-- PROFESSIONAL EXPERIENCE --

Career and work experience: I have worked 26 years as


Mechanical Technician.

Period:
January 2013-April 2016
Position:
Mechanical Static Technician
Company&Location:
Bonatti Spa in Libia to Mellitah Oil&Gas
Responsibilities:
-replacement of pipes, flanged connections and bolts, clean or change the
filters in desalination facility plant

-installation of different types and sizes of pipes, installation of gaskets


and blinds;

-repairing of sulfur conveyor band and guide rollers for loading in ships;
-installation and tested of various equipment and machinery;
-pressurization and leak test of pipe line to operating pressure with inert
gas, checking of integrity of flange joints, line-up of pipe with instruments;
-maintenance of different sizes and types of valves;
-replacement of pipes, flanged connections and bolts;
-change of different types and size of filters;
-preparation the list of necessary materials, tools and other materials
required for the job and propose for approval;
-attend at inspections and tests with client representatives of the installed
works;
-control water level, dampers in boilers fuel supply;

-maintaining the operation of equipment such as boilers, stokers, water


heaters, heat exchangers, steam traps, cooling towers, incinerators,
valves(ball, gate, globe, control, etc)
-making sure that all equipment is in good condition and are operating
properly;
-plant equipment and tools are cleaned.

Period:
July 2009 - November 2012
Position:
Mechanical Static Technician
Company & Location: Muzkis- Petronor Refinery Bilboa-Spain
Responsibilities:
- Removal of underground pipes cut with the help of winches, cranes,
crowbars
- Cutting and chamfering at ground level sections of 20 "(insert the ground
and strung together or flange to flange attached 4 screws)
-Install adjustable bracelets with 4 screws.
-Are awarded using a spacer of 4 mm (4 points)
- Preparing the ground related piping isometrics reactor under
-Selection of the components of the scheme isometric (sections, elbows,
valves drainage, reducers, flanges)
-Place the pieces in plan using level protractor, ruler, tape, under isometric
and welding.
-Mounting brackets and leveling concrete.
-Preparing plants for revision:
- Removing or replacing valves in order to verify
- Installation of stairs, passages
- Installing reinforcement (ceramic handled)
-removing all valves in the system (valves on 1/2 to 20) in order to verify
-partial replacement of corroded plant (as media prepares adjustable
isometric, be debited size, is chamfering, are put into the plan and scores)
-replacement platforms (sheet or grill) corroded
-replacing corroded railings and stairs (device uses autogenous, grinder,
hand drill)
-equipped with fittings and drainage installations.
-Discharge pipes cut with the help of winches, finds, cranes, crowbars
2

-Preparing the surface sections 20.

Period:
January 2007 - August 2008
Position:
Mechanical Static Technician
Company & Location: Tenghiz- Kazakhstan
Responsibilities:
- Assembling of metallic (profile I - 60-200mm L - 80-100mm)
- Mounting brackets and leveling concrete
- Construction under isometric with screws tightened with a torque
wrench.
- Installation of stairs and platforms related reactor crane and hoist (tables
and grills are mounted with screws or bolts 6mm shot in profile).
- Preparing the ground related piping isometrics reactor under.
-Selection of the components of the scheme isometric (sections, elbows,
valves drainage, reducers, flanges)
-Place the pieces in plan using level protractor, ruler, tape, under isometric
and welding
- Install the installation using the crane, winch, race and prepares final
welding.
- Installation of fittings, gaskets.
-preparation for hydraulic test.
- Mounting shafts (nipples, gauges on the 0 and the highest rate of
reactor).
- Conducting air tests the rest of the installation.
- Inlet and outlet collectors underground gasoline and diesel (barrel 20 ").
- Removing drains and valves.
- Cold cutting with adjustable roller bracelets depending on the size of the
pipe.
- Removal of underground pipes cut with the help of winches, cranes,
crowbars.
- Cutting and chamfering at ground level sections of 20 "(insert the ground
and strung together or flange to flange attached 4 screws).
-Install adjustable bracelets with 4 screws.
-All fittings to be removed from the system in order to verify.
-Cut out the grinder or torch, corroded portions installation (pipe, stairs,
sheets or grids).
3

-Debiting size and replace the screws, bolts or welding points shot.

Period:
August 1989 - January 2007
Position:
Mechanical Technician
Company & Location: Heavy Water Plant-Ramnicu Valcea-Romania
Responsibilities:
Repair of centrifugal pumps:
-check on the lathe spindle
-balance
Repair metering pumps:
-checking and repairing gear
-piston-state
-assembly
-greasing
Repair and maintenance of mechanical filters, ionic and cationic:
-filter-state mass
-protective rubber inner-state.
- I have mounted and dismounted manhole covers if was necessary
replacement the filler or indoor cleaning.
- I have replaced gaskets.
- On the system pipes I have mounted and dismounted: valves with the
following types closure: globe valves, gate valves, diaphragm valves. For
these I have performed the following works: I have replaced the worn
fittings, the worn diaphragms, the worn sealings.
For the centrifugal pumps I have performed the following works:
-I have mounted and dismounted couplings pumps;
-I have mounted and dismounted pump rotors;
-I have mounted and dismounted pump bearings;
-I have mounted and dismounted the worn shafts and gaskets;
-I have performed alignment of the pumps.
For the reciprocating dosing pumps I have performed the following works:
4

-Changing of the mechanical parts worn: gaskets, valves; pump plungers;


change of the filters.
For the heat exchangers, coolers, blowers and fans I have participated
with a team of mechanics at overhauls scheduled: changing gaskets,
isolated broken pipes by fitting of plugs; changing the belts, changing
couplings, changing bearings, changing rotors.
Repairs for centrifugal pumps.
-Maintenance repairs separators.
-checking the pallets, drainage.
-water-checking centrifugal pumps.
-check metering pumps for oil and product.
-checking the accompanying steam piping and insulation of pipe routes.
-checking and repairing vertical centrifugal pumps.
Languages: English and Italian