In previous assignment, we know how to produce and how big the equipment
to be used for our plant and then we have to optimize it. One of optimization can be
done is energy optimization which relates to optimization utility needed. Energy and
utility has to be optimized in order to reduce the cost production of our plant. This
energy optimization can be done by using heat exchanger network. By using this we
can determine the minimum utility of cold and hot utility to be used in exchanging
heat with hot and cold stream. There are several method can be used such as
composite curves, problem table cascade, and pinch design.
water utility in our plant is consisting of water utility for process water. The
amount of water utility for cooling system is 75.17 m3/day.
Besides water, we need electricity. The electricity in our plant is derived from
PLN and our own power generation Plant. Our power generation is produce
11,049,490 kWh electricity per year, while our total electricity needed in our plant is
Universitas Indonesia
12,861,190.80 kWh per year or equal to IDR .... The electricity that we calculated
here focus for process equipment. The electricity that we used is 3600.02 kWh
that contained electricity from reactor, distillation, and pump.