Você está na página 1de 6

Republic of the Philippines

Polytechnic University of the Philippines


COLLEGE OF ENGINEERING
ELECTRONICS AND COMMUNICATIONS ENGINEERING DEPARTMENT
3/F, CEA Bldg., Anonas cor. Pureza Sts., NDC Compound, Sta. Mesa, Manila

On the Job Training Daily Report of Activities

Name: Jeremias P. Roque, Jr.


Year & Section: IV 2
Course: Bachelor of Science in Electronics and Communications Engineering
Company: Globe Telecom
Department: Transmission Network Division Transmission Facility Management and Service
Provisioning

(Instruction: Fill up the table below. Accomplishments should be in bullet format with complete details of
tasks completed within the day. The filled tables are intended to be an example. Note: This line is only for
instructions. Please delete this after editing.)

Date and Time Accomplishments

Date: April 12, 2010 1. Reported at Globe Telecom BPI Buendia Center for
Time In: 9:00 AM orientation.
Time Out: 5:00 PM
Hours Spent: 7 hours 2. Studied the following topics on the module,
Fundamentals of Mobile Telephony:
a. Plesiochronous Digital Hierarchy (PDH)
b. Synchronous Digital Hierarchy (SDH)

3. Studied and observed Sir Jonathan Tolentino about


the basics of mapping of Transmission Networks
which includes alarm clearing, dt allocation, and the
other process of Network Management System.

4. Saved copies of Files Implementation Order


renaming them as revised files (225 of 1501 files)

Date: April 13, 2010 1. Studied the following topics on the module,
Time In: 7:45 AM Fundamentals of Mobile Telephony:
Time Out: 5:30 PM a. Review of PDH and SDH Technology
Hours Spent: 8 hours and 45 minutes b. Dense Wavelength Division Multiplexing
c. Transmission Overview

2. Saved copies of Facilities Implementation Order


files (781 of 1501 files)

Date: April 14, 2010 1. Studied the following topics on the module,
Time In: 7:45 AM Fundamentals of Mobile Telephony:
Time Out: 5:20 PM a. Review of DWDM and Transmission Overview
Hours Spent: 8 hours and 15 minutes b. Network Synchronization
c. Logical Channels
d. NMS/OSS Basics
e. Networking

2. Completed saving copies of Facilities Implementation


Order (1501 of 1501 files)

Date: April 15, 2010 1. Requested for security pass in Globe Telecom Plaza
Time In: 7:30 AM at Pioneer St., Mandaluyong
Time Out: 5: 00 PM
Hours Spent: 8 hours and 30 minutes 2. Studied the GSM/GPRS/WiMax Systems on the
module, Fundamentals of Mobile Telephony

3. Learned the basics of NMS and how use the software


interface c/o Sir Jonathan Tolentino

Date: April 16, 2010 1. Encoded Fiber Termination Plan files (28 new FTP
Time In: 7:30 AM files)
Time Out: 5:30 PM
Hours Spent: 9 hours 2. Updated existing FTP files renaming them as revised
(8 updated files)

Date: April 19, 2010 1. Encoded and/or revised a total of 42 Fiber


Time In: 7:30 AM Termination Plan files
Time Out: 5:15 PM
Hours Spent: 8 hours and 45 minutes

Date: April 20, 2010 1. Encoded and/or revised a total of 19 Fiber


Time In: 7:30 AM Termination Plan files
Time Out: 10:45 AM
Hours Spent: 3 hours and 15 minutes

Date: April 21, 2010 1. Encoded and/or revised 16 Fiber Termination Plan
Time In: 7:30 AM files
Time Out: 5:15 PM
Hours Spent: 8 hours and 15 minutes 2. Learned how to make PDH Channel Assignment by
recording existing trails from NMS c/o Maam Arlene
Allas

Date: April 22, 2010 1. Learned how to make Facility Implementation


Time In: 7:45 AM Orders for FOC c/o Maam Anna Faustino.
Time Out: 5: 15 PM
Hours Spent: 8 hours and 30 minutes 2. Encoded and sent 6 FIOs to their corresponding
requestors.

Date: April 23, 2010 1. Encoded 7 FTP files.


