1st Year (June 2013 June 2014) Outcomes

and Next Steps


- Presentation for 2nd PSC/JCC -

IJ-REDD+ Project
Indonesia-Japan Project for
Development of REDD+ Implementation Mechanism (IJREDD+)
Duration: June 2013- June 2016
July 22, 2014
Shigeru Takahara
Chief Advisor, IJ-REDD+

Project Set-up and Organization Structure


Project Office: Ministry of Forestry

JCC/PSC

Project Director
PJLKKHL

National Expert

National Coordinator
Japanese Experts

Project Staff (Program


Officer, Assistants, GIS
Specialist)

West Kalimantan
Project Office: GPNP

Technical Committee
BKSDA
Pontianak

Dinas
Kehutanan
Provinsi

Project Office: Dinas Kehutanan

Japanese Expert
Project Staff
(Program Officer,
Assistant)

Japanese Expert
GP
National
Park

Central Kalimantan
BKSDA
Palangka
Raya

KOMDA REDD+
Palangka Raya
University

Regional Coordinator

Field Coordinator
Project Staff
(Program Officer,
Assistants)

Target Districts and Pilot Site in West Kalimantan

Kab Pontianak

Kab Kubu Raya

Kab Kayong Utara


Pilot Site:
Gunung Palung NP

Kab Ketapang

1st Year Outcome of Output 1: Provincial Level West kalimantan


Coordination and Policy Support
Kick-off Workshop

Joint Workshop with JICA FCP Project in


October, 2013
About 130 participants from central and local
governments, universities, NGOs, partners
To socialize IJ-REDD+ and raise awareness of
initiatives regarding forest and climate change

Technical Committee

Provincial Technical Committee held in June, 2014


Progress report and discussion on project activities
Coordination among stakeholders
Provincial Level REDD+ Policy Support

Participated REDD+ Strategy(SRAP) Socialization


Workshop
Support printing and translation of SRAP Kalbar

Output 1 Provincial Level West Kalimantan


MRV Capacity Building
Monitoring (Remote Sensing, Field Survey, GIS) Training
Contribution to REDD+ MRV, RAD-GRK Monitoring
Basic Training at
Pontianak (Feb, 2014)
Satellite Image Analysis
Forest Resource
Monitoring

NEXT STEP
Action Plan by each
participant of the
training

Field Practice at
Pontianak (May, 2014)
Collect field data for land
use classification
Forest Inventory Survey

Training in Japan
(June, 2014)
High-level remote sensing
technology
Concept in REDD+
Field Visit

Follow-up Training at
Pontianak (Sept, 2014)
Forming MRV Working
Group under Provincial Gov.

Support provincial
mechanism of
REDD+ and
RAD-GRK MRV

Development of REDD+ Mechanism in West Kalimantan


- from Sub-National to Model SitesREL analysis and potential REDD+ sites
2000

Consul
-tant
Team

Base map making


(Land utilization,
Moratorium map,
deforestation map,
etc.)

2006
2009
2011
2013

Analysis of District
REL/RL

Identify potential REDD+


sites

Analysis on process (presentation by Consultant Team)


Peat Land Survey
(Peat distribution and
emission factor)
Output 2
REDD+ Model in Gunung Palung
National Park

Landscape
Approach

Next Step
Output 3
REDD+ Models in HL/HP/ APL

Selection Process of Sites of HP/HL/APL REDD+ Model (Output 1 to Output 3)


July 2014
Selecting candidate sites of
Output 3
Identifying REDD+ Potential Sites
through Satellite Image Analysis
Sep

Stakeholder
Consultation
Information Gathering
and Analysis

Dec 2014

Discussion with PJLKKHL


and Ministry of Forestry
SepOct

Ketapang,
KKU

Pontianak,
Kubu Raya

Land scape
Approach in the
Surrounding Area
of Gunung Palung
Naional Park

Define criteria for


selecting Output 3
Model Sites

Sept

Discussion with local gov


and stakeholders (FGD)

