SECTION VII
The Bidder shall provide the Bid Security in the form included hereafter pursuant to the
provisions in the Instructions to Bidders.
The Form of Contract Agreement will be used un-amended, except for the need to
complete Article 1.1 (Contract Documents) and Article 3 (Effective Date), as appropriate.
The form shall also include the Appendixes listed, which would be completed according to
the instructions for their completion provided at the beginning of each Appendix. If
required, the Price Schedule deemed to form part of the Contract would be modified
according to any corrections or modifications to the accepted bid resulting from price
corrections, pursuant to the provisions of the Instructions to Bidders.
The Performance Security and Bank Guarantee for Advance Payment forms enclosed
should not be completed by the bidders at the time of their bid preparation. Only the
successful Bidder will be required to provide performance security and a bank guarantee
for advance payment, according to one of the forms indicated herein and pursuant to the
provisions of the General and Special Conditions of Contract, respectively.
Recommended Sample Forms for Completion and Operational Acceptance are
included herein, together with Change Order Procedures and Forms that complement
the provisions in Part H of the General Conditions of Contract.
Section VII
Page - 2 / 65
Section VII
Page - 3 / 65
Section VII
Page - 4 / 65
Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and
to contract execution if we are awarded the contract, are listed below
Name and
address of
agent
Amount and
Currency
Purpose of
Commission
or gratuity
day of
, 20
[signature]
In the capacity of
[position]
Duly authorized to sign this bid for and on behalf of
[name of Bidder]
Section VII
Page - 5 / 65
Bid Security
Power of Attorney
Bidders Eligibility and Qualification
Eligibility & conformity of Facilities
Subcontractors proposed by the
Bidder
Attachment 6: Deviations
Attachment 7: Alternative bids, if any
120 days
Clauses ITB 15.1 & 19.2 Number of The number of copies of the Bid to be completed
copies of Bid
and returned shall be ONE original plus FOUR
copies plus ONE electronic copy.
Clause ITB 25.3 (b)
Time schedule :
Time to complete the facilities from Time to complete the facilities from the effective
the effective date specified in Article 3 date specified in Article 3 of the Contract
Agreement for determining time for completion of
of the Contract Agreement
pre-commissioning activities shall be as under.
(a) For first Diesel Generator Set (625 kVA)
Minimum 48 weeks and maximum 49
weeks. For the purposes of bid evaluation
Time to complete the facilities will be
considered as 48 weeks.
(b) For second Diesel Generator Set (1250
kVA) Minimum 52 weeks and maximum 53
weeks For the purposes of bid evaluation
Time to complete the facilities will be
considered as 52 weeks.
(c) For Third Diesel Generator Set (1250 kVA)
Minimum 56 weeks and maximum 57
weeks For the purposes of bid evaluation
Time to complete the facilities will be
Section VII
Page - 6 / 65
considered as 56 weeks.
The adjustment rate in the event of completion
The adjustment rate if completion is beyond the minimum period shall be 0.2 % for each
week of delay from that minimum period.
beyond the maximum period
In case of earlier delivery, a credit of 0.2% per week
will be given counting from minimum period.
Following are the desired performance for each of
the Diesel Generating Sets.
Clause ITB 33
Amount of performance security :
bid
Section VII
Page - 7 / 65
2.
The Schedules are one-line specifications and do not generally give a full description of
the plant and equipment to be supplied and the services to be performed under each
item. Bidders shall be deemed to have read the Technical Specifications and other
sections of the bidding documents and reviewed the Drawings to ascertain the full
scope of the requirements included in each item prior to filling in the rates and prices.
The entered rates and prices shall be deemed to include for the full scope as aforesaid,
including overheads and profit.
3.
If bidders are unclear or uncertain as to the scope of any item, they shall seek
clarification in accordance with the Instructions to Bidders in the bidding documents
prior to submitting their bid.
Pricing
4.
Prices shall be filled in indelible ink and any alterations necessary due to errors, etc.,
shall be initialled by the Bidder.
As specified in the Bid Data Sheet and Special Conditions of Contract, prices shall be
fixed and firm for the duration of the Contract.
5.
Bid prices shall be quoted in the manner indicated and in the currencies specified in
the Instructions to Bidders in the bidding documents.
For each item, bidders shall complete each appropriate column in the respective
Schedules, giving the price breakdown as indicated in the Schedules.
Prices given in the Schedules against each item shall be for the scope covered by that
item as detailed in the Technical Specifications, Drawings or elsewhere in the bidding
documents.
