Escolar Documentos
Profissional Documentos
Cultura Documentos
Project Management
THE MANAGERIAL PROCESS
Clifford F. Gray
Eric W. Larson
Third Edition
Chapter 4
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
Step 7:
Farhan Saleem
Farhan Saleem
SAMPLE TEMPLATE
PROJECT BRIEF
Project Name: ________________________________________________________________
Project Code: ______________________
Location: ____________________________________________________________________
Client: _____________________________
Consultant:_____________________________
Farhan Saleem
SAMPLE TEMPLATE
FINANCIAL DATA
Contract Date: ________________________________________________________________
Type of Contract: ______________________________________________________________
Contract Period: ______________________________________________________________
Cost of Project: _______________________________________________________________
Fund Source: ________________________________________________________________
Invoice Date: _______________________
Farhan Saleem
Project
Number
Value of
the project
Type of
Project
Completion
Period
Farhan Saleem
Lowest to Highest
1 to 5
Project value
1 to 4
1 to 5
1 to 4
Farhan Saleem
Client:
Consultants:
Finish Date:
Farhan Saleem
Type of Contract
Farhan Saleem
Cost of Project:
Fund Source:
Invoice Date:
Farhan Saleem
Farhan Saleem
Farhan Saleem
Farhan Saleem
Farhan Saleem
Farhan Saleem
SAMPLE TEMPLATE
PROJECT BRIEF
Project Name: _________________________________________________
Project Code: ________________
Client: ______________________
Consultant: ___________________
Contract Period:______________
PROJECT JUSTIFICATION
Farhan Saleem
Deliverables
Milestones
CONSTRAINTS
SCOPE EXCLUSIONS
MISCELLANEOUS
PROJECT APPROVAL
Prepared By: _______________________
Approved By: _______________________
Date: ______________
Date: ______________
Farhan Saleem
Project Manager
Project Code
Consultant
Client
Finish Date
Start Date
Contract Period
Cost of Project
Farhan Saleem
Farhan Saleem
Deliverables
Milestones
Farhan Saleem
10
Farhan Saleem
Farhan Saleem
11
Farhan Saleem
Farhan Saleem
12
CASE STUDY
A 100 unit housing colony construction project in a city
average location. Value of contracted works is 160 million
and the project is contracted to complete in 36 months using
fast track approach (design, procurement and construction).
Four construction categories: Category A Double storey
one unit houses with high class finish; Category B Double
storey one unit houses with normal finish; Category C
Double storey two unit houses; Category D Single storey
houses.
PROJECT OBJECTIVES
To develop the residential colony within 36 months at cost not to
exceed 160 Million. The quality objectives for the four categories
are:
Category A: High-Class
Category B: Medium
Category C: Medium
Category D: Medium
Farhan Saleem
13
Farhan Saleem
Farhan Saleem
14
Project Charter
Can contain an expanded version of scope statement
A document authorizing the project manager to initiate
and lead the project.
Project Creep
The tendency for the project scope to expand over
time due to changing requirements, specifications,
and priorities.
Farhan Saleem
Farhan Saleem
15
FIGURE 4.1
Farhan Saleem
FIGURE 4.2
Farhan Saleem
16
Farhan Saleem
Farhan Saleem
17
Assessment
Value
Lowest
Low
Average
2. Project value
High
Highest
>1000 million
Farhan Saleem
Assessment
Value
<5% of value
>20%
>10 years
3 years to 10 years
1 year to 3 years
<1 year
Farhan Saleem
18
3
2
3
4
Total value:
3+2+3+4 = 12
Farhan Saleem
Farhan Saleem
19
Farhan Saleem
Farhan Saleem
20
Farhan Saleem
Farhan Saleem
21
Farhan Saleem
Farhan Saleem
22
Farhan Saleem
Farhan Saleem
23
Farhan Saleem
2.
3.
4.
5.
Farhan Saleem
24
Farhan Saleem
Farhan Saleem
25
Farhan Saleem
Farhan Saleem
26
Farhan Saleem
Farhan Saleem
27
Benefit to Customer
(Short term)
Farhan Saleem
Direct Contribution
(Medium term)
Future Opportunity
(Long term)
Farhan Saleem
28
Success Factor
Category
SAMPLE TEMPLATE
Measurable Success Criteria
Deliverables Success
Procedural Success
Staff Success
Business Success
Farhan Saleem
Examples
Project Success Criteria Checklist
S. No.
Success Factor
Category
SAMPLE TEMPLATE
Measurable Success Criteria
Deliverables Success
1.
Procedural Success
1.
The project is to be
completed with no more than
10% schedule overruns.
Internal Project
Objectives
(PreCompletion)
Meeting schedule
Farhan Saleem
29
Success Factor
Category
SAMPLE TEMPLATE
Measurable Success Criteria
Staff Success
1.
Future
Opportunity
(Long Term)
2.
Internal Project
Objectives
(PreCompletion)
Within budget
Farhan Saleem
Examples
Project Success Criteria Checklist
S. No.
Success Factor
Category
SAMPLE TEMPLATE
Measurable Success Criteria
Business Success
1.
Future
Opportunity
(Long Term)
2.
Future
Opportunity
(Long Term)
Farhan Saleem
30
Farhan Saleem
Evaluating Success
Answering following questions will evaluate success of the project
Were success criteria met?
If the answer is yes, how was that accomplished, and how
can we ensure that our successes are repeated?
If the answer is no, why did we fail to meet our success
criteria?
Which criteria did we fail to meet?
Why did each failure occur?
Were the success criteria realistic and attainable?
What improvements can be made in the future to the way we
plan deliverables, execute projects or utilize project staff
resources?
EM-504: Project Management Framework And Tools
Farhan Saleem
31
Farhan Saleem
32