FIELD PERMEABILITY TEST

FALLING HEAD TEST


SNI 03-3968-1995
PROJECT
IGMC-STAGE 2
LOCATION
BERENGBENGKEL
STRUCTURE EMBANKMENT TYPE IA
HEIGHT OF CASING
50 cm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

ti

(cm)

(second)

5
7
9
10.5
12.5
14.5
17
18.5
20.5
22.5
23.5
27.4
32
38
43.5
48.5
53.5
57.5
60
63.5
66.5
68.5
70.5
73
74.5
76
77.5
79
81
82
83.5
85
86
87
88.3
89.4
101
109
128
131
133
ti =

ti 2

0
30
60
90
120
150
180
210
240
270
300
360
420
480
540
600
660
720
780
840
900
960
1020
1080
1140
1200
1260
1320
1380
1440
1500
1560
1620
1680
1740
1800
2700
3600
7200
10800
14400

0
900
3600
8100
14400
22500
32400
44100
57600
72900
90000
129600
176400
230400
291600
360000
435600
518400
608400
705600
810000
921600
1040400
1166400
1299600
1440000
1587600
1742400
1904400
2073600
2250000
2433600
2624400
2822400
3027600
3240000
7290000
12960000
51840000
116640000
207360000

2
67350 ti = 430276500

h = D-H(ti)
(cm)
195
193
191
189.5
187.5
185.5
183
181.5
179.5
177.5
176.5
172.6
168
162
156.5
151.5
146.5
142.5
140
136.5
133.5
131.5
129.5
127
125.5
124
122.5
121
119
118
116.5
115
114
113
111.7
110.6
99
91
72
69
67

h+r/2
(cm)
197.5
195.5
193.5
192
190
188
185.5
184
182
180
179
175.1
170.5
164.5
159
154
149
145
142.5
139
136
134
132
129.5
128
126.5
125
123.5
121.5
120.5
119
117.5
116.5
115.5
114.2
113.1
101.5
93.5
74.5
71.5
69.5
hi =

(ti) = 4536022500
2

No.

HOLE NO.
TEST DEPTH
Ground Water level
Hole Radius

N=
a=
k=1.15.r.a=
H

41
3.44E-05
1.98E-04 cm/sec

01
150 cm
80 cm
5 cm
Yi =
log(h(ti)+r/2)

Operator PS
D (cm)=

200

ti.Yi

2.296
2.291
2.287
2.283
2.279
2.274
2.268
2.265
2.260
2.255
2.253
2.243
2.232
2.216
2.201
2.188
2.173
2.161
2.154
2.143
2.134
2.127
2.121
2.112
2.107
2.102
2.097
2.092
2.085
2.081
2.076
2.070
2.066
2.063
2.058
2.053
2.006
1.971
1.872
1.854
1.842

0
68.7
137.2
205.5
273.5
341.1
408.3
475.6
542.4
608.9
675.9
807.6
937.3
1063.8
1188.8
1312.5
1434.3
1556.2
1680.0
1800.1
1920.2
2042.0
2163.0
2281.3
2402.2
2522.5
2642.1
2761.0
2876.7
2996.6
3113.3
3229.3
3347.4
3465.1
3580.3
3696.2
5417.5
7094.9
13479.5
20026.5
26524.6

87.711

ti.Yi = 133100.0

r=
GWL =

5 cm
100 cm

No.

ti

H
(cm)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

ti 2 h

(second)
37
42
47
52
57
62
67
72
77
82
87
92
97
102
107
112
117
122
127
ti

h+r/2

(cm)

0
47
126
174
270
380
500
628
785
960
1125
1310
1525
1860
2100
2522
2800
3240
4375

0
2209
15876
30276
72900
144400
250000
394384
616225
921600
1265625
1716100
2325625
3459600
4410000
6360484
7840000
10497600
19140625

24727
(ti)2 611424529

ti2

59463529

Yi
log(h(ti)+r/2)

(cm)
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5

97.5
92.5
87.5
82.5
77.5
72.5
67.5
62.5
57.5
52.5
47.5
42.5
37.5
32.5
27.5
22.5
17.5
12.5
7.5

