REKAPITULASI

RENCANA ANGGARAN BIAYA


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA MASJID

PEKERJAAN

: PEMBANGUNAN MASJID DZIKRULLAH PERUMAHAN YEPUPA

LOKASI

: JL. PENDIDIKAN PERUMAHAN YEPUPA

NO.

URIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

33,311,774.00

PEKERJAAN STRUKTUR

296,382,830.89

PEKERJAAN ARSITEKTUR

364,387,079.13

PEKERJAAN ELEKTRIKAL

2,097,000.00

JUMLAH
696,178,684.02
PPN 10%
69,617,868.40
JUMLAH + PPN 10%
765,796,552.43
PEMBULATAN
765,797,000.00
TERBILANG :
Tujuh Ratus Enam Puluh Lima Juta Tujuh Ratus Sembilan Puluh Tujuh Ribu
Rupiah

Pekanbaru, ..................2014
Konsultan Perencana

( SONDRA RAHARJA, ST)


CIVIL ENGINEER

REKAP

RENCANA ANGGARAN BIAYA (RAB)


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA MASJID

PEKERJAAN

: PEMBANGUNAN MASJID DZIKRULLAH PERUMAHAN YEPUPA

LOKASI

: JL. PENDIDIKAN PERUMAHAN YEPUPA

NO.

A.

B.
I

II

III

IV

VI

URAIAN PEKERJAAN

SAT

PEKERJAAN PERSIAPAN
1. Pembersihan lokasi
2. Pengukuran dan pasang bowplank
JUMLAH A
PEKERJAAN STRUKTUR
PEKERJAAN PONDASI :
a. Pondasi Tapak Type P1
1. Galian pondasi
2. Pasir urug
3. Lantai kerja
4. Bekisting pondasi
5. Pembesian
6. Cor beton mutu K-250
7. Penimbunan kembali bekas galian
PEKERJAAN SLOOF (TIE BEAM) :
a. Sloof Type S1 (200x400)
1. Galian sloof
2. Pasir urug bawah sloof
3. Lantai kerja
4. Bekisting sloof
5. Pembesian
6. Cor beton mutu K-250
b. Sloof Type S2 (200x300)
1. Galian sloof
2. Pasir urug bawah sloof
3. Lantai kerja
4. Bekisting sloof
5. Pembesian
6. Cor beton mutu K-250
c. Sloof Type S3 (150x300)
1. Galian sloof
2. Pasir urug bawah sloof
3. Lantai kerja
4. Bekisting sloof
5. Pembesian
6. Cor beton mutu K-250
PEKERJAAN COR LANTAI TERAS :
1. Timbunan bawah lantai
2. Pasir urug
3. Lantai kerja
4. Cor beton mutu K-225
PEKERJAAN COR LANTAI R. GHORIM & PERALATAN
1. Timbunan bawah lantai
2. Pasir urug
3. Lantai kerja
4. Cor beton mutu K-225
PEKERJAAN KOLOM :
a. Kolom Type K1 (20x30)
1. Pembesian
2. Bekisting kolom
3. Cor beton mutu K-250
b. Kolom Type K2 (30x30)
1. Pembesian
2. Bekisting kolom
3. Cor beton mutu K-250
PEKERJAAN BALOK DAG TERAS EL.+3.80 M :

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

M2
M1

352.00
76.00

12,075.00
382,386.50

4,250,400.00
29,061,374.00
33,311,774.00

M3
M3
M3
M2
KG
M3
M3

28.60
1.30
1.30
41.60
866.72
5.20
9.53

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80
988,080.79
39,675.00

1,554,052.50
243,535.50
984,211.97
7,081,276.80
12,770,086.88
5,138,020.11
378,235.00

M3
M3
M3
M2
KG
M3

5.44
1.36
1.36
54.40
493.70
5.44

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80
988,080.79

295,596.00
254,775.60
1,029,637.14
9,260,131.20
7,274,129.33
5,375,159.50

M3
M3
M3
M2
KG
M3

1.28
0.64
0.64
19.20
219.70
1.92

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80
988,080.79

69,552.00
119,894.40
484,535.12
3,268,281.60
3,237,080.57
1,897,115.12

M3
M3
M3
M2
KG
M3

0.16
0.08
0.08
2.72
24.24
0.20

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80
988,080.79

8,634.23
14,883.77
60,150.49
463,687.45
357,202.85
201,864.91

M3
M3
M3
M3

19.63
4.91
4.91
8.96

113,953.50
187,335.00
757,086.13
972,559.56

2,236,930.00
919,355.88
3,715,438.05
8,714,133.69

M3
M3
M3
M3

2.22
0.55
0.55
0.96

113,953.50
187,335.00
757,086.13
972,559.56

252,862.82
103,924.09
419,993.53
928,988.90

KG
M2
M3

169.80
93.92
5.64

14,733.80
313,099.00
988,080.79

2,501,842.08
29,406,258.08
5,568,032.87

KG
M2
M3

80.78
9.19
0.69

14,733.80
313,099.00
988,080.79

1,190,147.44
2,878,006.01
681,182.90

Page 2 of 73

RAB

NO.

URAIAN PEKERJAAN

SAT

Balok Type B (20x30)


1. Bekisting Balok
M2
2. Pembesian
KG
3. Cor beton mutu K-250
M3
VII
PEKERJAAN COR DAG TERAS (ELEVASI +3.80 M)
1. Bekisting plat dag
M2
2. Pembesian
KG
3. Cor beton mutu K-250
M3
VIII PEKERJAAN BALOK DAG TERAS EL.+5.00 M :
Balok Type RB(20x30)
1. Bekisting Balok
M2
2. Pembesian
KG
3. Cor beton mutu K-250
M3
IX
PEKERJAAN COR DAG (ELEVASI +5.00 M)
1. Bekisting plat dag
M2
2. Pembesian
KG
3. Cor beton mutu K-250
M3
X
PEKERJAAN STRUKTUR MENARA
a. Pekerjaan kolom
1. Pembesian
KG
2. Bekisting kolom
M2
3. Cor beton mutu K-250
M3
b. Pekerjaan Balok
1. Bekisting Balok
M2
2. Pembesian
KG
3. Cor beton mutu K-250
M3
c. Pekerjaan Plat Lantai (untuk semua elevasi)
1. Bekisting plat
M2
2. Pembesian
KG
3. Cor beton mutu K-250
M3
JUMLAH B
C.
PEKERJAAN ARSITEKTUR
I
PEKERJAAN FINISHING AREA EKSISTING
1. Pekerjaan plafond (rangka + penutup + list)
M2
2. Pekerjaan pengecatan pada dinding eksisting
M2
II
PEKERJAAN FINISHING AREA TERAS
1. Pekerjaan dinding parapet teras (1/2 bata)
M2
2. Pekerjaan plesteran dinding parapet bag. Dalam
M2
3. Pekerjaan list profil dinding parapet
M1
4. Pekerjaan batu alam dinding parapet
M2
5. Pekerjaan keramik lantai teras (40x40)
M2
6. Pekerjaan plint lantai keramik (10 x 40)
M1
7. Pekerjaan profil kolom
Unit
8. Pekerjaan kerawang
Unit
9. Pekerjaan dinding diatas kerawang (dg kamprot)
M2
10. Pekerjaan penebalan dinding pada ring balok dag
M2
11. Pekerjaan pengecatan pada seluruh area teras
M2
III
PEKERJAAN FINISHING RUANG GHORIM DAN PERALATAN
1. Pekerjaan dinding bata 1/2 bata
M2
2. Pekerjaan plesteran dinding bata
M2
3. Pekerjaan pintu type P1
Unit
4. Pekerjaan jendela bouvenlight
Unit
5. Pekerjaan keramik lantai (40x40)
M2
6. Pekerjaan plint lantai keramik (10 x 40)
M1
IV
PEKERJAAN GERBANG ENTRANCE
1. Kolom praktis
M1
2. Balok praktis
M1
3. Dinding bata
M2
4. Pasang batu alam
M2
5. Profil gerbang
M1
V
PEKERJAAN DAG KANOPI
a. Dag Kanopi Type C1 (elev. +3.15 M)
1. Bekisting balok Praktis
M2
2. Bekisting plat dag
M2
3. Pembesian balok praktis dan plat dag
KG

