.35
108.40
1050
107.37
107.33
108.38
1100
107.34
107.31
108.36
1150
107.31
107.29
108.34
1200
107.28
107.27
108.32
1250
107.25
107.25
108.30
1300
107.22
107.23
108.28
1350
107.19
107.21
108.26
1400
107.16
107.19
108.24
1450
107.13
107.17
108.17
1500
107.10
107.15
108.15
1550
107.07
107.13
108.13
1600
107.04
107.11
108.11
1650
107.01
107.09
108.09
1700
106.98
107.07
108.07
1750
106.95
107.05
108.05
1800
106.92
107.03
108.03
1850
106.89
107.01
108.01
1900
106.86
106.99
107.99
1950
106.83
106.97
107.97
2000
106.80
106.95
107.95
2040
106.78
106.93
107.93
2050
106.77
106.93
107.83
2100
106.74
106.91
107.81
2150
106.71
106.89
107.79
2200
106.68
106.87
107.77
0.61
FL=FSL+FB
109.10
109.08
109.06
109.04
109.02
109.00
108.98
108.96
108.94
108.92
108.90
108.88
108.86
108.84
108.82
108.80
108.78
108.76
108.74
108.72
108.70
108.68
108.66
108.64
108.62
108.60
108.58
108.56
108.54
108.47
108.45
108.43
108.41
108.39
108.37
108.35
108.33
108.31
108.29
108.27
108.25
108.23
108.13
108.11
108.09
108.07
FB
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
Cutting/Filling
-0.25
-0.24
-0.23
-0.22
-0.21
-0.20
-0.19
-0.18
-0.17
-0.16
-0.15
-0.14
-0.13
-0.12
-0.11
-0.10
-0.09
-0.08
-0.07
-0.06
-0.05
-0.04
-0.03
-0.02
-0.01
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.15
0.16
0.17
0.18
0.19
Gr Sl=
Gr drop
Gr drop
Gr Sl=
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
3000
3050
3100
3150
3200
3250
3300
3350
3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150
4200
4250
4300
4350
4400
4450
4500
4550
4600
4650
106.65
106.62
106.59
106.56
106.53
106.50
106.47
106.44
106.41
106.38
106.35
106.32
106.29
106.26
106.23
106.20
106.17
106.14
106.11
106.08
106.05
106.02
105.99
105.96
105.93
105.90
105.87
105.84
105.81
105.78
105.75
105.72
105.69
105.66
105.63
105.60
105.57
105.54
105.51
105.48
105.45
105.42
105.39
105.36
105.33
105.30
105.27
105.24
105.21
106.85
106.83
106.81
106.79
106.77
106.75
106.73
106.71
106.69
106.67
106.65
106.63
106.61
106.59
106.57
106.55
106.53
106.51
106.49
106.47
106.45
106.43
106.41
106.39
106.37
106.35
106.33
106.31
106.29
106.27
106.25
106.23
106.21
106.19
106.17
105.65
105.63
105.61
105.59
105.57
105.55
105.53
105.51
105.49
105.47
105.45
105.43
105.41
105.39
107.75
107.73
107.71
107.69
107.67
107.65
107.63
107.61
107.59
107.57
107.55
107.53
107.46
107.44
107.42
107.40
107.38
107.36
107.34
107.32
107.30
107.28
107.26
107.24
107.22
107.20
107.18
107.16
107.14
107.12
107.10
107.08
107.06
107.04
107.02
106.50
106.48
106.46
106.44
106.42
106.40
106.38
106.31
106.29
106.27
106.25
106.23
106.21
106.19
108.05
108.03
108.01
107.99
107.97
107.95
107.93
107.91
107.89
107.87
107.85
107.83
107.76
107.74
107.72
107.70
107.68
107.66
107.64
107.62
107.60
107.58
107.56
107.54
107.52
107.50
107.48
107.46
107.44
107.42
107.40
107.38
107.36
107.34
107.32
106.80
106.78
106.76
106.74
106.72
106.70
106.68
106.61
106.59
106.57
106.55
106.53
106.51
106.49
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.20
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.40
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.50
0.51
0.52
0.53
0.54
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
Fall=
4700
4750
