Escolar Documentos
Profissional Documentos
Cultura Documentos
(Instruction: Fill up the table below. Accomplishments should be in bullet format with complete details of
tasks completed within the day. The filled tables are intended to be an example. Note: This line is only for
instructions. Please delete this after editing.)
Date: April 12, 2010 1. Reported at Globe Telecom BPI Buendia Center for
Time In: 9:00 AM orientation.
Time Out: 5:00 PM
Hours Spent: 7 hours 2. Studied the following topics on the module,
Fundamentals of Mobile Telephony:
a. Plesiochronous Digital Hierarchy (PDH)
b. Synchronous Digital Hierarchy (SDH)
Date: April 13, 2010 1. Studied the following topics on the module,
Time In: 7:45 AM Fundamentals of Mobile Telephony:
Time Out: 5:30 PM a. Review of PDH and SDH Technology
Hours Spent: 8 hours and 45 minutes b. Dense Wavelength Division Multiplexing
c. Transmission Overview
Date: April 14, 2010 1. Studied the following topics on the module,
Time In: 7:45 AM Fundamentals of Mobile Telephony:
Time Out: 5:20 PM a. Review of DWDM and Transmission Overview
Hours Spent: 8 hours and 15 minutes b. Network Synchronization
c. Logical Channels
d. NMS/OSS Basics
e. Networking
Date: April 15, 2010 1. Requested for security pass in Globe Telecom Plaza
Time In: 7:30 AM at Pioneer St., Mandaluyong
Time Out: 5: 00 PM
Hours Spent: 8 hours and 30 minutes 2. Studied the GSM/GPRS/WiMax Systems on the
module, Fundamentals of Mobile Telephony
Date: April 16, 2010 1. Encoded Fiber Termination Plan files (28 new FTP
Time In: 7:30 AM files)
Time Out: 5:30 PM
Hours Spent: 9 hours 2. Updated existing FTP files renaming them as revised
(8 updated files)
Date: April 21, 2010 1. Encoded and/or revised 16 Fiber Termination Plan
Time In: 7:30 AM files
Time Out: 5:15 PM
Hours Spent: 8 hours and 15 minutes 2. Learned how to make PDH Channel Assignment by
recording existing trails from NMS c/o Maam Arlene
Allas
Date: April 27, 2010 1. Continued organizing the elements of Core Output
Time In: 7:45 AM file.
Time Out: 5:30 PM
Hours Spent: 8 hours and 45 minutes 2. Checked for the availability of fibers for the given
locations by Maam Anna Faustino.
Date: April 28, 2010 1. Continued organizing the elements of Core output
Time In: 7:30 AM files.
Time Out: 4:30 PM
Hours Spent: 7 hours and 40 minutes
Date: May 4, 2010 1. Organized the elements of Core Output file (work
Time In: 7:50 AM deffered).
Time Out: 5: 00 PM
Hours Spent: 8 hours and 10 minutes 2. Updated an FIO file and sent it to the requestor, Sir
Repuyan.
Date: May 6, 2010 1. Created an FTP for Bacolod BSC and updated the
Time In: 9:00 AM existing files.
Time Out: 5:00 PM
Hours Spent: 7 hours 2. Continued the research for the case study.
Date: May 7, 2010 1. Submitted the list of all the created FIO for FOC files
Time In: 11:45 AM to Maam Anna Faustino.
Time Out: 5:00 PM
Hours Spent: 4 hours and 15 minutes 2. Created an FIO for Makati Host and sent the file to the
requestor.
Date: May 13, 2010 1. Created an FIO for Tayuman Ermita which requires
Time In: 7:30 AM 5X core and mapped the locations on NMS c/o Maam
Time Out: 5:05 PM Mara Cruz
Hours Spent: 8 hours and 35 minutes
2. Updated the FTP of Kalambaguhan BSC and Lumbia
BTS
Date: May 14, 2010 1. Created FIO for FOC of Lambia Kalambaguhan
Time In: 7:50 AM Link.
Time Out: 5:15 PM
Hours Spent: 8 hours and 25 minutes 2. Continued drafting of the case study.
Date: May 18, 2010 1. Reviewed the 2G, 3G and WiMax Network
Time In: 12:25 PM architecture c/o lecture given by Sir Ryan Nato.
Time Out: 7:30 PM
Hours Spent: 7 hours and 5 minutes 2. Learned new mapping techniques using NMS
software of different vendors such as Huawei, ECI,
and Alcatel. Learned to set loopbacks for testing
purposes c/o Sir Ryan Nato and Sir Marvin
Veneracion.
Date: May 19, 2010 1. Mapped the connectivity between two RNCs
Time In: 8:45 AM (IUR).
Time Out: 8:30 PM
Hours Spent: 11 hours and 45 minutes 2. Re-mapped the previous Network Element (Malvar
XDM1000 Batangas2 ATS) by giving protection to
the loop.
Date: May 20, 2010 1. Visited the equipments at switch room at 7th
Time In: 8:15 AM floor of Globe Valero Building c/o of Sir Ram Derez
Time Out: 2:35 PM
Hours Spent: 5 hours and 20 minutes 2. Actual testing of site (with phone patch).
Date: May 21, 2010 1. Checked and corrected issued FIO for FOC and
Time In: 8:30 AM revised those who have wrong entry at BPI Building.
Time Out: 6:30 PM
Hours Spent: 9 hours 2. Checked, edited, and simplified FTPs with multiple
entries.
Date: May 25, 2010 1. Tour on the switch room at 5th floor of Globe
Time In: 8:45 AM Valero Building with lecture on basic cabling of copper
Time Out: 6:30 PM facility, tone testing, and making physical cross-
Hours Spent: 8 hours and 45 minutes connection c/o Sir Jonathan Ng and Sir Richard.
Date: May 26, 2010 1. Service provisioning and tour at different sites of
Time In: 9:00 AM Bulacan such as Malolos, Plaridel, Pulilan, and
Time Out: 7:00 PM Guiguinto which include lectures and discussion about
Hours Spent: 9 hours the technicalities of provisioning and cabling of copper
facility and optical fibers c/o Sir Ames Chua.
Date: June 3, 2010 1. Presentation of case study and assessment of all the
Time In: 2:00 PM things learned at Globe Telecom.
Time Out: 5:00 PM
Hours Spent: 3 hours
Acknowledged By:
_________________________________________
Engr. Anna Maria Faustino
Immediate Supervisor