INNOVATIVE MODULAR
PIPELAY SYSTEM
COMBINED WITH THE
PROVEN ZAP-LOKTM
MECHANICAL PIPELINE
CONNECTION ALLOWS
COST EFFECTIVE SUBSEA
PIPELINE INSTALLATION
IN THE OIL & GAS MARKET.
BENEFITS:
Operated from a range of
Offshore DP vessels and barges
Up to 5km lay rate in 24hrs
Limited modifications to vessel
Fast, efficient and safe
CAPABILITIES
Up to 20km of 10 pipe capacity on vessel with 1200m2 deck
Installed in up to 150m water depth
Conventional S-lay process
2-16 linepipe capability
Designed to DNV standards
Pipe Size
Pipe Grade
Grade B X65
Pipe Specification
API 5L
Pipe Material
Carbon steel
20m
150m
Lay Rate
Zap-LokTM Press
Control Cabin
Workshop Container
Hydraulic Power units
Electrical Power Units
Tensioner(s)
Anode Station
A-frame & Stinger
The MPS has been designed for pipelay on 2-16 diameter API 5L carbon steel pipe.
Concrete weight coated pipe can also be laid up to 12 diameter. The MPS can install pipe
in water depths down to 150m for smaller diameters and typically 100m water depth up
to 12 diameter.
Te
370
434
415
466
461
395
352
572
582
(Vessel with 800m2 back deck and sufficient carrying capacity could take 3 x pipe racks and could lay
10km of 12 pipe per trip)
2 to 12 NB (up to 16 in 2015)
Design Compliance
Material Capability
Pressure Rating
Coating Compatibility
General
WWW.CORTEZSUBSEA.COM