4800
4850
4900
4950
5000
5050
5060
5100
5150
5200
5250
5300
5350
5400
5450
5500
5550
5600
5650
5700
5750
5800
5850
5900
5950
6000
6050
6100
6150
6200
6250
6300
6350
6400
6450
6500
6550
6600
6650
6700
6750
6800
6850
6900
6950
7000
7050
105.18
105.15
105.12
105.09
105.06
105.03
105.00
104.97
104.96
104.94
104.91
104.88
104.85
104.82
104.79
104.76
104.73
104.70
104.67
104.64
104.61
104.58
104.55
104.52
104.49
104.46
104.43
104.40
104.37
104.34
104.31
104.28
104.25
104.22
104.19
104.16
104.13
104.10
104.07
104.04
104.01
103.98
103.95
103.92
103.89
103.86
103.83
103.80
103.77
105.37
105.35
105.33
105.31
105.29
105.27
105.25
105.23
105.23
105.21
105.19
105.17
105.15
105.13
105.11
105.09
105.07
105.05
105.03
105.01
104.99
104.97
104.95
104.93
104.91
104.89
104.87
104.85
104.83
104.81
104.79
104.77
104.75
104.73
104.71
104.69
104.67
104.15
104.13
104.11
104.09
104.07
104.05
104.03
104.01
103.99
103.97
103.95
103.93
106.17
106.15
106.13
106.11
106.09
106.07
106.05
106.03
106.03
105.81
105.79
105.77
105.75
105.73
105.71
105.69
105.67
105.65
105.63
105.61
105.59
105.57
105.55
105.53
105.51
105.49
105.47
105.45
105.33
105.31
105.29
105.27
105.25
105.23
105.21
105.19
105.17
104.65
104.63
104.61
104.59
104.57
104.55
104.53
104.51
104.49
104.47
104.45
104.33
106.47
106.45
106.43
106.41
106.39
106.37
106.35
106.33
106.33
106.11
106.09
106.07
106.05
106.03
106.01
105.99
105.97
105.95
105.93
105.91
105.89
105.87
105.85
105.83
105.81
105.79
105.77
105.75
105.63
105.61
105.59
105.57
105.55
105.53
105.51
105.49
105.47
104.95
104.93
104.91
104.89
104.87
104.85
104.83
104.81
104.79
104.77
104.75
104.63
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.19
0.20
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.40
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.50
0.51
0.52
0.53
0.54
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
Fall=
7100
7150
7200
7250
7300
7350
7400
7450
7500
7550
7600
7650
7700
7750
7800
7850
7900
7950
8000
Chainage
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
103.74
103.71
103.68
103.65
103.62
103.59
103.56
103.53
103.50
103.47
103.44
103.41
103.38
103.35
103.32
103.29
103.26
103.23
103.20
103.91
103.89
103.87
103.85
103.83
103.81
103.79
103.77
103.75
103.73
103.71
103.69
103.67
103.65
103.63
103.61
103.59
103.57
103.55
104.31
104.29
104.27
104.25
104.23
104.21
104.19
104.17
104.15
104.13
104.11
104.09
104.07
104.05
104.03
104.01
103.99
103.97
103.95
104.61
104.59
104.57
104.55
104.53
104.51
104.49
104.47
104.45
104.43
104.41
104.39
104.37
104.35
104.33
104.31
104.29
104.27
104.25
2040.00
FL=FSL+FB
107.93
107.91
107.89
107.87
107.85
107.83
107.81
107.79
107.77
107.75
107.73
107.71
107.69
107.67
107.65
107.58
107.56
107.54
107.52
107.50
107.48
107.46
107.44
107.42
107.40
107.38
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
m of LBMC
FB
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.17
0.18
0.19
0.20
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
Cutting/Filling
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.38
0.39
0.40
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.50
0.51
0.52
0.53
0.54
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
Chainage