Section VII
Page - 8 / 65
6.
Where there are errors between the total of the amounts given under the column for
the price breakdown and the amount given under the Total Price, the former shall
prevail and the latter will be corrected accordingly.
Where there are errors between the total of the amounts of Schedule Nos. 1 to 6 and
the amount given in Schedule No. 7 (Grand Summary), the former shall prevail and the
latter will be corrected accordingly.
Where there are discrepancies between amounts stated in figures and amounts stated
in words, the amounts stated in words shall prevail.
7.
Payments will be made to the Contractor in the currency or currencies indicated under
each respective item.
8.
Items left blank will be deemed to have been included in other items. The TOTAL for
each Schedule and the TOTAL of the Grand Summary shall be deemed to be the total
price for executing the Facilities and sections thereof in complete accordance with the
Contract, whether or not each individual item has been priced.
9.
When requested by the Employer for the purposes of making payments or part
payments, valuing variations or evaluating claims, or for such other purposes as the
Employer may reasonably require, the Contractor shall provide the Employer with a
breakdown of any composite or lump sum items included in the Schedules.
Section VII
Page - 9 / 65
Schedule No. 1
Item/
Equipment.
Code no.
Description
Code1
Unit Price
Qty.
(1)
EX-Works
(2)
2422.1
2422.2
2422.10
2422.3
2422.4
2422.5
2422.6
2422.7
2422.8
2428.9
FOB
Port of
Shipment
(3)
Total Price
EX-Works
(1) x (2)
FOB
Port of
Shipment
(1) x (3)
Section VII
Page - 10 / 65
Item/
Equipment.
Code no.
Code1
Description
Qty.
(1)
Unit Price
EX-Works
(2)
2422.11
Foundation bolts
2422.12
2422.13
2422.14
2422.15
2422.16
FOB
Port of
Shipment
(3)
Grand Total
TOTAL (to Schedule No. 7. Grand Summary
Code
Country
Name of Bidder
___________________
Signature of Bidder
___________________
Total Price
EX-Works
(1) x (2)
FOB
Port of
Shipment
(1) x (3)
Section VII
Page - 11 / 65
Bidders shall enter a code representing the country of origin of all imported plant and equipment.
Specify currency.
To detail where Lot is indicated.
- All items of supply under the Contract are indicated above. In the event any plant or equipment is being supplied locally, it should be shown in Schedule 2
2
Section VII
Page - 12 / 65
Schedule No. 2
[Bidder to indicate any of the equipment which it is supplying from Employers Country]
Item
Description
Qty.
Unit Price
Total Price
(1)
EXW
(2)
Birr
EXW
(1) x (2)
Birr
Currency
____________________
Signature of ____________________
Bidder
1
Specify currency in accordance with specifications in Bid Data Sheet under ITB Sub-Clause 12.1 (b).
Section VII
Page - 13 / 65
Qty.
Description
(1)
Currency
Unit Price1
Foreign
Local
(2)
(3)
Birr
__________________
__________________
Specify currency in accordance with specifications in Bid Data Sheet under ITB Sub-Clause 12.1
Total Price1
Foreign
(1) x (2)
Local
(1) x (3)
Birr
Section VII
Page - 14 / 65
Description
Unit Price1
Qty.
(1)
Currency
Foreign
(2)
Total Price1
Local
(3)
Birr
_______________
Specify currency in accordance with specifications in Bid Data Sheet under ITB Sub-Clause 12.1
Foreign
(1) x (2)
Local
(1) x (3)
Birr
Section VII
Page - 15 / 65
Qty.
Description
(1)
Currency
Local
(2)
Birr
_______________
Specify currency in accordance with specifications in Bid Data Sheet under ITB Sub-Clause 12.1
Total Price1
Local
(1) x (2)
Birr
Section VII
Page - 16 / 65
(1)
Currency
1
Unit Price1
Qty.
Description
Foreign
(2)
Local
(3)
Birr
Total Price1
Foreign
Local
(1) x (2)
(1) x (3)
Birr
Section VII
Page - 17 / 65
Item
Description
Unit Price1
Qty.
(1)
Foreign
(2)
Currency
Local
(3)
Birr
Training Services
TOTAL (to Schedule No.7 Grand Summary)
Name of Bidder
______________________
Signature of Bidder
______________________
Specify currency in accordance with specifications in Bid Data Sheet under ITB Sub-Clause 12.1 (c).