Page 3 of 73

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

68.80
602.44
5.16

322,529.00
14,733.80
988,080.79

22,189,995.20
8,876,209.51
5,098,496.88

128.64
1,586.17
12.86

382,559.00
14,733.80
988,080.79

49,210,476.97
23,370,255.21
12,710,177.26
-

11.20
98.07
0.84

322,529.00
14,733.80
988,080.79

3,612,324.80
1,444,964.34
829,987.86

16.00
197.29
1.60

382,559.00
14,733.80
988,080.79

6,120,944.00
2,906,861.14
1,580,929.27

416.34
37.01
2.78

14,733.80
313,099.00
988,080.79

6,134,270.29
11,587,167.79
2,742,517.04

19.78
222.48
1.48

322,529.00
14,733.80
988,080.79

6,378,333.50
3,277,975.82
1,465,521.43

8.31
102.41
0.83

382,559.00
14,733.80
988,080.79

3,177,152.50
1,508,842.61
820,601.10
296,382,830.89

199.82
466.16

297,006.67
21,107.10

59,348,763.15
9,839,243.52

27.72
27.72
39.60
27.72
106.26
108.96
22.00
18.00
14.15
16.10
27.72

83,361.20
48,520.80
14,679.75
622,865.88
554,938.60
114,333.65
49,904.25
1,092,198.13
85,090.80
48,520.80
21,107.10

2,310,772.46
1,344,996.58
581,318.10
17,265,842.06
58,967,220.17
12,457,794.16
1,097,893.50
19,659,566.25
1,203,864.64
781,184.88
585,088.81

63.43
126.86
2.00
2.00
24.00
24.00

83,361.20
48,520.80
1,423,545.10
907,309.01
554,938.60
114,333.65

5,287,600.92
6,155,348.69
2,847,090.20
1,814,618.03
13,318,526.28
2,744,007.53

33.30
17.32
34.04
25.26
4.18

75,557.63
93,459.00
83,361.20
81,243.38

2,516,068.99
1,618,709.95
2,837,365.16
339,191.09

4.98
2.10
25.85

322,529.00
382,559.00
14,733.80

1,606,839.48
801,843.66
380,798.81

RAB

NO.

URAIAN PEKERJAAN

SAT

4. Cor beton mutu K-225


M3
b. Dag Kanopi Type C2 (elev. +3.15 M)
1. Bekisting balok Praktis
M2
2. Bekisting plat dag
M2
3. Pembesian balok praktis dan plat dag
KG
4. Cor beton mutu K-225
M3
VI
PEKERJAAN ARSITEKTUR MENARA
1. Dinding bata
M2
2. List Profil
M1
3. Kubah bawang
Unit
VII
PEKERJAAN KUBAH UTAMA MASJID (By : Specialist)
Unit
JUMLAH C
D.
PEKERJAAN ELEKTRIKAL
a. Pekerjaan pasang lampu ruangan sholat
1. Lampu type TL 40 Watt
Bh
2. Lampu type TL 25 Watt
Bh
b. Pekerjaan saklar (ruang sholat)
1. Saklar tunggal
2. Saklar ganda
c. Pekerjaan stop kontak (ruang sholat)
d. Pekerjaan pasang lampu R. Ghorim dan peralatan
e. Pekerjaan saklar (R. ghorim & R. peralatan)
f. Pekerjaan stop kontak (ruang sholat)
g. Pekerjaan pasang lampu (teras)
1. Lampu type TL 40 Watt
2. Lampu type TL 25 Watt
h. Pekerjaan pasang lampu menara

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

0.75

972,559.56

731,364.79

3.92
1.70
20.91
0.59

322,529.00
382,559.00
14,733.80
972,559.56

1,264,958.74
648,820.06
308,127.28
575,755.26

56.67
24.72
1.00
1.00

83,361.20
440,625.00
34,615,000.00
82,915,000.00

4,724,245.93
10,892,250.00
34,615,000.00
82,915,000.00
364,387,079.13

9.00
5.00

60,000.00
40,000.00

540,000.00
200,000.00

Bh
Bh

3.00
5.00

20,000.00
25,000.00

60,000.00
125,000.00

Bh
Bh
Bh
Bh

4.00
2.00
2.00
2.00

12,000.00
40,000.00
20,000.00
12,000.00

48,000.00
80,000.00
40,000.00
24,000.00

Bh
Bh
Bh

13.00
2.00
2.00

60,000.00
40,000.00
60,000.00

780,000.00
80,000.00
120,000.00

JUMLAH D

2,097,000.00

GRAND TOTAL (A + B + C + D)

696,178,684.02

Page 4 of 73

RAB

ANALISA HARGA SATUAN PEKERJAAN


PERMEN PU REPUBLIK INDONESIA NO. 11/PRT/M/2
Ditetapkan di Jakarta tgl. 4 November 2013
A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan
NO
A

URAIAN
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

L.01
L.04

OH
OH

KOEF

0.1000
0.0500

15%

A.2.2.1.4. Pengukuran dan pemasangan 1 m' Bowplank


NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.1000
0.1000
0.0100
0.0050

M3
KG
M3

0.1200
0.0200
0.0070

BAHAN
Kayu balok 5/7
Paku biasa 2" - 3"
Kayu papan 3/20

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.2.3.1.1. Penggalian 1 M3 tanah biasa sedalam 1 m


NO

URAIAN

KODE

Page 5 of 73

SAT

KOEF

AHS

TENAGA
Pekerja
Mandor

L.01
L.04

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 6 of 73

OH
OH

0.7500
0.0250

15%

AHS

A.2.3.1.9. Pengurugan kembali 1 M3 galian tanah


Pengurugan kembali 1 M3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
NO
A

URAIAN
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

L.01
L.04

OH
OH

KOEF

0.5000
0.0500

15%

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


NO
A

URAIAN
TENAGA
Pekerja
Mandor

KODE

SAT

L.01
L.04

OH
OH

0.3000
0.0100

M3

1.2000

BAHAN
Pasir urug

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

Pengurugan 1 m3 dengan tanah urug


NO
A

URAIAN
TENAGA
Pekerja
Mandor
BAHAN
Tanah Urug

Page 7 of 73

KODE

SAT

KOEF

L.01
L.04

OH
OH

0.2500
0.0250

M3

1.2000

AHS

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 8 of 73

15%

AHS

A.4.1.1.4. Membuat 1 M3 lantai kerja beton mutu fc' = 7.4 MPa (K-100), slump (3-6) cm
NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.200
0.200
0.020
0.060

KG
KG
KG
Liter

230
893
1,027
200

BAHAN
Semen portland
Pasir beton
Kerikil (Maks 30 MM)
Air

KOEF

PERALATAN

D
Jumlah (A + B + C)
E
Overhead & profit
15%
F
Harga satuan pekerjaan (D+E)
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
A.4.1.1.20. Pemasangan 1 M2 bekisting untuk pondasi
NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.520
0.260
0.026
0.026

M3
KG
Ltr

0.040
0.300
0.100

BAHAN
Kayu kelas III
Paku 5 - 10 cm
Minyak bekisting

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.1.1.17. Pembesian 10 kg dengan besi polos atau ulir


NO
A

URAIAN

KODE

SAT

KOEF

TENAGA
Page 9 of 73

AHS

Pekerja
Tukang besi
Kepala tukang
Mandor
B

L.01
L.02
L.03
L.04

BAHAN
Besi beton (polos/ulir)
Kawat beton

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 10 of 73

OH
OH
OH
OH

0.070
0.070
0.007
0.004

KG
KG

10.500
0.150

15%

AHS

A.4.1.1.8. Membuat 1 M3 beton mutu fc' = 21.7 MPa (K-250), slump (12 2) cm, w/c =
NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083