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
106.02
105.99
105.96
105.93
105.90
105.87
105.84
105.81
105.78
105.75
105.72
105.69
105.66
105.63
105.60
106.56
106.54
106.52
106.50
106.48
106.46
106.44
106.42
106.40
106.38
106.36
106.34
106.32
106.30
106.28
107.06
107.04
107.02
106.90
106.88
106.86
106.84
106.82
106.80
106.78
106.76
106.74
106.72
106.70
106.68
107.36
107.34
107.32
107.20
107.18
107.16
107.14
107.12
107.10
107.08
107.06
107.04
107.02
107.00
106.98
5060.00
FL=FSL+FB
106.23
106.21
106.19
106.17
106.15
106.13
106.11
106.09
106.07
106.05
106.03
106.01
105.99
105.92
105.90
105.88
105.86
105.84
105.82
105.80
105.78
105.76
105.74
105.72
105.70
105.58
105.56
105.54
105.52
105.50
105.48
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
m of LBMC
FB
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.54
0.55
0.56
0.57
0.58
0.59
0.60
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
Cutting/Filling
0.42
0.43
0.44
0.44
0.45
0.46
0.47
0.47
0.48
0.49
0.50
0.51
0.51
0.52
0.53
0.54
0.54
0.55
0.56
0.57
0.58
0.58
0.59
0.60
0.61
0.61
0.62
0.63
0.64
0.65
0.65
1550
1600
1650
1700
1750
1800
104.10
104.07
104.04
104.02
103.99
103.96
104.76
104.74
104.72
104.70
104.68
104.66
105.16
105.14
105.12
105.10
105.08
105.06
105.46
105.44
105.42
105.40
105.38
105.36
0.30
0.30
0.30
0.30
0.30
0.30
0.66
0.67
0.68
0.68
0.69
0.70
PL =
1800
FSD=
S=
1.05
2500
FSL = PL-0.30 =
0.00
0.00
1000
FSD=
FSD=
1.05
1.05
FSD=
FSD=
1.05
1.00
FSD=
FSD=
1.00
0.90
From
0.00
700
1400
2040
2800
3600
4300
5060
6000
7000
To
To
To
To
To
To
To
To
To
To
OFFTAKING 2040
109.10
109.10
LBMC
To
B
700
1.25
1400
1.20
2040
1.20
2800
1.05
3600
1.00
4300
0.95
5060
0.90
6000
0.65
7000
0.60
8000
0.50
0.30
d
1.05
1.05
1.00
0.90
0.85
0.85
0.80
0.60
0.50
0.40
FB
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
108.80
Bed Slopee
1 in
1 in
1 in
1 in
1 in
1 in
1 in
1 in
1 in
1 in
Type of canal
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
2500 CC lining
0.75
FSD=
FSD=
0.90
0.85
FSD=
FSD=
0.85
0.85
0.50 at ch 4000 m
FSD=
FSD=
0.85
0.80
FSD=
FSD=
0.80
0.60
FSD=
FSD=
0.60
0.50
0.50 at ch 6500 m
FSD=
FSD=
0.50
0.40
OFFTAKINF AT 5060
FSD=
0.40
Gr slope
FSD=
S=
1700
0.55
2500
Off Taking
=
FSL at Ch. 2040.00
0.00
=
FSL of br at Ch.
Bed Lvl
0.00
=
LBC-1
From
To
B
0
To
700
0.70
700
To 1400
0.60
1400 To 2000
0.45
BL at Ch.
FSD=
FSD=
0.55
0.50
2040.00
107.93
107.93
107.08
0.30 m drop
Type of Canal
d
0.55
0.50
0.40
106.93
FB
0.30
0.30
0.30
Canal Slope
1 in Err:509 CC Lined Canal
1 in Err:509 CC Lined Canal
1 in
CC Lined Canal
FSD=
FSD=
0.50
0.40
FSD=
0.40
Gr Slope
FSD=
S=
1800
0.55
2500
Off Taking
=
FSL at Ch. 5060.00
0.00
=
FSL of br at Ch.
Bed Lvl
0.00
=
LBC-2
From
To
B
0
To
600
0.70
600
To 1200
0.60
1200 To 1800
0.45
BL at Ch.
FSD=
FSD=
0.55
0.50
FSD=
FSD=
0.50
0.40
5060.00
106.03
106.03
105.38
d
0.55
0.50
0.40
105.23
0.1 m drop
FB
0.30
0.30
0.30
Type of Canal
Canal Slope
1 in Err:509 CC Lined Canal
1 in Err:509 CC Lined Canal
1 in
CC Lined Canal
FSD=
0.40
Type of canal
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
CC lining
Type of Canal
CC Lined Canal
CC Lined Canal
CC Lined Canal
Type of Canal
CC Lined Canal
CC Lined Canal
CC Lined Canal