Sept

Information Gathering (Province, District,


NGO
Aug

SepNov

Collecting basic
information and field visit

Sep

Endorsed in Technical
Committee

Dec

SepOct

Activity plan
Oct
Nov

Evaluating candidate sites


for Output 3

Identify Output 3
model site

Output 3 activities

National Park REDD+ Model at Gunung Palung NP

Collaborative Management (MDK): 2 +4 = 6 villages


REDD+ Survey: covering whole NP & outside boundary

Structure of Activities at Palung National Park


TNGP mid-term
Management Plan

TN Management

Management System
Forest Conservation

Collaborative Management
Biodiversity Monitoring
Awareness Building
Community Facilitation
Carbon/Forest Monitoring

Livelihood Support
Partnership/Networking
Benefit sharing mechanism

Socio-economics Survey
Identify REDD+ activity

Field Guide
for
Collaborative
Management
in TNGP

REDD+
Model
Operation
Manual

Safeguard
REL/RL Development

REDD+ -related Activity

PDD
2014/7/16

1st year Outcomes of Output 2


Coordination activity
Kick-off Meeting at Ketapang
Kick off meeting at Ketapang held
December 11, 2013
About 60 participants from central and
local governments, National Par Staff,
universities, NGOs, partners
To socialize IJ-REDD+ and discussing
collaborative management of forest with
communities in buffer zone of NP

Other Coordination Activities


Actively participated in workshops, coordinating meetings,
trainings with USAID-IFACS, BKSDA Pontianak, NGOs

Collaborative Management with Communities


Facilitation Training
Visit to West Bali
National Park
(August, 2013)

- Capacity Building for National Park Staff

8 staff from
GPNP, 1 from
PJLKKHL
attended
Learn good
practice by
West Bali NP

Advanced Training in Japan


on Collaborative Management
(June, 2014)
11 staff (9 from NP, KLN, PJLKKHL)
participated.
Lecture at Min Environment Japan
and field practice at Sado island

Facilitation Training for 4 Series of Training


Gunung Palung NP
were conducted i i
Staff
network
(September,
January, February,
March)
About 13 participant
from NP staff
attended.
Follow-up training at
villages were also
conducted

Workshop on Collaborative
Management (July, 2014)

3 day workshop for


staff NP, local
government, NGO
Case study on
collaborative
management and
group discussion

Socio-economic Survey at Gunung Palung NP


Grasping characters of villages and
sub-villages around GPNP
Evaluating each items to determine the
number of samples for household
survey

1. Village profile
survey

2. Household
questionnaire
survey

3. Interview/
Workshop

Time frame

Activity

Survey

Identifying indicators to establish RL


Identifying drivers of deforestation and
forest degradation
Grasping basic information to develop a
REDD+ activity plan

Gathering detail information to identify


drivers of deforestation and forest
degradation
Assessing needs of local communities to
select REDD+ activities

2014
Feb
Determinatio
n
Number of
samples for
household
survey

Apr

May-Jul

On going
Determinatio
n
6 villages for
REDD+
activities

August

Sep-Nov

2015
Jan-Feb

Combined with
Pilot Activity

Done

Identifying drivers of deforestation and forest degradation


Developing a REDD+ activity plan
Reflecting to establishment of reference levels

Safeguards
Survey on FPIC
Survey on FPIC was conducted on January
and March, 2014
Identify stakeholders for FPIC , Needs
assessment for capacity building for FPIC

Survey and Training on Biodiversity


Survey

Some species were newly recorded


for TNGP, such as frogs and 4 bird
species.
10 camera traps were installed and
will be checked in about one month.

Biodiversity survey and training was


conducted in GPNP on 16-21 June, 2014.
Conducted by 8 researchers from LIPI with
12participants from GPNP staff .
Lectures and field practices were conducted
in 4 groups: i) birds, ii) mammals,
iii) insects and iv) reptiles and amphibia

Next Step of Output 2


Facilitation Training
Follow-up of Facilitation Training Field Practice- July to September
2nd Round of the Series of Facilitation Training (start from August)

Preparation of Pilot Activity at Target Villages


Training on
Collaborative
Management

Feed Back
Meeting on
Survey

Workshop on
REDD+ &
Safeguard

(July 2014)

(July/Aug 2014)

(Sep 2014)

Preparation for
set-up team with
NGOs

Star
t

Target Villages
and
Stakeholders

Preparation of
Action Plan

Team
Set-up

Development of Action
Plan on safeguard and
monitoring

Focus Group
Discussion

Training on
Pilot Activity
for Sedahan
(Sep 2014)