Total Price1
Foreign
Local
(1) x (2)
(1) x (3)
Birr
Section VII
Page - 18 / 65
Description
Currency
Schedule No. 1
Plant, Equipment, and Mandatory Spare Parts Supplied from Abroad (from schedule 1)
Schedule No. 2
Plant, Equipment, and Mandatory Spare Parts Supplied from Within the Employers
Country (from schedule 2)
Schedule No. 3
Schedule No. 4
Schedule No. 5
Schedule No. 6
______________________
Specify currency in accordance with specifications in Bid Data Sheet under ITB Clause 12.1
Total Price1
Foreign
Local
Birr
Section VII
Page - 19 / 65
Description
Code
Qty.
(1)
\ex\works
in
Foreign
currency
2
FOB
Port of
Shipmen
t in
Foreign
currency
2
(2 a)
(2 b)
Unit Price
Insuranc
Transportation split prices
e in
leading to DDP Tendaho
Local
Site in Foreign / Local
Currenc
currency
y
(4)
Ocean
Local
(3)
freight in
transport
FC / LC
from port of
loading to
factory site in
(4 a)
LC
4(b)
EXWorks
in
Foreign
currency
2
(1) x (2a)
FOB
Port of
Shipment
in Foreign
2
currency
(1) x (2b)
Total Price
Insuranc
Transportation split
e in
prices leading to DDP
Local
Tendaho Site in
Currenc
Foreign / Local
3
y
currency
Ocean
Local
(3)
freight in
transport
FC / LC
from port
of loading
to factory
3
site in LC
Grand Total
TOTAL
Code
Country
Name of Bidder
Signature of Bidder
1
2
______________________
___________________
Bidders shall enter a code representing the country of origin of all imported plant and equipment.
Specify currency.
Tot
al in
FC
Total
in LC
Section VII
Page - 20 / 65
_________________
(a)
has withdrawn its Bid during the period of bid validity specified by the Bidder in
the Form of Bid; or
(b)
does not accept the correction of errors in accordance with the Instructions to
Bidders (hereinafter the ITB) of the IFB; or
Section VII
Page - 21 / 65
having been notified of the acceptance of its Bid by the Employer during the
period of bid validity, (i) fails or refuses to execute the Contract Form, if
required, or (ii) fails or refuses to furnish the performance security, in
accordance with the ITB.
This guarantee will expire: (a) if the Bidder is the successful bidder, upon our receipt of
copies of the contract signed by the Bidder and the performance security issued to you upon
the instruction of the Bidder; or (b) if the Bidder is not the successful bidder, upon the earlier
of (i) our receipt of a copy of your notification to the Bidder of the name of the successful
bidder; or (ii) twenty-eight days after the expiration of the Bidders Bid.
Consequently, any demand for payment under this guarantee must be received by us at the
office on or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
458.
_____________________________
[signature(s)]
Section VII
Page - 22 / 65
day of __________, 20
BETWEEN
Tendaho Sugar Factory Project, a company incorporated under the laws of Federal
Democratic Republic of Ethiopia and having its principal place of business at P O Box 2574,
Salfaz Building (In Front Of Atlas Hotel), Cape Verde Road, Addis Ababa, Ethiopia,
(hereinafter
called
the
Employer),
and
(2)
[name
of
Contractor]
.. .. a corporation incorporated under the laws of
.. . [country of Contractor] and having its principal place of business
at . ..[address of Contractor] (hereinafter called the Contractor).
WHEREAS the Employer desires to engage the Contractor to design, manufacture, test,
deliver, install, complete and commission certain Facilities, viz.
DIESEL POWER
GENERATIONPLANT (the Facilities) and the Contractor have agreed to such engagement
upon and subject to the terms and conditions hereinafter appearing.
NOW IT IS HEREBY AGREED as follows:
Article 1. Contract
Documents
1.1
1.2
(a)
(b)
(c)
(d)
(e)
(f)
(g)
Section VII
Page - 23 / 65
Article 2. Contract
Price and Terms
of Payment
2.1
2.2
Section VII
Page - 24 / 65
Article 3. Effective
Date for
Determining Time
for Completion
3.1
(b)
(c)
(d)
Each party shall use its best efforts to fulfil the above conditions
for which it is responsible as soon as practicable.
Article 4.
Appendixes
3.2
If the conditions listed under 3.1 are not fulfilled within two (2)
months from the date of this Contract notification because of
reasons not attributable to the Contractor, the parties shall
discuss and agree on an equitable adjustment to the Contract
Price and the Time for Completion and/or other relevant
conditions of the Contract.
