3D MULTI STOREY BUILDING WITH SLAB MODELING

Data:
Length : 4 bays 13.1m
Height:6 bays 17.45m
Width:3 bays 10.36m
Outer column C1 300 x 300
Middle column C2 400 x 400
Inner column C3 450 x 450mm
Grade beam :300 x 450
Floor beam :230 x 450
Roof beam : 230 x 400
Slab thickness: 125mm
Concrete Grade M20
Steel Grade Fe 415

C1

C2

C1 - 300 X 300
C2 - 400 X 400
C2 - 450 X 450

C2

C1

C2

C2

C2

C3

C3

C3

C3

C3

C3

C2

C2

C2

PLAN

5th FLOOR

230 X 400

4th FLOOR

230 X 450

3rd FLOOR

230 X 450

2nd FLOOR

230 X 450

1st FLOOR

230 X 450

230 X 450

ELEVATION

C1

C1

1.Geometry creation:
New Project Select Space Length =meters; Force=KN;
File Name= Gravity example 1 Next
Select Add beam Finish Close. Snap node/Beam. It shows a table.
Node
1
2
3
4
5

X
0
3.65
6.40
9.45
13.0

Y
0
0
0
0
0

Z
0
0
0
0
0

Go to front view. Click Add Beam button. Connect the nodes of all beam.
Select the entire members Click Translational Repeat Z axis. No. of
steps=1
Default spacing=3.65m All Link steps Ok.
Then select 2nd row of the beam Right click Copy Right clickPaste the
beam
Z=3.35mOk. Then select the 3rd row of the beam Right click Copy
Right
clickPaste the beam Z=3.96mOk. One Floor created. Select all (or) Ctrl
+A.
Translational Repeat Y No. of steps =1 default spacing=(-)1.80m
All Link steps Open Ok. Go to front elevation. Select Top portion of beam
Translational Repeat Y No. of step=1 default spacing=3.65m Link steps
Ok.

Select top portion of first floor beam Translational Repeat Y No. of


steps =4
Default spacing=3.0m All Link steps Open Ok.
Select first floor by windowing view View select objects. Plan view.
Select 4
noded plates connect the each node of plate 1. Similarly

connect the

other
nodes of plates in the plan. View Selected objectsRendered view. Select
the
first floor in elevation using plate node cursor Translational Repeat
YNo. of steps=4 Default step spacing=3.0m Ok.
2.Member Properties:
General Property DefineRectangle YD=0.30 ZD=0.30 (C1) Add.
YD=0.40 ZD=0.40 (C2) Add. YD=0.45 ZD=0.45 (C3) Add. YD=0.40
ZD=0.23 (Roof beam) Add. YD=0.45 ZD=0.23 (Floor beam) Add.
YD=0.45 ZD=0.30(Grade beam) Add. thickness Node
1,2,3,4=0.15AddClose.
Go to plan view. Highlight 0.30x0.30 using node cursor windowing the
corner column C1 Assign to selected nodes AssignYes. Confirm the
selection by viewing isometric view.
Highlight 0.40x0.40 and windowing the middle column in the outer line of
plan(C2) Assign to selected nodes AssignYes. Confirm the selection

by viewing isometric view.


Highlight 0.45x0.45m and windowing the inner column in the plan(C3)
Assign to selected nodes AssignYes. Confirm the selection by viewing
isometric view.
Highlight 0.40x0.23m and select the Roof beam Assign to selected
beam AssignYes. Highlight 0.45x0.23m and select the other floor
beams Assign to selected beam AssignYes. Highlight 0.45x0.3m and
select the bottom Grade beam Assign to view AssignYes Close.
You can see the isometric view in render view.
3. Supports:
Change to Node cursor (joint) and select the nodes (joints).
(If more than one node use CTRL key and select the nodes)
Page control Support Create Fixed Add. Highlight support 2
Go to front view. Select bottom most nodes Assign to selected nodes
Assign Yes .
4. Loading :
Click loads Load case details Add. Number 1 Loading Type: Dead.
Title: DL Add Number 2. Loading type: Live Title: LL Add. Close .
Load case 2=Live Load Add Close.
Select Load case 1(Dead Load) Add Self Weight (Dead Load of beam &
Column) Factor =--1 Direction

Y Add. Member Load Uniform force

w1=-12KN/m Add. Plate loads Pressure on full plates

pressure=(-)4KN/m2 Add. click LL Floor Load Pressure=--2.0 KN/m2


Define Y range Mini.=3.65m. Max.=15.65 Add. Highlight selfweight
Assign to viewYes. Highlight member weight 12KN/mSelect Beam
parallel to X and Z Assign to selected beamAssignYes.

From Main menu Commands LoadingLoad Combination Load comb 3


Default=1.5
Available Load
Load case 1

Selected load

>
>>
Load case 2
<
<<
Load factor=1.5 Add Close.
From Main Menu CommandsLoading Load List (selecting Design loads)
Load List
Available Load
Load case 1
Load case 2
Load Comb 3

>
>>
<
<<

Load list
Load Comb 3

o.k. Close.
5. Analysis Type:
Analysis/print No print AddClose.
6. Post Analysis Print:
Post print Define Commands Analysis Results AddClose.
7. Design :
Click design Concrete Current code IS 456 Define parameters

Fck=20000KN/m2 Add. Fymain=415000KN/m2 Add.


Fysec=415000KN/m2 Add. Ratio=3%Add. Click CommandDesign beam
Add. Design column Add. Take ofAddClose.
Click Fck=20000KN/m2 and select the entire structure Assign to
selected beam Assign Yes. Click Fymain=415000KN/m 2 and select the
entire structure Assign to selected beam Assign Yes. Click
Fysec=415000KN/m2 and select the entire structure Assign to selected
beam Assign Yes. Click Ratio=3% and select the entire structure
Assign to selected beam Assign Yes. Click design beam
Selectbeam parallel to X and beam parallel to Z Assign to
selected beam Assign Yes . Click Design ColumnSelect Beam parallel
to Y Assign to selected beam Assign Yes.
Note: Save the File and Run the Program.
8. Analysis:
From Main Menu Analysis Run Analysis Done.
9. Results:
Post processing
Deflection.
ResultsView valueBeam results deflectionAnnotate.
Bending moment MZ :
Click Mz icon.
ResultsView valueBeam results

Bending moments Ends Midspan Annotate.


Shear Force FY
Click Fy icon.
ResultsView value Beam Results
Shear Force Ends Annotate.
(Remove other ticks already assigned)
Axial Force FX:
Click FX icon.
Results View value Beam Results
Axial Force Ends Annotate.
Note: Before going to another result remove the tick mark in beam results.
Design Check:
Main menu SelectBy specification All failed beams. Go to modeling
mode. Select
column 9at bottom portion) Double click the columnConcrete design.
Check the
bottom most storey column. If some columns in GF inner are failed, change
the size of
the column for inner portion and again run the analysis, verify the result.
Similarly
check the beam by double click the particular beam for find the
reinforcement. If all are
passed ok. Otherwise revise the beam section if failed.

9. Report:
Click Report setup icon Click input from available from left side.
Select sections , Loadings and sent to Right side by clicking > Select output.
From output select Beam end forces, reactions, shear forces, axial forces,
Beam force
detail summary.
To Take picture:
Click take picture icon Enter the title of the sketch. Then Go to report set
up. Select
picture Album. If you want to change the sketch title enter the title in
caption. Adjust
the picture size by adjusting height & width. Select Full page.
To export Results in word file:
File Export Report MS word file. Click save.