Activity Step
and PRA skills

Workshop in
Target Dusun

Explanation to
Kepala Desa
Sedahan Jaya

These process in community-level (each target Desa) will take 3-5 months

Result of Socio Economic Survey

1st Year Outcome of Output 4: Provincial Level in Central


Kalimantan
Coordination activity
Meeting with JICA-JST Project (Hokkaido Univ) on
collaboration between IJ-REDD+ (June 17, 2013)
Attended Peat Carbon Measurement Workshop coorganized by BSN and JICA-JST Project (July 15)
4th International Workshop on Wild
Fire and Carbon Management in
Peat-Forest in Indonesia (September
24 26, 2013)
- Final workshop of JICA-JST projectIJ-REDD+ participated as the moderator and
presenters of a special session, titled REDD+
Function on Conservation and Rehabilitation of
Peat land

MRV of Peat Land Emission


Joint Workshop on REL and MRV of Peat Land and Peat Forest
in Central Kalimantan (January 28-29, 2014)
- Central Kalimantan Provincial Government, JICA-JST Project, IJ-REDD+
About 90 participants attended from Central, Provincial and District Governments,
universities, partners, private companies as well as professors from Hokkaido Univ
and Tokyo Univ
Purpose is to share methodology of peat
emission MRV developed by JICA-JST Project
with policy makers and discuss how to
incorporate JICA-JST findings to MRV
mechanism of Central Kalimantan

Next Step

Considering to dispatch shot-term expert(s) to formulating a Manual


for Peat Land Emission Calculation utilized JICA-JST project
methodology
- from November (tentative) -

1st Year Outcome of Output 5: National Level REDD+ Mechanism


Active contribution and presentation at various meetings
International meetings
COP 19 at Warsaw (November 11-18,
2013)
>Support for organizing Side Event by MoFor at
Indonesia Pavilion at COP 19 Warsaw
>Joint presentation of IJ-REDD+ with JICA-JST
Project titled Japanese Contribution to the
Development of MRV System of Indonesian
Forest and Peatland

REDD+ Partnership Workshop and Meeting (Oct 8 10) at


Palangka Raya
> Presented by about 70 countries and organizations and
discussed progress and finance of REDD+
> IJ-REDD+ contributed through booth presentation of IJ-REDD+
and other JICA projects

Presentations at Workshops
Name of Workshop

Organizer

date

presentation

presenter

Workshop on Periodic
Center for
Nov 28, IJ-REDD+ Outline
Review of DA and related Standardizatio 2013
and Activities
REDD+ Activities
n, MoFor

Pak Noor

Seminar on JCM on
DNPI, JICA
REDD+ and Energy
Sector (55 year
anniversary of IndonesiaJapan Relation ship)

Workshop on REL of
REDD+ Demonstration
Projects

Dec 20

IJ-REDD+ Outline
and Activities

Takahara

FORDA, MoFor March


3 , 2014

Development of
REL by IJ-REDD+

Ms. Furuta,
Consultan
t Team

Activities related to Joint Credit Mechanism


Interactive Dialogue with Private Sector in Japan, as a program of Visiting
Program to Japan (February 7th )
Supporting REDD+ session in JCM Capacity Building Workshop organized
by JCM Secretariat Indonesia and Japan Research Institute (March 18)

Capacity Building
Satoyama Training Course in Japan (October 7 November 9,
2013)
participated by Mr. Agus Haryanto, Staff of PJLKKHL

Visiting Program to Japan (February 1 8, 2014)


(Joint activities with Output 1 and 5)
12 participants in decision making level from MoFor,
provincial and district governments and a university
Program is: -Meetings in Forestry Agency and JICA,
-Field visits to Satoyama forest management site and a
national forest in Kyoto

-Seminar by Kyoto University on tropical forest


management, -Dialogue with private sector,
-International Seminar on REDD+ co-organized by FAO
and FFPRI, where Ms. Yetti made a key note presentation

Next Step Output 5


Continuing coordination of overall project activities
Study on REDD+ Projects in Conservation Area
(July October, 2014)
Lessons learned from existing REDD+ projects in conservation
areas such as how to approach plus of REDD+ mechanism.
- Refer to activities in output 2
- Guideline for REDD+ in conservation areas

Supporting forest/climate change issues


Workshop on Harvested Wood Product and Climate Change
Policy support toward UNFCC COP 20 such as good practice survey

Terima Kasih
Thank you for your attention