4.1
4.2
IN WITNESS WHEREOF the Employer and the Contractor have caused this Agreement to
be duly executed by their duly authorized representatives the day and year first above
written.
Signed by, for and on behalf of the Employer
[Signature]
[Title]
in the presence of
Signed by, for and on behalf of the Contractor
[Signature]
[Title]
in the presence of
APPENDIXES
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Appendix 5
Appendix 6
Appendix 7
Appendix 8
Section VII
Page - 25 / 65
Section VII
Page - 26 / 65
In respect of plant and equipment supplied from abroad, the following payments shall be
made:
Ten percent (10%) of the total FOB amount as an advance payment against receipt of
invoice and an irrevocable advance payment security for the equivalent amount made out in
favour of the Employer. The advance payment security may be reduced in proportion to the
value of the plant and equipment shipped FOB or delivered to the site, as evidenced by
shipping and delivery documents.
Eighty percent (80%) of the total or pro rata FOB amount upon Incoterm FOB within fortyfive (45) days after receipt of invoice and shipping documents. In the event that shipping is
delayed upon the written instruction of the Employer for more than twenty-eight (28) days
beyond the date shown in the Program of Performance provided in accordance with GCC
Sub-Clause 18.2, the Contractor may make application for this part of the payment against
warehouse receipts, provided always that the plant and equipment are ready for shipment
on the date shown in the said Program.
Ten percent (10%) of the total FOB amount upon issue of the Operational Acceptance
Certificate, within forty-five (45) days after receipt of invoice or if there is no acceptance , a
certificate signed by Employer confirming that the Contractor issues a Bank Guarantee for
equivalent amount.
Schedule No. 2. Plant and Equipment Supplied from within the Employers Country
In respect of plant and equipment supplied from within the Employers country, the following
payments shall be made:
Ten percent (10%) of the total Ex-works amount in local currency as an advance payment
against receipt of invoice, and an irrevocable advance payment security for the equivalent
amount made out in favour of the Employer. The advance payment security may be reduced
in proportion to the value of the plant and equipment delivered to the site, as evidenced by
shipping and delivery documents.
Eighty percent (80%) of the total or pro rata DDU amount upon Incoterm Ex-Works, upon
delivery to the site within forty-five (45) days after receipt of invoice.
Section VII
Page - 27 / 65
Interest free advance payment equal to twenty percent (20%) of the amount in the
schedules of prices for the transportation (sea) of the plant against a bank
guarantee.
Eighty percent (80%) of the amount in the schedule of prices for sea transportation
upon delivery of the plant at port of landing, following the presentation of any valid
documentation proving receipt of Plant at Port of landing . Bank guarantee shall be
released upon the presentation of any valid documentation proving receipt of Plant at
Port of landing
Hundred percent (100%) of the amount in the schedule of prices for sea
transportation upon delivery of the plant at port of landing, following the presentation
of any valid documentation proving receipt of Plant at Port of landing .
Hundred percent (100%) of the amount in the schedule of prices for Inland
transportation from Port of Djibouti & upon delivery of the plant at Project site at
Tendaho, following the presentation of any valid documentation proving provisional
acceptance of plant at site of erection.
Section VII
Page - 28 / 65
Section VII
Page - 29 / 65
Section VII
Page - 30 / 65
Section VII
Page - 31 / 65
Cargo Insurance
Covering loss or damage occurring, while in transit from the suppliers or
manufacturers works or stores until arrival at the Site, to the Facilities (including spare
parts therefor) and to the construction equipment to be provided by the Contractor or
its Subcontractors.
Amount
Deductible limits
Parties insured
From
To
Section VII
Page - 32 / 65
(d)
Deductible limits
-Nil
Parties insured
- Contractor
(e)
Workers Compensation
In accordance with the statutory requirements applicable in Ethiopia.
(f)
Employers Liability
In accordance with the statutory requirements applicable in Ethiopia
(g)
Other Insurances
The Contractor is also required to take out and maintain at its own cost the following
insurances:
Details:
Amount Deductible limits
[in currency(ies)]
Parties insured
[names]
From
[place]
To
[place]
The Employer shall be named as co-insured under all insurance policies taken out by the
Contractor pursuant to GCC Sub-Clause 34.1, except for the Third Party Liability, Workers
Compensation and Employers Liability Insurances. The Contractors Subcontractors shall
be named as co-insured under all insurance policies taken out by the Contractor pursuant to
GCC Sub-Clause 34.1, except for the Cargo, Workers Compensation and Employers
Liability Insurances. All insurers rights of subrogation against such co-insured for losses or
claims arising out of the performance of the Contract shall be waived under such policies.