KG
KG
KG
Liter

384
692
1,039
215

BAHAN
Semen portland
Pasir beton
Kerikil (Maks 30 MM)
Air

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.1.1.7. Membuat 1 M3 beton mutu fc' = 19.3 MPa (K-225), slump (12 2) cm, w/c =
NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083

KG
KG
KG
Liter

371
698
1,047
215

BAHAN
Semen portland
Pasir beton
Kerikil (Maks 30 MM)
Air

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.1.1.22. Pemasangan 1 M2 bekisting untuk kolom


NO

URAIAN

Page 11 of 73

KODE

SAT

KOEF

AHS

TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Kayu kelas III
Paku 5 - 10 cm
Minyak Bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu dia.8 - 10cm/pjg 4m

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

OH
OH
OH
OH

0.660
0.330
0.033
0.033

M3
KG
Ltr
M3
Lbr
Btg

0.040
0.400
0.200
0.015
0.350
2.000

15%

A.4.1.1.23. Pemasangan 1 M2 bekisting untuk balok


NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.660
0.330
0.033
0.033

M3
KG
Ltr
M3
Lbr
Btg

0.040
0.400
0.200
0.018
0.350
2.000

BAHAN
Kayu kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu dia.8 - 10cm/pjg 4m

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.1.1.24. Pemasangan 1 M2 bekisting untuk lantai


NO

URAIAN

Page 12 of 73

KODE

SAT

KOEF

AHS

TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Kayu kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu dia.8 - 10cm/pjg 4m

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 13 of 73

OH
OH
OH
OH

0.660
0.330
0.033
0.033

M3
KG
Ltr
M3
Lbr
Btg

0.040
0.400
0.200
0.015
0.350
6.000

15%

AHS

Pemasangan 1 M2 Plafond Gypsum


NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
1.000
0.100
0.015

M2
KG
M'
M3
KG
BH
KG

1.100
0.300
2.500
0.021
0.300
3.000
0.040

BAHAN
Gypsum Board
Cornes
Textile Tape
Kayu Kelas II
Paku biasa 2" - 3"
Paku Beton
Paku Gypsum

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

1 M2 PENGECATAN TEMBOK BARU ( LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PE
NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.020
0.063
0.006
0.003

KG
KG
KG

0.100
0.100
0.260

BAHAN
Plamir (untuk tembok)
Cat dasar (untuk tembok)
Cat penutup 2 kali (untuk tembok)

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal batu campura
NO

URAIAN
Page 14 of 73

KODE

SAT

KOEF
AHS

NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor
BAHAN
1. Bata merah
2. Semen PortlanD
3. Pasir Pasang

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 15 of 73

KODE

SAT

KOEF

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
0.100
0.010
0.015

Bh
KG
M3

70.000
18.950
0.038

15%

AHS

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
0.150
0.015
0.015

KG
M3

6.240
0.024

BAHAN
Semen Portland
Pasir Pasang

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

1 M2 PASANGAN DINDING ROSTER / TERAWANG


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
0.100
0.010
0.015

Unit
KG
M3

1.000
12.800
0.035

BAHAN
1. Roster / Terawang (sesuai gbr)
2. Semen portland
3. Pasir pasang

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

Membuat 1 M1 profil dinding dengan adukan 1SP : 4PP uk. 5 cm (NON SNI)
NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
Page 16 of 73

KODE

SAT

L.01
L.02

OH
OH

KOEF

0.075
0.038
AHS

3. Kepala Tukang
4. Mandor
B

L.03
L.04

BAHAN
1. Semen portland
2. Pasir pasang

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 17 of 73

OH
OH

0.004
0.004

KG
M3

2.500
0.015

15%

AHS

1 m2 Pasang Dinding Batu Tempel Hitam (NON SNI)


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.620
0.350
0.035
0.030

M2
KG
KG
M3

1.050
0.100
11.750
0.035

BAHAN
1. Batu Tempel Hitam
2. Anti Lumut/Vernis Batu
3. Semen Abu-abu
4. Pasir Pasang

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

Pemasangan 1 M2 lantai keramik ukuran 40cm x 40cm (NON SNI)


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.200
0.100
0.010
0.010

BH
KG
M3
KG

6.250
10.000
0.045
1.410

BAHAN
1. Ubin keramik (40x40) cm
2. Semen Portland
3. Pasir pasang
4. Semen warna

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

MEMASANG 1 M1 PLINT 10 X 40 CM (NON SNI 2013)


NO

URAIAN

Page 18 of 73

KODE

SAT

KOEF

AHS

TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor

L.01
L.02
L.03
L.04

BAHAN
1. Plint keramik (10 x 40) cm
2. Semen portland
3. Pasir pasang
4. Semen warna

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 19 of 73

OH
OH
OH
OH

0.900
0.009
0.035
0.005

BH
KG
M3
KG

2.650
1.140
0.003
0.006

15%

AHS

Membuat 1 M1 profil kolom (NON SNI)


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.075
0.038
0.004
0.004

KG
M3
Bh

12.500
0.045
60.000

BAHAN
1. Semen portland
2. Pasir pasang
3. Bata merah

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

Pemasangan 1 m2 plesteran kamprot 1SP : 4PP tebal 15 mm


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Batu
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.600
0.300
0.030
0.030

KG
M3

6.240
0.024

BAHAN
Semen portland
Pasir pasang

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kela
NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang kayu
Page 20 of 73

KODE

SAT

L.01
L.03

OH
OH

KOEF

7.000
21.000
AHS

3. Kepala tukang
4. Mandor
B

L.03
L.04

BAHAN
1. Balok kayu kelas II
2. Paku 5 - 10 cm
3. Lem kayu

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 21 of 73

OH
OH

2.100
0.350

M3
KG
KG

1.100
1.250
1.000

15%

AHS

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang kayu
3. Kepala tukang
4. Mandor

KODE

SAT

L.01
L.03
L.03
L.04

OH
OH
OH
OH

1.000
3.000
0.300
0.050

M3
KG

0.040
0.500

BAHAN
1. Papan kayu (4 x 30) cm
2. Lem kayu

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.6.2.5. Pemasangan 1 buah engsel pintu


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang kayu
3. Kepala tukang
4. Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.015
0.150
0.015
0.001

Bh

1.000

BAHAN
1. Engsel pintu

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

Memasang 1 buah grendel pintu (NON SNI 2013)


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Kayu
3. Kepala Tukang
4. Mandor
Page 22 of 73

KODE

SAT

L.01
L.03
L.03
L.04

OH
OH
OH
OH

KOEF

0.020
0.200
0.020
0.001
AHS

BAHAN
1. Gerendel pintu kw. 1

BH

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 23 of 73

1.000

15%

AHS

Memasang 1 buah kunci tanam antik 2 slag (NON-SNI 2013)


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Kayu
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.03
L.03
L.04

OH
OH
OH
OH

0.060
0.600
0.060
0.003

BH

1.000

BAHAN
Kunci tanam 2 slag kw. 1

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

Mendempul dan Menggosok 1 m kayu (NON-SNI 2013)


NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Cat
3. Kepala Tukang
4. Mandor

KODE

SAT

L.01
L.03
L.03
L.04

OH
OH
OH
OH

0.040
0.040
0.004
0.003

KG
KG
KG

0.050
0.050
0.050

BAHAN
1. Dempul Jadi
2. Minyak Cat (Tinner)
3. Batu Apung

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lap
NO
A

URAIAN
TENAGA
1. Pekerja
2. Tukang Cat
3. Kepala Tukang
Page 24 of 73

KODE

SAT

L.01
L.03
L.03

OH
OH
OH

KOEF

0.070
0.009
0.006
AHS

4. Mandor
B

L.04

BAHAN
1. Cat menie
2. Plamuur (untuk kayu)
3. Cat dasar (untuk kayu)
4. Cat penutup (untuk kayu)
5. Kuas
6. Pengencer
7. Ampelas