Time In: 7:45 AM
Time Out: 5:30 PM 2. Transferred newly encoded FTP files to the main
Hours Spent: 8 hours and 45 minutes server updating those who have the same file name.

3. Encoded and sent FIOs to the corresponding


requestors.

Date: April 26, 2010 1. Sent FIOs to the corresponding requestors.


Time In: 7:45 AM
Time Out: 1:00 PM 2. Organized the elements of core output files checking
Hours Spent: 4 hours and 15 minutes for redundancy, transferring unique elements to a new
file.

Date: April 27, 2010 1. Continued organizing the elements of Core Output
Time In: 7:45 AM file.
Time Out: 5:30 PM
Hours Spent: 8 hours and 45 minutes 2. Checked for the availability of fibers for the given
locations by Maam Anna Faustino.

3. Incorporating revised FTP files on the previous ones.

Date: April 28, 2010 1. Continued organizing the elements of Core output
Time In: 7:30 AM files.
Time Out: 4:30 PM
Hours Spent: 7 hours and 40 minutes

Date: May 4, 2010 1. Organized the elements of Core Output file (work
Time In: 7:50 AM deffered).
Time Out: 5: 00 PM
Hours Spent: 8 hours and 10 minutes 2. Updated an FIO file and sent it to the requestor, Sir
Repuyan.

3. Updated the FTP of Ermita TOC and Ermita MSC.

Date: May 5, 2010 1. Established back-up files of D:\sgd of server to


Time In: 8:20 AM an external drive
Time Out: 5:35 PM
Hours Spent: 8 hours and 45 minutes 2. Started the research work for the case study

Date: May 6, 2010 1. Created an FTP for Bacolod BSC and updated the
Time In: 9:00 AM existing files.
Time Out: 5:00 PM
Hours Spent: 7 hours 2. Continued the research for the case study.

3. Learned how to make an FIO for E1 level c/o Sir


Jonathan Tolentino.

Date: May 7, 2010 1. Submitted the list of all the created FIO for FOC files
Time In: 11:45 AM to Maam Anna Faustino.
Time Out: 5:00 PM
Hours Spent: 4 hours and 15 minutes 2. Created an FIO for Makati Host and sent the file to the
requestor.

3. Continued with the research for the case study.

Date: May 11, 2010 1. Started drafting the case study.


Time In: 7:40 AM
Time Out: 5:00 PM
Hours Spent: 8 hours and 20 minutes
Date: May 12, 2010 1. Created and issued FIO files for Manda Timog
Time In: 7:30 AM Tayuman Ermita
Time Out: 5: 35 PM
Hours Spent: 9 hours and 5 minutes 2. Mapping of Manda Host Timog through NMS c/o
Maam Mara Cruz.

3. Created and issued FIO file for FOC allocation of


Ugongval Dalandanan and sent the file to Maam
Anna Faustino

Date: May 13, 2010 1. Created an FIO for Tayuman Ermita which requires
Time In: 7:30 AM 5X core and mapped the locations on NMS c/o Maam
Time Out: 5:05 PM Mara Cruz
Hours Spent: 8 hours and 35 minutes
2. Updated the FTP of Kalambaguhan BSC and Lumbia
BTS

3. Mapping of Manda Host Timog and sent the


file to Maam Mara Cruz

Date: May 14, 2010 1. Created FIO for FOC of Lambia Kalambaguhan
Time In: 7:50 AM Link.
Time Out: 5:15 PM
Hours Spent: 8 hours and 25 minutes 2. Continued drafting of the case study.

3. Updated the TFM daily broadcast c/o Maam Anna.

Date: May 17, 2010 1. Familiarization on Network Operations Center (NOC)


Time In: 9:00 AM area at Globe Valero Building.
Time Out: 12:15 PM
Hours Spent: 3 hours and 15 minutes

Date: May 18, 2010 1. Reviewed the 2G, 3G and WiMax Network
Time In: 12:25 PM architecture c/o lecture given by Sir Ryan Nato.
Time Out: 7:30 PM
Hours Spent: 7 hours and 5 minutes 2. Learned new mapping techniques using NMS
software of different vendors such as Huawei, ECI,
and Alcatel. Learned to set loopbacks for testing
purposes c/o Sir Ryan Nato and Sir Marvin
Veneracion.