Section VII
Page - 33 / 65
Parties insured
[names]
From
[place]
To
[place]
Section VII
Page - 34 / 65
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for completion of facilities.
2.
The time and the date of completion of the Facilities as stipulated in the bid
document shall be deemed to be the essence of the Contract. The Contractor shall
so organise his resources and perform this work so as to complete it not later than
the time agreed to.
3.
The Contractor shall submit a detailed PERT network for the time frame specified,
consisting of adequate number of activities covering various key phases of the
Contract such as design, procurement, manufacturing at works, despatch activities,
according to sequence of erection, testing and commissioning.
The Contractor shall discuss the network so submitted with the Employer and the
agreed network, which maybe in the form as submitted or in revised form in line with
the outcome of discussions shall form part of the Contract. If in the opinion of the
Employer / Project Manager proper progress is not maintained, suitable changes
shall be made in the Contractor's operations to achieve the time schedule specified
in the notification of award.
4.
The above PERT network shall be reviewed and periodic review reports shall be
submitted by the Contractor as desired by the Employer.
5.
Subsequent to effective date of contract, the Contractor shall make available to the
Employer within thirty (30) days a detailed manufacturing program, in line with the
agreed PERT network.
Such manufacturing program shall be reviewed, updated and submitted to the
Employer / Project Manager once in every two months thereafter.
6.
The Employer reserves the right to withhold payments for Contractor's failure to
comply with the above.
7.
The following salient features of time schedule laid out for major activities involved in
completion of facilities calculated from the effective date of contract till completion of
all the activities. Since the Contract is of turnkey nature[ excluding civil works ], the
time schedule indicated for all the activities up to and excluding Completion of
Facilities might have some variations at the Contractors end , suiting to
methodology / Planning of execution by the Contractor.
But the contractor is expected to adhere to time indicated for Completion of
Facilities and this specific time schedule will be considered as Completion date
given in Bid Data Sheet [ ITB Clause 25.3 (b) ] .The Contractor shall confirm that his
Program of completion of facilities shall be formulated accordingly.
Section VII
Page - 35 / 65
Salient features of the time schedule are furnished below. Effective date of Contract
has been considered as Zero date
Sr.
No.
1.
Minimum
WEEKS
0
Maximum
WEEKS
0
10
12
14
16
18
20
38
40
40
44
44
47
48
49
50
51
52
53
44
48
48
51
52
53
54
55
Section VII
Page - 36 / 65
Sr.
No.
e
Minimum
WEEKS
56
Maximum
WEEKS
57
48
52
52
55
56
57
58
59
60
61
Section VII
Page - 37 / 65
Approved Subcontractors
Nationality
Section VII
Page - 38 / 65
General
1.1
1.2
All personnel, facilities, works and supplies will be provided by the Employer in good
time so as not to delay the performance of the Contractor, in accordance with the
approved Time Schedule and Program of Performance pursuant to GCC Sub-Clause
18.2.
1.3
Unless otherwise indicated, all personnel, facilities, works and supplies will be
provided free of charge to the Contractor.
2.
Scope
2.1)
Personnel
Only operating and maintenance personnel will be provided after completion of
facilities onwards for trials, commissioning , guarantee tests and further regular
running.
2.2)
Facilities
2.2.1
The Employer shall provide water for use of the Contractor for carrying out
the works at one point on the site. Further distribution of water for works shall
be carried out by the Contractor.
The Employer shall provide potable water, in the form and content as is
available to the employees of Employer, at one point on the area allocated for
Contractor's staff houses. The Contractor shall make his own arrangement
for further distribution of water to his staff houses.
The Employer shall provide water for use as stated above free of charge.
The Contractor shall inform the Project Manager, with a copy to the
Employer, of the estimated requirement of water for the Facilities and his
staff houses and labour camp.
Section VII
Page - 39 / 65
The Contractor shall make arrangement of water storage at site for the
Facilities and for staff houses and labour camp at his own cost.
Not Withstanding the above, the Employer shall not be responsible for any
disruption in the supply of water.
2.2.2
The site does not have provision of electricity supply from the state grid network. The
Employer through this bid will be installing Diesel Generators to meet the electricity
needs of the site. As such the Employer will not be able to provide electrical power at
the site for the purpose of facilities and for Contractors Use. The Contractor shall
make his own arrangement for electrical power for the works.
In view of above, The Contractor shall provide electricity, for lighting and domestic
electrical gadgets, to all his staff houses.