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 25 of 73

OH

0.003

KG
KG
KG
KG
BH
KG
Lbr

0.200
0.150
0.170
0.260
0.010
0.030
0.200

15%

AHS

Pekerjaan 1 unit kusen pintu (Type P.1) + daun pintu panel kayu (NON-SNI 2013)
NO
A

D
E
F

URAIAN

KODE

SAT

KOEF

PEKERJAAN KAYU
Kusen Pintu Kayu Klas I
Daun Pintu Kayu Klas I

M3
M2

0.022
1.594

PEKERJAAN ALAT PENGGANTUNG


Pasang Engsel Pintu 4"
Pasang Gerendel pintu kw. 1
Kunci tanam 2 slag + handle kw. 1

BH
BH
BH

3.000
2.000
1.000

PEKERJAAN PENGECATAN
Mendempul dan menggosok kusen
Mengecat kusen (1 lps plamir, 1 lps cat dsr, 2 lps cat
Mendempul dan menggosok pintu panil
Mengecat pintu panil (1 lps plamir, 1 lps cat dsr, 2 lp

M2
M2
M2
M2

1.044
1.044
3.188
3.188

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

0%

PEMASANGAN 1 UNIT BV RD TYPE BV (NON-SNI 2013)


NO
A

URAIAN
TENAGA
Upah pasang
BAHAN
1. Kusen Pintu / Jendela All Uk. 4''x1 3/4''
2. Karet List
3. Frame Jendela All
4. Kaca t = 5 mm ( Bening )
5. Casement Uk.
6. Handle Jendela

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 26 of 73

KODE

SAT

KOEF

Ls

0.060

M1
M1
M1
M2
Bh
Bh

3.200
3.200
2.800
0.330
2.000
1.000

15%

AHS

A.4.1.1.35. Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm


NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

0.180
0.020
0.020
0.020
0.006
0.009

M3
KG
Ltr
KG
KG
KG
KG
KG

0.002
0.010

BAHAN
Kayu kelas III
Paku 5 - 12 cm
Minyak bekisting
Besi beton (polos/ulir)
Kawat beton
Semen portland
Pasir beton
Kerikil (Maks 30 MM)

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

3.000
0.450
4.000
0.006
0.009

15%

A.4.1.1.36. Membuat 1 M' ring balok beton bertulang (10 x 15) cm


NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 - 12 cm
Minyak bekisting
Besi beton (polos/ulir)
Kawat beton
Semen portland
Pasir beton

Page 27 of 73

KODE

SAT

KOEF

L.01
L.02
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH
OH

0.297
0.033
0.033
0.033
0.010
0.015

M3
KG
Ltr
KG
KG
KG
KG

0.003
0.020
3.600
0.050
5.500
0.009

AHS

Kerikil (Maks 30 MM)

KG

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 28 of 73

0.015

15%

AHS

Pemasangan Kubah Utama By : Specialist


NO
A

D
E
F

URAIAN

KODE

TENAGA
Upah

SAT

KOEF

Ls

0.200

BAHAN
Kubah Utama Mesjid dg GRC

Unit

1.000

PERALATAN
Peralatan dan alat batu

Set

1.000

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

15%

Pemasangan Kubah Menara By : Specialist


NO
A

D
E
F

URAIAN
TENAGA
Upah

KODE

SAT

KOEF

Ls

0.200

BAHAN
Kubah Menara Mesjid dg GRC

Unit

1.000

PERALATAN
Peralatan dan alat batu

Set

1.000

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

Page 29 of 73

15%

AHS

Page 30 of 73

AHS

HARGA SATUAN PEKERJAAN


BLIK INDONESIA NO. 11/PRT/M/2013
Jakarta tgl. 4 November 2013
HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
90,000.00
JUMLAH (A)

6,000.00
4,500.00
10,500.00
-

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

10,500.00
1,575.00
12,075.00

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

6,000.00
7,500.00
800.00
450.00
14,750.00

2,500,000.00
13,000.00
2,500,000.00
JUMLAH (B)

300,000.00
260.00
17,500.00
317,760.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

332,510.00
49,876.50
382,386.50

JUMLAH HARGA
Rp.

Page 31 of 73

AHS

60,000.00
90,000.00
JUMLAH (A)

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 32 of 73

45,000.00
2,250.00
47,250.00
-

47,250.00
7,087.50
54,337.50

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
90,000.00
JUMLAH (A)

30,000.00
4,500.00
34,500.00
-

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

34,500.00
5,175.00
39,675.00

JUMLAH HARGA
Rp.

60,000.00
90,000.00
JUMLAH (A)

18,000.00
900.00
18,900.00

120,000.00

144,000.00
144,000.00

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

162,900.00
24,435.00
187,335.00

JUMLAH HARGA
Rp.

60,000.00
90,000.00
JUMLAH (A)

15,000.00
2,250.00
17,250.00

68,200.00

81,840.00
-

Page 33 of 73

AHS

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 34 of 73

81,840.00

99,090.00
14,863.50
113,953.50

AHS

u fc' = 7.4 MPa (K-100), slump (3-6) cm, w/c = 0.87


HARGA SATUAN
JUMLAH HARGA
Rp.
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

72,000.00
15,000.00
1,600.00
5,400.00
94,000.00

1,200.00
108.57
181.48
25.00
JUMLAH (B)

276,000.00
96,954.29
186,381.48
5,000.00
564,335.77

JUMLAH (C)
JUMLAH (D)
x Jumlah D

658,335.77
98,750.37
757,086.13

0 kg/m3, Bukling factor pasir = 20 %


HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

31,200.00
19,500.00
2,080.00
2,340.00
55,120.00

2,200,000.00
15,000.00
4,000.00
JUMLAH (B)

88,000.00
4,500.00
400.00
92,900.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

148,020.00
22,203.00
170,223.00

JUMLAH HARGA
Rp.

Page 35 of 73

AHS

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

4,200.00
5,250.00
560.00
360.00
10,370.00

11,000.00
15,000.00
JUMLAH (B)

115,500.00
2,250.00
117,750.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 36 of 73

128,120.00
19,218.00
147,338.00

AHS

MPa (K-250), slump (12 2) cm, w/c = 0.56


HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

99,000.00
20,625.00
2,240.00
7,470.00
129,335.00

1,200.00
108.57
181.48
25.00
JUMLAH (B)

460,800.00
75,131.43
188,559.26
5,375.00
729,865.69

JUMLAH (C)
JUMLAH (D)
x Jumlah D

MPa (K-225), slump (12 2) cm, w/c = 0.58


HARGA SATUAN
Rp.

859,200.69
128,880.10
988,080.79

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

99,000.00
20,625.00
2,240.00
7,470.00
129,335.00

1,200.00
108.57
181.48
25.00
JUMLAH (B)

445,200.00
75,782.86
190,011.11
5,375.00
716,368.97

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

845,703.97
126,855.60
972,559.56

JUMLAH HARGA
Rp.

Page 37 of 73

AHS

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

39,600.00
24,750.00
2,640.00
2,970.00
69,960.00

2,200,000.00
15,000.00
4,000.00
2,600,000.00
110,000.00
15,000.00
JUMLAH (B)

88,000.00
6,000.00
800.00
39,000.00
38,500.00
30,000.00
202,300.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

272,260.00
40,839.00
313,099.00

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

39,600.00
24,750.00
2,640.00
2,970.00
69,960.00

2,200,000.00
16,000.00
4,000.00
2,600,000.00
110,000.00
15,000.00
JUMLAH (B)

88,000.00
6,400.00
800.00
46,800.00
38,500.00
30,000.00
210,500.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

280,460.00
42,069.00
322,529.00

JUMLAH HARGA
Rp.