1.98900462
1.96614173
1.94200805
1.91645395
1.8893017
1.86033801
1.82930377
1.79588002
1.75966784
1.7201593
1.67669361
1.62838893
1.57403127
1.51188336
1.43933269
1.35218252
1.24303805
1.09691001
0.87506126

hi 31.0657807

-2.543E-04

100
80
f(x) = - 0.0215468877x + 78.0415733037

60
40
20
0
0

500 100015002000250030003500400045005000

ti.Yi

ti.Yi
0
92.40866
244.693
333.463
510.1115
706.9284
914.6519
1127.813
1381.339
1651.353
1886.28
2133.189
2400.398
2812.103
3022.599
3410.204
3480.507
3553.988
3828.393
33490.42

FIELD PERMEABILITY TEST


FALLING HEAD TEST
SNI 03-3968-1995
PROJECT
IGMC-STAGE 2
LOCATION
BERENGBENGKEL
STRUCTURE
EMBANKMENT TYPE IB
HEIGHT OF CASING
50 cm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

ti

(cm)

(second)

75
96.5
99
101
103
104.5
105
106.5
107.5
108.5
109
110.5
110.5
110.5
111
112
112
112
115
117
125
126
120
ti =

ti 2

0
120
150
180
210
240
270
300
330
360
390
420
450
480
510
540
570
600
1800
3600
7200
9000
10800

0
14400
22500
32400
44100
57600
72900
90000
108900
129600
152100
176400
202500
230400
260100
291600
324900
360000
3240000
12960000
51840000
81000000
116640000

2
38520 ti = 268250400

h = D-H(ti)
(cm)
125
103.5
101
99
97
95.5
95
93.5
92.5
91.5
91
89.5
89.5
89.5
89
88
88
88
85
83
75
74
80

h+r/2
(cm)
127.5
106
103.5
101.5
99.5
98
97.5
96
95
94
93.5
92
92
92
91.5
90.5
90.5
90.5
87.5
85.5
77.5
76.5
82.5
hi =

(ti) = 1483790400
2

No.

HOLE NO.
TEST DEPTH
Ground Water level
Hole Radius

N=
23
a= 1.05E-05
k=1.15.r.a= 6.02E-05 cm/sec

01
150 cm
80 cm Operator PS
5 cm D (cm)=
Yi =
log(h(ti)+r/2)

ti.Yi

2.106
2.025
2.015
2.006
1.998
1.991
1.989
1.982
1.978
1.973
1.971
1.964
1.964
1.964
1.961
1.957
1.957
1.957
1.942
1.932
1.889
1.884
1.916
45.320

200

0.0
243.0
302.2
361.2
419.5
477.9
537.0
594.7
652.6
710.3
768.6
824.8
883.7
942.6
1000.3
1056.6
1115.3
1174.0
3495.6
6955.1
13603.0
16953.0
20697.7
ti.Yi =

73768.8

FIELD PERMEABILITY TEST


FALLING HEAD TEST
SNI 03-3968-1995
PROJECT
IGMC-STAGE 2
LOCATION
BERENGBENGKEL
STRUCTURE
EMBANKMENT TYPE IIB
HEIGHT OF CASING
50 cm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

ti

(cm)

(second)

20
56
62
66
69
76
81.5
88
98
100
102
102.8
104.7
106.2
107
107.6
108.3
113.2
113.8
115
114.5
114
113.5
113.5
113
113
ti =

ti2
0
60
120
180
240
300
360
420
480
540
600
660
720
780
840
900
1800
2700
3600
7200
10800
14400
18000
21600
25200
28800

0
3600
14400
32400
57600
90000
129600
176400
230400
291600
360000
435600
518400
608400
705600
810000
3240000
7290000
12960000
51840000
116640000
207360000
324000000
466560000
635040000
829440000

141300

ti2 = 2658834000

h = D-H(ti)
(cm)
180
144
138
134
131
124
118.5
112
102
100
98
97.2
95.3
93.8
93
92.4
91.7
86.8
86.2
85
85.5
86
86.5
86.5
87
87

h+r/2
(cm)
182.5
146.5
140.5
136.5
133.5
126.5
121
114.5
104.5
102.5
100.5
99.7
97.8
96.3
95.5
94.9
94.2
89.3
88.7
87.5
88
88.5
89
89
89.5
89.5
hi =

(ti)2 = 19965690000
V

No.

