tecnologia ALSTOM
D. Pezzella/A. Guizzetti
Agenda
Introduction
Page 3
Page 7
Page 24
Fleet Experience
Page 26
Summary
Page 34
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Today .....
24 hr
24 hr
600
Forecast
500
LAM50
Asia
Russia CIS
400
MEA
Oceania
300
India
China
200
Europe
100
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
GT26
296 MW
>320
GT24
>230
193 MW
GT13E2
>200 MW
GT11N2
115 MW
GT gross electrical output at the generator terminals, including gearbox (where applicable) and generator losses but excluding duct and auxiliary losses.
Calculated with 100% methane at ISO conditions, GT cooling air cooler contribution included where applicable
50 Hz
60 Hz
60 & 50 Hz
CL = Shaft Centre-Line
SSS = Self-Shifting Synchronous
3PRH = Triple Pressure Reheat
GSU = Generator Step-Up
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
KA26-2
Multi Shaft
2-on-1
MW
467
935
% (LHV)
59.5
59.5
kJ/kWh (LHV)
6055
6050
Btu/kWh (LHV)
5739
5735
KA26-1
Single Shaft
1-on-1
KA26-2
Multi Shaft
2-on-1
MW
473
947
% (LHV)
>60
>60
kJ/kWh (LHV)
<6000
<6000
Btu/kWh (LHV)
<5688
<5688
FLEXIBILITY
PERFORMANCE*
PERFORMANCE
GT26/KA26 (2011)
The Pioneer in Operational Flexibility
2012
2006
2002
1999
Compressor Upgrade +
Exhaust Housing
Upgrade
Standard EV-burner +
LP-Turbine Upgrade
Superior Part-Load Efficiency
Start up <60 min
High fuel flexibility
Compressor +
Turbine + Combustor
Upgrade +
Staged EV-combustion
2002 features plus:
Increased mass flow
Improved cooling and
leakage
Start-up optimization
Lower Emissions
Low Load Operation option
Fast Hot Start (< 30 min)
option
Compressor +
SEV Burner +
LP-Turbine Upgrade
2006 features plus:
Increased mass flow
High all-round performance
Unprecedented
part-load efficiency (virtually
constant from 100% to 80%
load)
Switchable Operation Modes
(PO and MCO)
GT26/KA26 (2011)
2011 Engine Overview
SEV-combustor
EV-combustor
22-stage compressor
4-stage LP-turbine
Solid Rotor
1-stage HP-turbine
4 rows VGVs
100%
90%
80%
70%
60%
50%
40%
KA26
2%-4% abs.
Single Combustor GT
single combustor engine
Performance Optimised
(PO)
Maximum Power and Efficiency
Normal Inspection Intervals
Normal Availability
Normal Maintenance Costs
On-line
switch
over
100% Load
Hot Start
Warm Start
Cold Start
GT Ignition
~30 min
~100 min
~150 min
100%
90%
80%
70%
60%
50%
40%
30%
20%
Shut-down
10%
0%
1
10
11
Time
compressor
airin
filter
High
Fogging
Nozzles
combustor
Silencer
turbine
Evaporative Cooling
-
Fogging
-
High Fogging
-
70
60
50
EU Limit
40
30
LLOC
20
10
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
CO Emission (mg/Nm3)
Typical CO Emission
100
EU Limit
Average GT26 CO Emission
80
Typical GT CO Emission
60
20
LLOC
0
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
KA26-1 ecoHEATTM
Capable of
> 300 MWth
Heat
With bypass
& duct firing
(Option)
Condensing-Heating
Mode
Capable of
> 500 MW
Low Load
Operation
Condensing Mode
Power
9000
7000
27000
21000
63000
49000
45000
35000
Boroscopic GT Inspection
(no burner/cans exchange foreseen,
no combustor tuning)
Visual
Inspection
B
(incl. Control
System Insp.)