3. Mapped and tested the loopback of the Network


Element (Malvar XDM1000 Batangas2 ATS)
applying all the techniques learned.

Date: May 19, 2010 1. Mapped the connectivity between two RNCs
Time In: 8:45 AM (IUR).
Time Out: 8:30 PM
Hours Spent: 11 hours and 45 minutes 2. Re-mapped the previous Network Element (Malvar
XDM1000 Batangas2 ATS) by giving protection to
the loop.

3. Mapped another Network element (Dulag ALU


Lahug 5F ADX).
4. Visited the equipments at switch room at 7th
floor of Globe Valero Building. Equipments visited
were BSC, MSS, RNC, ODF, SDR, BTS, Node B,
ODF Rack, and Multiplexers of the following vendors:
Huawei, ECI, Alcatel, Nokia, Ericsson, and ZTE.

5. Actual testing of the site (with phone patch from the


site).

6. Testing of loopback of Valero Canero (editing of


endpoints).

Date: May 20, 2010 1. Visited the equipments at switch room at 7th
Time In: 8:15 AM floor of Globe Valero Building c/o of Sir Ram Derez
Time Out: 2:35 PM
Hours Spent: 5 hours and 20 minutes 2. Actual testing of site (with phone patch).

Date: May 21, 2010 1. Checked and corrected issued FIO for FOC and
Time In: 8:30 AM revised those who have wrong entry at BPI Building.
Time Out: 6:30 PM
Hours Spent: 9 hours 2. Checked, edited, and simplified FTPs with multiple
entries.

3. Documenting Core Audits at Globe Valero.

Date: May 24, 2010 1. Familiarization on Service Provisioning Group of


Time In: 8:30 AM Globe Telecom at 5th floor of Globe Valero Building.
Time Out: 6:00 PM
Hours Spent: 8 hours and 30 minutes 2. Lecture about 2G, 3G, and WiMax provisioning c/o Sir
Jonathan Ng.

Date: May 25, 2010 1. Tour on the switch room at 5th floor of Globe
Time In: 8:45 AM Valero Building with lecture on basic cabling of copper
Time Out: 6:30 PM facility, tone testing, and making physical cross-
Hours Spent: 8 hours and 45 minutes connection c/o Sir Jonathan Ng and Sir Richard.

2. Service provisioning at Market! Market!, Bonifacio


Global City, Taguig City.

Date: May 26, 2010 1. Service provisioning and tour at different sites of
Time In: 9:00 AM Bulacan such as Malolos, Plaridel, Pulilan, and
Time Out: 7:00 PM Guiguinto which include lectures and discussion about
Hours Spent: 9 hours the technicalities of provisioning and cabling of copper
facility and optical fibers c/o Sir Ames Chua.

2. Actual making of physical cross-connect at Pulilan


Site.

Date: May 27, 2010 1. Thorough discussion about the equipments


Time In: 9:00 AM inside the switch room at Guiguinto site c/o Sir Jose
Time Out: 6:00 PM Gonzalogo.
Hours Spent: 8 hours
2. Tour at Calumpit West site.

Date: May 28, 2010 1. Service Provisioning at Meralco Foundation


Time In: 9:00 AM Institute Site at Pasig City c/o Sir Romeo Cartago, Jr.
Time Out: 6:00 PM
Hours Spent: 8 hours

Date: May 31, 2010 1. Completion of requirements on accomplishment


Time In: 8:30 AM reports and finalizing of case study.
Time Out: 11:00 AM
Hours Spent: 2 hours and 30 minutes

Date: June 1, 2010 2. Final Examinations


Time In: 1:30 PM
Time Out: 3:00 PM
Hours Spent: 1 hour and 30 minutes

Date: June 3, 2010 1. Presentation of case study and assessment of all the
Time In: 2:00 PM things learned at Globe Telecom.
Time Out: 5:00 PM
Hours Spent: 3 hours

Acknowledged By:

_________________________________________
Engr. Anna Maria Faustino
Immediate Supervisor

*Signature line of I.S. is optional.

Você também pode gostar