NON CONFORMANCE REPORT

Spacer
Orientation.
[1]Title:

beneath

[3] NCR Issued To: AYTB SHOP 2

SAMSUNG

sockolet

Due

to

Wrong

[2] NCR No.:

SRLF-NCR-WP-

089
[4] Issue Date:

NOVEMBER

07,2016

[6] Location of Problem: AYTB SHOP 2 SAMSUNG


[8] NCR Written By (print): Moureen Dela Merced

[5] Response Due Date:


[7]

( Piping

Ref.

Doc.:

SAES-L-350

Para 9.1 & 9.7

QCI)
During inprocess inspection at AYTB
SHOP 2, It was noted and recorded by Contractor QCI that the Subcontractor AYTB failed to measure
and execute correct orientation of the Olet and spacer welded for the Jacketed Spools. In Line
number Q98-SF-1058-13-001-A, The Spacers were found to be just beneath the 18X1 olet
placement which is not acceptable as per IFC Drawings.
[9] Condition Description (Requirement and Nonconformity Found):

Attachment(s): Yes No 1) Photo (4 page), 3) Q98-SF-1058-13-001-A


[10] Repeated Violation
Yes No
[11] Recommended material/equipment disposition and any special instructions:
Rework Repair Use-As-Is Reject (Repair or Use-As-Is require COMPANY approval)
[12] Use-As-Is or Repair, COMPANY Approved by:
Attach evidence of COMPANY approval
[13] Recommended Corrective Action (Required Yes No): Include in your response, the date Corrective Action will be
implemented.

[14] Recommended Preventive Action (Required Yes No): Include in your response, the date Preventive Action will be
implemented.

[15] Root Cause of condition:

[16] Response Prepared by:


(Name)

Date:
(Sign.)

[17] Engineering Disposition Required Yes No


[18] Response Approved by:
(Name)

Date:
(Sign.)

[19] Verified by:


(Name)

Closed Date:
(Sign.)