Any temporary electrical installation work at the site, required for erection or
construction works, shall be approved by the electrical inspectorate of Government
of Federal Democratic Republic of Ethiopia. No unauthorized person shall be
deployed for installation of such works.
2.2.3
The contractor shall make his own arrangement for accommodation for all the
categories of his staff for which the Employer will provide an area of land. Water and
electricity shall be provided by the employer at no cost (but subject to availability) to
the housing accommodation of contractors personnel.
The Contractor shall ensure that his employees do not misuse or waste the electricity
or water provided by the Employer.
The Contractor shall be responsible for maintaining high standards of sanitation and
health and shall take immediate corrective action when directed by the Employer or
the local authorities.
The Contractor upon completion of the Contract, remove all camps and housing
together with all associated services including all necessary water supplies and
installations for drinking and other purposes, sanitation, drainage, refuse disposal,
fencing and fire fighting equipment.
5.
All buildings and all sheds and temporary structures which the Contractor may erect
for his own purposes shall be erected only on land placed at the Contractors
disposal by the Employer. Such facilities in respect of design, situation, layout, water
supply, washing and cooking facilities, lighting, sanitary and health arrangements
and welfare be appropriate in all respects for their purpose, shall comply with
relevant laws and regulations and be subject to the approval of the Project Manager.
Section VII
Page - 40 / 65
1.
The Employer shall provide vacant land for storage of plant and machinery supplied
by the Contractor prior to their installation. It will be the responsibility of the
Contractor to deploy proper security staff, fence the area properly, and protect from
rain, protect from theft etc.
2.
Subject to availability, the Employer may provide any closed storage areas for
storage of valuable components of plant and machinery. It will be the responsibility of
the Contractor to deploy proper security staff, protect from theft etc.
3.
In the event of non-availability of such closed storage areas from the Employer, the
Contractor shall make his own arrangements as a part of temporary works.
2.3
Facilities
2.3.1
The Employer will carryout all the related civil foundations and other related works of
the diesel power generator plant and ancillaries. However the Contractor is
responsible for initial & final grouting of related machinery, structures and equipment
including supply of grouting material.
2.3.2
The Contractor shall make his own arrangements for carrying out any machine shop
facilities required during the erection and commissioning. In case of emergency, the
Employer subject to availability, can make available existing machine shop facilities
on chargeable basis
2.4
Supplies
The Employer will not be making any of the supplies in the contract except for the
following.
-
2.5
Other responsibilities
The Employer shall provide possession of and access to all other areas reasonably
required for the proper execution of the Contract including all requisite rights of way.
The Employer shall give full possession of and accord all access thereto on or before
__________ [date to be mentioned while finalizing the contract ]
Section VII
Page - 41 / 65
2.
Shop layout drawings of the Facilities [complete diesel power generator plant] showing
plan, elevation views of engine generator set and ancillary equipment including daily
tank and storage tank, fuel consumption rate curves and fuel consumption rate at 25%,
50%, 75% and 100% load, ventilation and combustion air requirements, and power
and control system electrical diagrams - terminal points. The DIESEL POWER
GENERATOR PLANT shall be accommodated in the house shown in the enclosed
layout drawing.
3.
4.
Detailed floor plan for the generator units showing individual set disposition, foundation
plan together with berthing diagrams, static and dynamic loadings cut outs and
openings and through holes to be opened for piping, electric cabling, instrumentation
cabling etc.; preferred location of control panel and other details to permit design of
Civil engineering works.
Section VII
Page - 42 / 65
Flow diagrams showing sizes of pipes, showing levels, location of all valves and
fittings for following
-
Fuel oil
Service water
Cooling water if any
Drains
Exhaust piping
6.
7.
8.
Section VII
Page - 43 / 65
General
This Appendix sets out
(a) the functional guarantees referred to in GCC Clause 28 (Functional Guarantees)
(b) the preconditions to the validity of the functional guarantees, either in production
and/or consumption, set forth below
(c) the minimum level of the functional guarantees
(d) the formula for calculation of liquidated damages for failure to attain the
functional guarantees.
2.
Preconditions
The Contractor gives the functional guarantees (specified herein) for the facilities,
subject to the following preconditions being fully satisfied:
The Employer shall provide sufficient, properly qualified operating and maintenance
personnel; shall supply and make available fuel oil for the duration setout for
guarantee tests, utilities, lubricants and oil other than initial fill ,and any other
materials and facilities; and shall perform all work and services of whatsoever nature,
including those required by the Contractor to properly carry out Pre-commissioning,
Commissioning and Guarantee Tests.