Page 38 of 73

AHS

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

39,600.00
24,750.00
2,640.00
2,970.00
69,960.00

2,200,000.00
16,000.00
4,000.00
2,600,000.00
110,000.00
15,000.00
JUMLAH (B)

88,000.00
6,400.00
800.00
39,000.00
38,500.00
90,000.00
262,700.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 39 of 73

332,660.00
49,899.00
382,559.00

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

18,000.00
75,000.00
8,000.00
1,350.00
102,350.00

33,333.33
2,000.00
500.00
2,500,000.00
13,000.00
20,000.00
25,000.00
JUMLAH (B)

36,666.67
600.00
1,250.00
52,500.00
3,900.00
60,000.00
1,000.00
155,916.67

JUMLAH (C)
JUMLAH (D)
x Jumlah D

R, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )


HARGA SATUAN
Rp.

258,266.67
38,740.00
297,006.67

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

1,200.00
4,725.00
504.00
225.00
6,654.00

21,500.00
25,300.00
27,000.00
JUMLAH (B)

2,150.00
2,530.00
7,020.00
11,700.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

18,354.00
2,753.10
21,107.10

h (5x11x22) cm tebal batu campuran 1SP : 2PP


HARGA SATUAN
JUMLAH HARGA

Page 40 of 73

AHS

Rp.

Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

18,000.00
7,500.00
800.00
1,350.00
27,650.00

250.00
1,200.00
121,000.00
JUMLAH (B)

17,500.00
22,740.00
4,598.00
44,838.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 41 of 73

72,488.00
10,873.20
83,361.20

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

18,000.00
11,250.00
1,200.00
1,350.00
31,800.00

1,200.00
121,000.00
JUMLAH (B)

7,488.00
2,904.00
10,392.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

42,192.00
6,328.80
48,520.80

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

18,000.00
7,500.00
800.00
1,350.00
27,650.00

902,492.50
1,200.00
121,000.00
JUMLAH (B)

902,492.50
15,360.00
4,235.00
922,087.50

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

949,737.50
142,460.63
1,092,198.13

JUMLAH HARGA
Rp.

60,000.00
75,000.00
Page 42 of 73

4,500.00
2,812.50
AHS

80,000.00
90,000.00
JUMLAH (A)

300.00
337.50
7,950.00

1,200.00
121,000.00
JUMLAH (B)

3,000.00
1,815.00
4,815.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 43 of 73

12,765.00
1,914.75
14,679.75

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

37,200.00
26,250.00
2,800.00
2,700.00
68,950.00

416,666.67
45,000.00
2,250.00
121,000.00
JUMLAH (B)

437,500.00
4,500.00
26,437.50
4,235.00
472,672.50

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

541,622.50
81,243.38
622,865.88

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

12,000.00
7,500.00
800.00
900.00
21,200.00

70,500.00
1,200.00
121,000.00
2,330.00
JUMLAH (B)

440,625.00
12,000.00
5,445.00
3,285.30
461,355.30

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

482,555.30
72,383.30
554,938.60

JUMLAH HARGA
Rp.

Page 44 of 73

AHS

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

54,000.00
675.00
2,800.00
450.00
57,925.00

15,000.00
1,200.00
121,000.00
2,330.00
JUMLAH (B)

39,750.00
1,368.00
363.00
14.56
41,495.56

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 45 of 73

99,420.56
14,913.08
114,333.65

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

4,500.00
2,812.50
300.00
337.50
7,950.00

1,200.00
121,000.00
250.00
JUMLAH (B)

15,000.00
5,445.00
15,000.00
35,445.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

43,395.00
6,509.25
49,904.25

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

36,000.00
22,500.00
2,400.00
2,700.00
63,600.00

1,200.00
121,000.00
JUMLAH (B)

7,488.00
2,904.00
10,392.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

sen pintu dan kusen jendela, kayu kelas I


HARGA SATUAN
Rp.

73,992.00
11,098.80
85,090.80

JUMLAH HARGA
Rp.

60,000.00
75,000.00
Page 46 of 73

420,000.00
1,575,000.00
AHS

80,000.00
90,000.00
JUMLAH (A)

168,000.00
31,500.00
2,194,500.00

2,600,000.00
15,000.00
5,000.00
JUMLAH (B)

2,860,000.00
18,750.00
5,000.00
2,883,750.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 47 of 73

5,078,250.00
761,737.50
5,839,987.50

AHS

un pintu panel, kayu kelas I atau II


HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

60,000.00
225,000.00
24,000.00
4,500.00
313,500.00

2,800,000.00
5,000.00
JUMLAH (B)

112,000.00
2,500.00
114,500.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

428,000.00
64,200.00
492,200.00

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

900.00
11,250.00
1,200.00
72.00
13,422.00

14,000.00
JUMLAH (B)

14,000.00
14,000.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

27,422.00
4,113.30
31,535.30

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
Page 48 of 73

1,200.00
15,000.00
1,600.00
90.00
AHS

JUMLAH (A)

17,890.00

15,000.00
JUMLAH (B)

15,000.00
15,000.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 49 of 73

32,890.00
4,933.50
37,823.50

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

3,600.00
45,000.00
4,800.00
270.00
53,670.00

93,150.00
JUMLAH (B)

93,150.00
93,150.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

146,820.00
22,023.00
168,843.00

JUMLAH HARGA
Rp.

60,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

2,400.00
3,000.00
320.00
225.00
5,945.00

26,000.00
25,000.00
100.00
JUMLAH (B)

1,300.00
1,250.00
5.00
2,555.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

8,500.00
1,275.00
9,775.00

1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)


HARGA SATUAN
JUMLAH HARGA
Rp.
Rp.

60,000.00
75,000.00
80,000.00
Page 50 of 73

4,200.00
675.00
480.00
AHS

90,000.00
JUMLAH (A)

270.00
5,625.00

22,000.00
25,000.00
25,000.00
27,000.00
10,000.00
5,000.00
5,000.00
JUMLAH (B)

4,400.00
3,750.00
4,250.00
7,020.00
100.00
150.00
1,000.00
20,670.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 51 of 73

26,295.00
3,944.25
30,239.25

AHS

pintu panel kayu (NON-SNI 2013)


HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

5,839,987.50
492,200.00
JUMLAH (A)

130,611.32
784,517.58
915,128.90

31,535.30
37,823.50
168,843.00
JUMLAH (B)

94,605.90
75,647.00
168,843.00
339,095.90

9,775.00
30,239.25
9,775.00
30,239.25
JUMLAH (C)
JUMLAH (D)
x Jumlah D

10,202.17
31,560.71
31,160.75
96,396.68
169,320.30
1,423,545.10
1,423,545.10

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

744,306.00
JUMLAH (A)

44,658.36
44,658.36

122,300.00
5,000.00
85,570.00
95,000.00
18,000.00
30,000.00
JUMLAH (B)

391,360.00
16,000.00
239,596.00
31,350.00
36,000.00
30,000.00
744,306.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 52 of 73

788,964.36
118,344.65
907,309.01

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
75,000.00
75,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

10,800.00
1,500.00
1,500.00
1,500.00
480.00
810.00
16,590.00

2,200,000.00
16,000.00
4,000.00
11,000.00
15,000.00
1,200.00
108.57
181.48
JUMLAH (B)

4,400.00
160.00
33,000.00
6,750.00
4,800.00
0.65
1.63
49,112.28

JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

65,702.28
9,855.34
75,557.63

JUMLAH HARGA
Rp.

