In addition the present peak demand of
electricity in country is above 20,000 MW, which
is estimated to cross 30,000 MW by the year
2017. A large-scale injection of dependable,
cheap and renewable energy thus becomes
inevitable. The Hydropower projects will provide
the dependable power/energy at affordable
price. Contribution of 4500 MW power from
Diamer Basha Dam will go a long way in
alleviating this situation.F
a
2
ower Wing [Hydroelectric] is operating
‘under generation license granted by the Power
Regulator NEPRA for operation, maintenance
and development ct hydel power resources in
Pakistan
Operational Performance
WAPDA-Hydroelectric owns and operates 19
hydel power stations with aggregated installed
{generation capacity of 6,902 MW. Major hydel
Power stations include Tarbela [3478 MW,
Ghazi Barotha [1,450 MW), Mangla [1,000 MW)
Warsak (263 MW]
The utilization of capacity for Hydel Generation
is largely dependent on net head of respective
power station and quantum of water indents
allowed by IRSA. The Net Electrical Output
INEO) for the year stood at 31,780 GWh as
‘compared to last year NEO of 31,306 GWh with
IT REPORT FY 2014 - 15
Profitability Position
Power sales revenue during FY 2014-16 stood
at Rs. 68,111 million (2014: Rs. 82,071 million)
due to upward revision of power sales tarifi
while cost of electricity stood at Rs. 22,352
million (2014: 20,628 million] bringing the net
revenue surplus of Rs. 33,736 million (2014.
21,451 million). The value of property, plant
and equipments increased to the level of Rs.
1,067,673 million (2014: Rs. 291,948 miltion|
This increase is mainly due to revaluation of
Land, Building, Civil Works and Dam &
Reservoirs,
The average return on investment at net
cartying cost of property, plant and equipment
‘worked out as 16% for the year as compared
to 10.8% of last year.
Profit & Loss Comparison
increase in Generation £74 Gh, curing FY
2014-15, This excess generation was mainly pamnicutans | iY20ie= 15] Fr 2003-4
Contributed by Mangla 3nd Duber Khvar
saestGcusne oT | sent) 0m
‘eaneation rand lu ther Income Aa a4
ein 7st ae
non tenets
= pons ie
ma Saar heal cd
“ eorecuonpe oa
aaovo-11 anit? awn2-19 ZOO-14 DOVeIS ‘Surplus fr Development st
enertion own)
ns
ost Pratt on Re)