2.2
The portable test banks required for carrying the load tests of generators will be
arranged by the Contractor.
2.3
Duration of tests
Two full load tests utilizing the Contractors Test Bank / available Employers load for
each of the generator set. Each test of FOUR hours minimum including starting
cycle, synchronization with other unit/s for parallel operation and shut down cycle.
During the test, the following readings will be recorded at every 20 minutes intervals:
1.
2.
3.
4.
5.
6.
7.
Kilowatts
Amperes
Voltage
Coolant temperature
Room temperature
Frequency
Oil pressure
Section VII
Page - 44 / 65
Fuel Consumption
Similarly Two load tests at ten percent [ 10% ] overload utilizing the Contractors
Test Bank / available Employers load for each of the generator set. Each test of
ONE hour shall be conducted.
Test alarm and shutdown circuits by simulating conditions also need to be
demonstrated and proved.
3.
Functional Guarantees
Subject to compliance with the foregoing preconditions, the Contractor guarantees as
follows:
3.1
3.2
4.
4.1
Section VII
Page - 45 / 65
4.3
Minimum Levels
Notwithstanding the provisions of this paragraph, if as a result of the guarantee
test(s), the following minimum levels of performance guarantees (and consumption
guarantees) are not attained by the Contractor, the Contractor shall at its own cost
make good any deficiencies until the Facilities reach any of such minimum
performance levels, pursuant to GCC Sub-Clause 28.2:
(a)
(b)
5.
one
Limitation of Liability
Subject to para. 4.3 above, the Contractors aggregate liability to pay liquidated
damages for failure to attain the functional guarantees shall not exceed Ten percent (
10 %) of the Contract price
Section VII
Page - 46 / 65
_________________
The Guarantor shall insert an amount representing the percentage of the Contract Price specified
in the Contract and denominated either in the currency(ies) of the Contract or a freely convertible
currency acceptable to the Employer.
Section VII
Page - 47 / 65
a registered letter from the Contractor (i) attaching a copy of its notice
requesting issuance of the Operational Acceptance Certificate and (ii) stating
that the project manager has failed to issue such Certificate within the time
required or provide in writing justifiable reasons why such Certificate has not
been issued, so that Operational Acceptance is deemed to have occurred.
(b)
(c)
(i)
(ii)
(iii)
Consequently, any demand for payment under this guarantee must be received by us at this
office on or before that date.
[This text shall be revised as and where necessary to take into account (i) partial acceptance of
the Facilities in accordance with Sub-Clause GCC 25.4; and (ii) extension of the performance
security when the Contractor is liable for an extended warranty obligation pursuant to Sub-Clause
27.10 of the GCC (although in the latter case the Employer might want to consider an extended
warranty security in lieu of the extension of the performance security).]
[To insert the date twenty-eight days after the expected expiration date of the Defect Liability
Period. The Employer should note that in the event of an extension of the time for completion of
the Contract, the Employer would need to request an extension of this guarantee from the
Guarantor. Such request must be in writing and must be made prior to the expiration date
established in the guarantee. In preparing this guarantee, the Employer might consider adding the
following text to the form, at the end of the penultimate paragraph: The Guarantor agrees to a
one-time extension of this guarantee for a period not to exceed [six months][one year], in
response to the Employers written request for such extension, such request to be presented to
the Guarantor before the expiry of the guarantee.]
Section VII
Page - 48 / 65
Section VII
Page - 49 / 65
It is a condition for any claim and payment under this guarantee to be made that the
advance payment referred to above must have been received by the Contractor on his
account
number
___________
at
[name
and
address
of
Bank.].
Section VII
Page - 50 / 65
Insert the expected expiration date of the Time for Completion. The Employer should
note that in the event of an extension of the time for completion of the Contract, the
Employer would need to request an extension of this guarantee from the Guarantor.
Such request must be in writing and must be made prior to the expiration date
established in the guarantee. In preparing this guarantee, the Employer might consider
adding the following text to the form, at the end of the penultimate paragraph: The
Guarantor agrees to a one-time extension of this guarantee for a period not to exceed
[six months][one year], in response to the Employers written request for such extension,
such request to be presented to the Guarantor before the expiry of the guarantee.
Section VII
Page - 51 / 65
However, you are required to complete the outstanding items listed in the attachment hereto
as soon as practicable.
This letter does not relieve you of your obligation to complete the execution of the Facilities
in accordance with the Contract nor of your obligations during the Defect Liability Period.