60,000.00
75,000.00
75,000.00
75,000.00
80,000.00
90,000.00
JUMLAH (A)

17,820.00
2,475.00
2,475.00
2,475.00
800.00
1,350.00
27,395.00

2,200,000.00
16,000.00
4,000.00
11,000.00
15,000.00
1,200.00
108.57

6,600.00
320.00
39,600.00
750.00
6,600.00
0.98

Page 53 of 73

AHS

181.48
JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

Page 54 of 73

2.72
53,873.70

81,268.70
12,190.30
93,459.00

AHS

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000,000.00
JUMLAH (A)

12,000,000.00
12,000,000.00

60,000,000.00
JUMLAH (B)

60,000,000.00
60,000,000.00

100,000.00
JUMLAH (C)
JUMLAH (D)
x Jumlah D

100,000.00
100,000.00
72,100,000.00
10,815,000.00
82,915,000.00

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

25,000,000.00
JUMLAH (A)

5,000,000.00
5,000,000.00

25,000,000.00
JUMLAH (B)

25,000,000.00
25,000,000.00

100,000.00
JUMLAH (C)
JUMLAH (D)
x Jumlah D

100,000.00
100,000.00
30,100,000.00
4,515,000.00
34,615,000.00

Page 55 of 73

AHS

Page 56 of 73

AHS

DAFTAR HARGA SATUAN BAHAN DAN UPAH


LOKASI
TAHUN
C

:
:

PEKANBARU
2014

KODE
HSBU

TENAGA DAN MATERIAL

SATUAN

HARGA SATUAN
(Rp)

(2)

(3)

(4)

(1)

A.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
B.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.

UPAH TENAGA :
U.001 Pekerja
U.002 Tukang gali
U.003 Tukang kayu
U.004 Tukang batu
U.005 Tukang besi
U.006 Tukang cat
U.007 Kepala tukang
U.008 Mandor
U.009 Mekanik
U.010 Operator

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

60,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
80,000.00
90,000.00
75,000.00
80,000.00

M3
M3
M3
M3
M3
M3
Lbr
Btg
KG
KG
KG
BH
KG
KG
KG
M3
M3
KG
M3
KG
Bh
KG
KG
KG
Ltr
M2
KG
M'
KG
KG
KG
Unit
M2
KG
BH

2,500,000.00
2,500,000.00
2,200,000.00
2,500,000.00
2,600,000.00
2,800,000.00
110,000.00
15,000.00
13,000.00
15,000.00
16,000.00
20,000.00
25,000.00
11,000.00
15,000.00
120,000.00
68,200.00
108.57
121,000.00
181.48
250.00
1,200.00
2,250.00
2,330.00
4,000.00
33,333.33
2,000.00
500.00
21,500.00
25,300.00
27,000.00
902,492.50
416,666.67
45,000.00
70,500.00

BAHAN:
B.001 Kayu balok 5/7
B.002 Kayu papan 3/20
B.003 Kayu kelas III
B.004 Kayu Kelas II
B.005 Balok kayu kelas II
B.006 Papan kayu (4 x 30) cm
B.007 Plywood tebal 9 mm
B.008 Dolken kayu dia.8 - 10cm/pjg 4m
B.009 Paku biasa 2" - 3"
B.010 Paku 5 - 10 cm
B.011 Paku 5 - 12 cm
B.012 Paku Beton
B.013 Paku Gypsum
B.014 Besi beton (polos/ulir)
B.015 Kawat beton
B.016 Pasir urug
B.017 Tanah Urug
B.018 Pasir beton
B.019 Pasir Pasang
B.020 Kerikil (Maks 30 MM)
B.021 Bata merah
B.022 Semen portland
B.023 Semen Abu-abu
B.024 Semen warna
B.025 Minyak bekisting
B.026 Gypsum Board
B.027 Cornes
B.028 Textile Tape
B.029 Plamir (untuk tembok)
B.030 Cat dasar (untuk tembok)
B.031 Cat penutup 2 kali (untuk tembok)
B.032 Roster / Terawang (sesuai gbr)
B.033 Batu Tempel Hitam
B.034 Anti Lumut/Vernis Batu
B.035 Ubin keramik (40x40) cm

Page 57 of 73

HSBU

KODE
TENAGA DAN MATERIAL
HSBU
36. B.036 Plint keramik (10 x 40) cm
37. B.037 Engsel pintu
38. B.038 Gerendel pintu kw. 1
39. B.039 Kunci tanam 2 slag kw. 1
40. B.040 Dempul Jadi
41. B.041 Minyak Cat (Tinner)
42. B.042 Batu Apung
43. B.043 Cat menie
44. B.044 Plamuur (untuk kayu)
45. B.045 Cat dasar (untuk kayu)
46. B.046 Cat penutup (untuk kayu)
47. B.047 Kuas
48. B.048 Pengencer
49. B.049 Ampelas
50. B.050 Kusen Pintu / Jendela All Uk. 4''x1 3/4''
51. B.051 Karet List
52. B.052 Frame Jendela All
53. B.053 Kaca t = 5 mm ( Bening )
54. B.054 Casement Uk.
55. B.055 Handle Jendela
56. B.056 Kubah Utama Mesjid dg GRC
57. B.057 Kubah Menara Mesjid dg GRC
58. B.058 Lem kayu
59. B.059 Peralatan dan alat batu
60. B.060 Air
61. B.061 Lampu type TL 40 Watt
62. B.062 Lampu type TL 25 Watt
63. B.063 Saklar tunggal
64. B.064 Saklar ganda
65. B.065 Stop kontak

Page 58 of 73

SATUAN
BH
BH
BH
BH
KG
KG
KG
KG
KG
KG
KG
BH
KG
Lbr
M1
M1
M1
M2
Bh
Bh
Unit
Unit
KG
Set
Liter
BH
BH
BH
BH
BH

HARGA SATUAN
(Rp)
15,000.00
14,000.00
15,000.00
93,150.00
26,000.00
25,000.00
100.00
22,000.00
25,000.00
25,000.00
27,000.00
10,000.00
5,000.00
5,000.00
122,300.00
5,000.00
85,570.00
95,000.00
18,000.00
30,000.00
60,000,000.00
25,000,000.00
5,000.00
100,000.00
25.00
60,000.00
40,000.00
20,000.00
25,000.00
12,000.00

HSBU

RENCANA ANGGARAN BIAYA (RAB)


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA MASJID

PEKERJAAN

: PEMBANGUNAN MASJID DZIKRULLAH PERUMAHAN YEPUPA

LOKASI

: JL. PENDIDIKAN PERUMAHAN YEPUPA

NO.

A.

URAIAN PEKERJAAN

SAT

PEKERJAAN PERSIAPAN
1. Pembersihan lokasi
2. Pengukuran dan pasang bowplank

VOLUME

HARGA SATUAN
(Rp)

M2
M1

352.00
76.00

12,075.00
382,386.50

4,250,400.00
29,061,374.00
33,311,774.00

PEKERJAAN STRUKTUR
PEKERJAAN PONDASI :
a. Pondasi Tapak Type P1
1. Galian pondasi
2. Pasir urug

M3
M3

28.60
1.30

54,337.50
187,335.00

1,554,052.50
243,535.50

3. Lantai kerja

M3

1.30

757,086.13

984,211.97

4. Bekisting pondasi

M2

41.60

170,223.00

7,081,276.80

5. Pembesian

KG

866.72

14,733.80

12,770,086.88

JUMLAH A
B.
I

JUMLAH HARGA
(Rp)

Page 59 of 73

URAIAN RAB

NO.

II

URAIAN PEKERJAAN

SAT

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

6. Cor beton mutu K-250

M3

5.20

988,080.79

5,138,020.11

1. Penimbunan kembali bekas galian

M3

9.53

39,675.00

378,235.00

M3
M3
M3
M2
KG
M3

5.44
1.36
1.36
54.40
493.70
5.44

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80
988,080.79

295,596.00
254,775.60
1,029,637.14
9,260,131.20
7,274,129.33
5,375,159.50

M3
M3
M3
M2
KG

1.28
0.64
0.64
19.20
219.70

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80

69,552.00
119,894.40
484,535.12
3,268,281.60
3,237,080.57

PEKERJAAN SLOOF (TIE BEAM) :


a. Sloof Type S1 (200x400)
1. Galian sloof
2. Pasir urug bawah sloof
3. Lantai kerja
4. Bekisting sloof
5. Pembesian
6. Cor beton mutu K-250
b. Sloof Type S2 (200x300)
1. Galian sloof
2. Pasir urug bawah sloof
3. Lantai kerja
4. Bekisting sloof
5. Pembesian

Page 60 of 73

URAIAN RAB

NO.