HOLE NO.
TEST DEPTH
Ground Water level
Hole Radius

N=
26
a= 5.09E-06
k=1.15.r.a= 2.92E-05 cm/sec
D

01
150 cm
80 cm
5 cm
Yi =
log(h(ti)+r/2)
2.261
2.166
2.148
2.135
2.125
2.102
2.083
2.059
2.019
2.011
2.002
1.999
1.990
1.984
1.980
1.977
1.974
1.951
1.948
1.942
1.944
1.947
1.949
1.949
1.952
1.952
52.550

Operator
D (cm)=

PS
200
ti.Yi
0
130.0
257.7
384.3
510.1
630.6
749.8
864.7
969.2
1085.8
1201.3
1319.1
1433.0
1547.2
1663.2
1779.5
3553.3
5267.3
7012.5
13982.5
21000.4
28036.0
35089.0
42106.8
49185.9
56212.5

ti.Yi = 275971.9

FIELD PERMEABILITY TEST


FALLING HEAD TEST
SNI 03-3968-1995
PROJECT
IGMC-STAGE 2
LOCATION
BERENGBENGKEL
STRUCTURE
EMBANKMENT TYPE IIB
HEIGHT OF CASING
0 cm
No.

ti

H
(cm)
0
0.5
1
2.5
3.9
4.2
4.8
6.5
7.4
7.7
8
8.6
9
9.5
10
9.5
11
16.8
20.8
41
56.8
68
83.7
85
84.5
84.5
ti =

(second)
0
60
120
180
240
300
360
420
480
540
600
660
720
780
840
900
1800
2700
3600
7200
10800
14400
18000
21600
25200
28800

h = D-H(ti)
(cm)

0
3600
14400
32400
57600
90000
129600
176400
230400
291600
360000
435600
518400
608400
705600
810000
3240000
7290000
12960000
51840000
1.2E+008
2.1E+008
3.2E+008
4.7E+008
6.4E+008
8.3E+008

2
141300 ti = 2.7E+009

400
399.5
399
397.5
396.1
395.8
395.2
393.5
392.6
392.3
392
391.4
391
390.5
390
390.5
389
383.2
379.2
359
343.2
332
316.3
315
315.5
315.5

h+r/2
(cm)
402.5
402
401.5
400
398.6
398.3
397.7
396
395.1
394.8
394.5
393.9
393.5
393
392.5
393
391.5
385.7
381.7
361.5
345.7
334.5
318.8
317.5
318
318
hi =

(ti)2 = 2.0E+010
V

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

ti2

HOLE NO.
TEST DEPTH
Ground Water level
Hole Radius

N=
a=
k=1.15.r.a=

26
4.17E-06
2.40E-05 cm/sec

01
400 cm
80 cm
5 cm
Yi =
log(h(ti)+r/2)

Operator
D (cm)=

PS
400
ti.Yi

2.605
2.604
2.604
2.602
2.601
2.600
2.600
2.598
2.597
2.596
2.596
2.595
2.595
2.594
2.594
2.594
2.593
2.586
2.582
2.558
2.539
2.524
2.504
2.502
2.502
2.502

0
156.3
312.4
468.4
624.1
780.1
935.8
1091.0
1246.4
1402.0
1557.6
1713.0
1868.4
2023.6
2178.8
2335.0
4666.9
6982.9
9294.2
18418.4
27418.0
36351.3
45063.3
54037.7
63061.2
72069.9

66.967

ti.Yi = 356056.6

FIELD PERMEABILITY TEST


FALLING HEAD TEST
SNI 03-3968-1995
PROJECT
IGMC-STAGE 2
LOCATION
BERENGBENGKEL
STRUCTURE
EMBANKMENT TYPE V
HEIGHT OF CASING
50 cm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

ti

(cm)

(second)
0
30
60
90
120
150
180
210
240
270
300
360
420
480
540
600
660
720
780
840
900
1800
2700
3600
7200
10800
14400
18000
21600

0
900
3600
8100
14400
22500
32400
44100
57600
72900
90000
129600
176400
230400
291600
360000
435600
518400
608400
705600
810000
3240000
7290000
12960000
51840000
1.2E+008
2.1E+008
3.2E+008
4.7E+008

88050

ti2 = 1.2E+009

50
94
107
111
114.2
119
128.6
130.5
131.2
132.1
133.8
138.7
140.2
143.5
145.2
146.8
147.8
148.5
149.5
150.2
150.8
157.7
164
168
165
161.3
160
160
159
ti =

t i2

h = D-H(ti)
(cm)
150
106
93
89
85.8
81
71.4
69.5
68.8
67.9
66.2
61.3
59.8
56.5
54.8
53.2
52.2
51.5
50.5
49.8
49.2
42.3
36
32
35
38.7
40
40
41

h+r/2
(cm)
152.5
108.5
95.5
91.5
88.3
83.5
73.9
72
71.3
70.4
68.7
63.8
62.3
59
57.3
55.7
54.7
54
53
52.3
51.7
44.8
38.5
34.5
37.5
41.2
42.5
42.5
43.5
hi =