Very truly yours,
___________________________________________________
Title
(Project Manager)
Section VII
Page - 52 / 65
2.
This letter does not relieve you of your obligation to complete the execution of the Facilities
in accordance with the Contract nor of your obligations during the Defect Liability Period.
Very truly yours,
_________________________________________________
Title
(Project Manager)
Section VII
Page - 53 / 65
General
Change Order Log
References for Changes
ANNEXES
Annex 1
Annex 2
Annex 3
Annex 4
Annex 5
Annex 6
Annex 7
______
______
Section VII
Page - 54 / 65
General
This section provides samples of procedures and forms for implementing changes in
the Facilities during the performance of the Contract in accordance with GCC Clause
39 (Change in the Facilities) of the General Conditions of Contract.
2.
3.
(2)
(3)
(4)
(5)
Note:
(a)
Requests for Change issued from the Employers Home Office and the
Site representatives of the Employer shall have the following respective
references:
Home Office
Site
(b)
CR-H-nnn
CR-S-nnn
The above number nnn is the same for Request for Change, Estimate
for Change Proposal, Acceptance of Estimate, Change Proposal and
Change Order.
Section VII
Page - 55 / 65
Date:
Contract Number:
[Contract number]
2.
3.
Originator of Change:
4.
5.
Facilities and/or Item No. of equipment related to the requested Change: [Description]
6.
Employer: [Name]
Contractor (by Application for Change Proposal No. [Number]5:
Description
7.
8.
(a)
Please submit your estimate to us showing what effect the requested Change will
have on the Contract Price.
(b)
Your estimate shall include your claim for the additional time, if any, for
completion of the requested Change.
Refer to Annex 7.
Section VII
Page - 56 / 65
If you have any opinion negative to the adoption of the requested Change in
connection with the conformability to the other provisions of the Contract or the
safety of the Plant or Facilities, please inform us of your opinion in your proposal
of revised provisions.
(d)
Any increase or decrease in the work of the Contractor relating to the services of
its personnel shall be calculated.
(a) You shall not proceed with the execution of the work for the requested Change
until we have accepted and confirmed the amount and nature in writing.
__________________________________________________
(Employers Name)
__________________________________________________
(Signature)
__________________________________________________
(Name of signatory)
__________________________________________________
(Title of signatory)
Section VII
Page - 57 / 65
2.
3.
4.
5.
Engineering
(i)
(ii)
(Amount)
Engineer
Draftsperson
hrs x
hrs x
rate/hr =
rate/hr =
hrs
Other Cost
_____________________________________________________
(Contractors Name)
_____________________________________________________
(Signature)
_____________________________________________________
(Name of signatory)
______________________________________________________
(Title of signatory)
Section VII
Page - 58 / 65
Section VII
Page - 59 / 65
Date: ____________
(Employers Name)
(Signature)
(Name and Title of signatory)
Section VII
Page - 60 / 65
2.
3.
Originator of Change:
4.
5.
6.
Facilities and/or Item No. of Equipment related to the requested Change: [Facilities]
7.
Employer: [Name]
Contractor: [Name]
Section VII
Page - 61 / 65
Direct material
Major construction equipment
Direct field labour (Total
hrs)
Subcontracts
Indirect material and labour
Site supervision
Head office technical staff salaries
Process engineer
Project engineer
Equipment engineer
Procurement
Draftsperson
Total
(h)
(i)
(j)
hrs @
hrs @
hrs @
hrs @
hrs @
hrs
rate/hr
rate/hr
rate/hr
rate/hr
rate/hr
10.
11.
12.
Validity of this Proposal: within [Number] days after receipt of this Proposal by the
Employer
13.
(a)
(b)
The amount of any increase and/or decrease shall be taken into account in the
adjustment of the Contract Price.
Section VII
Page - 62 / 65
(Contractors Name)
(Signature)
(Name of signatory)
(Title of signatory)
Section VII
Page - 63 / 65
Date:
2.
3.
4.
Originator of Change:
5.
Authorized Price:
Employer: [Name]
Contractor: [Name]
7.
Authorized by:
Date:
(Employer)
Accepted by:
Date:
(Contractor)
Section VII
Page - 64 / 65
2.
3.
4.
5.
Facilities and/or Item No. of equipment related to the requested Change: [Facilities]
6.
7.
8.
9.
(Employers Name)
(Signature)
(Name of signatory)
(Title of signatory)
dated: [Date]
Section VII
Page - 65 / 65
(Contractors Name)
(Signature)
(Name of signatory)
(Title of signatory)