URAIAN PEKERJAAN

SAT

6. Cor beton mutu K-250


c. Sloof Type S3 (150x300)
1. Galian sloof
2. Pasir urug bawah sloof
3. Lantai kerja
4. Bekisting sloof
5. Pembesian
6. Cor beton mutu K-250
III
PEKERJAAN COR LANTAI TERAS :
1. Timbunan bawah lantai
2. Pasir urug
3. Lantai kerja
4. Cor beton mutu K-225
IV
PEKERJAAN COR LANTAI R. GHORIM & PERALATAN
1. Timbunan bawah lantai
2. Pasir urug
3. Lantai kerja
4. Cor beton mutu K-225
V
PEKERJAAN KOLOM :
a. Kolom Type K1 (20x30)
1. Pembesian
2. Bekisting kolom
3. Cor beton mutu K-250
b. Kolom Type K2 (30x30)
1. Pembesian
2. Bekisting kolom
3. Cor beton mutu K-250
VI
PEKERJAAN BALOK DAG TERAS EL.+3.80 M :
Balok Type B (20x30)
1. Bekisting Balok
2. Pembesian
3. Cor beton mutu K-250
VII
PEKERJAAN COR DAG TERAS (ELEVASI +3.80 M)
1. Bekisting plat dag
2. Pembesian
3. Cor beton mutu K-250
VIII PEKERJAAN BALOK DAG TERAS EL.+5.00 M :
Balok Type RB(20x30)
1. Bekisting Balok
2. Pembesian
3. Cor beton mutu K-250
IX
PEKERJAAN COR DAG (ELEVASI +5.00 M)
1. Bekisting plat dag
2. Pembesian
3. Cor beton mutu K-250
X
PEKERJAAN STRUKTUR MENARA
a. Pekerjaan kolom
1. Pembesian
2. Bekisting kolom
3. Cor beton mutu K-250
b. Pekerjaan Balok
1. Bekisting Balok
2. Pembesian
3. Cor beton mutu K-250
c. Pekerjaan Plat Lantai (untuk semua elevasi)
1. Bekisting plat
2. Pembesian
3. Cor beton mutu K-250
JUMLAH B
C.
PEKERJAAN ARSITEKTUR
I
PEKERJAAN FINISHING AREA EKSISTING
1. Pekerjaan plafond (rangka + penutup + list)
2. Pekerjaan pengecatan pada dinding eksisting

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

M3

1.92

988,080.79

1,897,115.12

M3
M3
M3
M2
KG
M3

0.16
0.08
0.08
2.72
24.24
0.20

54,337.50
187,335.00
757,086.13
170,223.00
14,733.80
988,080.79

8,634.23
14,883.77
60,150.49
463,687.45
357,202.85
201,864.91

M3
M3
M3
M3

19.63
4.91
4.91
8.96

113,953.50
187,335.00
757,086.13
972,559.56

2,236,930.00
919,355.88
3,715,438.05
8,714,133.69

M3
M3
M3
M3

2.22
0.55
0.55
0.96

113,953.50
187,335.00
757,086.13
972,559.56

252,862.82
103,924.09
419,993.53
928,988.90

KG
M2
M3

169.80
93.92
5.64

14,733.80
313,099.00
988,080.79

2,501,842.08
29,406,258.08
5,568,032.87

KG
M2
M3

80.78
9.19
0.69

14,733.80
313,099.00
988,080.79

1,190,147.44
2,878,006.01
681,182.90

M2
KG
M3

68.80
602.44
5.16

322,529.00
14,733.80
988,080.79

22,189,995.20
8,876,209.51
5,098,496.88

M2
KG
M3

128.64
1,586.17
12.86

382,559.00
14,733.80
988,080.79

49,210,476.97
23,370,255.21
12,710,177.26
-

M2
KG
M3

11.20
98.07
0.84

322,529.00
14,733.80
988,080.79

3,612,324.80
1,444,964.34
829,987.86

M2
KG
M3

16.00
197.29
1.60

382,559.00
14,733.80
988,080.79

6,120,944.00
2,906,861.14
1,580,929.27

KG
M2
M3

416.34
37.01
2.78

14,733.80
313,099.00
988,080.79

6,134,270.29
11,587,167.79
2,742,517.04

M2
KG
M3

19.78
222.48
1.48

322,529.00
14,733.80
988,080.79

6,378,333.50
3,277,975.82
1,465,521.43

M2
KG
M3

8.31
102.41
0.83

382,559.00
14,733.80
988,080.79

3,177,152.50
1,508,842.61
820,601.10
296,382,830.89

M2
M2

199.82
466.16

297,006.67
21,107.10

59,348,763.15
9,839,243.52

Page 61 of 73

URAIAN RAB

NO.
II

URAIAN PEKERJAAN
PEKERJAAN FINISHING AREA TERAS
1. Pekerjaan dinding parapet teras (1/2 bata)

SAT

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

M2

27.72

83,361.20

2,310,772.46

2. Pekerjaan plesteran dinding parapet bag. Dalam


M2
3. Pekerjaan list profil dinding parapet
M1
4. Pekerjaan batu alam dinding parapet
M2
5. Pekerjaan keramik lantai teras (40x40)
M2
6. Pekerjaan plint lantai keramik (10 x 40)
M1
7. Pekerjaan profil kolom
Unit
8. Pekerjaan kerawang
Unit
9. Pekerjaan dinding diatas kerawang (dg kamprot)
M2
10. Pekerjaan penebalan dinding pada ring balok dag
M2
11. Pekerjaan pengecatan pada seluruh area teras
M2
III
PEKERJAAN FINISHING RUANG GHORIM DAN PERALATAN
1. Pekerjaan dinding bata 1/2 bata
M2
2. Pekerjaan plesteran dinding bata
M2
3. Pekerjaan pintu type P1
Unit
4. Pekerjaan jendela bouvenlight
Unit
5. Pekerjaan keramik lantai (40x40)
M2
6. Pekerjaan plint lantai keramik (10 x 40)
M1
IV
PEKERJAAN GERBANG ENTRANCE
1. Kolom praktis
M1
2. Balok praktis
M1
3. Dinding bata
M2
4. Pasang batu alam
M2
5. Profil gerbang
M1
V
PEKERJAAN DAG KANOPI
a. Dag Kanopi Type C1 (elev. +3.15 M)
1. Bekisting balok Praktis
M2
2. Bekisting plat dag
M2
3. Pembesian balok praktis dan plat dag
KG
4. Cor beton mutu K-225
M3
b. Dag Kanopi Type C2 (elev. +3.15 M)
1. Bekisting balok Praktis
M2
2. Bekisting plat dag
M2
3. Pembesian balok praktis dan plat dag
KG
4. Cor beton mutu K-225
M3
VI
PEKERJAAN ARSITEKTUR MENARA
1. Dinding bata
M2
2. List Profil
M1
3. Kubah bawang
Unit
VII
PEKERJAAN KUBAH UTAMA MASJID (By : Specialist)
Unit
JUMLAH C
D.
PEKERJAAN ELEKTRIKAL
a. Pekerjaan pasang lampu ruangan sholat
1. Lampu type TL 40 Watt
Bh
2. Lampu type TL 25 Watt
Bh

27.72
39.60
27.72
106.26
108.96
22.00
18.00
14.15
16.10
27.72

48,520.80
14,679.75
622,865.88
554,938.60
114,333.65
49,904.25
1,092,198.13
85,090.80
48,520.80
21,107.10

1,344,996.58
581,318.10
17,265,842.06
58,967,220.17
12,457,794.16
1,097,893.50
19,659,566.25
1,203,864.64
781,184.88
585,088.81

63.43
126.86
2.00
2.00
24.00
24.00

83,361.20
48,520.80
1,423,545.10
907,309.01
554,938.60
114,333.65

5,287,600.92
6,155,348.69
2,847,090.20
1,814,618.03
13,318,526.28
2,744,007.53

33.30
17.32
34.04
25.26
4.18

75,557.63
93,459.00
83,361.20
81,243.38

2,516,068.99
1,618,709.95
2,837,365.16
339,191.09

4.98
2.10
25.85
0.75

322,529.00
382,559.00
14,733.80
972,559.56

1,606,839.48
801,843.66
380,798.81
731,364.79

3.92
1.70
20.91
0.59

322,529.00
382,559.00
14,733.80
972,559.56

1,264,958.74
648,820.06
308,127.28
575,755.26

56.67
24.72
1.00
1.00

83,361.20
440,625.00
34,615,000.00
82,915,000.00

4,724,245.93
10,892,250.00
34,615,000.00
82,915,000.00
364,387,079.13

9.00
5.00

60,000.00
40,000.00

540,000.00
200,000.00

3.00

20,000.00

60,000.00

b. Pekerjaan saklar (ruang sholat)


1. Saklar tunggal

Bh

Page 62 of 73

URAIAN RAB

NO.