(4-5 days**)
18000
14000
54000
42000
GT Opening
36000
28000
72000
56000
* For High Intermediate-Load Operation - actual intervals may vary depending on operation regime
** Actual inspection duration may vary depending on operating conditions,
outage scope, parts availability, and staff qualification
** From generator breaker off to breaker on
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Operating
NER300
AEP Mountaineer
US - 58 MWth
Chilled Ammonia, coal
EoN Karlshamn
Sweden - 5 MWth
WE Energie
US - 5 MWth
Chilled AmmoniaFuel oil Chilled Ammonia, Coal
Under construction
TCM Mongstad
EDF Le Havre
Norway - 40 MWth
France 5 MWth
Chilled Ammonia - Gas Adv. Amines - Coal
Total Lacq
France - 30 MWth
Oxy - Gas
PGE Belchatow
Poland 260 MWen
Adv. Amines - Lignite
NER300
2nd
Gen
NER300
Datang- China
Oxy 350 MWe lignite,
Post 350 MWe eq. coal
Selected for receiving
EEPR funding
2 Gen
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
1x KA26-1
1x KA26-1
1x KA26-1
1x KA26-1
1x KA26-1
3x KA26-1
1x KA26-1
1x KA26-1
2x KA26-1
GILBERT
BURGIN
AGAWAM
MIDLOTHIAN
ISLAND COGEN
LAKE ROAD
MILFORD
BLACKSTONE
BAYSIDE
HAYS
MIDLOTHIAN II
BELLINGHAM
LA PALOMA
1x GT24
2x GT24
1x KA24-1
4x KA24-1
1x KA24-1*
3x KA24-1
2x KA24-1
2x KA24-1
1x KA24-1**
4x KA24-1
2x KA24-1
2x KA24-1
4x KA24-1
MONTERREY
ROSARITO
HERMOSILLO
MONTERREY III
EL SAUZ
2x KA24-1
2x KA24-1
1x KA24-1
4x KA24-1
1x KA24-1**
TERMOBAHIA
1x KA24-1*
TOCOPILLA
1x KA26-1
DOCK SUD
1x KA26-2
RINGSEND
AGHADA
1xKA26-1
1xKA26-1
ROCKSAVAGE
ENFIELD
SHOREHAM
CORYTON
LANGAGE
GRAIN
STAYTHORPE
PEMBROKE
1xKA26-2
1xKA26-1
1xKA26-1
1xKA26-2
1xKA26-2
3xKA26-1*
4xKA26-1
5xKA26-1
FLEVO
CLAUS C
2xKA26-1
1xKA26-3**
CYCOFOS
FOS SUR MER
1xKA26-1
1xKA26-1
RDK
KW EMSLAND
1xKA26-1**
1xKA26-2
TPP26
*
CoGen Projects
** Repowering Projects
(Status: Jan 2012)
1x KA26-1*
TERGA
3x KA26-1
GHANNOUCH
SCANDALE
GISSI
MODUGNO
1xKA26-1
2x KA26-1(*)
2x KA26-1
1x KA26-2
FUJAIRAH
UTRAN
1x KA26-1
JEGURUPADU III 2x KA26-1
2xKA26-2; 1xKA26-1*
ALIVERI
1x KA26-1
Tzafit
2x KA26-1
CHIBA
1x KA26-1
PORYONG
4x KA24-2
HAI FU
2x KA24-2
BOWIN
BANG BO
KHANG KHOI
2x KA26-1
1x KA26-1
2x KA26-2
SWANBANK
TALLAWARRA
1x KA26-1
1x KA26-1
TARANAKI
1x KA26-1
SENOKO
SENOKO II
TUAS CCP5
KEPPEL II
Banyan
1x KA26-1**
2x KA26-1**
1x KA26-1
2x KA26-1
1x KA26-1
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Reduced emissions
NOx emissions well below EU limits (50 mg/Nm3)
CO capability well below EU limits (100 mg/Nm3)
Low overall CO2 emissions due to high efficiency over full load-range
CO2 Capture Ready solutions already available
www.alstom.com/power