: PEMASANGAN VINYL
: RSUD RAA. SOEWON
: 2015
URAIAN PEKERJAAN
VOLUME
1
2
I. PEKERJAAN PERSIAPAN
a. Pengukuran/ Uitzet
b. Administrasi, Dokumentasi
dan Asbuild Drawing
c. Pekerjaan bongkaran
d. Papan nama proyek
e. Pembersihan/ Perapian
3
1.00 Ls
3.00 Jilid
1.00
1.00
1.00
Terbilang
Mengetahui;
PPA
Ls
Ls
Ls
50.00 m2
63.36 m2
No
URAIAN PEKERJAAN
VOLUME
H. PIRNO, S.Sos, MM
NIP. 19630410 198511 1 001
H KABUPATEN PATI
SOEWONDO PATI
GARAN BIAYA
ANALISA
4
H.SATUAN
Rp.
5
JUMLAH
TOTAL
6
Taksir
Taksir
100,000.00
200,000.00
Rp
Rp
Taksir
Taksir
Taksir
300,000.00
350,000.00
128,000.00
Rp
300,000.00
Rp
350,000.00
Rp
128,000.00
Rp 1,478,000.00
A.4.4.1.9
A.4.4.1.11
484,176.00
484,176.00
Rp 24,208,800.00
Rp 30,677,391.36
###
56,364,191.36
TOTAL A + B
PPN 10%
100,000.00
600,000.00
5,636,419.14
JUMLAH TOTAL
62,000,610.50
DIBULATKAN
62,000,000.00
Pati,
November 2015
Dibuat oleh;
PPTK;
ANALISA
4
H.SATUAN
Rp.
5
JUMLAH
TOTAL
6
ARIS SUGIARTO, SH
NIP. 19630910 200604 1 002
PEKERJAAN
LOKASI
TAHUN ANGGARAN
Uraian
Kode
A. TENAGA
Pekerja
L.01
OH
0.700
50,000.00
Tukang Batu
L.02
OH
0.350
60,000.00
Kepala Tukang
L.03
OH
0.034
70,000.00
Mandor
L.04
OH
0.004
70,000.00
m2
1.050
350,000.00
Lem
Kg
0.350
40,000.00
10% * D
P)
SOEWONDO PATI
Jumlah Harga
(RP)
35,000.00
21,000.00
2,380.00
280.00
58,660.00
367,500.00
14,000.00
381,500.00
440,160.00
44,016.00
484,176.00
Tentang Standar Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum Kabupaten Pati T
UPAH TENAGA
NO
URAIAN
2
1 Pekerja
2 Tukang
3 Kepala tukang
4 Mandor
HARGA PERSATUAN
3
/ hari
/ hari
/ hari
/ hari
4
50,000.00
60,000.00
70,000.00
70,000.00
HARGA BAHAN
NO
URAIAN
1 Batu Belah
2 Batu pecah 2/3
3 Bendrat (Kawat beton)
4 Batu Bata
5 Besi beton polos
6 Cat penutup (tembok)
7 Cat dasar tembok
8 Kayu balok klas II
9 Kayu dolken
10 Kayu klas III
11 Minyak bekisting
12 Paku
13 Pasir beton
14 Pasir urug
15 Tanah padas
16 Air
17 Besi profil
18 Profil aluminium 1,75" x 4"
19 Sekrup fixer
20 Sealant
21 Profil kaca
22 Profil aluminium ram jendela 1,25" x 2,
23 Pasir pasang
24 Plamir
25 Plywood tebal 9 mm
26 Semen portland
27 Solar
28 Cat Plamur
29 Genteng kudus
30 Nok Genteng kudus
31 Kayu kruing
HARGA PERSATUAN
3
/ m3
/ m3
/ m3
/ bh
/ kg
/ kg
/ kg
/ m3
/ m3
/ m3
/ ltr
/ kg
/ m3
/ m3
/ m3
/ liter
/ kg
/ m1
/ bh
/ kg
/ m1
/ m1
/ m3
/ kg
/ lbr
/ kg
/ liter
/ kg
/ bh
/ bh
/ m3
4
170,000.00
243,151.07
18,000.00
750.00
11,000.00
27,000.00
50,000.00
5,900,000.00
30,000.00
1,180,000.00
15,000.00
18,000.00
315,000.00
115,000.00
60,000.00
17.50
13,000.00
85,000.00
4,000.00
30,000.00
8,000.00
75,000.00
253,000.00
25,000.00
135,000.00
1,500.00
6,500.00
25,000.00
2,000.00
4,500.00
7,500,000.00
32 Besi setrip 5 mm
33 Paku 12 cm
34 Closed jongkok INA
35 Gypsum board tebal 9 mm
36 Paku sekrup
37 List gypsum
38 Rangka hollow
39 Kaca rayband 5 mm
/ kg
/ kg
/ bh
/ lbr
/ kg
/ m1
/ m2
/ m2
11,000.00
18,000.00
140,000.00
60,000.00
25,000.00
10,000.00
15,000.00
100,000.00
/ bh
/ bh
/ bh
/ bh
/ m2
/ m3
155,000.00
30,000.00
12,500.00
32,500.00
45,000.00
50,000.00
KETERANGAN
5
KETERANGAN
5
727,071,000.00
19,262,000.00
19,262,000.00
4,920,000.00
770,515,000.00
1,905,346,143.00
94.36169
2.499886
2.499886
0.638534
100.00
1,071,971,143.00
1,071,971,143.00
28,370,000.00
28,370,000.00
6,120,000.00
94.46085
2.499931
2.499931
0.539287
1,134,831,143.00
100.00