01
150 cm
80 cm
5 cm
Yi =
log(h(ti)+r/2)
2.183
2.035
1.980
1.961
1.946
1.922
1.869
1.857
1.853
1.848
1.837
1.805
1.794
1.771
1.758
1.746
1.738
1.732
1.724
1.719
1.713
1.651
1.585
1.538
1.574
1.615
1.628
1.628
1.638
51.651

(ti)2 = 7.8E+009
V

No.

HOLE NO.
TEST DEPTH
Ground Water level
Hole Radius

N=
29
a= 1.41E-05
k=1.15.r.a= 8.08E-05 cm/sec
D

PENGUKURAN PERMEABILITAS (TIPE V)


KEDALAMAN 1.50 M MAT : - 0.70 M

120
100

Operator
D (cm)=

PS
200
ti.Yi
0
61.1
118.8
176.5
233.5
288.3
336.4
390.0
444.7
498.8
551.1
649.7
753.7
850.0
949.4
1047.5
1147.1
1247.3
1344.9
1443.5
1542.1
2972.3
4280.7
5536.1
11333.0
17440.9
23448.8
29311.0
35391.4

ti.Yi = 143788.9

FIELD PERMEABILITY TEST


FALLING HEAD TEST
SNI 03-3968-1995
PROJECT
IGMC-STAGE 2
LOCATION
BERENGBENGKEL
STRUCTURE
EMBANKMENT TYPE V
HEIGHT OF CASING
0 cm
No.

ti

H
(cm)
10
73.5
82
84.5
85.4
87.2
88.1
89.7
91
91.1
91.8
92.3
92.5
92.6
92.7
93
93
93
93
93
93
92
91.3
92
92
91
89.5
89
88
87.5
87
ti =

(second)
0
30
60
90
120
150
180
210
240
270
300
360
420
480
540
600
660
720
780
840
900
1800
2700
3600
7200
10800
14400
18000
21600
25200
28800

0
900
3600
8100
14400
22500
32400
44100
57600
72900
90000
129600
176400
230400
291600
360000
435600
518400
608400
705600
810000
3240000
7290000
12960000
51840000
1.2E+008
2.1E+008
3.2E+008
4.7E+008
6.4E+008
8.3E+008

142050

ti2 = 2.7E+009

h = D-H(ti)
(cm)
390
326.5
318
315.5
314.6
312.8
311.9
310.3
309
308.9
308.2
307.7
307.5
307.4
307.3
307
307
307
307
307
307
308
308.7
308
308
309
310.5
311
312
312.5
313

h+r/2
(cm)
392.5
329
320.5
318
317.1
315.3
314.4
312.8
311.5
311.4
310.7
310.2
310
309.9
309.8
309.5
309.5
309.5
309.5
309.5
309.5
310.5
311.2
310.5
310.5
311.5
313
313.5
314.5
315
315.5
hi =

(ti) = 2.0E+010
2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

t i2

HOLE NO.
TEST DEPTH
Ground Water level
Hole Radius

N=
31
a= 1.38E-07
k=1.15.r.a= 7.95E-07 cm/sec
D

01
400 cm
80 cm
5 cm
Yi =
log(h(ti)+r/2)

Operator
D (cm)=

PS
400
ti.Yi

2.594
2.517
2.506
2.502
2.501
2.499
2.497
2.495
2.493
2.493
2.492
2.492
2.491
2.491
2.491
2.491
2.491
2.491
2.491
2.491
2.491
2.492
2.493
2.492
2.492
2.493
2.496
2.496
2.498
2.498
2.499

0
75.5
150.3
225.2
300.1
374.8
449.5
524.0
598.4
673.2
747.7
897.0
1046.4
1195.8
1345.2
1494.4
1643.8
1793.3
1942.7
2092.2
2241.6
4485.7
6731.2
8971.4
17942.8
26929.3
35935.8
44932.3
53948.6
62957.4
71971.2

77.450

ti.Yi = 354617.1

Você também pode gostar