URAIAN PEKERJAAN

SAT

VOLUME

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

2. Saklar ganda

Bh

5.00

25,000.00

125,000.00

c. Pekerjaan stop kontak (ruang sholat)


d. Pekerjaan pasang lampu R. Ghorim dan peralatan
e. Pekerjaan saklar (R. ghorim & R. peralatan)
f. Pekerjaan stop kontak (ruang sholat)
g. Pekerjaan pasang lampu (teras)
1. Lampu type TL 40 Watt
2. Lampu type TL 25 Watt
h. Pekerjaan pasang lampu menara

Bh
Bh
Bh
Bh

4.00
2.00
2.00
2.00

12,000.00
40,000.00
20,000.00
12,000.00

48,000.00
80,000.00
40,000.00
24,000.00

Bh
Bh
Bh

13.00
2.00
2.00

60,000.00
40,000.00
60,000.00

780,000.00
80,000.00
120,000.00

JUMLAH D

2,097,000.00

GRAND TOTAL (A + B + C + D)

696,178,684.02

Page 63 of 73

URAIAN RAB

KODE AHS
KODE HSBU

1 AHS.001
2 U.001
3 U.002
4 U.003
5 U.004
6 B.001
7 B.002
8 B.003
9 B.004
10 B.005
11 B.006

AHS.002
U.001
U.002
U.003
U.004
B.007
B.008
B.009
B.010

AHS.003
U.001
U.004

AHS.004
U.001
U.002
U.003
U.004
B.004
B.005
B.006
B.009

AHS.005
U.001
U.002
U.003
U.004
B.005
B.006
B.007
B.008
B.009
B.010

ahs.001

AHS.001
AHS.001
AHS.001
AHS.001
AHS.001
AHS.001
AHS.001
AHS.001
AHS.001
AHS.001

U.001
U.002
U.003
U.004
B.001
B.002
B.003
B.004
B.005
B.006

AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.003
AHS.003

U.001
U.002
U.003
U.004
B.007
B.008
B.009
B.010
U.001
U.004

AHS.004

AHS.004
AHS.004
AHS.004
AHS.004
AHS.004
AHS.004
AHS.004
AHS.004

U.001
U.002
U.003
U.004
B.004
B.005
B.006
B.009

AHS.005

AHS.005
AHS.005
AHS.005
AHS.005
AHS.005
AHS.005
AHS.005
AHS.005

U.001
U.002
U.003
U.004
B.005
B.006
B.007
B.008

ahs.002

AHS.003

AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002
AHS.002

AHS.005
AHS.005

B.009
B.010

U.001
U.003
U.007
U.008

B.001
B.009
B.002

C
(1)

A.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.

KODE
HSBU

TENAGA DAN MATERIAL


(2)

MATERIAL :
B.001 Kayu balok 5/7
B.002 Kayu papan 3/20
B.003 Kayu kelas III
B.004 Kayu Kelas II
B.005 Balok kayu kelas II
B.006 Papan kayu (4 x 30) cm
B.007 Plywood tebal 9 mm
B.008 Dolken kayu dia.8 - 10cm/pjg 4m
B.009 Paku biasa 2" - 3"
B.010 Paku 5 - 10 cm
B.011 Paku 5 - 12 cm
B.012 Paku Beton
B.013 Paku Gypsum
B.014 Besi beton (polos/ulir)
B.015 Kawat beton
B.016 Pasir urug
B.017 Tanah Urug
B.018 Pasir beton
B.019 Pasir Pasang
B.020 Kerikil (Maks 30 MM)
B.021 Bata merah
B.022 Semen portland
B.023 Semen Abu-abu
B.024 Semen warna
B.025 Minyak bekisting
B.026 Gypsum Board
B.027 Cornes
B.028 Textile Tape
B.029 Plamir (untuk tembok)
B.030 Cat dasar (untuk tembok)
B.031 Cat penutup 2 kali (untuk tembok)
B.032 Roster / Terawang (sesuai gbr)
B.033 Batu Tempel Hitam
B.034 Anti Lumut/Vernis Batu
B.035 Ubin keramik (40x40) cm
B.036 Plint keramik (10 x 40) cm
B.037 Engsel pintu
B.038 Gerendel pintu kw. 1

39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.

B.039 Kunci tanam 2 slag kw. 1


B.040 Dempul Jadi
B.041 Minyak Cat (Tinner)
B.042 Batu Apung
B.043 Cat menie
B.044 Plamuur (untuk kayu)
B.045 Cat dasar (untuk kayu)
B.046 Cat penutup (untuk kayu)
B.047 Kuas
B.048 Pengencer
B.049 Ampelas
B.050 Kusen Pintu / Jendela All Uk. 4''x1 3/4''
B.051 Karet List
B.052 Frame Jendela All
B.053 Kaca t = 5 mm ( Bening )
B.054 Casement Uk.
B.055 Handle Jendela
B.056 Kubah Utama Mesjid dg GRC
B.057 Kubah Menara Mesjid dg GRC
B.058 Lem kayu
B.059 Peralatan dan alat batu
B.060 Air
B.061 Lampu type TL 40 Watt
B.062 Lampu type TL 25 Watt
B.063 Saklar tunggal
B.064 Saklar ganda
B.065 Stop kontak

SATUAN

HARGA SATUAN
(Rp)

VOLUME

(3)

(4)

(4)

M3
M3
M3
M3
M3
M3
Lbr
Btg
KG
KG
KG
BH
KG
KG
KG
M3
M3
KG
M3
KG
Bh
KG
KG
KG
Ltr
M2
KG
M'
KG
KG
KG
Unit
M2
KG
BH
BH
BH
BH

2,500,000.00
2,500,000.00
2,200,000.00
2,500,000.00
2,600,000.00
2,800,000.00
110,000.00
15,000.00
13,000.00
15,000.00
16,000.00
20,000.00
25,000.00
11,000.00
15,000.00
120,000.00
68,200.00
108.57
121,000.00
181.48
250.00
1,200.00
2,250.00
2,330.00
4,000.00
33,333.33
2,000.00
500.00
21,500.00
25,300.00
27,000.00
902,492.50
416,666.67
45,000.00
70,500.00
15,000.00
14,000.00
15,000.00

1.66
12.48
11,407.46
162.96
4,759.30
1.05
6,737.90
1,940.40
2,821.09
4.16
-

11,407.46
162.96

6,737.90
1,940.40
2,821.09

BH
KG
KG
KG
KG
KG
KG
KG
BH
KG
Lbr
M1
M1
M1
M2
Bh
Bh
Unit
Unit
KG
Set
Liter
BH
BH
BH
BH
BH

93,150.00
26,000.00
25,000.00
100.00
22,000.00
25,000.00
25,000.00
27,000.00
10,000.00
5,000.00
5,000.00
122,300.00
5,000.00
85,570.00
95,000.00
18,000.00
30,000.00
60,000,000.00
25,000,000.00
5,000.00
100,000.00
25.00
60,000.00
40,000.00
20,000.00
25,000.00
12,000.00

1,378.00
-

Você também pode gostar